CN107463733A - A kind of arrangement method and system of the ceiling joist based on BIM - Google Patents
A kind of arrangement method and system of the ceiling joist based on BIM Download PDFInfo
- Publication number
- CN107463733A CN107463733A CN201710594280.7A CN201710594280A CN107463733A CN 107463733 A CN107463733 A CN 107463733A CN 201710594280 A CN201710594280 A CN 201710594280A CN 107463733 A CN107463733 A CN 107463733A
- Authority
- CN
- China
- Prior art keywords
- ceiling
- furred ceiling
- keel
- bim
- furred
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Architecture (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Theoretical Computer Science (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Electromagnetism (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of arrangement method and system of the ceiling joist based on BIM, wherein, this method comprises the following steps:Suspended ceiling modeling race is selected in the file management system of BIM softwares, and the suspended ceiling modeling race is arranged in the ceiling void of room model, according to the size of ceiling void arrangement furred ceiling;Furred ceiling finished surface is set relative to the height of room top and the material layers of furred ceiling;The type of the keel framework of furred ceiling is selected, and the keel framework for selection of being arranged according to the installation arranging rule of default keel framework and the planar dimension of furred ceiling.The present invention can be rapidly completed the keel framework mounting structure of various moulding furred ceilings and effect is presented on the premise of quickly design suspended ceiling modeling, the installation method of unified keel framework, improve the stability and security of keel framework.
Description
Technical field
The present invention relates to house ornamentation design field, and in particular to a kind of arrangement method and system of the ceiling joist based on BIM.
Background technology
Ceiling suspended ceiling is the important component of house decoration, and furred ceiling can not only make up the deficiency of original building structure, is increased
Strong decorative effect, the illuminating effect that indoor light source level reaches good, and the function with heat-insulation and heat-preservation can also be enriched, but passed
System house ornamentation design process in can not directly present keel structure and node it is coarse can not effective guiding construction, cause live keel bone
Frame fabrication and installation gimmick differs, keel framework has structure potential safety hazard, the increase of the keel proportion of goods damageds, increases asking for decoration cost
Topic.
It is domestic gradually to start to contact BIM (Building InformationModeling, architecture information after 2002
Model) theory and technology, BIM is recognized as " architecture information in Eleventh Five-Year Plan as focus on research direction, and by the Ministry of Construction
Best solution ".Various furred ceilings are required for making keel framework, during how solving traditional house ornamentation by BIM technology
Ceiling joist arrangement problem, realize the reasonable arrangement of ceiling joist and ensure skeleton structure safety, can be true in the design phase
While embodying furred ceiling presentation effect, ceiling joist of automatically and reasonably arranging, and the usage quantity for accurately calculating keel is BIM technology
In one of the developing direction in house ornamentation field.
The content of the invention
The present invention is for above-mentioned technical problem existing for the arrangement of existing ceiling joist, there is provided using based on building BIM skills
Art is to BIM+ software secondary developments, there is provided a kind of arrangement method and system of the ceiling joist based on BIM, realizes BIM technology
Good application in house ornamentation field.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of arrangement method of the ceiling joist based on BIM,
Comprise the following steps:
Step 1, suspended ceiling modeling race is selected in the file management system of BIM softwares, and the suspended ceiling modeling race is arranged
The ceiling void of model in room, according to the size of ceiling void arrangement furred ceiling;
Step 2, furred ceiling finished surface is set relative to the height of room top and the material layers of furred ceiling;
Step 3, select furred ceiling keel framework type, and according to the installation arranging rule of default keel framework and hang
The planar dimension on top is arranged the keel framework of selection..
The beneficial effects of the invention are as follows:On the premise of quickly design suspended ceiling modeling, various moulding furred ceilings can be rapidly completed
Keel framework mounting structure and effect is presented, the installation method of unified keel framework, improve the stability and peace of keel framework
Quan Xing.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, the suspended ceiling modeling race includes flat-top, falls a grade furred ceiling, light trough furred ceiling, arch furred ceiling and vault type furred ceiling.
