CN107476328A - A kind of prefabricated pier foundation construction of driving into type - Google Patents

A kind of prefabricated pier foundation construction of driving into type Download PDF

Info

Publication number
CN107476328A
CN107476328A CN201710848845.XA CN201710848845A CN107476328A CN 107476328 A CN107476328 A CN 107476328A CN 201710848845 A CN201710848845 A CN 201710848845A CN 107476328 A CN107476328 A CN 107476328A
Authority
CN
China
Prior art keywords
pier
prefabricated
driving
foundation construction
prefabricated pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710848845.XA
Other languages
Chinese (zh)
Inventor
徐升才
熊信福
黄辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGHENG CONSTRUCTION GROUP Co Ltd
Original Assignee
ZHONGHENG CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGHENG CONSTRUCTION GROUP Co Ltd filed Critical ZHONGHENG CONSTRUCTION GROUP Co Ltd
Priority to CN201710848845.XA priority Critical patent/CN107476328A/en
Publication of CN107476328A publication Critical patent/CN107476328A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The prefabricated pier foundation construction of a kind of driving into type provided by the invention, report and design document supporting course and the requirement of pier body size are surveyed in base area, in factory or building site concrete knoll body.Unwrapping wire is carried out again to layout, and determines pier position.Prefabricated pier body is finally squeezed into by ground and supporting course using hammering method or slotting method of shaking.The prefabricated pier foundation construction of a kind of driving into type disclosed by the invention, substitute manually digging hole Cast-in-place concrete pier construction technology, greatly save labour, reduce labor intensity, save labour cost, reduce construction costs, and safely.

Description

A kind of prefabricated pier foundation construction of driving into type
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of prefabricated pier foundation construction of driving into type.
Background technology
In architectural engineering foundation basic construction, common pier foundation construction technology is to take manually digging hole to supporting course In ground, field mixing concrete is reproduced, pours to smash and forms.Due to the general pier length≤6m of pier foundation.Supporting course can be more close Real silty clay, middle sand, gravelly sand soil, gravelly soil and harder rock soil etc..So artificial shoveling difficulty is larger, labour is big, Speed of application is slow, labour cost is high.Particularly underground water is relatively abundant, situations such as weak intercalated layer be present, it occur frequently that construction quality And security incident.
The content of the invention
The present invention is solves existing pier foundation construction, and difficulty is larger, labour is big, speed of application is slow, labour cost is high Almost problem, there is provided one kind can save labour, reduce labor intensity, save labour cost and construction costs, the duration is fast, The prefabricated pier foundation construction of driving into type of safety.
In order to solve the technical problem of the present invention, the present invention is achieved by the following technical solutions:A kind of driving into type is pre- Pier foundation construction processed, comprises the following steps:
Step 1:Levelling of the land:By design requirement absolute altitude, excavation and filling and the smooth location earthwork;
Step 2:Unwrapping wire is layouted:By design requirement, line setting, the position of pier base is determined;
Step 3:Make pier body:By the pier length of design requirement and pier footpath, in existing mill or prefabrication pier body;
Step 4:Using hammering method or slotting method of shaking, pier position is lifted to by loop wheel machine, then hammered to supporting course, prefabricated pier is squeezed into Design requirement is held into layer;On the one hand its frictional force is increased, it is on the one hand low compared with conventional method expense, the time is short, good into pier quality.
Step 5:Pier to supporting course can not be reached individually, constructed using drawing bore method or excavating load;
Step 6:Blow counts and pier body embedded depth are recorded, completes prefabricated pier foundation construction.
Preferably, the section of the prefabricated pier is circular or square.
Preferably, the making material of the prefabricated pier is concrete, regeneration concrete or the shaped steel of different labels.
Compared with prior art, the beneficial effect that obtains of the present invention is:
The prefabricated pier foundation construction of a kind of driving into type disclosed by the invention, using prefabricated pier construction technology, substitute manually digging hole Cast-in-place concrete pier construction technology, greatlys save labour, reduces labor intensity, saves labour cost, reduces construction costs.
The prefabricated pier foundation construction of a kind of driving into type disclosed by the invention, is fabricated into from prefabricated pier and squeezes into supporting course, entirely Process mechanism degree is high, and quality control is strict, horizontal so as to which construction quality and safety in production be greatly improved.
The prefabricated pier foundation construction of a kind of driving into type disclosed by the invention, increases pier side friction, improves pier base The bearing capacity of plinth, nothing left soil, without harmful substances such as waste water, poison gases.Site operation civilization, cleaning, meet environmental protection and save green Color construction requirement.
Brief description of the drawings
Fig. 1 is the prefabricated pier foundation construction schematic diagram of driving into type.
Reference:1st, prefabricated pier;2nd, tamping machine is hammered into shape;3rd, supporting course.
Embodiment
Below in conjunction with the accompanying drawings, embodiment is described in detail.(Incorporated by reference to accompanying drawing, it is described in detail)
Referring to accompanying drawing 1, a kind of prefabricated pier foundation construction of driving into type, comprise the following steps:
Step 1:Levelling of the land:By design requirement absolute altitude, excavation and filling and the smooth location earthwork;
Step 2:Unwrapping wire is layouted:By design requirement, line setting, the position of pier base is determined;
Step 3:Make pier body:By the pier length of design requirement and pier footpath, at the scene or prefabrication pier body;
Step 4:Using hammering method or slotting method of shaking, pier position is lifted to by loop wheel machine, will be pre- with the hammering of tamping machine hammer 2 to supporting course 3 Pier 1 processed squeezes into the holding into layer of design requirement;On the one hand increase its frictional force, it is on the one hand low compared with conventional method expense, the time is short, into Pier quality is good.Conventional method is using cast-in-place perfusion, it is necessary to which substantial amounts of human and material resources, costly.
Step 5:Pier to supporting course can not be reached individually, constructed using drawing bore method or excavating load;
Step 6:Blow counts and pier body embedded depth are recorded, completes prefabricated pier foundation construction.
Further, the section of the prefabricated pier is circular or square.
Further, the making material of the prefabricated pier is concrete, regeneration concrete or the shaped steel of different labels.
A kind of prefabricated pier foundation construction of driving into type, using prefabricated pier construction technology, substitute manually digging hole Cast-in-place concrete pier Construction technology, labour is greatlyd save, reduce labor intensity, save labour cost, reduce construction costs.Made from prefabricated pier To supporting course is squeezed into, overall process mechanization degree is high, and quality control is strict, raw so as to which construction quality and safety be greatly improved Production is horizontal.
Listed above is only one of specific embodiment of the present invention.It is clear that the invention is not restricted to above example, may be used also To there is many similar reshapings.What one of ordinary skill in the art directly can export or associate from present disclosure All deformations, are considered as invention which is intended to be protected.

Claims (3)

  1. A kind of 1. prefabricated pier foundation construction of driving into type, it is characterised in that:Comprise the following steps:
    Step 1:Levelling of the land:By design requirement absolute altitude, excavation and filling and the smooth location earthwork;
    Step 2:Unwrapping wire is layouted:By design requirement, line setting, the position of pier base is determined;
    Step 3:Make pier body:By the pier length of design requirement and pier footpath, at the scene or prefabrication pier body;
    Step 4:Using hammering method or slotting method of shaking, pier position is lifted to by loop wheel machine, then hammered to supporting course, prefabricated pier is squeezed into Design requirement is held into layer;
    Step 5:Pier to supporting course can not be reached individually, constructed using drawing bore method or excavating load;
    Step 6:Blow counts and pier body embedded depth are recorded, completes prefabricated pier foundation construction.
  2. A kind of 2. prefabricated pier foundation construction of driving into type as claimed in claim 1, it is characterised in that:The prefabricated pier is cut Face is circular or square.
  3. A kind of 3. prefabricated pier foundation construction of driving into type as claimed in claim 1, it is characterised in that:The system of the prefabricated pier Make concrete, regeneration concrete or the shaped steel that material is different labels.
CN201710848845.XA 2017-09-20 2017-09-20 A kind of prefabricated pier foundation construction of driving into type Pending CN107476328A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710848845.XA CN107476328A (en) 2017-09-20 2017-09-20 A kind of prefabricated pier foundation construction of driving into type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710848845.XA CN107476328A (en) 2017-09-20 2017-09-20 A kind of prefabricated pier foundation construction of driving into type

Publications (1)

Publication Number Publication Date
CN107476328A true CN107476328A (en) 2017-12-15

Family

ID=60586635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710848845.XA Pending CN107476328A (en) 2017-09-20 2017-09-20 A kind of prefabricated pier foundation construction of driving into type

Country Status (1)

Country Link
CN (1) CN107476328A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610342A (en) * 2019-01-18 2019-04-12 中铁上海工程局集团有限公司 A kind of high-speed railway bridge major diameter prefabricated tubular pile long spire drawing hole construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775446A (en) * 2014-01-15 2015-07-15 广东强光海洋工程有限公司 Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier
CN105019454A (en) * 2014-04-17 2015-11-04 江苏省交通科学研究院股份有限公司 Deep soft soil high-strength prestressed pipe pile hammer piling construction method
WO2016118430A1 (en) * 2015-01-24 2016-07-28 Su Hao Seismic-proof connectors to protect buildings and bridges from earthquake hazards and enable fast construction

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775446A (en) * 2014-01-15 2015-07-15 广东强光海洋工程有限公司 Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier
CN105019454A (en) * 2014-04-17 2015-11-04 江苏省交通科学研究院股份有限公司 Deep soft soil high-strength prestressed pipe pile hammer piling construction method
WO2016118430A1 (en) * 2015-01-24 2016-07-28 Su Hao Seismic-proof connectors to protect buildings and bridges from earthquake hazards and enable fast construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中华人民共和国***: "《建筑桩基技术规范(JGJ94-2008)》", 1 October 2008, 中国建筑工业出版社 *
周景星等: "《基础工程(第2版)》", 28 February 2007, 清华大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610342A (en) * 2019-01-18 2019-04-12 中铁上海工程局集团有限公司 A kind of high-speed railway bridge major diameter prefabricated tubular pile long spire drawing hole construction method

Similar Documents

Publication Publication Date Title
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103821060B (en) A kind of construction method of existing highway soft foundation Treating technology
US3903662A (en) Method of securing structural support elements in soil
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN110374111A (en) A kind of slope cooperates with support system with steel pipe piled anchor
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN106638579A (en) Construction method of coral sand foundation expanding cement mortar injection pile
CN202672162U (en) Combined type retaining structure
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN204662494U (en) Highway retaining wall reinforced structure
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN107476328A (en) A kind of prefabricated pier foundation construction of driving into type
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN206220100U (en) A kind of deep foundation pit supporting structure for closing on protection building
CN201588222U (en) Superposed digging/embedding foundation
CN205329735U (en) Foundation ditch excavation closes on existing shallow foundation protection architecture
CN102235017B (en) Lateral force resisting method for soft soil foundation building
CN205088687U (en) Supporting structure of strut foundation ditch
EP1521886A1 (en) Method for increasing load-bearing capacity of soil
CN209385141U (en) Railway tunnel protection structure crossed with water passing tunnel
CN203129163U (en) Reinforcing framework structure for dam foundation
CN112281801A (en) Mucky soil resistance-increasing steel pipe pile foundation reinforcing structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215