CN107489277B - 一种新型钢-混梁柱节点施工结构及综合施工方法 - Google Patents
一种新型钢-混梁柱节点施工结构及综合施工方法 Download PDFInfo
- Publication number
- CN107489277B CN107489277B CN201710766495.2A CN201710766495A CN107489277B CN 107489277 B CN107489277 B CN 107489277B CN 201710766495 A CN201710766495 A CN 201710766495A CN 107489277 B CN107489277 B CN 107489277B
- Authority
- CN
- China
- Prior art keywords
- steel
- column
- construction
- concrete
- rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 53
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 99
- 239000010959 steel Substances 0.000 claims abstract description 99
- 239000004567 concrete Substances 0.000 claims abstract description 46
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 29
- 238000000034 method Methods 0.000 claims abstract description 23
- 238000005516 engineering process Methods 0.000 claims abstract description 11
- 238000009434 installation Methods 0.000 claims abstract description 4
- 238000003466 welding Methods 0.000 claims description 14
- 238000013461 design Methods 0.000 claims description 3
- 238000003754 machining Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000012545 processing Methods 0.000 abstract description 2
- 238000004088 simulation Methods 0.000 abstract description 2
- 230000007547 defect Effects 0.000 description 7
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 3
- 210000000988 bone and bone Anatomy 0.000 description 2
- 238000005536 corrosion prevention Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 238000000275 quality assurance Methods 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710766495.2A CN107489277B (zh) | 2017-08-30 | 2017-08-30 | 一种新型钢-混梁柱节点施工结构及综合施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710766495.2A CN107489277B (zh) | 2017-08-30 | 2017-08-30 | 一种新型钢-混梁柱节点施工结构及综合施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107489277A CN107489277A (zh) | 2017-12-19 |
CN107489277B true CN107489277B (zh) | 2024-04-12 |
Family
ID=60646014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710766495.2A Active CN107489277B (zh) | 2017-08-30 | 2017-08-30 | 一种新型钢-混梁柱节点施工结构及综合施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107489277B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680809A (zh) * | 2019-02-28 | 2019-04-26 | 清华大学 | 上层钢管柱与下层钢筋混凝土柱的转换节点及施工方法 |
CN109680811B (zh) * | 2019-03-01 | 2024-05-28 | 中建四局第三建筑工程有限公司 | 一种装配式建筑预制型钢柱节点连接结构及其施工方法 |
CN111539061B (zh) * | 2020-06-02 | 2022-12-13 | 甘肃省建设监理有限责任公司 | 一种基于bim的梁柱节点钢筋避让结构的钢筋处理方法 |
CN112095922A (zh) * | 2020-09-02 | 2020-12-18 | 中国建筑第八工程局有限公司 | 钢结构柱 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06212691A (ja) * | 1993-01-18 | 1994-08-02 | Shimizu Corp | 建築物の施工方法 |
JP2009161974A (ja) * | 2008-01-04 | 2009-07-23 | Takenaka Komuten Co Ltd | 鉄筋コンクリート梁の構築方法 |
CN105332510A (zh) * | 2015-11-12 | 2016-02-17 | 徐仁贵 | 一种复杂梁柱节点核心区施工方法 |
CN207314523U (zh) * | 2017-08-30 | 2018-05-04 | 中建四局第一建筑工程有限公司 | 一种新型钢-混梁柱节点施工结构 |
-
2017
- 2017-08-30 CN CN201710766495.2A patent/CN107489277B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06212691A (ja) * | 1993-01-18 | 1994-08-02 | Shimizu Corp | 建築物の施工方法 |
JP2009161974A (ja) * | 2008-01-04 | 2009-07-23 | Takenaka Komuten Co Ltd | 鉄筋コンクリート梁の構築方法 |
CN105332510A (zh) * | 2015-11-12 | 2016-02-17 | 徐仁贵 | 一种复杂梁柱节点核心区施工方法 |
CN207314523U (zh) * | 2017-08-30 | 2018-05-04 | 中建四局第一建筑工程有限公司 | 一种新型钢-混梁柱节点施工结构 |
Also Published As
Publication number | Publication date |
---|---|
CN107489277A (zh) | 2017-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107489277B (zh) | 一种新型钢-混梁柱节点施工结构及综合施工方法 | |
CN110119516B (zh) | 一种基于bim技术的钢筋翻样方法 | |
CN103806660B (zh) | 劲性混凝土结构梁-柱节点施工方法 | |
CN101011781B (zh) | 桥梁钢塔柱制造过程中焊接变形控制方法 | |
CN207277561U (zh) | 内置型钢高强混凝土芯柱叠合柱-钢梁组合框架 | |
CN207314554U (zh) | 一种钢梁与十字型内加劲方钢管柱全螺栓连接节点 | |
CN103422620A (zh) | 一种预制中空型钢混凝土柱及其拼接结构和拼接方法 | |
CN104074276A (zh) | 钢管混凝土柱与钢筋混凝土梁的连接结构及施工方法 | |
CN207048074U (zh) | 一种h型钢梁与内加劲方钢管柱全螺栓连接节点及一种十字形节点加劲区块 | |
CN104294920B (zh) | 一种u形钢混凝土组合梁与异形钢管混凝土柱的节点组件及制备方法 | |
CN103938785A (zh) | 一种预制混凝土构件 | |
CN211037781U (zh) | 一种外墙扣件式脚手架连墙件 | |
CN104196246A (zh) | 一种连续桁架多向受力结构局部抽空原位提升施工方法 | |
CN204919805U (zh) | 用于工业化装配式钢结构住宅的束筒钢框架组合结构 | |
CN205296481U (zh) | 用于工业化建造民用钢结构建筑的组合剪力墙结构体系 | |
CN105002982A (zh) | 用于工业化装配式钢结构住宅的束筒钢框架组合结构 | |
CN102392493A (zh) | 垂直補强板式方钢管柱h型钢梁节点 | |
CN207314523U (zh) | 一种新型钢-混梁柱节点施工结构 | |
CN202280157U (zh) | 垂直補强板式方钢管柱h型钢梁节点 | |
CN209958493U (zh) | 一种装配式剪力墙c字形薄壁型钢连接节点 | |
CN203034615U (zh) | 新型冷弯矩形钢管柱和h型钢梁外套管式连接节点 | |
CN204081090U (zh) | 一种u形钢混凝土组合梁与异形钢管混凝土柱的节点组件 | |
CN104032828B (zh) | 一种工业化的模块式多高层装配式钢结构中心支撑体系 | |
Li et al. | Application research on the design of assembled shear wall joint based on BIM technology | |
CN105442756A (zh) | 一种组合异形柱、装配有该柱的结构体系及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Country or region after: China Address after: 510030 room 904, 6th floor, traffic bureau building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province Applicant after: China Construction Fourth Engineering Bureau First Construction Co.,Ltd. Applicant after: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD. Address before: 510030 room 904, 6th floor, traffic bureau building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province Applicant before: China Construction Fourth Engineering Bureau First Construction Engineering Co.,Ltd. Country or region before: China Applicant before: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |