CN107542101A - A kind of four floating drum buoyancy tank combined type foundation structures of sea and its construction method - Google Patents

A kind of four floating drum buoyancy tank combined type foundation structures of sea and its construction method Download PDF

Info

Publication number
CN107542101A
CN107542101A CN201710895702.4A CN201710895702A CN107542101A CN 107542101 A CN107542101 A CN 107542101A CN 201710895702 A CN201710895702 A CN 201710895702A CN 107542101 A CN107542101 A CN 107542101A
Authority
CN
China
Prior art keywords
buoyancy tank
floating drum
floating
foundation structure
combined type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710895702.4A
Other languages
Chinese (zh)
Other versions
CN107542101B (en
Inventor
丁红岩
张浦阳
练继建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201710895702.4A priority Critical patent/CN107542101B/en
Publication of CN107542101A publication Critical patent/CN107542101A/en
Application granted granted Critical
Publication of CN107542101B publication Critical patent/CN107542101B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Landscapes

  • Revetment (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the infrastructure technologies field of ocean engineering, disclose a kind of marine four floating drum buoyancy tank combined type foundation structures and its construction method, its foundation structure is sequentially connected according to its central point in the horizontal plane including four surrounds the floating drum that square is arranged, a buoyancy tank is connected between each two floating drum, the center line of buoyancy tank along its length passes through the axis of its both ends floating drum;Floating drum and buoyancy tank top are connected with changeover portion pylon, and changeover portion pylon is used to connect top wind power equipment;The step of its construction method enters water, suction penetration, grouting ballast, installation superstructure, recycling including precast construction, initial adjustment preparation, delivery waterborne, basis.The present invention has the characteristics of gravity type foundation and suction bucket foundation concurrently, and while bearing power increase, transport mounting means is easy, and recyclable recycling, construction cost substantially reduces.

Description

A kind of sea four floating drums-buoyancy tank combined type foundation structure and its construction method
Technical field
The invention belongs to the infrastructure technologies field of ocean engineering, is to be related to one kind to be applied to sea turn specifically Electric and sea survey wind facility foundation structure and its construction method, realize what overall package, transport controlled, and sank to installing, reclaiming Institutional operation.
Background technology
The development of offshore wind farm industry has driven a series of construction of wind power plants.Guide's work as offshore wind farm engineering Journey, offshore wind measuring tower structure are a kind of tall and slender structure buildings, and the foundation pattern used mostly at present is steel pipe pile foundation.It is this The complicated construction technique of foundation pattern, transport installation need large-scale equipment to be transported, lifted, thus long in time limit, and construction cost With higher;The piling positioning of steel-pipe pile and torsional angle etc. are difficult to accurately hold, and pile sinking efficiency comparison is low.Residing for the anemometer tower structure of top Marine environment generally include wave, stream and main wind load.Upper load be delivered to bottom can be formed it is larger curved , it is necessary to while designing a kind of new foundation structure pattern and meet requirement for bearing capacity, construction cost can reduce square.Traditional Foundation pattern has gravity type foundation, overall to rely on dead load and thereon the weight resistance external load of filler and ballast, maintains Structural stability, Construction Principle is concise, and filler and ballast material cost are low, but all very big for basis deadweight and physical dimension, The scope that basis occupies sea bed is wider, and for the deepwater field also required to seabed conditions, construction, means of transportation and cost are equal It is restricted.More new cylinder-shaped foundation structure form is simple, and applicable seabed conditions are extensive, while sheath skirt resistant slide is stable Property it is higher, construction and installation principle is concise, but sinking watching has the problem of not in place and leveling control is difficult, simultaneously The problems such as flexing occurs for the steel constructions such as skirtboard under working condition be present, equally govern the development of bucket foundation.The above is asked Inscribe and equally existed in wind-driven generator at sea, the increase of blower fan single-machine capacity and the diversity of deepwater field sea bed geological conditions New challenge is proposed to the foundation structure pattern of offshore wind power equipment.
The content of the invention
Use that gravity type foundation cost is low, bearing capacity is strong and the basic convenient transportation of suction tube, wide adaptability etc. to integrate The characteristics of aspect, while in order to avoid single structure pattern gene basis oversized caused construction technology and construction cost The burden of aspect, the invention provides a kind of marine four floating drums-buoyancy tank combined type foundation structure and its construction method, have gravity concurrently Formula basis and the characteristics of suction bucket foundation, while bearing power increase, transport mounting means is easy, recyclable recycling, applies Work cost substantially reduces.
In order to solve the above-mentioned technical problem, the present invention is achieved by following technical scheme:
A kind of sea four floating drums-buoyancy tank combined type foundation structure, including four identical floating drums, four identical buoyancy tanks and One changeover portion pylon;Four floating drums are sequentially connected according to its central point in the horizontal plane to be surrounded square and is arranged, Connected per the two neighboring floating drum by a buoyancy tank, the center line of the buoyancy tank along its length is through described in its both ends The axis of floating drum;The floating drum connects changeover portion pylon with the buoyancy tank top, and the changeover portion pylon is used to connect top wind Electric equipment;
The floating drum is made up of floating drum top cover, barrel, sheath skirt, radial rib plate, ring floor, subdivision plate;The floating drum top Covering portion edge sets the barrel, lower edges to set the sheath skirt;The floating drum top cover forms described floating with the barrel The superstructure of cylinder, the superstructure of the floating drum is interior to set the radial rib plate and the ring floor;The floating drum top cover The substructure of the floating drum is formed with the sheath skirt, skirtboard in annular is provided with the substructure of the floating drum;
The buoyancy tank is made up of buoyancy tank top plate, buoyancy tank bottom plate, side plate, floor, anti-skid skirtboard, the buoyancy tank top plate, described Buoyancy tank bottom plate, the side plate form the casing of cuboid cavity structure, and the box house of the buoyancy tank is provided with horizontal and vertical Polylith floor, the casing of the buoyancy tank is divided into interconnected region by floor described in polylith;The buoyancy tank top plate both ends are pre- Provided with stomata, the buoyancy tank bottom plate both ends are preset with water hole, and institute is realized by gas-liquid displacement using the stomata and the water hole State water-filling and the draining of the box house of buoyancy tank;The buoyancy tank bottom plate lower edges set the anti-skid skirtboard;
The changeover portion pylon is made up of four identical columns, some support bars, eight braces;Four column bottoms End pours into the floating drum top cap central of four floating drums and welded together with it respectively, and from the bottom to top with identical angle It is centroclinal to foundation structure;The more support bars form truss type steel structure between being connected to four columns;It is described Brace is connected between the column buoyancy tank adjacent thereto, and the brace lower end is passed through institute by the buoyancy tank roof center State inside buoyancy tank, the brace is internally provided with the air-liquid pipeline extended to below buoyancy tank bottom plate and grout lines;Described in every Air-liquid pipeline, grout lines and liquid level sensor are respectively arranged with inside column, wherein air-liquid pipeline is prolonged by the column Extend below the floating drum top cover of the floating drum, wherein grout lines are extended to superstructure and the institute of the floating drum by the column State the box house of buoyancy tank, wherein liquid level sensor is used for during towage by observing inside the column liquid after fluid-tight The liquid level change of body, judges the atmospheric pressure state in the floating drum corresponding to the column bottom.
Preferably, the barrel of the floating drum highly 1/3rd arrives half for the floating drum cap diameter, The sheath skirt height and the ratio of height to diameter of the floating drum cap diameter of the floating drum are 0.8-1.5;The annular of the floating drum 2nd/to three/3rds of a diameter of floating drum cap diameter of interior skirtboard, the height of skirtboard is described in the annular 2nd/to three/3rds of sheath skirt height.
Preferably, the barrel of the side plate of the buoyancy tank and the floating drum is highly consistent, the anti-skid skirtboard of the buoyancy tank Height 1/3rd arrive half for the side plate height.
Preferably, it is provided with the range of the middle part of the sheath skirt to bottom and cuts native ring, it is described to cut native ring and be arranged in cylinder The interior surface of revolution and/or the outer surface of revolution of skirt, the section outline for cutting native ring can be angular or arc.
A kind of construction method of above-mentioned marine four floating drums-buoyancy tank combined type foundation structure, is carried out in accordance with the following steps:
(1) land based plant is prefabricated processes all parts, and the floating drum, the buoyancy tank, the changeover portion pylon are pacified Dress up four floating drum buoyancy tank foundation structure on integral combined type sea;
(2) four floating drum buoyancy tank foundation structures on combined type sea are lifted into sea, are sunk to, passed through using foundation structure deadweight Increase buoyancy to being inflated in the sheath skirt of the floating drum, and the draft needed according to towage is adjusted, it is last described vertical Water filling fluid-tight in post;
(3) transportation by driving towage is carried out to four floating drum buoyancy tank foundation structures on combined type sea;
(4) sink to installing after four floating drum buoyancy tank foundation structures are consigned to specified location on combined type sea, described floating drum Substructure pump-down process makes foundation structure sink to reduce buoyancy, while water-filling makes foundation structure certainly in the casing of the buoyancy tank Increase again, foundation structure is further sunk, until the anti-skid skirtboard of the sheath skirt of the floating drum and buoyancy tank contact sea bed;
(5) after the sheath skirt of the floating drum and the anti-skid skirtboard insertion ground of the buoyancy tank, to the bottom of the floating drum Structure is drawn water, and foundation structure is further sunk until the floating drum top cover and the buoyancy tank bottom plate completely attach to mud face, continuation The substructure of the floating drum is persistently drawn water, to carry out negative pressure consolidation process to the soil body;
(6) after the completion of negative pressure is reinforced, the box house grouting treatment using grout lines to buoyancy tank, the top of floating drum is tied Structure carries out jackstone ballast or grouting ballast;
(7) after the completion of grouting treatment, top wind power equipment is lifted, carries out installation waterborne, construction is completed.
Wherein, the draft needed according to towage described in step (2) is adjusted, especially by the adjustment buoyancy tank Box house ballast water capacity or the floating drum substructure displacement carry out.
Wherein, the transportation by driving towage described in step (3) is navigated using single-point or two point supports, and to being except arrangement before support is navigated Water-filling ballast is carried out inside the other three or two floating drums beyond the floating drum of cable point, there is foundation structure and be used for Neutralize the hypsokinesis angle buried and appear elephant for the first time.
Wherein, during step (3) described towage, set by the level detection of the column after internal water flooding and its inside It is standby, the situation of change of each column internal liquid level is observed, whether preliminary judgement basis structure keeps poised state, is balanced if any deviateing The inclination of position carries out leveling.
Wherein, in the suction penetration process described in step (5), taken out by the substructure increase of the floating drum in updip Water speed rate and/or the floating drum having a down dip substructure inflation or water-filling, carry out Levelling operation.
Wherein, lifting top wind power equipment is removed during recycling first, secondly by the gas-liquid pipe inside the vertical rod Sheath skirt internal water flooding or inflation increase internal pressure of the road to the floating drum, and pass through the air-liquid pipeline pair inside the brace Water filling or inflation increase internal pressure are carried out inside the anti-skid skirtboard of the buoyancy tank so that the sheath skirt of the floating drum and the buoyancy tank Anti-skid skirtboard separated with foundation, after whole foundation structure is slowly floated up on sea, towed back to by towboat land.
The beneficial effects of the invention are as follows:
Marine four floating drums-buoyancy tank combined type foundation structure of the present invention, by four floating drums, four buoyancy tanks and changeover portion tower Frame combines;Floating drum superstructure as ballast compartment, substructure as suction bucket foundation, have concurrently gravity-type structure and The characteristics of suction cylinder-shaped foundation structure, while the form of four pontoon combinations causes the diameter of each floating drum relative to identical scale The geometry size of bucket foundation or gravity type foundation greatly reduces;Buoyancy tank is as connector by four independent floating drum groups Integrator structure, its upper box body load-bearing, the anti-skid skirtboard increase structure stability against slope in bottom, and sink to completing upper back Grouting is integrally formed the pedestal of structure in casing;Therefore the characteristics of buoyancy tank also has gravity-type structure and suction apron board structure concurrently;It is floating Case and pontoon combination structure cause the interaction between floating drum to strengthen, while the supporting role of the anti-skid skirtboard in buoyancy tank bottom improves The lateral rigidity of floating drum sheath skirt, prevent that flexing phenomenon occurs for sheath skirt in sinking watching;Changeover portion pylon structure is except as upper Outside the attachment structure of portion's wind power equipment, its major function is to be internally provided with pipe-line system, it is possible to achieve in transportation Cement-grouting consolidation operation after detection, leveling and installation.After the wind power equipment installation of top, changeover portion pylon structure Superstructure load is uniformly distributed on four floating drums and four buoyancy tanks by strong point effect, gives full play to combined type basis knot The bearing capacity of all parts in structure.
The marine four floating drums-buoyancy tank combined type foundation structure and its construction method of the present invention so that the waterline of single floating drum Face area is smaller, and towage process easily accurately controls leveling, and the collaboration added in combination with floating box structure between four floating drums is made With increasing the contact area of the bottom of foundation and sea bed, the increase of end bearing power, furthermore buoyancy tank is as top changeover portion pylon Supporting construction, optimize the force transfer system of structure so that basic each several part stress is more uniformly distributed.Due to floating drum top and buoyancy tank case Internal portion finally needs ballast grouting treatment, increases the deadweight of foundation structure, improves stability against overturning, total bearing capacity performance Lifting, therefore the lower skirtboard of floating drum and buoyancy tank height can substantially reduce, and save material cost, while basic submergence depth subtracts Small, the probability of run-off the straight in sinking watching reduces, and sinking Levelling operation is greatly simplified, and integral construction measure is optimized.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of marine four floating drums provided by the present invention-buoyancy tank combined type foundation structure;
Fig. 2 is the vertical view visual angle schematic diagram of marine four floating drums provided by the present invention-buoyancy tank combined type foundation structure;
Fig. 3 is that marine four floating drums provided by the present invention-buoyancy tank combined type foundation structure looks up visual angle schematic diagram;
Fig. 4 is the spar structures schematic diagram of marine four floating drums provided by the present invention-buoyancy tank combined type foundation structure;
Fig. 5 is the floating box structure schematic diagram of marine four floating drums provided by the present invention-buoyancy tank combined type foundation structure;
Fig. 6 is the changeover portion pylon structure signal of marine four floating drums provided by the present invention-buoyancy tank combined type foundation structure Figure.
In figure:1st, floating drum, 11, floating drum top cover, 12, barrel, 13, sheath skirt, 14, radial rib plate, 15, ring floor, 16, ring Skirtboard in shape, 17, cut native ring;2nd, buoyancy tank, 21, buoyancy tank top plate, 22, buoyancy tank bottom plate, 23, side plate, 24, floor, 25, anti-skid skirt Plate;3rd, changeover portion pylon, 31, column, 32, support bar, 33, brace.
Embodiment
For the content of the invention, feature and the effect of the present invention can be further appreciated that, following examples are hereby enumerated, and coordinate accompanying drawing Describe in detail as follows:
As shown in Figure 1 to Figure 3, present embodiment discloses a kind of marine four floating drums-buoyancy tank combined type foundation structure, main bag Include four 1, four, identical floating drum changeover portion pylons 3 of identical buoyancy tank 2, one.
Four floating drums 1 are sequentially connected according to its central point and can surround square and be arranged in the horizontal plane.
As shown in figure 4, each floating drum 1 by floating drum top cover 11, barrel 12, sheath skirt 13, radial rib plate 14, ring floor 15, Skirtboard 16 in annular, cut native ring 17 and form.The circular upper edge of floating drum top cover 11 edge is provided with the barrel 12 of annular, lower edges It is provided with the sheath skirt 13 of annular;The height of barrel 12 is smaller, and generally 1/3rd of the diameter of floating drum top cover 11 arrive half; The height of sheath skirt 13 and the diameter dimension of floating drum top cover 11 approach, and ratio (ratio of height to diameter) is about 0.8-1.5.Floating drum top cover 11 and cylinder The superstructure of floating drum 1 that wall 12 is formed has the characteristics of gravity bucket foundation, can be as the ballasted area after installation.It is floating Uniform radial rib plate 14 and uniform ring floor 15 are provided with 1 superstructure of cylinder, primarily to preventing barrel 12 from existing Deformed after ballast.Skirtboard 16 in highly less annular is provided with the substructure of floating drum 1, plays anti-skid part and floor Effect;The diameter of skirtboard 16 skirtboard 16 typically in 2nd/1 to three/3rds of the diameter of floating drum top cover 11, annular in annular Height typically in the range of 2nd/1 to three/3rds of the height of sheath skirt 13.The floating drum that floating drum top cover 11 is formed with sheath skirt 13 1 substructure has the characteristics of wide shallow formula suction bucket foundation, and being on the one hand used for during floating drag the substructure of floating drum 1 can be with Inflation, cavity is formed to increase foundation structure buoyancy and realize the control leveling during towage;On the other hand sinking to pacifying The substructure of floating drum 1 is vented during dress and reduces buoyancy, to ensure that its normally sinks, skirtboard in bottom sheath skirt 13 and annular 16 are finally inserted into inside ground, not only basis is brought into close contact by way of taking out negative pressure, while being capable of consolidated subsoil base Plinth, while ensureing that structure has stability against overturning, stability against slope of also having exhibited standard.The middle part of sheath skirt 13 bottom of to The section arbitrary height at end, which is provided with, cuts native ring 17, and the interior surface of revolution of sheath skirt 13 or the outer surface of revolution can be arranged in by cutting native ring 17, Or the inside and outside surface of revolution is arranged simultaneously, its section outline can be angular or arc.The main function for cutting native ring 17 is to reduce The side friction of sheath skirt in sinking watching, ensure that foundation structure sinks to design requirement depth.
Four floating drums 1 are connected with each other by four buoyancy tanks 2, and a buoyancy tank 2 is connected between every two neighboring floating drum 1.Buoyancy tank 2 Both ends are welded on floating drum 1 so that four buoyancy tanks 2 and four floating drums 1 form an entirety, buoyancy tank 2 along its length in Heart line passes through the axis of its both ends floating drum 1, superstructure load is evenly transferred to each floating drum 1 of foundation structure and is floated On case 2.
As shown in figure 5, buoyancy tank 2 is made up of buoyancy tank top plate 21, buoyancy tank bottom plate 22, side plate 23, floor 24, anti-skid skirtboard 25. Buoyancy tank top plate 21, buoyancy tank bottom plate 22, side plate 23 form the casing of cuboid cavity structure, the height (i.e. the height of side plate 23) of casing With the superstructure of floating drum 1 (i.e. the height of barrel 12) unanimously, i.e., the superstructure of floating drum 1, the tank floor of buoyancy tank 1 flush, and ensure It is heavy pass through after the completion of basis be bonded completely with sea bed face.The box house of buoyancy tank 2 is provided with horizontal and vertical polylith floor 24, polylith Floor 24 will be divided into interconnected multiple regions inside buoyancy tank 2, the effect of floor 24 is to strengthen the inside rigidity of buoyancy tank 2, is prevented Bending deformation occurs for the side plate 23 of steel construction after grouting.The both ends of buoyancy tank top plate 21 are preset with the stomata of Valve controlling, for gas Inflate or be vented when water is replaced;The both ends of buoyancy tank bottom plate 22 are preset with the water hole of Valve controlling, for adjusting filled water amount in buoyancy tank. Stomata and water hole can be set it is multiple standby, to prevent indivedual blockage phenomenons.Stomata is connected with independent pipe-line system, and Water hole is not provided with pipeline, and box house water-filling, the draining for realizing buoyancy tank 2 can be replaced by gas-liquid.The lower edges of buoyancy tank bottom plate 22 Anti-skid skirtboard 25 is provided with, 1/3rd of the height substantially height of side plate 23 of anti-skid skirtboard 25 arrives half.Buoyancy tank 2 Casing can be increased during towage with water-filling conducts oneself with dignity, and by adjusting different drafts, reaches wanting for towage stability Ask;When sinking to installing, complete water filling, ensure fall rate, basis is heavy pass through after the completion of, the box house of buoyancy tank 2 passes through transition The characteristics of grout lines of section pylon 3 carry out cement-grouting consolidation, and increase dead load makes it have gravity type foundation structure.Buoyancy tank 2 The anti-skid skirtboard 25 that lower periphery one encloses mainly provides resistant slide, antidumping bearing capacity, while the area of buoyancy tank bottom plate 22 is larger, can As main sole plate structure.
As shown in fig. 6, changeover portion pylon 3 is made up of 32, eight four identical columns 31, some support bars braces 33. The bottom of four root post 31 pours into the center of floating drum top cover 11 of four floating drums 1 and welded together with it respectively, and four root posts 31 are equal It is centroclinal to foundation structure with identical angle from the bottom to top;More support bars 32 are welded between four root posts 31 and form purlin Posture steel construction.Because the column 31 of changeover portion pylon 3 is inserted into inside floating drum 1, therefore segment limit should be inserted in column 31 It is internal to prevent from deforming provided with cross floor of putting more energy into.Changeover portion pylon 3 is mainly used for connecting combined type foundation structure and top Wind power equipment, its tower height are adjusted correspondingly according to the depth of water of reality.Gas-liquid is respectively arranged with inside per root post 31 Pipeline, grout lines and liquid level sensor, wherein air-liquid pipeline by column 31 extend to the floating drum top cover 11 of floating drum 1 with Under, the substructure water-filling of floating drum 1, draining can also can be inflated, exhaust to the substructure of floating drum 1, so as to realize towage Aeration quantity or ballast water capacity are adjusted after increasing buoyancy, and foundation structure inclination when buoyancy is inadequate in journey, makes its corresponding floating drum 1 Rise is sunk, so as to adjust the balance of mass-type foundation structure;Wherein the interface of grout lines can be opened in the side wall of column 31 Certain altitude, grout lines extend to the box house of the superstructure of floating drum 1 and buoyancy tank 2 by column 31.Per root post 31 with Brace 33 is connected between its adjacent buoyancy tank 2, the lower end of brace 33 is passed through inside buoyancy tank 2 by the center of buoyancy tank top plate 21, brace 33 In addition to playing a part of transmitting the load of superstructure to buoyancy tank 1, air-liquid pipeline and grout lines are also equipped with inside it, its Air-liquid pipeline can be close to floor 24 in an intermediate position in buoyancy tank 2 and set, and buoyancy tank bottom plate be extended to below 22, for anti-skid It is inflated inside skirtboard 25;Its grout lines extends to buoyancy tank top plate below 21, for the box house grouting to buoyancy tank 1.
After structure installation, it is in the milk to the superstructure jackstone ballast of floating drum 1 or by grout lines, simultaneously Mortar will be poured into by grout lines to the box house of buoyancy tank 2, led to inside column 31 without grouting, each pipe-line system holding Freely.Each region of box house of buoyancy tank 2 is connection therefore can ensure that mortar is full of the casing of whole buoyancy tank 2, general every The grout lines of column 31 are provided with two outlets, to two buoyancy tanks 2 being connected on same floating drum 1 while are in the milk respectively, so that Ensure that same buoyancy tank 2 realizes the filling speed from both ends to centre, improve speed of application and grouting uniformity coefficient.Per root post 31 Brace 33 is connected between buoyancy tank 2 adjacent thereto can also realize that the extension from the casing middle part of buoyancy tank 2 to both ends is in the milk, this Kind grouting way can carry out carrying out respectively simultaneously with the grouting by floating drum 1.
Using liquid level sensor, four root posts 31 of changeover portion pylon 3 are also used as leveling observation system, main former Reason is that liquid fluid-tight gas is filled with inside column 31, on the one hand ensure that the bottom inflatable of floating drum 1 is not revealed, is on the other hand dragging By observing the liquid level situation of change of liquid after the inside fluid-tight of column 31 during boat, it can be determined that the bottom of column 31 institute is right Answer air pressure size in floating drum 1 and whether gas leakage, so as to control the air pressure balance inside four floating drums 1, ensure whole basis Structure is in erectility.
When structure is integrally reclaimed, air-liquid pipeline inside vertical rod 1 inside of sheath skirt 13 of floating drum 1 is carried out water filling or Inflate, the air-liquid pipeline inside brace 33 carries out water filling or inflation to the inside of anti-skid skirtboard 25 of buoyancy tank 2, so makes floating drum 1 The air pressure inside of anti-skid skirtboard 25 of sheath skirt 13 and buoyancy tank 2 strengthens, and total pressure head, which reduces, gradually jacks up foundation structure, treats sheath skirt 13 Basis will slowly be floated after departing from sea bed with anti-skid skirtboard 25, finally be hauled to bank.
Four floating drums 1 and four buoyancy tanks 2 weld together successively, independent each other, inflation, row between each several part The measures such as water, grouting can be carried out independently simultaneously, do not interfere with each other, shortened construction period.
The construction method of four floating drum buoyancy tank foundation structures of combinations thereof formula sea, is carried out in accordance with the following steps:
(1) precast construction:Land based plant is prefabricated to process all parts, and floating drum 1, buoyancy tank 2, changeover portion pylon 3 are pacified Dress up four floating drum buoyancy tank foundation structure on integral combined type sea.
(2) initial adjustment prepares:Four floating drum buoyancy tank foundation structures are lifted into sea on combined type sea, and it is heavy to be conducted oneself with dignity using foundation structure Enter certain depth, buoyancy is increased by inflation in the sheath skirt 13 to floating drum 1, and the draft needed according to towage is adjusted Section, the substructure of floating drum 1 is inflated by the inside water-filling ballast of buoyancy tank 2 when absorbing water inadequate, when absorbing water excessive increase displacement or A certain amount of ballast water is discharged in inflation in buoyancy tank 2, reduces deadweight.
Rear column 31 in water filling fluid-tight, prepared for follow-up delivery waterborne.
(3) delivery waterborne:Four floating drum buoyancy tank foundation structures on combined type sea are carried out by towing cable rope using towboat equipment Single-point towage, heaving pile point are arranged therein on one or two floating drum 1, typically flushed with the water surface, and towage speed is unsuitable too fast.
, it is necessary to carrying out water-filling ballast inside the other three or two floating drums 1 before towage, structure is set to have necessarily Hypsokinesis angle, the floating drum 1 of heaving pile point can produce obvious burying and appear for the first time as therefore initial hypsokinesis during overall towage Angle can neutralize the phenomenon that leans forward for burying first formation, so as to ensure the stability requirement during haul, reduce dynamic response.
During delivery, by the level detection equipment in the column 31 and column 31 after internal water flooding, observe each vertical Whether the situation of change of the internal liquid level of post 31, preliminary judgement basis structure keep poised state, if any inclining for deviation equilbrium position Tiltedly carry out leveling.
(4) basis enters water:Sink to installing after delivery to specified location, the processing of the lower exhaust of floating drum 1 is made with reducing buoyancy Foundation structure is sunk, while water-filling in the casing of buoyancy tank 2, foundation structure deadweight increase, foundation structure is further sunk, until The sheath skirt 13 of floating drum 1 and the anti-skid skirtboard 25 of buoyancy tank 2 contact sea bed.
(5) suction penetration:It is right after the sheath skirt 13 of floating drum 1 and the anti-skid skirtboard 25 of buoyancy tank 2 insert ground certain depth The substructure of floating drum 1 is drawn water, and foundation structure is further sunk up to floating drum top cover 11 and the full contact mud of buoyancy tank bottom plate 22 face, Continue to draw water to the substructure of floating drum 1 and continue for some time, negative pressure consolidation process is carried out to the soil body.
In suction penetration process, when soil property is uneven or the substructure of floating drum 1 pumping rate it is inconsistent, cause each floating Difference occurs for 1 submergence depth of cylinder, so that foundation structure run-off the straight, it is therefore desirable to Levelling operation is carried out, by updip The substructure of floating drum 1 increases pumping rate and/or in the substructure of floating drum 1 inflation having a down dip or water-filling, progress Levelling operation.
(6) be in the milk ballast:After the completion of negative pressure is reinforced, the casing by the grout lines of vertical rod 31 and brace 33 to buoyancy tank 2 Inside carries out grouting treatment, and the superstructure of floating drum 1 can be with jackstone ballast or grouting ballast.
(7) superstructure is installed:After the completion of grouting treatment, top wind power equipment is lifted, carries out installation waterborne.
(8) recycle:Lifting top wind power equipment is removed first, secondly by the air-liquid pipeline inside vertical rod 31 to floating The internal water flooding of sheath skirt 13 of cylinder 1 or inflation increase internal pressure, and pass through resistance of the air-liquid pipeline inside brace 33 to buoyancy tank 2 The sliding inside of skirtboard 25 carries out water filling or inflation increase internal pressure so that the sheath skirt 13 of floating drum 1 and the anti-skid skirtboard 25 of buoyancy tank 2 Separated with foundation, buoyancy further increases, and whole foundation structure slowly floats, floating to after on sea can by towboat by its Tow back to land.
Although the preferred embodiments of the present invention are described above in conjunction with accompanying drawing, the invention is not limited in upper The embodiment stated, above-mentioned embodiment is only schematical, be not it is restricted, this area it is common Technical staff in the case of present inventive concept and scope of the claimed protection is not departed from, may be used also under the enlightenment of the present invention By make it is many in the form of specific conversion, these are belonged within protection scope of the present invention.

Claims (10)

1. a kind of sea four floating drums-buoyancy tank combined type foundation structure, it is characterised in that including four identical floating drums, four phases Same buoyancy tank and a changeover portion pylon;Four floating drums are sequentially connected according to its central point in the horizontal plane surrounds square It is arranged, is connected per the two neighboring floating drum by a buoyancy tank, the center line of the buoyancy tank along its length passes through The axis of floating drum described in its both ends;The floating drum connects changeover portion pylon with the buoyancy tank top, and the changeover portion pylon is used for Connect top wind power equipment;
The floating drum is made up of floating drum top cover, barrel, sheath skirt, radial rib plate, ring floor, subdivision plate;On the floating drum top cover Portion edge sets the barrel, lower edges to set the sheath skirt;The floating drum top cover forms the floating drum with the barrel Superstructure, the superstructure of the floating drum is interior to set the radial rib plate and the ring floor;The floating drum top cover and institute The substructure that sheath skirt forms the floating drum is stated, skirtboard in annular is provided with the substructure of the floating drum;
The buoyancy tank is made up of buoyancy tank top plate, buoyancy tank bottom plate, side plate, floor, anti-skid skirtboard, the buoyancy tank top plate, the buoyancy tank Bottom plate, the side plate form the casing of cuboid cavity structure, and the box house of the buoyancy tank is provided with horizontal and vertical more Block floor, the casing of the buoyancy tank is divided into interconnected region by floor described in polylith;The buoyancy tank top plate both ends are preset with Stomata, the buoyancy tank bottom plate both ends are preset with water hole, and described float is realized by gas-liquid displacement using the stomata and the water hole The water-filling of the box house of case and draining;The buoyancy tank bottom plate lower edges set the anti-skid skirtboard;
The changeover portion pylon is made up of four identical columns, some support bars, eight braces;Four column bottoms point The floating drum top cap central of four floating drums is not poured into and is welded together with it, and from the bottom to top with identical angle to base Plinth structure centre tilts;The more support bars form truss type steel structure between being connected to four columns;The brace It is connected between the column buoyancy tank adjacent thereto, the brace lower end is passed through described floating by the buoyancy tank roof center Inside case, the brace is internally provided with the air-liquid pipeline extended to below buoyancy tank bottom plate and grout lines;The every column Inside is respectively arranged with air-liquid pipeline, grout lines and liquid level sensor, and wherein air-liquid pipeline is extended to by the column Below the floating drum top cover of the floating drum, wherein grout lines extend to the superstructure of the floating drum and described floating by the column The box house of case, wherein liquid level sensor are used for during towage by observing inside the column liquid after fluid-tight Liquid level changes, and judges the atmospheric pressure state in the floating drum corresponding to the column bottom.
2. a kind of marine four floating drums-buoyancy tank combined type foundation structure according to claim 1, it is characterised in that described floating The barrel of cylinder highly arrives half, the sheath skirt height of the floating drum for 1/3rd of the floating drum cap diameter Ratio of height to diameter with the floating drum cap diameter is 0.8-1.5;A diameter of floating drum of skirtboard in the annular of the floating drum 2nd/to three/3rds of cap diameter, it is described annular in skirtboard height be the sheath skirt height 1 to three/3rds / bis-.
3. a kind of marine four floating drums-buoyancy tank combined type foundation structure according to claim 1, it is characterised in that described floating The barrel of the side plate of case and the floating drum is highly consistent, and the height of the anti-skid skirtboard of the buoyancy tank is the side plate height 1/3rd arrive half.
A kind of 4. marine four floating drums-buoyancy tank combined type foundation structure according to claim 1, it is characterised in that the cylinder It is provided with the range of the middle part of skirt to bottom and cuts native ring, it is described to cut native ring and be arranged in the interior surface of revolution of sheath skirt and/or outer return Turn face, the section outline for cutting native ring can be angular or arc.
5. a kind of construction method of four floating drums-buoyancy tank combined type foundation structure marine as any one of claim 1-4, its It is characterised by, carries out in accordance with the following steps:
(1) land based plant is prefabricated processes all parts, and the floating drum, the buoyancy tank, the changeover portion pylon are mounted to Four floating drum buoyancy tank foundation structures on the combined type sea of one;
(2) four floating drum buoyancy tank foundation structures on combined type sea are lifted into sea, sunk to using foundation structure deadweight, by institute State inflation in the sheath skirt of floating drum and increase buoyancy, and the draft needed according to towage is adjusted, in the last column Water filling fluid-tight;
(3) transportation by driving towage is carried out to four floating drum buoyancy tank foundation structures on combined type sea;
(4) sink to installing after four floating drum buoyancy tank foundation structures are consigned to specified location on combined type sea, the bottom of described floating drum Structure pump-down process makes foundation structure sink to reduce buoyancy, while water-filling increases foundation structure deadweight in the casing of the buoyancy tank Add, foundation structure is further sunk, until the anti-skid skirtboard of the sheath skirt of the floating drum and buoyancy tank contact sea bed;
(5) after the sheath skirt of the floating drum and the anti-skid skirtboard insertion ground of the buoyancy tank, to the substructure of the floating drum Draw water, foundation structure is further sunk until the floating drum top cover and buoyancy tank bottom plate full contact mud face, continue to institute The substructure for stating floating drum is persistently drawn water, to carry out negative pressure consolidation process to the soil body;
(6) after the completion of negative pressure is reinforced, the box house grouting treatment using grout lines to buoyancy tank, the superstructure of floating drum is entered Row jackstone ballast or grouting ballast;
(7) after the completion of grouting treatment, top wind power equipment is lifted, carries out installation waterborne, construction is completed.
6. a kind of construction method of marine four floating drums according to claim 5-buoyancy tank combined type foundation structure, its feature exist In the draft needed according to towage described in step (2) is adjusted, especially by the box house for adjusting the buoyancy tank The substructure displacement of ballast water capacity or the floating drum is carried out.
7. a kind of construction method of marine four floating drums according to claim 5-buoyancy tank combined type foundation structure, its feature exist In, the transportation by driving towage described in step (3) is navigated using single-point or two point supports, and to except described in arrangement heaving pile point before support is navigated Water-filling ballasts are carried out inside the other three beyond floating drum or two floating drums, foundation structure is had to bury for neutralization and is appeared for the first time The hypsokinesis angle of elephant.
8. a kind of construction method of marine four floating drums according to claim 5-buoyancy tank combined type foundation structure, its feature exist During step (3) described towage, by the column after internal water flooding and its level detection equipment of inside, observation is each vertical Whether the situation of change of post internal liquid level, preliminary judgement basis structure keep poised state, if any the inclination for deviateing equilbrium position Carry out leveling.
9. a kind of construction method of marine four floating drums according to claim 5-buoyancy tank combined type foundation structure, its feature exist In, in the suction penetration process described in step (5), by the substructure of the floating drum in updip increase pumping rate and/ Or in the substructure inflation for the floating drum having a down dip or water-filling, progress Levelling operation.
10. a kind of construction method of marine four floating drums according to claim 5-buoyancy tank combined type foundation structure, its feature It is, lifting top wind power equipment is removed during recycling first, secondly by the air-liquid pipeline inside the vertical rod to described The sheath skirt internal water flooding of floating drum or inflation increase internal pressure, and by the air-liquid pipeline inside the brace to the buoyancy tank Anti-skid skirtboard inside carry out water filling or inflation increase internal pressure so that the anti-skid skirt of the sheath skirt of the floating drum and the buoyancy tank Plate separates with foundation, after whole foundation structure is slowly floated up on sea, is towed back to by towboat land.
CN201710895702.4A 2017-09-28 2017-09-28 Construction method of offshore four-buoy-buoyancy tank combined foundation structure Active CN107542101B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710895702.4A CN107542101B (en) 2017-09-28 2017-09-28 Construction method of offshore four-buoy-buoyancy tank combined foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710895702.4A CN107542101B (en) 2017-09-28 2017-09-28 Construction method of offshore four-buoy-buoyancy tank combined foundation structure

Publications (2)

Publication Number Publication Date
CN107542101A true CN107542101A (en) 2018-01-05
CN107542101B CN107542101B (en) 2023-06-30

Family

ID=60964640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710895702.4A Active CN107542101B (en) 2017-09-28 2017-09-28 Construction method of offshore four-buoy-buoyancy tank combined foundation structure

Country Status (1)

Country Link
CN (1) CN107542101B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222058A (en) * 2018-02-14 2018-06-29 天津大学 A kind of bucket foundation and its construction method with adjustable anti-buckling device
CN109653229A (en) * 2018-11-19 2019-04-19 中交上海三航科学研究院有限公司 The more negative well bore pressure cylinder anemometer tower composite foundations of jacket automate negative pressure method for sinking
CN109736343A (en) * 2019-03-01 2019-05-10 江苏金风科技有限公司 Offshore wind power foundation, its installation method and wind power generating set
GB2570911A (en) * 2018-02-09 2019-08-14 Frederic Armour Joseph Modular marine vessel
CN110172991A (en) * 2019-05-07 2019-08-27 天津大学 A kind of three blower foundations recycling construction method
CN110172992A (en) * 2019-05-07 2019-08-27 天津大学 A kind of four blower foundations recycling construction method
CN110397064A (en) * 2019-06-28 2019-11-01 天津大学 A kind of separable ring cylinder jacket frame foundation structure and its construction method
CN110453714A (en) * 2019-07-21 2019-11-15 天津大学 A kind of offshore wind farm jacket gravity type cylinder-shaped foundation structure and its construction method
CN110453712A (en) * 2019-06-28 2019-11-15 天津大学 A kind of combined cylinder buoyancy tank foundation structure and its construction method
CN110607799A (en) * 2018-06-15 2019-12-24 深圳市移动海工技术有限公司 Multifunctional caisson foundation structure and burial depth control method thereof
CN110949615A (en) * 2019-11-15 2020-04-03 中国电建集团华东勘测设计研究院有限公司 Floating pile-stabilizing platform device based on anchoring positioning control and pile sinking method
CN111846130A (en) * 2020-07-30 2020-10-30 广东精铟海洋工程股份有限公司 Tower structure of ocean floating tower
CN112556260A (en) * 2020-12-22 2021-03-26 天津大学 Floating ice type wind power foundation recovery equipment and operation method
CN113235544A (en) * 2021-04-29 2021-08-10 南通泰胜蓝岛海洋工程有限公司 Construction process of guide frame platform
CN113463679A (en) * 2021-06-16 2021-10-01 丁红岩 Offshore wind power multi-cylinder jacket foundation installation and recovery method
CN114875953A (en) * 2022-06-13 2022-08-09 中国华能集团清洁能源技术研究院有限公司 Suction type pile-barrel composite foundation

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1512636A (en) * 1975-07-23 1978-06-01 Redpath Dorman Long Ltd Maritime assemblies
EP0911255A2 (en) * 1997-10-15 1999-04-28 Deep Oil Technology, Incorporated Installation of decks on offshore substructures
CN101255701A (en) * 2007-01-25 2008-09-03 天津市海王星海上工程技术有限公司 At-sea composite foundation
CN104264704A (en) * 2014-10-13 2015-01-07 天津大学前沿技术研究院有限公司 Combination type hexagon buoyancy tank foundation for seaborne anemometer tower
CN205396471U (en) * 2016-02-17 2016-07-27 中船重工建筑工程设计研究院有限责任公司 Novel deep sea semi -submerged formula floating marine wind power platform
CN205653814U (en) * 2016-05-13 2016-10-19 中国水电顾问集团国际工程有限公司 Marine wind finding radar foundation structure of caisson type
CN106801431A (en) * 2017-02-28 2017-06-06 天津大学 A kind of three rise gantry type wind power foundation structure and its construction method certainly
CN208136938U (en) * 2017-09-28 2018-11-23 天津大学 A kind of marine four floating drums-buoyancy tank combined type foundation structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1512636A (en) * 1975-07-23 1978-06-01 Redpath Dorman Long Ltd Maritime assemblies
EP0911255A2 (en) * 1997-10-15 1999-04-28 Deep Oil Technology, Incorporated Installation of decks on offshore substructures
CN101255701A (en) * 2007-01-25 2008-09-03 天津市海王星海上工程技术有限公司 At-sea composite foundation
CN104264704A (en) * 2014-10-13 2015-01-07 天津大学前沿技术研究院有限公司 Combination type hexagon buoyancy tank foundation for seaborne anemometer tower
CN205396471U (en) * 2016-02-17 2016-07-27 中船重工建筑工程设计研究院有限责任公司 Novel deep sea semi -submerged formula floating marine wind power platform
CN205653814U (en) * 2016-05-13 2016-10-19 中国水电顾问集团国际工程有限公司 Marine wind finding radar foundation structure of caisson type
CN106801431A (en) * 2017-02-28 2017-06-06 天津大学 A kind of three rise gantry type wind power foundation structure and its construction method certainly
CN208136938U (en) * 2017-09-28 2018-11-23 天津大学 A kind of marine four floating drums-buoyancy tank combined type foundation structure

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2570911A (en) * 2018-02-09 2019-08-14 Frederic Armour Joseph Modular marine vessel
GB2570911B (en) * 2018-02-09 2022-02-02 Frederic Armour Joseph Modular marine vessel
CN108222058A (en) * 2018-02-14 2018-06-29 天津大学 A kind of bucket foundation and its construction method with adjustable anti-buckling device
CN110607799B (en) * 2018-06-15 2024-03-22 深圳市移动海工技术有限公司 Multifunctional caisson foundation structure and burial depth control method thereof
CN110607799A (en) * 2018-06-15 2019-12-24 深圳市移动海工技术有限公司 Multifunctional caisson foundation structure and burial depth control method thereof
CN109653229A (en) * 2018-11-19 2019-04-19 中交上海三航科学研究院有限公司 The more negative well bore pressure cylinder anemometer tower composite foundations of jacket automate negative pressure method for sinking
CN109736343A (en) * 2019-03-01 2019-05-10 江苏金风科技有限公司 Offshore wind power foundation, its installation method and wind power generating set
CN110172991B (en) * 2019-05-07 2021-06-04 天津大学 Construction method for recycling three-cylinder fan foundation
CN110172991A (en) * 2019-05-07 2019-08-27 天津大学 A kind of three blower foundations recycling construction method
CN110172992A (en) * 2019-05-07 2019-08-27 天津大学 A kind of four blower foundations recycling construction method
CN110172992B (en) * 2019-05-07 2021-06-04 天津大学 Four-barrel fan foundation recycling construction method
CN110397064A (en) * 2019-06-28 2019-11-01 天津大学 A kind of separable ring cylinder jacket frame foundation structure and its construction method
CN110453712A (en) * 2019-06-28 2019-11-15 天津大学 A kind of combined cylinder buoyancy tank foundation structure and its construction method
CN110397064B (en) * 2019-06-28 2024-03-19 天津大学 Combined annular tube jacket foundation structure and construction method thereof
CN110453714A (en) * 2019-07-21 2019-11-15 天津大学 A kind of offshore wind farm jacket gravity type cylinder-shaped foundation structure and its construction method
CN110949615B (en) * 2019-11-15 2020-12-29 中国电建集团华东勘测设计研究院有限公司 Floating pile-stabilizing platform device based on anchoring positioning control and pile sinking method
CN110949615A (en) * 2019-11-15 2020-04-03 中国电建集团华东勘测设计研究院有限公司 Floating pile-stabilizing platform device based on anchoring positioning control and pile sinking method
CN111846130A (en) * 2020-07-30 2020-10-30 广东精铟海洋工程股份有限公司 Tower structure of ocean floating tower
CN112556260A (en) * 2020-12-22 2021-03-26 天津大学 Floating ice type wind power foundation recovery equipment and operation method
CN112556260B (en) * 2020-12-22 2024-01-05 天津大学 Floating ice type wind power foundation recovery equipment and operation method
CN113235544A (en) * 2021-04-29 2021-08-10 南通泰胜蓝岛海洋工程有限公司 Construction process of guide frame platform
CN113235544B (en) * 2021-04-29 2022-07-26 南通泰胜蓝岛海洋工程有限公司 Construction process of guide frame platform
CN113463679A (en) * 2021-06-16 2021-10-01 丁红岩 Offshore wind power multi-cylinder jacket foundation installation and recovery method
CN114875953A (en) * 2022-06-13 2022-08-09 中国华能集团清洁能源技术研究院有限公司 Suction type pile-barrel composite foundation

Also Published As

Publication number Publication date
CN107542101B (en) 2023-06-30

Similar Documents

Publication Publication Date Title
CN107542101A (en) A kind of four floating drum buoyancy tank combined type foundation structures of sea and its construction method
CN107740436A (en) A kind of three floating drum buoyancy tank combined type foundation structures of sea and its construction method
CN107653895A (en) Six floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN107806108A (en) Three floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN107630461A (en) Four floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN109838351B (en) Floating type automatic wind-to-water wind power generation equipment with multiple wind power generators
CN107630462A (en) A kind of six floating drum buoyancy tank combined type foundation structures of sea and its construction method
CN109629568A (en) The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
CN110453712A (en) A kind of combined cylinder buoyancy tank foundation structure and its construction method
CN101666101B (en) Movable prefabricated multi-barrel type gravity mixed foundation
CN110374820A (en) A kind of separable ring cylinder buoyancy tank foundation structure and its construction method
CN109811767A (en) Suction barrel base piling positioning frame
CN207987950U (en) Four floating drum buoyancy tank foundation structures on a kind of combined type sea
CN103556651A (en) Precast concrete jacket type offshore wind turbine foundation
CN102296629B (en) Tower-drum structure suitable for ocean engineering and installation method thereof
CN102639868B (en) Marine wind turbine whole machine
CN105133558A (en) Deep-water bare rock platform and construction method thereof
CN106759430A (en) A kind of wind-powered electricity generation whole machine construction method of three bucket foundations and concrete support structure
CN107284612A (en) Sit bottom jack up wind-powered electricity generation pile driving barge
CN211200441U (en) Offshore single-pile foundation with compacted grouting reinforced foundation
CN208136938U (en) A kind of marine four floating drums-buoyancy tank combined type foundation structure
CN108625390A (en) The construction process and the more leg jacket foundation structures of pile foundation gravity type offshore wind turbine height stake of offshore wind turbine foundation
KR20230026975A (en) Offshore wind farm structure installed by jacking method and its construction method
CN105908772A (en) Offshore wind turbine gravity type base, base system and gravity type base construction method
CN107724414A (en) Five floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant