CN107530200A - The conveyance control method and shearing device of continuous sheet - Google Patents

The conveyance control method and shearing device of continuous sheet Download PDF

Info

Publication number
CN107530200A
CN107530200A CN201580079967.6A CN201580079967A CN107530200A CN 107530200 A CN107530200 A CN 107530200A CN 201580079967 A CN201580079967 A CN 201580079967A CN 107530200 A CN107530200 A CN 107530200A
Authority
CN
China
Prior art keywords
continuous sheet
delivery section
display elements
mentioned
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201580079967.6A
Other languages
Chinese (zh)
Other versions
CN107530200B (en
Inventor
渡部友弘
田代文大
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Unicharm Corp
Original Assignee
Unicharm Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Unicharm Corp filed Critical Unicharm Corp
Publication of CN107530200A publication Critical patent/CN107530200A/en
Application granted granted Critical
Publication of CN107530200B publication Critical patent/CN107530200B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61FFILTERS IMPLANTABLE INTO BLOOD VESSELS; PROSTHESES; DEVICES PROVIDING PATENCY TO, OR PREVENTING COLLAPSING OF, TUBULAR STRUCTURES OF THE BODY, e.g. STENTS; ORTHOPAEDIC, NURSING OR CONTRACEPTIVE DEVICES; FOMENTATION; TREATMENT OR PROTECTION OF EYES OR EARS; BANDAGES, DRESSINGS OR ABSORBENT PADS; FIRST-AID KITS
    • A61F13/00Bandages or dressings; Absorbent pads
    • A61F13/15Absorbent pads, e.g. sanitary towels, swabs or tampons for external or internal application to the body; Supporting or fastening means therefor; Tampon applicators
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61FFILTERS IMPLANTABLE INTO BLOOD VESSELS; PROSTHESES; DEVICES PROVIDING PATENCY TO, OR PREVENTING COLLAPSING OF, TUBULAR STRUCTURES OF THE BODY, e.g. STENTS; ORTHOPAEDIC, NURSING OR CONTRACEPTIVE DEVICES; FOMENTATION; TREATMENT OR PROTECTION OF EYES OR EARS; BANDAGES, DRESSINGS OR ABSORBENT PADS; FIRST-AID KITS
    • A61F13/00Bandages or dressings; Absorbent pads
    • A61F13/15Absorbent pads, e.g. sanitary towels, swabs or tampons for external or internal application to the body; Supporting or fastening means therefor; Tampon applicators
    • A61F13/45Absorbent pads, e.g. sanitary towels, swabs or tampons for external or internal application to the body; Supporting or fastening means therefor; Tampon applicators characterised by the shape
    • A61F13/49Absorbent articles specially adapted to be worn around the waist, e.g. diapers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H23/00Registering, tensioning, smoothing or guiding webs
    • B65H23/04Registering, tensioning, smoothing or guiding webs longitudinally
    • B65H23/18Registering, tensioning, smoothing or guiding webs longitudinally by controlling or regulating the web-advancing mechanism, e.g. mechanism acting on the running web
    • B65H23/188Registering, tensioning, smoothing or guiding webs longitudinally by controlling or regulating the web-advancing mechanism, e.g. mechanism acting on the running web in connection with running-web

Landscapes

  • Health & Medical Sciences (AREA)
  • Epidemiology (AREA)
  • Engineering & Computer Science (AREA)
  • Biomedical Technology (AREA)
  • Heart & Thoracic Surgery (AREA)
  • Vascular Medicine (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Animal Behavior & Ethology (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Veterinary Medicine (AREA)
  • Absorbent Articles And Supports Therefor (AREA)

Abstract

A kind of conveyance control method of the continuous sheet of absorbent commodity, it is characterised in that the conveyance control method of the continuous sheet includes:First delivery section and the second delivery section positioned at the position for leaning on upstream side on the conveying direction than first delivery section, the continuous sheet for being provided with display elements repeatedly is conveyed along conveying direction towards cutting part;The cutting part is cut between the display elements to the continuous sheet;Obtain the runout information that the display elements deviate from reference position;Obtain the positional information for the elastic adjustment portion being arranged on the conveying direction between first delivery section and second delivery section;Transporting velocity of first delivery section to the continuous sheet is changed based on the runout information;Based on the runout information and the positional information, change transporting velocity of second delivery section to the continuous sheet.

Description

The conveyance control method and shearing device of continuous sheet
Technical field
The present invention relates to the conveyance control method of continuous sheet and shearing device.
Background technology
A kind of shearing device of well-known continuous sheet of absorbent commodity.The shearing device includes:Cutting part, The cutting part is cut between display elements to the continuous sheet for being provided with the display elements repeatedly;First delivery section, this first Delivery section conveys continuous sheet along conveying direction towards cutting part.
Prior art literature
Patent document
Patent document 1:International Publication No. 2010/150357
The content of the invention
Problems to be solved by the invention
In the shearing device, there is the component for being provided with runout information obtaining section, the runout information obtaining section is used to take Obtain the runout information that display elements deviate from reference position.Also, there is the shearing device of runout information obtaining section in this set In, even if for segmentation unit length during cutting continuous sheet because the small of continuous sheet stretches and changed, Continuous sheet can be suitably cut, carries out changing the first delivery section pair based on the runout information obtained by the runout information obtaining section That control of the transporting velocity of continuous sheet.
On the other hand, it is provided with the shearing device:Second delivery section, second delivery section are set in the conveying direction The position of upstream side is being leaned on than the first delivery section, continuous sheet is conveyed along conveying direction;Elastic regulation (Japanese:ダンサー) Portion, the elastic adjustment portion are arranged between the first delivery section and the second delivery section in the conveying direction;Positional information obtaining section, should Positional information obtaining section is used for the positional information for obtaining elastic adjustment portion, in order to control tension force (tension), based on by upper rheme The positional information for putting information acquiring section acquirement changes transporting velocity of second delivery section to continuous sheet.
For example, make what transporting velocity rose because changing control of first delivery section to the transporting velocity of continuous sheet In the case of, elastic adjustment portion is gradually increasing.Also, based on the positional information of elastic adjustment portion, i.e. the rising of elastic adjustment portion, The second delivery section is set to increase to the transporting velocity of continuous sheet so that the control that elastic adjustment portion declines plays a role.
But in this control, there are the following problems, i.e. changes the first delivery section to continuous sheet from based on runout information Transporting velocity after played a role to for the control for controlling tension force (tension) and changing the transporting velocity of the second delivery section, The time is expended, the fast-response of control is not sufficiently good.
The present invention be in view of problem as described above and make, it is therefore intended that improve continuous sheet conveying control it is fast Fast response.
The solution used to solve the problem
Main inventive for achieving the object above is the conveyance control method of the continuous sheet of absorbent commodity, its feature It is,
The conveyance control method of above-mentioned continuous sheet includes:
First delivery section and positioned at than above-mentioned first delivery section on above-mentioned conveying direction by upstream side position the Two delivery sections, the continuous sheet for being provided with display elements repeatedly is conveyed along conveying direction towards cutting part;
Above-mentioned cutting part is cut between above-mentioned display elements to above-mentioned continuous sheet;
Obtain the runout information that above-mentioned display elements deviate from reference position;
Obtain the elastic tune being arranged on above-mentioned conveying direction between above-mentioned first delivery section and above-mentioned second delivery section The positional information in section portion;
Transporting velocity of above-mentioned first delivery section to above-mentioned continuous sheet is changed based on above-mentioned runout information;
Based on above-mentioned runout information and above-mentioned positional information, change above-mentioned second delivery section to the defeated of above-mentioned continuous sheet Send speed.
Other features of the present invention can be recognized from the record of this specification and accompanying drawing.
The effect of invention
Using the present invention, it is possible to increase the fast-response of the conveying control of continuous sheet.
Brief description of the drawings
Fig. 1 is the top view of the deployed condition of the diaper 1 of present embodiment.
Fig. 2A~Fig. 2 C are the decomposition explanation figures of each several part of the diaper 1 of present embodiment.Fig. 2A is that the decomposition of front portion 3 is said Bright figure.Fig. 2 B are the decomposition explanation figures of lower crotch 5.Fig. 2 C are the decomposition explanation figures at rear portion 7.
Fig. 3 is the schematic diagram of a part for the manufacture device 50 for representing diaper 1.
Fig. 4 is the block diagram of a part for the manufacture device 50 for representing diaper 1.
Fig. 5 is the schematic diagram for the appearance for representing cutter 61a cutting leakproofs plate substrate 100.
Fig. 6 is for illustrating explanation figure the problem of being related to the cutting of leakproof plate substrate 100.
Fig. 7 is the figure of the flow chart for the conveying control for representing leakproof plate substrate 100.
Embodiment
By the record of this specification and accompanying drawing, following item at least specify that.
A kind of conveyance control method of continuous sheet, this method are the conveying controlling party of the continuous sheet of absorbent commodity Method, it is characterised in that
The conveyance control method of above-mentioned continuous sheet includes:
First delivery section and positioned at than above-mentioned first delivery section on above-mentioned conveying direction by upstream side position the Two delivery sections, the continuous sheet for being provided with display elements repeatedly is conveyed along conveying direction towards cutting part;
Above-mentioned cutting part is cut between above-mentioned display elements to above-mentioned continuous sheet;
Obtain the runout information that above-mentioned display elements deviate from reference position;
Obtain the elastic tune being arranged on above-mentioned conveying direction between above-mentioned first delivery section and above-mentioned second delivery section The positional information in section portion;
Transporting velocity of above-mentioned first delivery section to above-mentioned continuous sheet is changed based on above-mentioned runout information;
Based on above-mentioned runout information and above-mentioned positional information, change above-mentioned second delivery section to the defeated of above-mentioned continuous sheet Send speed.
Using the conveyance control method of this continuous sheet, it is possible to increase the quick response of the conveying control of continuous sheet Property.
On the basis of the conveyance control method of the continuous sheet, preferably,
Above-mentioned first delivery section conveys the continuous sheet in the state of being contacted with above-mentioned continuous sheet,
When obtaining above-mentioned runout information, it is pointed on the part contacted with above-mentioned first delivery section of above-mentioned continuous sheet Above-mentioned display elements detected, so as to obtain above-mentioned runout information.
Using the conveyance control method of this continuous sheet, can precision carry out well continuous sheet conveying control and Cut-out.
On the basis of the conveyance control method of the continuous sheet, preferably,
Above-mentioned first delivery section is ribbon conveyer.
Using the conveyance control method of this continuous sheet, can precision carry out well continuous sheet conveying control and Cut-out.
On the basis of the conveyance control method of the continuous sheet, preferably,
From that end by above-mentioned cutting part side of the part contacted with above-mentioned ribbon conveyer of above-mentioned continuous sheet to upper State the part carried by the sheet material supporting part relative with above-mentioned cutting part of continuous sheet by above-mentioned belt conveying pusher side that The length on above-mentioned conveying direction at end, the full-length than cutting the single sheet of material obtained after above-mentioned continuous sheet are small.
Using the conveyance control method of this continuous sheet, can precision carry out well continuous sheet conveying control and Cut-out.
On the basis of the conveyance control method of the continuous sheet, preferably,
When obtaining above-mentioned runout information, the above-mentioned display elements being located on above-mentioned continuous sheet are entered using detection means Row detection, so as to obtain above-mentioned runout information,
From above-mentioned continuous sheet by the position that above-mentioned detection means detect to above-mentioned continuous sheet by with above-mentioned cutting The length on above-mentioned conveying direction at that end by above-mentioned belt conveying pusher side of the part of the relative sheet material supporting part carrying in portion Degree, than cut the single sheet of material obtained after above-mentioned continuous sheet full-length it is 2 times small.
Using the conveyance control method of this continuous sheet, can precision carry out well continuous sheet conveying control and Cut-out.
On the basis of the conveyance control method of the continuous sheet, preferably, above-mentioned continuous sheet
Conveyance control method also have:
Towards above-mentioned cutting part convey above-mentioned continuous sheet when, by above-mentioned first delivery section, above-mentioned second delivery section and The 3rd delivery section being arranged on above-mentioned conveying direction between above-mentioned first delivery section and above-mentioned elastic adjustment portion is conveyed,
Transporting velocity of above-mentioned 3rd delivery section to above-mentioned continuous sheet is changed based on above-mentioned runout information.
Using the conveyance control method of this continuous sheet, the conveying of the stabilization of continuous sheet can be carried out.
On the basis of the conveyance control method of the continuous sheet, preferably,
The conveyance control method of above-mentioned continuous sheet also has:Above-mentioned first delivery section is arranged on above-mentioned conveying direction Adhesive applicating portion between above-mentioned 3rd delivery section is by adhesive applicating to above-mentioned continuous sheet.
, being capable of stably adhesive-applying using the conveyance control method of this continuous sheet.
On the basis of the conveyance control method of the continuous sheet, preferably,
When obtaining above-mentioned runout information, the above-mentioned display elements being located on above-mentioned continuous sheet are carried out using video camera Shooting, above-mentioned runout information is obtained based on the above-mentioned display elements photographed.
Using the conveyance control method of this continuous sheet, can precision carry out well continuous sheet conveying control and Cut-out.
Secondly, a kind of shearing device, the device is the shearing device of the continuous sheet of absorbent commodity, it is characterised in that
Above-mentioned shearing device includes:
Cutting part, above-mentioned cutting part are cut between display elements to the above-mentioned continuous sheet for being provided with the display elements repeatedly Cut;