Further, the step 2 also includes setting falling height of grade furred ceiling relative to the height of furred ceiling finished surface.
Further, the type of the keel framework of the selection furred ceiling, is specifically included:
When the furred ceiling finished surface is not more than preset height relative to the height of room top, individual layer keel are selected, it is no
Then select double-layer keel.
Further, after the step 3, in addition to:
Step 4, the keel framework according to arrangement, count the keel length and number of fitting parts of all size, generation furred ceiling dragon
Bone auxiliary material inventory.
Beneficial effect using above-mentioned further scheme is that accurate statistics keel and accessory use dosage, avoid material
Waste, reduce house ornamentation cost.
For achieving the above object, the present invention also provides a kind of arranging system of the ceiling joist based on BIM, its feature
It is, including:
First arrangement module, for selecting suspended ceiling modeling race in the file management system of BIM softwares, and by the furred ceiling
Moulding race is arranged in the ceiling void of room model, according to the size of ceiling void arrangement furred ceiling;
First setup module, for setting height of the furred ceiling finished surface relative to room top;
Second setup module, for setting the material layers of furred ceiling;
Second arrangement module, the type of the keel framework for selecting furred ceiling, and according to the installation of default keel framework
The planar dimension of arranging rule and furred ceiling is arranged the keel framework of selection.
The beneficial effects of the invention are as follows:On the premise of quickly design suspended ceiling modeling, various moulding furred ceilings can be rapidly completed
Keel framework mounting structure and effect is presented, the installation method of unified keel framework, improve the stability and peace of keel framework
Quan Xing.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, the suspended ceiling modeling race includes flat-top, falls a grade furred ceiling, light trough furred ceiling, arch furred ceiling and vault type furred ceiling.
Further, the system also includes the 3rd setup module, and it is relative that the 3rd setup module for setting falls grade furred ceiling
In the height of the height of furred ceiling finished surface.
Further, the second arrangement module, specifically for when the furred ceiling finished surface is relative to the height of room top
During no more than preset height, individual layer keel are selected, otherwise select double-layer keel, and arrange according to the installation of default keel framework
The planar dimension of rule and furred ceiling is arranged the keel framework of selection.
Further, the system also includes statistical module, and the statistical module is used for the keel framework according to arrangement, and statistics is each
The keel length and number of fitting parts of kind specification, generate ceiling joist auxiliary material inventory.
Beneficial effect using above-mentioned further scheme is that accurate statistics keel and accessory use dosage, avoid material
Waste, reduce house ornamentation cost.
Brief description of the drawings
Fig. 1 is a kind of flow chart of the arrangement method of the ceiling joist based on BIM provided in an embodiment of the present invention;
Fig. 2 is a kind of structured flowchart of the arranging system of the ceiling joist based on BIM provided in an embodiment of the present invention;
Fig. 3 is a kind of structured flowchart of the arranging system of the ceiling joist based on BIM provided in an embodiment of the present invention;
Fig. 4 is a kind of structured flowchart of the arranging system of the ceiling joist based on BIM provided in an embodiment of the present invention.
Embodiment
The principle and feature of the present invention are described below in conjunction with accompanying drawing, the given examples are served only to explain the present invention, and
It is non-to be used to limit the scope of the present invention.
For the present invention based on the REVIT platforms in building BIM softwares, the framework combined using BS+CS, is to REVIT platforms
The secondary development of progress, REVIT platforms can also be replaced by other BIM software operating platforms, such as SketchUp softwares.
Fig. 1 is a kind of flow chart of the arrangement method of the ceiling joist based on BIM provided in an embodiment of the present invention, such as Fig. 1
Shown, this method comprises the following steps:
101st, suspended ceiling modeling race is selected in the file management system of BIM softwares, and the suspended ceiling modeling race is arranged in
The ceiling void of room model, according to the size of ceiling void arrangement furred ceiling;
Specifically, presetting various suspended ceiling modeling races in file management system, such as flat-top, fall a grade furred ceiling, light trough furred ceiling, arch
The modes such as furred ceiling, vault type furred ceiling, after selecting suspended ceiling modeling race, furred ceiling can be directly presented in room model, pass through the side of dragging
Furred ceiling is arranged in the ceiling void of room model by formula.
The 102nd, furred ceiling finished surface is set relative to the height of room top and the material layers of furred ceiling.
Specifically, after the completion of furred ceiling arrangement, set interface that furred ceiling finished surface is set relative to room in the attribute of suspended ceiling member
Between top surface height parameter, you can determine the position of furred ceiling, in addition, will also attribute set interface in set furred ceiling material
Layer, such as plasterboard, acrylic.
103rd, the type of the keel framework of furred ceiling is selected, and according to the installation arranging rule and furred ceiling of default keel framework
Planar dimension arrange the keel framework of selection.
Specifically, the installation arranging rule of every kind of keel framework, i.e. keel framework each component are preset in BIM softwares
Mounting means, after the type for selecting keel framework, you can by way of array arrangement, arranged automatically according to the planar dimension of furred ceiling
The keel framework of cloth selection.
A kind of arrangement method of ceiling joist based on BIM provided in an embodiment of the present invention, can be in quickly design furred ceiling
On the premise of moulding, the keel framework mounting structure of various moulding furred ceilings can be rapidly completed and effect is presented, unified keel framework
Installation method, improve the stability and security of keel framework.
Alternatively, in this embodiment, the step 2 also includes setting falling height of grade furred ceiling relative to furred ceiling finished surface
Height.
Specifically, when in the suspended ceiling modeling race of selection comprising grade furred ceiling is fallen, it there is provision of and fall grade furred ceiling relative to furred ceiling
The height of the height of finished surface.
Alternatively, in this embodiment, the type of the keel framework of the selection furred ceiling, is specifically included:
When the furred ceiling finished surface is not more than preset height relative to the height of room top, individual layer keel are selected, it is no
Then select double-layer keel.
Specifically, the setting height(from bottom) that double-layer keel is mutually greater than necessary with individual layer keel, therefore, when furred ceiling finished surface is relative
When the height of room top is not more than preset height (such as 10 centimeters), individual layer keel are selected, otherwise select double-layer keel.
Alternatively, in this embodiment, as shown in figure 1, after the step 103, this method also includes:
104th, according to the keel framework of arrangement, the keel length and number of fitting parts of all size is counted, generates ceiling joist
Auxiliary material inventory.
Specifically, after the completion of keel arrangement, the size of keel and the use dosage of accessory also determine that, by accurately uniting
Meter keel and accessory use dosage, can avoid waste of material, reduce house ornamentation cost.
In addition, after inventory generation, keel needed for the material system of BIM softwares and related accessory can be obtained in real time
Situation on sale and quantity in stock, the phenomenon of short supply occurs during preventing from receiving material.
Correspondingly, the present invention also provides a kind of arranging system of the ceiling joist based on BIM, as shown in Fig. 2 the system bag
Include:
First arrangement module, for selecting suspended ceiling modeling race in BIM file management system, and by the suspended ceiling modeling
Race is arranged in the ceiling void of room model, according to the size of ceiling void arrangement furred ceiling;
First setup module, for setting height of the furred ceiling finished surface relative to room top;
Second setup module, for setting the material layers of furred ceiling;
Second arrangement module, the type of the keel framework for selecting furred ceiling, and according to the installation of default keel framework
The planar dimension of arranging rule and furred ceiling is arranged the keel framework of selection.
A kind of arranging system of ceiling joist based on BIM provided in an embodiment of the present invention, can be in quickly design furred ceiling
On the premise of moulding, the keel framework mounting structure of various moulding furred ceilings can be rapidly completed and effect is presented, unified keel framework
Installation method, improve the stability and security of keel framework.
Alternatively, in this embodiment, as shown in figure 3, the system also includes the 3rd setup module, the described 3rd sets mould
Block, which is used to set, falls height of grade furred ceiling relative to the height of furred ceiling finished surface.
Alternatively, in this embodiment, the second arrangement module, specifically for when the furred ceiling finished surface is relative to room
Between the height of top surface when being not more than preset height, select individual layer keel, otherwise select double-layer keel, and according to default keel bone
The installation arranging rule of frame and the planar dimension of furred ceiling are arranged the keel framework of selection.
Alternatively, in this embodiment, as shown in figure 4, the system also includes statistical module, the statistical module is used for root
According to the keel framework of arrangement, the keel length and number of fitting parts of all size are counted, generates ceiling joist auxiliary material inventory.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.
Claims (10)
1. a kind of arrangement method of the ceiling joist based on BIM, it is characterised in that comprise the following steps:
Step 1, suspended ceiling modeling race is selected in the file management system of BIM softwares, and the suspended ceiling modeling race is arranged in room
Between model the ceiling void, according to the size of the ceiling void arrange furred ceiling;
Step 2, furred ceiling finished surface is set relative to the height of room top and the material layers of furred ceiling;
Step 3, select furred ceiling keel framework type, and according to the installation arranging rule of default keel framework and furred ceiling
Planar dimension is arranged the keel framework of selection.
A kind of 2. arrangement method of ceiling joist based on BIM according to claim 1, it is characterised in that the furred ceiling
Moulding race includes flat-top, falls a grade furred ceiling, light trough furred ceiling, arch furred ceiling and vault type furred ceiling.
A kind of 3. arrangement method of ceiling joist based on BIM according to claim 1, it is characterised in that the step 2
Also include setting falling height of grade furred ceiling relative to the height of furred ceiling finished surface.
A kind of 4. arrangement method of ceiling joist based on BIM according to claim 3, it is characterised in that the selection
The type of the keel framework of furred ceiling, is specifically included:
When the furred ceiling finished surface is not more than preset height relative to the height of room top, individual layer keel are selected, are otherwise selected
Select double-layer keel.
A kind of 5. arrangement method of ceiling joist based on BIM according to claim any one of 1-4, it is characterised in that
After the step 3, in addition to:
Step 4, the keel framework according to arrangement, count the keel length and number of fitting parts of all size, and generation ceiling joist is auxiliary
Material inventory.
A kind of 6. arranging system of the ceiling joist based on BIM, it is characterised in that including:
First arrangement module, for selecting suspended ceiling modeling race in the file management system of BIM softwares, and by the suspended ceiling modeling
Race is arranged in the ceiling void of room model, according to the size of ceiling void arrangement furred ceiling;
First setup module, for setting height of the furred ceiling finished surface relative to room top;
Second setup module, for setting the material layers of furred ceiling;
Second arrangement module, the type of the keel framework for selecting furred ceiling, and arranged according to the installation of default keel framework
The planar dimension of rule and furred ceiling is arranged the keel framework of selection.
A kind of 7. arranging system of ceiling joist based on BIM according to claim 6, it is characterised in that the furred ceiling
Moulding race includes flat-top, falls a grade furred ceiling, light trough furred ceiling, arch furred ceiling and vault type furred ceiling.
8. the arranging system of a kind of ceiling joist based on BIM according to claim 6, it is characterised in that also including
Three setup modules, the 3rd setup module, which is used to set, falls height of grade furred ceiling relative to the height of furred ceiling finished surface.
9. the arranging system of a kind of ceiling joist based on BIM according to claim 8, it is characterised in that described second
Arrangement module, specifically for when the furred ceiling finished surface is not more than preset height relative to the height of room top, selection is single
Layer keel, double-layer keel is otherwise selected, and arranged according to the installation arranging rule of default keel framework and the planar dimension of furred ceiling
The keel framework of cloth selection.
A kind of 10. arranging system of ceiling joist based on BIM according to claim any one of 6-9, it is characterised in that
Also include statistical module, the statistical module is used for the keel framework according to arrangement, counts the keel length of all size and match somebody with somebody
Number of packages amount, generate ceiling joist auxiliary material inventory.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710594280.7A CN107463733A (en) | 2017-07-20 | 2017-07-20 | A kind of arrangement method and system of the ceiling joist based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710594280.7A CN107463733A (en) | 2017-07-20 | 2017-07-20 | A kind of arrangement method and system of the ceiling joist based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107463733A true CN107463733A (en) | 2017-12-12 |
Family
ID=60544363
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710594280.7A Pending CN107463733A (en) | 2017-07-20 | 2017-07-20 | A kind of arrangement method and system of the ceiling joist based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107463733A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108170935A (en) * | 2017-12-25 | 2018-06-15 | 巧夺天宫(深圳)科技有限公司 | Folded grade furred ceiling design method, storage device and system |
CN108182309A (en) * | 2017-12-20 | 2018-06-19 | 巧夺天宫(深圳)科技有限公司 | Drawing practice and relevant device |
CN108268699A (en) * | 2017-12-22 | 2018-07-10 | 巧夺天宫(深圳)科技有限公司 | Interior decoration furred ceiling setting system, method, equipment and computer program product |
CN108280257A (en) * | 2017-12-22 | 2018-07-13 | 巧夺天宫(深圳)科技有限公司 | Method for drafting and relevant device |
CN108301551A (en) * | 2017-12-30 | 2018-07-20 | 浙江亚厦装饰股份有限公司 | Building ceiling industrializes decorative system and installation method |
CN108733939A (en) * | 2018-05-28 | 2018-11-02 | 东易日盛家居装饰集团股份有限公司 | A kind of keel of partition wall arrangement method and system based on BIM |
CN109057126A (en) * | 2018-08-17 | 2018-12-21 | 中国十七冶集团有限公司 | A kind of building decoration furred ceiling based on BIM technology |
CN113077140A (en) * | 2021-03-31 | 2021-07-06 | 贵州建工梵净山建筑工程有限公司 | Phosphogypsum construction optimization method based on BIM technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100614916B1 (en) * | 2006-03-16 | 2006-08-28 | (주)넥스컴스 | Reinforcement bim for contruct building of insert part is formed |
US8843350B2 (en) * | 2011-06-03 | 2014-09-23 | Walter P. Moore and Associates, Inc. | Facilities management system |
CN106649938A (en) * | 2016-09-28 | 2017-05-10 | 杭州迪咖科技有限公司 | BIM-based fine decoration co-design method |
CN106709660A (en) * | 2016-12-29 | 2017-05-24 | 天津市建筑设计院 | BIM-based architectural design method |
-
2017
- 2017-07-20 CN CN201710594280.7A patent/CN107463733A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100614916B1 (en) * | 2006-03-16 | 2006-08-28 | (주)넥스컴스 | Reinforcement bim for contruct building of insert part is formed |
US8843350B2 (en) * | 2011-06-03 | 2014-09-23 | Walter P. Moore and Associates, Inc. | Facilities management system |
CN106649938A (en) * | 2016-09-28 | 2017-05-10 | 杭州迪咖科技有限公司 | BIM-based fine decoration co-design method |
CN106709660A (en) * | 2016-12-29 | 2017-05-24 | 天津市建筑设计院 | BIM-based architectural design method |
Non-Patent Citations (1)
Title |
---|
罗兰 等: "某项目装饰工程基于Revit的BIM技术应用研究", 《土木建筑工程信息技术》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108182309A (en) * | 2017-12-20 | 2018-06-19 | 巧夺天宫(深圳)科技有限公司 | Drawing practice and relevant device |
CN108268699A (en) * | 2017-12-22 | 2018-07-10 | 巧夺天宫(深圳)科技有限公司 | Interior decoration furred ceiling setting system, method, equipment and computer program product |
CN108280257A (en) * | 2017-12-22 | 2018-07-13 | 巧夺天宫(深圳)科技有限公司 | Method for drafting and relevant device |
CN108170935A (en) * | 2017-12-25 | 2018-06-15 | 巧夺天宫(深圳)科技有限公司 | Folded grade furred ceiling design method, storage device and system |
CN108301551A (en) * | 2017-12-30 | 2018-07-20 | 浙江亚厦装饰股份有限公司 | Building ceiling industrializes decorative system and installation method |
CN108733939A (en) * | 2018-05-28 | 2018-11-02 | 东易日盛家居装饰集团股份有限公司 | A kind of keel of partition wall arrangement method and system based on BIM |
CN109057126A (en) * | 2018-08-17 | 2018-12-21 | 中国十七冶集团有限公司 | A kind of building decoration furred ceiling based on BIM technology |
CN113077140A (en) * | 2021-03-31 | 2021-07-06 | 贵州建工梵净山建筑工程有限公司 | Phosphogypsum construction optimization method based on BIM technology |
CN113077140B (en) * | 2021-03-31 | 2023-10-17 | 贵州建工梵净山建筑工程有限公司 | Phosphogypsum construction optimization method based on BIM technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107463733A (en) | A kind of arrangement method and system of the ceiling joist based on BIM | |
CN105046534B (en) | Aided design system (iAD) Internet-based | |
CN105446069B (en) | A kind of holographic imaging full trim simulation shows method and display systems based on BIM | |
CN112883476B (en) | Layout method and device of building space and electronic equipment | |
CN103578137A (en) | Three-dimensional modeling system and method for prefabricated parts | |
CN104077446B (en) | The method and system of two-dimentional electrical construction document are extracted from digital three-dimemsional model | |
CN102194027A (en) | Optimized analytical method and system for noise control in transformer station | |
CN103066698A (en) | Implement method for automatic generation of visible power grid trend chart in dispatching system | |
CN110414151B (en) | Residence type shared area calculation method based on CAD | |
CN101996242A (en) | Three-dimensional R-tree index expansion structure-based three-dimensional city model adaptive method | |
CN103577936A (en) | Distributed maintenance and global sharing system for power grid model and implementation method thereof | |
Marta et al. | 7D BIM for sustainability assessment in design processes: A case study of design of alternatives in severe climate and heavy use conditions | |
CN109191577A (en) | A kind of distribution BIM collaborative platform | |
CN110433495A (en) | The configuration method and device of virtual scene, storage medium and electronic equipment in game | |
CN110162852A (en) | A method of automatically generating light steel keel gypsum board furred ceiling model | |
CN108733873A (en) | Technique profile design drawing generating method, system, device and readable storage medium storing program for executing | |
CN107292065A (en) | A kind of quick composing system of floor tile based on BIM technology and method | |
CN109887092A (en) | The design platform of photovoltaic plant under the complicated landform built using virtual reality technology | |
Liang et al. | Research on design optimization of prefabricated residential houses based on BIM technology | |
EP2795545A1 (en) | System for distributing electrical energy over a cluster of electrical devices, method for distributing electrical energy over a cluster of electrical devices of such a system and controller for use in such a system | |
CN103235858B (en) | The method of the analytical calculation building scale of construction | |
CN108733939A (en) | A kind of keel of partition wall arrangement method and system based on BIM | |
CN109684736A (en) | Stirrup model generating method, system, device and readable storage medium storing program for executing in component | |
CN107515961A (en) | A kind of ceramic tile parquets arrangement method based on BIM | |
Yun et al. | Basic research on BIM-based quantity take-off guidelines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171212 |