CN107476328A - A kind of prefabricated pier foundation construction of driving into type - Google Patents
A kind of prefabricated pier foundation construction of driving into type Download PDFInfo
- Publication number
- CN107476328A CN107476328A CN201710848845.XA CN201710848845A CN107476328A CN 107476328 A CN107476328 A CN 107476328A CN 201710848845 A CN201710848845 A CN 201710848845A CN 107476328 A CN107476328 A CN 107476328A
- Authority
- CN
- China
- Prior art keywords
- pier
- prefabricated
- driving
- foundation construction
- prefabricated pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The prefabricated pier foundation construction of a kind of driving into type provided by the invention, report and design document supporting course and the requirement of pier body size are surveyed in base area, in factory or building site concrete knoll body.Unwrapping wire is carried out again to layout, and determines pier position.Prefabricated pier body is finally squeezed into by ground and supporting course using hammering method or slotting method of shaking.The prefabricated pier foundation construction of a kind of driving into type disclosed by the invention, substitute manually digging hole Cast-in-place concrete pier construction technology, greatly save labour, reduce labor intensity, save labour cost, reduce construction costs, and safely.
Description
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of prefabricated pier foundation construction of driving into type.
Background technology
In architectural engineering foundation basic construction, common pier foundation construction technology is to take manually digging hole to supporting course
In ground, field mixing concrete is reproduced, pours to smash and forms.Due to the general pier length≤6m of pier foundation.Supporting course can be more close
Real silty clay, middle sand, gravelly sand soil, gravelly soil and harder rock soil etc..So artificial shoveling difficulty is larger, labour is big,
Speed of application is slow, labour cost is high.Particularly underground water is relatively abundant, situations such as weak intercalated layer be present, it occur frequently that construction quality
And security incident.
The content of the invention
The present invention is solves existing pier foundation construction, and difficulty is larger, labour is big, speed of application is slow, labour cost is high
Almost problem, there is provided one kind can save labour, reduce labor intensity, save labour cost and construction costs, the duration is fast,
The prefabricated pier foundation construction of driving into type of safety.
In order to solve the technical problem of the present invention, the present invention is achieved by the following technical solutions:A kind of driving into type is pre-
Pier foundation construction processed, comprises the following steps:
Step 1:Levelling of the land:By design requirement absolute altitude, excavation and filling and the smooth location earthwork;
Step 2:Unwrapping wire is layouted:By design requirement, line setting, the position of pier base is determined;
Step 3:Make pier body:By the pier length of design requirement and pier footpath, in existing mill or prefabrication pier body;
Step 4:Using hammering method or slotting method of shaking, pier position is lifted to by loop wheel machine, then hammered to supporting course, prefabricated pier is squeezed into
Design requirement is held into layer;On the one hand its frictional force is increased, it is on the one hand low compared with conventional method expense, the time is short, good into pier quality.
Step 5:Pier to supporting course can not be reached individually, constructed using drawing bore method or excavating load;
Step 6:Blow counts and pier body embedded depth are recorded, completes prefabricated pier foundation construction.
Preferably, the section of the prefabricated pier is circular or square.
Preferably, the making material of the prefabricated pier is concrete, regeneration concrete or the shaped steel of different labels.
Compared with prior art, the beneficial effect that obtains of the present invention is:
The prefabricated pier foundation construction of a kind of driving into type disclosed by the invention, using prefabricated pier construction technology, substitute manually digging hole
Cast-in-place concrete pier construction technology, greatlys save labour, reduces labor intensity, saves labour cost, reduces construction costs.
The prefabricated pier foundation construction of a kind of driving into type disclosed by the invention, is fabricated into from prefabricated pier and squeezes into supporting course, entirely
Process mechanism degree is high, and quality control is strict, horizontal so as to which construction quality and safety in production be greatly improved.
The prefabricated pier foundation construction of a kind of driving into type disclosed by the invention, increases pier side friction, improves pier base
The bearing capacity of plinth, nothing left soil, without harmful substances such as waste water, poison gases.Site operation civilization, cleaning, meet environmental protection and save green
Color construction requirement.
Brief description of the drawings
Fig. 1 is the prefabricated pier foundation construction schematic diagram of driving into type.
Reference:1st, prefabricated pier;2nd, tamping machine is hammered into shape;3rd, supporting course.
Embodiment
Below in conjunction with the accompanying drawings, embodiment is described in detail.(Incorporated by reference to accompanying drawing, it is described in detail)
Referring to accompanying drawing 1, a kind of prefabricated pier foundation construction of driving into type, comprise the following steps:
Step 1:Levelling of the land:By design requirement absolute altitude, excavation and filling and the smooth location earthwork;
Step 2:Unwrapping wire is layouted:By design requirement, line setting, the position of pier base is determined;
Step 3:Make pier body:By the pier length of design requirement and pier footpath, at the scene or prefabrication pier body;
Step 4:Using hammering method or slotting method of shaking, pier position is lifted to by loop wheel machine, will be pre- with the hammering of tamping machine hammer 2 to supporting course 3
Pier 1 processed squeezes into the holding into layer of design requirement;On the one hand increase its frictional force, it is on the one hand low compared with conventional method expense, the time is short, into
Pier quality is good.Conventional method is using cast-in-place perfusion, it is necessary to which substantial amounts of human and material resources, costly.
Step 5:Pier to supporting course can not be reached individually, constructed using drawing bore method or excavating load;
Step 6:Blow counts and pier body embedded depth are recorded, completes prefabricated pier foundation construction.
Further, the section of the prefabricated pier is circular or square.
Further, the making material of the prefabricated pier is concrete, regeneration concrete or the shaped steel of different labels.
A kind of prefabricated pier foundation construction of driving into type, using prefabricated pier construction technology, substitute manually digging hole Cast-in-place concrete pier
Construction technology, labour is greatlyd save, reduce labor intensity, save labour cost, reduce construction costs.Made from prefabricated pier
To supporting course is squeezed into, overall process mechanization degree is high, and quality control is strict, raw so as to which construction quality and safety be greatly improved
Production is horizontal.
Listed above is only one of specific embodiment of the present invention.It is clear that the invention is not restricted to above example, may be used also
To there is many similar reshapings.What one of ordinary skill in the art directly can export or associate from present disclosure
All deformations, are considered as invention which is intended to be protected.
Claims (3)
- A kind of 1. prefabricated pier foundation construction of driving into type, it is characterised in that:Comprise the following steps:Step 1:Levelling of the land:By design requirement absolute altitude, excavation and filling and the smooth location earthwork;Step 2:Unwrapping wire is layouted:By design requirement, line setting, the position of pier base is determined;Step 3:Make pier body:By the pier length of design requirement and pier footpath, at the scene or prefabrication pier body;Step 4:Using hammering method or slotting method of shaking, pier position is lifted to by loop wheel machine, then hammered to supporting course, prefabricated pier is squeezed into Design requirement is held into layer;Step 5:Pier to supporting course can not be reached individually, constructed using drawing bore method or excavating load;Step 6:Blow counts and pier body embedded depth are recorded, completes prefabricated pier foundation construction.
- A kind of 2. prefabricated pier foundation construction of driving into type as claimed in claim 1, it is characterised in that:The prefabricated pier is cut Face is circular or square.
- A kind of 3. prefabricated pier foundation construction of driving into type as claimed in claim 1, it is characterised in that:The system of the prefabricated pier Make concrete, regeneration concrete or the shaped steel that material is different labels.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710848845.XA CN107476328A (en) | 2017-09-20 | 2017-09-20 | A kind of prefabricated pier foundation construction of driving into type |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710848845.XA CN107476328A (en) | 2017-09-20 | 2017-09-20 | A kind of prefabricated pier foundation construction of driving into type |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107476328A true CN107476328A (en) | 2017-12-15 |
Family
ID=60586635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710848845.XA Pending CN107476328A (en) | 2017-09-20 | 2017-09-20 | A kind of prefabricated pier foundation construction of driving into type |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107476328A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610342A (en) * | 2019-01-18 | 2019-04-12 | 中铁上海工程局集团有限公司 | A kind of high-speed railway bridge major diameter prefabricated tubular pile long spire drawing hole construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775446A (en) * | 2014-01-15 | 2015-07-15 | 广东强光海洋工程有限公司 | Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier |
CN105019454A (en) * | 2014-04-17 | 2015-11-04 | 江苏省交通科学研究院股份有限公司 | Deep soft soil high-strength prestressed pipe pile hammer piling construction method |
WO2016118430A1 (en) * | 2015-01-24 | 2016-07-28 | Su Hao | Seismic-proof connectors to protect buildings and bridges from earthquake hazards and enable fast construction |
-
2017
- 2017-09-20 CN CN201710848845.XA patent/CN107476328A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775446A (en) * | 2014-01-15 | 2015-07-15 | 广东强光海洋工程有限公司 | Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier |
CN105019454A (en) * | 2014-04-17 | 2015-11-04 | 江苏省交通科学研究院股份有限公司 | Deep soft soil high-strength prestressed pipe pile hammer piling construction method |
WO2016118430A1 (en) * | 2015-01-24 | 2016-07-28 | Su Hao | Seismic-proof connectors to protect buildings and bridges from earthquake hazards and enable fast construction |
Non-Patent Citations (2)
Title |
---|
中华人民共和国***: "《建筑桩基技术规范(JGJ94-2008)》", 1 October 2008, 中国建筑工业出版社 * |
周景星等: "《基础工程(第2版)》", 28 February 2007, 清华大学出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610342A (en) * | 2019-01-18 | 2019-04-12 | 中铁上海工程局集团有限公司 | A kind of high-speed railway bridge major diameter prefabricated tubular pile long spire drawing hole construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203741868U (en) | Reinforced concrete retaining wall structure with combined anchor wire | |
CN105239586B (en) | Method for supporting foundation pit by adopting support structure | |
CN103696784B (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN103821060B (en) | A kind of construction method of existing highway soft foundation Treating technology | |
US3903662A (en) | Method of securing structural support elements in soil | |
CN106368219A (en) | Supporting reinforcing structure of deep foundation pit and construction method | |
CN110374111A (en) | A kind of slope cooperates with support system with steel pipe piled anchor | |
CN104762956B (en) | Method for forming pile based on construction waste recycled aggregate | |
CN106638579A (en) | Construction method of coral sand foundation expanding cement mortar injection pile | |
CN202672162U (en) | Combined type retaining structure | |
CN104988914A (en) | Cast-in-situ bored pile breakage processing method under water area environment | |
CN204662494U (en) | Highway retaining wall reinforced structure | |
CN102966109A (en) | Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation | |
CN107476328A (en) | A kind of prefabricated pier foundation construction of driving into type | |
CN105040707A (en) | Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall | |
CN204780975U (en) | A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit | |
CN206220100U (en) | A kind of deep foundation pit supporting structure for closing on protection building | |
CN201588222U (en) | Superposed digging/embedding foundation | |
CN205329735U (en) | Foundation ditch excavation closes on existing shallow foundation protection architecture | |
CN102235017B (en) | Lateral force resisting method for soft soil foundation building | |
CN205088687U (en) | Supporting structure of strut foundation ditch | |
EP1521886A1 (en) | Method for increasing load-bearing capacity of soil | |
CN209385141U (en) | Railway tunnel protection structure crossed with water passing tunnel | |
CN203129163U (en) | Reinforcing framework structure for dam foundation | |
CN112281801A (en) | Mucky soil resistance-increasing steel pipe pile foundation reinforcing structure and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171215 |