First delivery section, above-mentioned first delivery section convey above-mentioned continuous sheet along conveying direction towards above-mentioned cutting part;
Second delivery section, above-mentioned second delivery section are arranged on above-mentioned conveying direction than the above-mentioned top trip of first delivery section The position of side, above-mentioned continuous sheet is conveyed along above-mentioned conveying direction;
Elastic adjustment portion, above-mentioned elastic adjustment portion are arranged on above-mentioned first delivery section and above-mentioned the on above-mentioned conveying direction Between two delivery sections;
Runout information obtaining section, above-mentioned runout information obtaining section are used to obtain what above-mentioned display elements deviateed from reference position Runout information;
Positional information obtaining section, above-mentioned positional information obtaining section are used for the positional information for obtaining above-mentioned elastic adjustment portion;
Control unit, above-mentioned control unit change above-mentioned first based on the runout information obtained by above-mentioned runout information obtaining section Delivery section is to the transporting velocity of above-mentioned continuous sheet, based on the runout information obtained by above-mentioned runout information obtaining section and by upper The positional information of positional information obtaining section acquirement is stated, changes transporting velocity of above-mentioned second delivery section to above-mentioned continuous sheet.
Using this shearing device, it is possible to increase the fast-response of the conveying control of continuous sheet.
Summary on the disposable diaper of present embodiment
As the disposable diaper of one of the absorbent commodity of present embodiment, for the disposable urine of belt (style of opening) Cloth (hereinafter also referred to as diaper 1).
Fig. 1 is the vertical view of the deployed condition (referring to the state that diaper 1 is stretched as to no fold) of the diaper 1 of present embodiment Figure.Fig. 2A~Fig. 2 C are the decomposition explanation figures of each several part of the diaper 1 of present embodiment.Fig. 2A is the decomposition explanation figure of front portion 3. Fig. 2 B are the decomposition explanation figures of lower crotch 5.Fig. 2 C are the decomposition explanation figures at rear portion 7.
The diaper 1 of present embodiment is as shown in figure 1, including front portion 3, lower crotch 5 and rear portion 7.Front portion 3 is to be located at wearer Front portion (veutro) part (body encloses portion).In addition, rear portion 7 is positioned at the part (body encloses portion) at the rear portion (dorsal part) of wearer. Lower crotch 5 is the part between front portion 3 and rear portion 7.
In the following description, all directions are defined as illustrated in fig. 1.That is, by from front portion 3, posteriorly 7 directions gone are set to " article length direction L ", the direction intersected with article length direction L is set to " product width W ".CL shown in Fig. 1 is Represent the line in the center (being set to diaper center CL) of the diaper 1 on article length direction L.In addition, as shown in Fig. 2 will be with product The direction that length direction L and product width W intersects is set to " thickness direction ", and the side of the skin of wearer is set to " skin side ", the opposite side of the skin side is set to " non-skin side ".
Diaper 1 include absorber 21, upper piece 22, leakage prevention sheet 23, backsheet 24, skin lateral plate 26, waist rugate thin film 28, Magic tape 30 and object tape 29.
Absorber 21 is used to absorb liquid.That is, absorber 21 is that the liquid-absorbent that will can absorb the excretas such as urine is former The component (absorbent core) that the bed of material is folded and forms, spread all over front portion 3, lower crotch 5 and the configuration of the ground of rear portion 7.Fig. 1's uses shadow part table The region shared by region representation absorber 21 shown.
Absorber 21 has rectangular shape.But the shape of absorber 21 is not limited to the shape shown in Fig. 1.In addition, Absorber 21 is arranged at lower crotch 5.
Absorber 21 is wrapped up by the core pack piece 25 being made up of liquid-permeable sheet (non-woven fabrics), in a thickness direction by upper piece 22 Hes Leakage prevention sheet 23 clips configuration.As the liquid-absorbent raw material for forming absorber 21, such as the liquid such as paper pulp fiber can be used The liquid-absorbent shot-like particle such as absorbency fiber, superabsorbent polymer.Alternatively, it is also possible to containing except liquidabsorbing fibres with And the liquid-absorbent raw material beyond liquid-absorbent shot-like particle.
Upper piece 22 be disposed on absorber 21 skin side liquid permeability component.
Leakage prevention sheet 23 is disposed on the liquid-impermeable component of the non-skin side of absorber 21.In addition, in the leakage prevention sheet 23 Non-skin side be printed with the display elements such as cartoon pattern.
Backsheet 24 is the component (extraneous adornment piece) of the extraneous adornment for the non-skin side for forming diaper 1, such as by nonwoven Cloth is formed.Backsheet 24 (reference picture 2A~Fig. 2 C) is configured with the non-skin side of leakage prevention sheet 23.
In addition, the product width W of diaper 1 both sides and rear portion 7 are provided with hem 14.The hem 14 is led To be made up of (reference picture 2C) skin lateral plate 26 and backsheet 24.Skin lateral plate 26 is to spread all over front portion 3, lower crotch 5 and rear portion 7 The component of the skin side of formation, such as be made up of non-woven fabrics.Skin lateral plate 26 and form leg side described later gauffer 16 (equivalent to Three-dimensional gauffer) component, the position in the outside of skin lateral plate 26 forms hem 14.
In addition, the end edge portion in the formation leg-openings portion of diaper 1 has along the article length side along article length direction L A pair of the leg creases 15 (calf circumference pars contractilis) stretched to L.In the present embodiment, the leg creases 15 are by being arranged on skin side Rubber covered wire between piece 26 and backsheet 24 is formed, and the rubber covered wire invests retractility to skin lateral plate 26 and backsheet 24.Separately Outside, the rubber covered wire is set to rear portion 7 on the L of article length direction from front portion 3.In addition, leg creases 15 are not limited to by rubber Line is formed, such as can also be made up of stretchable sheet (film).
In addition, on product width W, have in the position than leg creases 15 in the inner part along article length direction L There are a pair of the leg side gauffers 16 to be stretched along article length direction L.The leg side gauffer 16 is used to prevent the clearance lenkage from calf circumference, main To be made up of the position of the inner side of skin lateral plate 26.
Leg side gauffer 16 (skin lateral plate 26) is at the end junction surface 17 at the both ends on the L of article length direction (in Fig. 1 In be rectangle part) engagement.In addition, between a pair of end junction surface 17 part (it is following, for convenience of explanation, referred to as main part 18) there was only the Outboard Sections engagement (being referred to as main body junction surface 18a) on product width W.Therefore, the main part 18 is by a pair End junction surface 17 and main body junction surface 18a are surrounded and are formed as pocket-like, and are erected using main body junction surface 18a as fulcrum.In addition, Inboard portion on the product width W of main part 18 is provided with rubber covered wire 19, so the inboard portion has retractility. So, leg side gauffer 16 is same with leg creases 15 by holding junction surface 17 and main part 18 to form, on the L of article length direction Set from front portion 3 to rear portion 7.
In addition, it is configured with waist rugate thin film 28 (reference picture 2C) between the absorber 21 at rear portion 7 and backsheet 24.Should Waist rugate thin film 28 is the component along the product width W bandings stretched.Waist rugate thin film 28 is assigned to the grade of backsheet 24 With retractility, so as to form waist gauffer.The product width W of waist rugate thin film 28 length is longer than absorber 21.Cause This, waist gauffer is protruding outside formation of the self-priming acceptor 21 again to product width W.
A pair of magic tapes 30 are fixed on the hem 14 at rear portion 7 using fixed part 32.In the present embodiment, by magic tape 30 part, which sandwiches, to be formed between the skin lateral plate 26 of hem 14 and backsheet 24 (reference picture 2C), so as to install thread gluing Band 30.
Magic tape 30 includes fixation portions 32 and joint portion 31.Also, by making the joint portion 31 and target described later Band 29 combines, and can enable a wearer to put on diaper 1.In addition, the width on the article length direction L of fixed part 32 is than joint portion 31 Width on the L of article length direction is big.Also, in the present embodiment, the part in joint portion 31 has velcro.
Object tape 29 is configured in the non-skin side (reference picture 2A) of the backsheet 24 of front portion 3.Object tape 29 is energy and thread gluing Formed with 30 components combined, such as by non-woven fabrics.In addition, the object tape 29 of present embodiment as shown in figure 1, be formed as along Product width W rectangular component.
Manufacture device 50 on diaper 1
Next, illustrate the manufacture device 50 of above-mentioned diaper 1.
In the present embodiment, the leakproof plate substrate 100 to strip sheet is cut, by the leakproof plate substrate after cutting 100 are bonded with the back plate substrate 110 of strip sheet.Also, further by object tape base material and the leakage prevention sheet to fit together Base material 100 and back plate substrate 110 are bonded.Also, make (absorber 21, upper plate substrate and the skin side chip base such as other base materials Material etc.) base material that is fit together with above-mentioned three is bonded, finally cut into article shape.
Hereinafter, part (the cut-out dress that leakproof plate substrate 100 is cut in manufacture device 50 is mainly illustrated using Fig. 3 and Fig. 4 Put).Fig. 3 is the schematic diagram of a part for the manufacture device 50 for representing diaper 1.Fig. 4 is the one of the manufacture device 50 for representing diaper 1 Partial block diagram.Fig. 5 is the schematic diagram for the appearance for representing cutter 61a cutting leakproofs plate substrate 100.
Manufacture device 50 (shearing device) includes supply unit 52, cutting roller 61 (equivalent to cutting part), anvil roller 62 (quite In sheet material supporting part), adhesive applicating portion 63, elastic adjustment unit 64, controller 70 and detector group.
Supply unit 52 is the unit for conveying leakproof plate substrate 100, has along conveying direction and conveys leakproof plate substrate 100 The delivery section 58 of first delivery section the 54~the 3rd and multiple free rolls (driven voller).In addition, leakproof plate substrate volume 100 is (not shown) On spool, when conveying leakproof plate substrate 100 using supply unit 52, leakproof plate substrate 100 is continuously released from spool.
First delivery section 54 is that the delivery section of leakproof plate substrate 100 is conveyed along conveying direction towards cutting roller 61.This first Delivery section 54 is arranged on the upstream side of cutting roller 61 and close to the front side of cutting roller 61 in the conveying direction.
First delivery section 54 is that the belt of the leakproof plate substrate 100 is conveyed in the state of being contacted with leakproof plate substrate 100 Conveyer, including driven by motor (not shown) the first driven roller 54a, in the conveying direction be located at than first driven roller First driven voller 54b of the position of 54a downstreams and the band being erected on the first driven roller 54a and the first driven voller 54b 54c.Also, the first driven roller 54a by making to be driven using motor is rotated, band 54c is moved, and thus conveying with 54c with connecing Tactile leakproof plate substrate 100.In addition, the first delivery section 54 of present embodiment is suction conveyer, so as to contacted with 54c Leakproof plate substrate 100 is adsorbed in the state with 54c and conveys the leakproof plate substrate 100.
Second delivery section 56 is arranged in the conveying direction to be leaned on than the first delivery section 54 and the 3rd delivery section 58 described later The position of upstream side, it is the delivery section along conveying direction conveying leakproof plate substrate 100.Second delivery section 56 is in the conveying direction It is arranged on the upstream side of elastic adjustment unit 64 (elastic adjustment portion 65) and close to the front side of the elastic adjustment unit 64.
Second delivery section 56 includes the second driven roller 56a driven by motor (not shown), and is configured to across leakproof The second driven voller 56b relative with second driven roller 56a of plate substrate 100.Also, second by making to drive using motor Driven roller 56a rotates, and conveys the leakproof plate substrate 100 contacted with the second driven roller 56a.
(in other words, 3rd delivery section 58 is arranged between the first delivery section 54 and the second delivery section 56 in the conveying direction Between first delivery section 54 and elastic adjustment unit 64 (elastic adjustment portion 65)), it is along conveying direction conveying leakproof plate substrate 100 Delivery section.3rd delivery section 58 is arranged on the upstream side in adhesive applicating portion 63 and close to the bonding agent in the conveying direction The front side of coated portion 63.
3rd delivery section 58 and the second delivery section 56 are same, also include the 3rd driven roller driven by motor (not shown) 58a, and be configured to across the threeth driven voller 58b relative with the 3rd driven roller 58a of leakproof plate substrate 100.Also, by making Rotated using the 3rd driven roller 58a of motor driving, convey the leakproof plate substrate 100 contacted with the 3rd driven roller 58a.
Cutting roller 61, which is used to that the leakproof plate substrate 100 of strip sheet that comes will to be conveyed using supply unit 52, to be cut, generation The leakproof plate substrate 100 of billet sheet.Here, for convenience of explanation, the leakproof plate substrate 100 of strip sheet is referred to as continuous anti- Dropping fraction 102 (equivalent to continuous sheet), the leakproof plate substrate 100 of the billet sheet after cutting is referred to as individual leakage prevention sheet 104. Above-mentioned display elements are provided with repeatedly on continuous leakage prevention sheet 102, and cutting roller 61 enters between the display elements to continuous leakage prevention sheet 102 Row cutting.In addition, " being cut between display elements to continuous leakage prevention sheet 102 " is not necessarily referring to be printed with display elements Part cut.
Cutting roller 61 has cutter 61a, and anvil roller 62 is configured to relative across leakproof plate substrate 100 with cutting roller 61. That is leakproof plate substrate 100 is located at the clearance G of cutting roller 61 and anvil roller 62.In addition, cutter 61a is with the length of cutter Mode of the degree direction along rotation direction of principal axis is arranged on the outer peripheral face of cutting roller 61.
Cutting roller 61 and anvil roller 62 can be driven and rotate by motor (not shown) respectively.In addition, both rotations Direction of principal axis is parallel.
Sustainable utilization supply unit 52 conveys continuous leakage prevention sheet 102 in the state of being rotated in cutting roller 61 and anvil roller 62 When, being located at for continuous leakage prevention sheet 102 is more progressively longer by the length of the part of the position of conveyance direction downstream side than above-mentioned clearance G, Soon, cutter 61a reaches above-mentioned clearance G (that is, the position relative with anvil roller 62) (reference picture because of the rotation of cutting roller 61 5).Also, cutter 61a cuts continuous leakage prevention sheet 102 when reaching the clearance G and generates individual leakage prevention sheet 104.
Individual leakage prevention sheet 104 of the carrying generation of anvil roller 62, is moved to individual leakage prevention sheet 104 and is closed with back plate substrate 110 The interflow position C of stream, and individual leakage prevention sheet 104 is fixed on back plate substrate 110 in interflow position C.That is, generation Individual leakage prevention sheet 104 is moved with the state being positioned on anvil roller 62 with the rotation of anvil roller 62, is reached and back chip base soon The interflow position C that material 110 collaborates.Also, in the interflow position, individual leakage prevention sheet 104 is set to be bonded with back plate substrate 110.
In addition, in the present embodiment, the girth of anvil roller 62 is set as to 2 times of the girth of cutting roller 61.In addition, by anvil A semi-perimeter (girth of cutting roller 61) for roller 62 is set as the length on the article length direction L with 1 sheet articles (diaper 1) (represent this length with reference L1.In other words, the length on the article length direction L of backsheet 24) it is identical.
Thus, in a period of cutting roller 61 rotates 1 week (half revolution of anvil roller 62), carry out to 1 sheet articles (diaper 1) The back plate substrate 110 of length L1 amounts fixes the action of individual leakage prevention sheet 104.Thus, when cutting connects under the state shown in fig. 5 During continuous leakage prevention sheet 102 so that continuous leakage prevention sheet 102 from front end E1 to cutting position (being in other words the position of clearance G) it is defeated Send the length on direction to reach the length of the leakage prevention sheet 23 in 1 sheet articles (diaper 1) and (represent this length with reference L2.When So, L2 size is smaller than L1) mode convey continuous leakage prevention sheet 102.
In addition, equally just to cut (the continuous leakage prevention sheet of leakproof plate substrate 100 whenever the length L2 that delivered leakage prevention sheet 23 102) imagination is manufactured.That is, will be above-mentioned in a manner of the segmentation unit length for making continuous leakage prevention sheet 102 reaches length L2 Display elements are printed onto on continuous leakage prevention sheet 102 repeatedly.In other words, with the typographical display element (reference repeatedly of length L2 pitch Fig. 6 upper figure).
Adhesive applicating portion 63 is used to leakproof plate substrate 100 (individual leakage prevention sheet 104) will be made to be bonded to back plate substrate 110 Bonding agent, be coated on leakproof plate substrate 100 (continuous leakage prevention sheet 102).The adhesive applicating portion 63 is set in the conveying direction Put between the first delivery section 54 and the 3rd delivery section 58.In other words, adhesive applicating portion 63 is arranged in the conveying direction The downstream of three delivery sections 58 and close to the rear side of the 3rd delivery section 58.In addition, the adhesive applicating portion 63 of present embodiment Hot-melt adhesive is coated on leakproof plate substrate 100.
Elastic adjustment unit 64 is used to act synergistically with the second above-mentioned delivery section 56 and controls of leakproof plate substrate 100 Power (tension).Elastic adjustment unit 64 includes elastic adjustment portion 65 and positional information obtaining section 66.
The position (being the position on above-below direction in the present embodiment) of elastic adjustment portion 65 can change.That is, it is elastic Adjustment portion 65 can move along the vertical direction.In addition, elastic adjustment portion 65 is arranged on the first delivery section 54 and in the conveying direction Between two delivery sections 56.
Positional information obtaining section 66 is used for the positional information for obtaining elastic adjustment portion 65.The positional information of present embodiment takes Obtain the position-detection sensor that portion 66 is the position on the above-below direction for detect elastic adjustment portion 65.
In addition, about how control tension force, see below.
Controller 70 is the control unit (control unit) for being used to control manufacture device 50 (shearing device).Controller 70 includes CPU and memory etc..CPU is the arithmetic processing apparatus for being used to control manufacture device 50 (shearing device) overall.Memory is used for Ensure region and operating area that CPU program storage is got up etc..Programme-control each lists of the CPU according to storage in memory Member.
Testing result is output in controller 70 by detector group.The detection knot that controller 70 is exported based on self-detector group Fruit, control each unit.In the present embodiment, as the detector group, provided with the display member to being located on continuous leakage prevention sheet 102 The video camera 72 that element is detected.In addition, about how video camera 72 is used, see below.In addition, above-mentioned elastic adjustment unit A part in 64 (positional information obtaining sections 66) and detector group.
Control on conveying of the supply unit 52 to leakproof plate substrate 100
Next, illustrate the control of conveying of the supply unit 52 to leakproof plate substrate 100 using Fig. 6 and Fig. 7.Fig. 6 is For illustrating explanation figure the problem of being related to the cutting of leakproof plate substrate 100.Fig. 7 is the conveying control for representing leakproof plate substrate 100 The figure of the flow chart of system.First, the control of conveying carried out by the first delivery section 54 and the 3rd delivery section 58 is illustrated, then again Illustrate the control of conveying carried out by the second delivery section 56.
Conveying on the first delivery section 54 and the 3rd delivery section 58 controls
In addition, as described above, (continuously to prevent whenever the length L2 that delivered leakage prevention sheet 23 just cuts leakproof plate substrate 100 Dropping fraction 102) imagination be designed.That is, will in a manner of the segmentation unit length for making continuous leakage prevention sheet 102 reaches length L2 Above-mentioned display elements are printed onto on continuous leakage prevention sheet 102 repeatedly.In other words, with length L2 pitch, typographical display is first repeatedly Element.
But because leakproof plate substrate 100 is rolled up on spool, so the leakproof chip base of the radially inner side positioned at spool Material 100 is wound by consolidation, and the leakproof plate substrate 100 positioned at radial outside is wound with being relaxed.Consequently, it can happen segmentation is single Bit length (pitches of display elements) is in the radially inner side phenomenon different with radial outside.That is, leakproof plate substrate 100 is somewhat stretched Contracting, its telescopic level is different with radial outside in radially inner side, so there occurs above-mentioned this phenomenon.
In addition, not being the state on spool in leakproof plate substrate 100, but continuously it is released and conveys from spool When, it can also produce above-mentioned this phenomenon.I.e., now, leakproof plate substrate 100 is accelerated or slows down, so to leakproof plate substrate 100 Drag force it is different because of the acceleration or deceleration.Particularly, the leakproof plate substrate 100 in volume on spool is used up and just changed Into after new leakproof plate substrate, the state of self-stopping technology accelerates to leakproof plate substrate 100 suddenly, so being applied with stronger pulling Power.So, because unit length (pitches of display elements) can also occur to split for the acceleration or deceleration of leakproof plate substrate 100 because of place Different and different phenomenon.
The appearance of leakproof plate substrate 100 when in Fig. 6 upper figure representing that above-mentioned phenomenon does not occur.In the leakproof plate substrate On 100, segmentation unit length, the pitch of display elements are fixed (length L2) in any place.In addition, in order that figure simplifies To facilitate explanation, display elements are represented with the bullet of the central portion positioned at segmentation unit and double circles of open circles.
On the other hand, represent that there occurs the appearance of the leakproof plate substrate 100 during the phenomenon in Fig. 6 figure below.It is anti-at this On dropping fraction base material 100, the pitch for splitting unit length and display elements gradually increases from right to left.In addition, display elements are in itself And from right to left, increase relative to deviation when above-mentioned phenomenon not occurring.In addition, Fig. 6 is the mental map understood for convenience, It is different from the appearance of reality.
Here, as represented in above-mentioned example, when being cut to continuous leakage prevention sheet 102, continuous leakproof The length from front end E1 to cutting position on the conveying direction of (clearance G) of piece 102 needs to reach defined length, i.e. needs Reach the length L2 of the leakage prevention sheet 23 in 1 sheet articles (diaper 1).Thus, in the case where above-mentioned phenomenon does not occur, in order to reach Length L2, the first delivery section 54 (the 3rd delivery section 58) of setting is to the transporting velocity of continuous leakage prevention sheet 102.It is for example, false If transporting velocity is at the uniform velocity, in the situation that the time after continuous leakage prevention sheet 102 is cut untill cutting next time is the T seconds Under, transporting velocity is set as L2/T.
But in the case of there occurs above-mentioned phenomenon, if enter to exercise the past end E1 to clearance G be always length L2 that The conveying of sample, then as shown in the arrow upward of Fig. 6 figure below, it can no longer carry out appropriate cutting.
So, in the present embodiment, runout information obtaining section is (in the present embodiment by above-mentioned video camera 72 and above-mentioned Controller 70 is formed) runout information that display elements deviate from reference position is obtained, the runout information based on acquirement changes first Transporting velocity of the delivery section 58 of delivery section 54 and the 3rd to continuous leakage prevention sheet 102.
The flow chart of reference picture 7 illustrates.First, above-mentioned video camera 72 shooting display elements are utilized on defined opportunity (step S1).The entirety of display elements can be shot, a part for display elements can also be shot.Here, based on will be located at point The bullet for cutting the central portion of unit illustrates as the example of reference object.In addition, as the opportunity, as long as periodicity (fixed) opportunity, as one, following example can be enumerated, i.e. be provided for cutter 61a close to above-mentioned The proximity transducer that gap G etc. situation is detected, the signal based on the proximity transducer are shot.In addition, runout information Obtaining section (video camera 72) as shown in figure 3, be pointed to continuous leakage prevention sheet 102 with the first delivery section 54 (that is, ribbon conveyer) Display elements on the part of contact are detected.
Then, shooting result (display elements photographed) is output to controller 70 (step S3) by video camera 72, control Device 70 analyzes image (step S5).Also, controller 70 obtains display elements (bullet) from benchmark position by the analysis of image Put (that is, do not occur display elements (bullet) during above-mentioned phenomenon should position) runout information (step S7) that deviates.At this In embodiment, obtain when conveying direction is set as into just (+) direction, display elements (bullet) exist relative to reference position How many (biases) is deviate from+(-) direction, is used as runout information.
Then, controller 70 is based on the runout information obtained by runout information obtaining section, change the first delivery section 54 and Transporting velocity (step S9) of 3rd delivery section 58 to continuous leakage prevention sheet 102.In addition, by the transporting velocity of the first delivery section 54 and The transporting velocity of 3rd delivery section 58 controls as same speed all the time.
For example, when display elements (bullet) deviate from a amount relative to reference position on-direction (than benchmark position Put situation about delaying), the first delivery section 54 (the 3rd delivery section 58) is set into (rising) to the transporting velocity of continuous leakage prevention sheet 102 To make the length from front end E1 to cutting position on the conveying direction of (clearance G) of continuous leakage prevention sheet 102 reach L2+a.For example, Assuming that transporting velocity is at the uniform velocity, in the situation that the time after continuous leakage prevention sheet 102 is cut untill cutting next time is the T seconds Under, transporting velocity is set as (L2+a)/T.On the contrary, display elements (bullet) relative to reference position on+direction partially During amount from a (situation about shifting to an earlier date than reference position), by the first delivery section 54 (the 3rd delivery section 58) to continuous leakage prevention sheet 102 Transporting velocity set (decline) as, make continuous leakage prevention sheet 102 from front end E1 to cutting position on the conveying direction of (clearance G) Length reach L2-a.
In addition, in this example, the bias a of acquirement and the amount a added and subtracted with L2 phases are set as identical value, but the present invention This is not limited to, both can also be set as different amounts.
In addition, as runout information, the example for obtaining bias has been enumerated, but bias can not also be obtained, but only Only obtain be+or-(be in advance or delay) information.Also, at this point it is possible to+in the case of, fixation is cut from L2 Value (the same value) ,-in the case of, to L2 plus fixed value (the same value).
Alternatively, it is also possible to bias a given thresholds, in the case of more than threshold value, be added or subtract each other with L2.Separately Outside, the average value for the bias that can also be obtained over several times, based on the average value tried to achieve, it is added or subtracts each other with L2.
It is also, continuous with revised length (such as L2+a or L2-a) cutting when cutter 61a reaches the clearance G Leakage prevention sheet 102, generate individual leakage prevention sheet 104 (step S11) corresponding with the variation of segmentation unit length.
Conveying on the second delivery section 56 controls
Conveying on the second delivery section 56 controls, and illustrates comparative example first, then puts off until some time later bright example of the present invention.
Comparative example
Second delivery section 56 conveys leakproof plate substrate 100 along conveying direction, as described above, being arranged on elastic adjustment unit 64 The upstream side of (elastic adjustment portion 65) and close to the front side of the elastic adjustment unit 64, the second delivery section 56 and elastic adjustment unit 64 act synergistically and control the tension force (tension) of leakproof plate substrate 100.That is, the positional information of elastic adjustment unit 64 obtains Portion 66 (position-detection sensor) exports to controller 70 positional information of acquired elastic adjustment portion 65 on defined opportunity. Also, controller 70 changes transporting velocity of second delivery section 56 to continuous leakage prevention sheet 102 based on the positional information.For example, control Device 70 processed changes above-mentioned transporting velocity so that elastic adjustment portion 65 is located at defined reference position.Elastic adjustment portion 65 be located at than In the case of the high position in reference position, transporting velocity is set to increase, so that elastic adjustment portion 65 declines.On the contrary, in elastic regulation In the case that portion 65 is located at the position lower than reference position, decline transporting velocity, so that elastic adjustment portion 65 rises.Thus, The tension force (tension) of leakproof plate substrate 100 can be controlled.
Example of the present invention
In a comparative example, controller 70 changes the first delivery section based on the runout information obtained by runout information obtaining section 54 and the 3rd delivery section 58 to the transporting velocity of continuous leakage prevention sheet 102, but the second delivery section 56 is not carried out to be based on the deviation The control of information.
In this case, such as being based on runout information in controller 70 makes the first delivery section 54 and the 3rd delivery section 58 right When the transporting velocity of continuous leakage prevention sheet 102 rises, elastic adjustment portion 65 is gradually increasing, so above-mentioned tension force (tension) Control (that is, make the second delivery section 56 transporting velocity rise so that elastic adjustment portion 65 decline control) play a role.Separately On the one hand, first delivery section 54 and the 3rd delivery section 58 are made to continuous leakage prevention sheet 102 based on runout information in controller 70 When transporting velocity have dropped, elastic adjustment portion 65 is gradually reduced, so the control of above-mentioned tension force (tension) (that is, makes second The transporting velocity of delivery section 56 declines so that the control that elastic adjustment portion 65 rises) play a role.
But in this control, there are the following problems, i.e. changes the first delivery section from controller 70 based on runout information 54 and the 3rd delivery section 58 to changing the in order to control tension force (tension) after the transporting velocity of continuous leakage prevention sheet 102 Untill the control of the transporting velocity of two delivery sections 56 plays a role, the time is expended, the fast-response of control is not sufficiently good.
So, in the present embodiment, controller 70 is based not only on the positional information of elastic adjustment portion 65, is also based in addition Runout information changes transporting velocity (step S9) of second delivery section 56 to continuous leakage prevention sheet 102.For example, in display elements When (bullet) deviate from a amount relative to reference position edge-direction, controller 70 not only makes the first delivery section 54 and the 3rd Delivery section 58 rises to the transporting velocity of continuous leakage prevention sheet 102, and makes conveying of second delivery section 56 to continuous leakage prevention sheet 102 Speed similarly rises (such as rising a/T amount).On the other hand, display elements (bullet) relative to reference position along+ When direction deviate from a amount, controller 70 not only makes the first delivery section 54 and the 3rd delivery section 58 to continuous leakage prevention sheet 102 Transporting velocity declines, and the second delivery section 56 is similarly declined the transporting velocity of continuous leakage prevention sheet 102 and (such as decline a/ T amount).In addition, the conveying control of the second delivery section 56 based on positional information is performed in the same manner as comparative example.
When so arranged, controller 70 can make the first delivery section 54 and the 3rd delivery section 58 to continuous leakage prevention sheet 102 transporting velocity rises the opportunity of (decline), the transporting velocity of the second delivery section 56 is risen (decline).Therefore, compared with Example is compared, it is possible to increase conveys the fast-response of control.
On the shearing device of present embodiment and the validity of conveyance control method
In the present embodiment, controller 70 is believed based on the runout information obtained by runout information obtaining section and by position The positional information that obtaining section 66 obtains is ceased, changes transporting velocity of second delivery section 56 to above-mentioned continuous sheet.
Therefore, as described above, it is possible to increase the fast-response of the conveying control of continuous leakage prevention sheet 102.
In addition, to convey this in the state of being contacted with continuous leakage prevention sheet 102 continuous for the first delivery section 54 of present embodiment Leakage prevention sheet 102, runout information obtaining section be pointed to continuous leakage prevention sheet 102 (when obtaining runout information) with the first delivery section 54 Display elements on the part of contact are detected, so as to achieve runout information.
Runout information obtaining section can also be pointed to continuous leakage prevention sheet 102 not with it is aobvious on the part of any location contacts Show that element is detected, but in this case, because continuous leakage prevention sheet 102 rocks, it is possible that can not precision well Obtain runout information.On the other hand, in the present embodiment, the display elements on the part for the stabilization for being pointed to continuous leakage prevention sheet 102 Detected, thus can precision obtain runout information well.Therefore, also can precision carry out continuous leakage prevention sheet 102 well Conveying control and cut-out.
In addition, in the present embodiment, as described above, runout information obtaining section (video camera 72) is pointed to continuous leakage prevention sheet Display elements on 102 part contacted with the first delivery section 54 are detected, so the runout information obtaining section is with cutting It is separated to cut roller 61.Thus, the segmentation unit in the continuous leakage prevention sheet 102 of the step S1 display elements photographed is printed with step Rapid S11 is not to be cut and (turn into individual leakage prevention sheet 104 after step S11 cuttings), but in the conveying direction than the segmentation (downstream) the segmentation unit of unit (for convenience of explanation, referred to as shooting segmentation unit) in advance (for convenience of explanation, is referred to as Cut-out segmentation unit) turn into individual leakage prevention sheet 104.As described above, segmentation unit length is to change, but the change of the variation Degree is generally slow, and the variation and the variation of cut-out segmentation unit of shooting segmentation unit are not significantly to change.Thus, even if should It is inconsistent that unit is split in shooting segmentation unit and the cut-out, will not also produce problem (because not will be in 1mm also not The extremely tight cut-out as wrong position is cut off is understood as target).But shooting segmentation unit and the cut-out It is preferably as far as possible close to split unit.
So, in the present embodiment, it is ribbon conveyer to make the first delivery section 54.It is that belt is defeated in the first delivery section 54 In the case of sending machine, as shown in figure 3, the first delivery section 54 can be formed as to the elongated shape along conveying direction, so can make First delivery section 54 (ribbon conveyer) is easily close to cutting roller 61.
Therefore, runout information obtaining section (video camera 72) also can close to cutting roller 61, so as to make shooting segmentation unit with Cut-out segmentation unit approaches.Thus, it is possible to precision carries out the conveying control and cut-out of continuous leakage prevention sheet 102 well.
In addition, in the present embodiment, thus achieve:Make being contacted with ribbon conveyer from continuous leakage prevention sheet 102 Partial end E2 (reference picture 3) the leaning on to the part carried by anvil roller 62 using continuous leakage prevention sheet 102 by the side of cutting roller 61 The end E3 of belt conveying pusher side (is in the present embodiment, to be located to lean on the conveying direction upstream side position of some than above-mentioned clearance G Position, reference picture 3 and Fig. 5) length in the conveying direction, it is more anti-than cutting individual that obtain after continuous leakage prevention sheet 102 The full-length (that is, length L2 when above-mentioned phenomenon not occurring) of dropping fraction 104 is small.
Accordingly, it is capable to make runout information obtaining section (video camera 72) close to cutting roller 61, so as to make shooting segmentation unit with Cut-out segmentation unit approaches.Thus, it is possible to precision carries out the conveying control and cut-out of continuous leakage prevention sheet 102 well.
In addition, in the present embodiment, equally realize:Make the detected component (video camera from continuous leakage prevention sheet 102 72) the position D (reference picture 3) of detection leans on belt conveying pusher side to the part carried by anvil roller 62 of continuous leakage prevention sheet 102 E3 length in the conveying direction is held, than the full-length for cutting individual leakage prevention sheet 104 obtained after continuous leakage prevention sheet 102 (that is, length L2's when above-mentioned phenomenon not occurring) is 2 times small.
Accordingly, it is capable to make runout information obtaining section (video camera 72) close to cutting roller 61, so as to make shooting segmentation unit with Cut-out segmentation unit approaches.Thus, it is possible to precision carries out the conveying control and cut-out of continuous leakage prevention sheet 102 well.
In addition, in the present embodiment, runout information obtaining section (when obtaining runout information) is set for 72 pairs using video camera Display elements on continuous leakage prevention sheet 102 are shot, and runout information is achieved based on the display elements photographed.
Therefore, instant playback element is complicated, also can suitably obtain runout information.Thus, also can precision carry out well The conveying control and cut-out of continuous leakage prevention sheet 102.
Other embodiment
Above-mentioned embodiment is used to be readily appreciated that the present invention, explains the present invention with being not intended to limit.Energy of the present invention Changed and improved with enough not departing from purport, and the present invention includes the equivalent of the present invention certainly.
In the above-described embodiment, the continuous sheet as absorbent commodity, it is (continuous anti-to illustrate leakproof plate substrate 100 Dropping fraction 102), but the present invention is not limited to this, as long as the continuous sheet of absorbent commodity, can be arbitrary thing Product.
In addition, in the above-described embodiment, have and be arranged on the first delivery section 54 and elastic adjustment portion in the conveying direction Between 65, and convey along conveying direction the 3rd delivery section 58 of continuous leakage prevention sheet 102.Also, controller 70 is based on by deviateing The runout information that information acquiring section obtains changes transporting velocity of the 3rd delivery section 58 to continuous leakage prevention sheet 102.
But the present invention is not limited to this, the 3rd delivery section 58, which can also be not present, (to be not required to set the 3rd conveying Portion 58).
But it should be noted that when the feelings between the first delivery section 54 and elastic adjustment portion 65 with the 3rd delivery section 58 Under condition, it can also stablize in the case of even if distance be present to the first delivery section 54 and elastic adjustment portion 65 and convey continuous leakage prevention sheet 102 aspect, preferably above-mentioned embodiment.
In addition, in this case, as shown in figure 3, it is preferred that in the conveying direction in the first delivery section 54 and the 3rd delivery section It is provided between 58 for by the adhesive applicating portion 63 on adhesive applicating to continuous leakage prevention sheet 102.
In this case, due to being the adhesive-applying on the continuous leakage prevention sheet 102 for the conveying stablized, so can Stably adhesive-applying.
In addition, in the above-described embodiment, runout information obtaining section is continuous to being located at using detection means (video camera 72) Display elements on leakage prevention sheet 102 are detected, so as to achieve the runout information that display elements deviate from reference position, but this Invention is not limited to this.
As described above, when above-mentioned phenomenon occurs, the pitch for splitting unit length and display elements changes, consequently also Deviate the position that display elements occur.Therefore, by obtaining segmentation unit length, the pitch of display elements, and its variation is held, Also the runout information that display elements deviate from reference position can be obtained.Also, runout information is obtained in this way, based on asking The form that the runout information obtained changes the transporting velocity of continuous leakage prevention sheet 102 falls within scope of the invention.
, can also as long as splitting unit length, the pitch of display elements in addition, obtaining and having held both variations Do not obtain display elements deviate from how many from reference position.For example, on splitting unit length, one is enumerated, can also be obtained Segmentation unit length is that edge+direction changes or edge-direction changes, and in the case of being changed in edge+direction, fixation is cut from L2 Value (the same value), in the case of being changed in edge-direction, to L2 plus fixed value (the same value).So, it is contemplated that hair Bright purpose, it may be said that obtain the thing for deviateing and obtaining that segmentation unit length (pitches of display elements) is equivalence.Thus, wide In justice, the acquirement (assurance of variation) of above-mentioned segmentation unit length (pitches of display elements) is also contained in display elements from base Level is put in the category of the acquirement of the runout information of deviation.Therefore, segmentation unit length (pitches of display elements) is obtained, is based on The form that the segmentation unit length (pitches of display elements) held changes the transporting velocity of continuous leakage prevention sheet 102 falls within this The category of invention.
Description of reference numerals
1st, diaper;3rd, it is anterior;5th, lower crotch;7th, rear portion;14th, hem;15th, leg creases;16th, leg side gauffer;17th, hold Junction surface;18th, main part;18a, main body junction surface;19th, rubber covered wire;21st, absorber;22nd, upper piece;23rd, leakage prevention sheet;24th, back Piece;25th, core pack piece;26th, skin lateral plate;28th, waist rugate thin film;29th, object tape;30th, magic tape;31st, joint portion;32nd, it is solid Determine portion;50th, manufacture device;52nd, supply unit;54th, the first delivery section;54a, the first driven roller;54b, the first driven voller;54c、 Band;56th, the second delivery section;56a, the second driven roller;56b, the second driven voller;58th, the 3rd delivery section;58a, the 3rd driven roller; 58b, the 3rd driven voller;61st, cutting roller;61a, cutter;62nd, anvil roller;63rd, adhesive applicating portion;64th, elastic adjustment unit; 65th, elastic adjustment portion;66th, positional information obtaining section;70th, controller;72nd, video camera;100th, leakproof plate substrate;102nd, it is continuous anti- Dropping fraction;104th, individual leakage prevention sheet;110th, back plate substrate;C, position is collaborated;D, detection position;E1, front end;E2, end;E3, end; G, gap.

Claims (9)

1. a kind of conveyance control method of continuous sheet, this method is the conveyance control method of the continuous sheet of absorbent commodity, Characterized in that,
The conveyance control method of the continuous sheet includes:
First delivery section and the second delivery section positioned at the position for leaning on upstream side in the conveying direction than first delivery section, The continuous sheet for being provided with display elements repeatedly is conveyed along the conveying direction towards cutting part;
The cutting part is cut between the display elements to the continuous sheet;
Obtain the runout information that the display elements deviate from reference position;
Obtain the elastic adjustment portion being arranged on the conveying direction between first delivery section and second delivery section Positional information;
Transporting velocity of first delivery section to the continuous sheet is changed based on the runout information;
Based on the runout information and the positional information, change conveying speed of second delivery section to the continuous sheet Degree.
2. the conveyance control method of continuous sheet according to claim 1, it is characterised in that
First delivery section conveys the continuous sheet in the state of being contacted with the continuous sheet,
When obtaining the runout information, the institute that is pointed on the part contacted with first delivery section of the continuous sheet State display elements to be detected, so as to obtain the runout information.
3. the conveyance control method of continuous sheet according to claim 2, it is characterised in that
First delivery section is ribbon conveyer.
4. the conveyance control method of continuous sheet according to claim 3, it is characterised in that
From that end by the cutting part side of the part contacted with the ribbon conveyer of the continuous sheet to the company That end by the belt conveying pusher side of the part carried by the sheet material supporting part relative with the cutting part of continuous sheet material Length on the conveying direction, the full-length than cutting the single sheet of material obtained after the continuous sheet are small.
5. the conveyance control method of continuous sheet according to any one of claim 1 to 4, it is characterised in that
When obtaining the runout information, the display elements being located on the continuous sheet are examined using detection means Survey, so as to obtain the runout information,
From the continuous sheet by the position that the detection means detect to the continuous sheet by with the cutting part phase To sheet material supporting part carry part that end by the belt conveying pusher side the length on the conveying direction, than Cut the full-length of the single sheet of material obtained after the continuous sheet 2 times are small.
6. the conveyance control method of continuous sheet according to any one of claim 1 to 5, it is characterised in that
The conveyance control method of the continuous sheet also has:
When conveying the continuous sheet towards the cutting part, by first delivery section, second delivery section and in institute The 3rd delivery section being arranged on conveying direction between first delivery section and the elastic adjustment portion is stated to be conveyed,
Transporting velocity of 3rd delivery section to the continuous sheet is changed based on the runout information.
7. the conveyance control method of continuous sheet according to any one of claim 1 to 6, it is characterised in that
The conveyance control method of the continuous sheet also has:First delivery section and institute are arranged on the conveying direction The adhesive applicating portion between the 3rd delivery section is stated by adhesive applicating to the continuous sheet.
8. the conveyance control method of continuous sheet according to any one of claim 1 to 7, it is characterised in that
When obtaining the runout information, the display elements being located on the continuous sheet are clapped using video camera Take the photograph, the runout information is obtained based on the display elements photographed.
9. a kind of shearing device, the device is the shearing device of the continuous sheet of absorbent commodity, it is characterised in that
The shearing device includes:
Cutting part, the cutting part are cut between display elements to the continuous sheet for being provided with the display elements repeatedly;
First delivery section, first delivery section convey the continuous sheet along conveying direction towards the cutting part;
Second delivery section, second delivery section are arranged on than first delivery section on the conveying direction by upstream side Position, the continuous sheet is conveyed along the conveying direction;
Elastic adjustment portion, the elastic adjustment portion are arranged on first delivery section and described second defeated on the conveying direction Send between portion;
Runout information obtaining section, the runout information obtaining section are used to obtain the deviation that the display elements deviate from reference position Information;
Positional information obtaining section, the positional information obtaining section are used for the positional information for obtaining the elastic adjustment portion;
Control unit, the control unit change first conveying based on the runout information obtained by the runout information obtaining section Portion is to the transporting velocity of the continuous sheet, based on the runout information obtained by the runout information obtaining section and by institute's rheme The positional information of information acquiring section acquirement is put, changes transporting velocity of second delivery section to the continuous sheet.
CN201580079967.6A 2015-06-29 2015-06-29 The conveyance control method and disconnecting device of continuous sheet Active CN107530200B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/068697 WO2017002171A1 (en) 2015-06-29 2015-06-29 Method for controlling transport of continuous sheet, and cutting device

Publications (2)

Publication Number Publication Date
CN107530200A true CN107530200A (en) 2018-01-02
CN107530200B CN107530200B (en) 2019-03-08

Family

ID=56015164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201580079967.6A Active CN107530200B (en) 2015-06-29 2015-06-29 The conveyance control method and disconnecting device of continuous sheet

Country Status (3)

Country Link
JP (1) JP5923673B1 (en)
CN (1) CN107530200B (en)
WO (1) WO2017002171A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001005345A1 (en) * 1999-07-19 2001-01-25 Kao Corporation Production method for absorbent article
JP2005080827A (en) * 2003-09-08 2005-03-31 Oji Paper Co Ltd Manufacturing method for absorbent article
JP2007061440A (en) * 2005-08-31 2007-03-15 Kao Corp Manufacturing method of absorbent article
CN102264329A (en) * 2009-02-03 2011-11-30 株式会社瑞光 Method of manufacturing disposable wearing article and device for manufacturing the disposable wearing article

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100466557B1 (en) * 1996-11-13 2005-01-15 킴벌리-클라크 월드와이드, 인크. Process and apparatus for registering a continuously moving, treatable layer with another layer
JP4292691B2 (en) * 2000-06-28 2009-07-08 株式会社村田製作所 Web conveyance positioning method and apparatus
US7047852B2 (en) * 2001-10-24 2006-05-23 Kimberly-Clark Worldwide, Inc. Feedforward control system for an elastic material
JP2005314035A (en) * 2004-04-27 2005-11-10 Daio Paper Corp Continuous material conveying device
JP5973155B2 (en) * 2011-12-05 2016-08-23 花王株式会社 Manufacturing method of composite material

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001005345A1 (en) * 1999-07-19 2001-01-25 Kao Corporation Production method for absorbent article
JP2005080827A (en) * 2003-09-08 2005-03-31 Oji Paper Co Ltd Manufacturing method for absorbent article
JP2007061440A (en) * 2005-08-31 2007-03-15 Kao Corp Manufacturing method of absorbent article
CN102264329A (en) * 2009-02-03 2011-11-30 株式会社瑞光 Method of manufacturing disposable wearing article and device for manufacturing the disposable wearing article

Also Published As

Publication number Publication date
CN107530200B (en) 2019-03-08
WO2017002171A1 (en) 2017-01-05
JP5923673B1 (en) 2016-05-24
JPWO2017002171A1 (en) 2017-06-29

Similar Documents

Publication Publication Date Title
US9237970B2 (en) Manufacturing method and apparatus for composite body of continuous sheet associated with absorbent article and manufacturing method for absorbent article
US6558499B1 (en) Disposable absorbent article having graphics and process for making
ES2715873T3 (en) Apparatus and method for high speed cross bending
CN107613919A (en) Sheet material fixing means and fixing device for sheet
JP6145594B1 (en) Manufacturing method and manufacturing apparatus for sheet-like member according to absorbent article
CN107530200A (en) The conveyance control method and shearing device of continuous sheet
CN107613920A (en) Sheet material fixing means and fixing device for sheet
JP6145554B1 (en) Manufacturing method and manufacturing apparatus for sheet-like member according to absorbent article
EP2596778B1 (en) Apparatus and method for applying short machine direction adhesive patches to a carrier layer
JP6145586B1 (en) Manufacturing method and manufacturing apparatus for sheet-like member according to absorbent article
JP5855933B2 (en) Composite and disposable diaper manufacturing method
JP5973155B2 (en) Manufacturing method of composite material
JP5895044B1 (en) Folding device and folding method
CN110944610A (en) Method for manufacturing absorbent article
CN107635517B (en) The manufacturing method and manufacturing device of the sheet component of absorbent commodity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant