The node of column and beam and its construction method of the anti-buckling energy-consumption component of replacement easy to install
Technical field
The invention patent relates to the seismic resistance field of building structure, in particular to a kind of anti-buckling energy-consumption structure of replacement easy to install
The node of column and beam and its construction method of part.
Background technique
The anti-seismic performance of bean column node is always that field is given priority in building structure.For bean column node, generally
By moving on on beam plastic hinge region outside cylinder, the thought of strong column and weak beam is realized.
105780960 A of CN provides a kind of fully-prefabricated assembled column-beam anti-buckling energy-consumption node, the anti-buckling energy-consumption
Node includes two anti-buckling edge of a wing metal plate energy-consumption dampers, two high-strength web connecting plates, one first pre-buried girder steel and one the
Two pre-buried girder steels;One end of the first pre-buried girder steel is embedded in the concrete column, the protruding cylinder of the other end;Described
One end of two pre-buried girder steels is embedded in the beams of concrete, the protruding beam-ends face of the other end;The first pre-buried girder steel and
The upper lower flange of two pre-buried girder steels is connected by the two anti-buckling edge of a wing metal plate energy-consumption dampers;First pre-buried steel
Beam is connected with the two sides in the middle part of the second pre-buried girder steel by the two high-strength web connecting plates.The advantage is that: can pass through
The anti-buckling energy-consumption node realizes that plastic hinge is moved out from cylinder, to reduce the damage to anti-buckling energy-consumption joint cores
Wound realizes the anti-seismic performance requirement of " strong column and weak beam " and " strong shear capacity and weak bending capacity ".
And CN103556780A also provides a kind of anti-buckling shape steel-concrete combined beam in the edge of a wing, including pillar and the edge of a wing are prevented
Buckling fashioned iron portion.The anti-buckling fashioned iron portion in the edge of a wing is installed on pillar, the anti-buckling fashioned iron portion in the edge of a wing include girder steel, floor,
Peg, bolt and anti-buckling steel bushing plate, the floor are fixed on girder steel by peg, and the anti-buckling steel bushing plate passes through bolt
It is anchored at girder steel lower flange and lower part web.It has construct it is convenient, from heavy and light, intensity is high, rigidity is big, positive and negative Moment
The symmetrical advantage of lower performance.
The mechanical mechanism of above-mentioned document is, for girder steel, plastic hinge turns to be moved to Liang Shanghou, due to the upper and lower wing
Edge undertakes " drawing-pressure " cyclic reverse loading, may generate buckling when being pressurized, therefore, anti-buckling support is designed as on the edge of a wing
Form, the energy-dissipating property of Lai Tigao bean column node.
CN104088375A discloses a kind of buckling-restrained reinforcement constitution, upper reinforcement, lower rebar, buckling-restrained steel
Muscle, confinement sleeve, threaded coupling sleeve and closed material composition, the advantage is that: in the reciprocal of the accidental loads such as earthquake load
Under effect, constraint of the Reinforcement in compressive buckling by external constraint casing, to improve Reinforcement
Axially compression bearing capacity, had both been able to maintain the power transmission load-carrying properties of Reinforcement itself under cyclic reverse loading, while can be with
It prevents the buckling of Reinforcement from failing, improves entire pier stud component or pier stud-girder connection energy dissipation capacity.
The method of CN104088375A is similar with the principle of CN 105780960 A, CN103556780A, is to set reinforcing bar, the steel edge of a wing
Confining part is set, its compressive buckling is prevented.Similar scheme is arranged also just like CN105525679A also between beam-column
Energy consumption stick consume energy.
However, how anti-buckling component is quickly installed there is also certain damage and restores anti-buckling after geological process
Dissipative member becomes a urgent problem to be solved.In the prior art, also not mixed to bean column node, especially beams of concrete-
This problem of anti-buckling energy-consumption component quick-replaceable in solidifying earth pillar carries out the analysis and solution of system.
Summary of the invention
The object of the present invention is to provide the node of column and beam and its construction party of a kind of anti-buckling energy-consumption component of replacement easy to install
Method solves how quickly to install the technical issues of restoring anti-buckling energy-consumption component.
A kind of node of column and beam of the anti-buckling energy-consumption component of replacement easy to install, comprising: concrete column 1, the second beams of concrete
2-2, concrete column 1 are also prefabricated with the first short beam 2-1, the second beams of concrete 2-2 for prefabricated and cylinder;First short beam 2-1
It is embedded with the first vertical muscle 3-1 of prominent first end face short beam 2-1, the upper and lower side of the end of the second beams of concrete 2-2 is provided with enterprise
Mouth 2-3, the vertical muscle 3-2 of the second of the second beams of concrete 2-2 stretch out tongue and groove end face, and the first vertical muscle 3-1 and the second vertical muscle 3-2 are mutually right
It answers;Energy consumption bar member 4 is connected between the first vertical vertical muscle 3-2 of muscle 3-1 and second;
Pre-buried first position-limiting tube 9 in the first short beam 2-1;
Energy consumption bar member 4 includes: the 5th connection sleeve 10- with the first vertical muscle 3-1 the first screwed assembly 10 connecting
1, the 6th connection sleeve 10-2, the 5th connection sleeve 10-1 includes third flange, the 4th flange and gear conjunction portion, third flange, the
Four flange inners have screw thread;There is screw thread on the inside of 6th connection sleeve, the outside spiral shell with energy consumption bar member 4 and the 4th flange
Line connection;
Vertical plate 6-2 is arranged in second beams of concrete 2-2 at tongue and groove;
Energy consumption bar member 4 and the second vertical muscle 3-2 the second screwed assembly 7 connecting include: the first connection sleeve 7-1,
Second connection sleeve 7-2, third connection sleeve 7-3, the 4th connection sleeve 7-4;The 4th connection sleeve 7-4 includes first convex
Edge, the second flange and gear conjunction portion, are provided with screw thread on the inside of the first flange and the second flange and connect with the second vertical muscle 3-2, the
Two flanges are inserted into the through-hole 6-3 of vertical plate 6-2, are also equipped with screw thread in the outer surface of the first flange;The third connector sleeve
The inner surface of cylinder 7-3 is threadedly coupled the outer surface for the first flange for connecting sleeve 7-4 with the 4th;Second connection sleeve 7-2's is interior
Surface is threadedly coupled the end of energy consumption bar member 4;The inner surface of the first connection sleeve 7-1 is threadedly connected to the second connector sleeve
Cylinder 7-2 and third connect sleeve 7-3.
Further, using the connection side of Alveolus type or shaped-steel joint between the first short beam 2-1 and the second beams of concrete 2-2
Formula connection.
Further, the first position-limiting tube 9 is steel pipe, the 5th connection third flange of sleeve 10-1 and connecing for the first position-limiting tube 9
Contacting surface is shiny surface.
Further, the two sides of tongue and groove 2-3 and the second beams of concrete 2-2 it is affixed have block 2-4;Steel plate is constrained first
Screw rod 8-3 is connected on the bottom plate of 8-1, the outside of the energy consumption bar member 4 in tongue and groove is provided with concrete restraining plate, and second about
The outside of concrete restraining plate is arranged in beam steel plate 8-2, and by concrete restraining plate and the second constraint steel plate 8-2 is provided with and spiral shell
The corresponding hole bar 8-3.
A kind of construction method of the node of column and beam of the anti-buckling energy-consumption component of replacement easy to install, installation energy consumption bar member 4,
Installation steps are as follows:
First, the 4th connection sleeve 7-4 is passed through into the second vertical muscle 3-2 and is entered in through-hole 6-3, third is connected into sleeve 7-
3 are threaded on the first flange of the 4th connection sleeve 7-4, and the first connection sleeve set 7-1 is covered on energy consumption bar member 4,
In the second connection of end thread connection sleeve 7-2 of energy consumption stick;
Second, energy consumption bar member 4 is connect with the first screwed assembly;
Third, with second connect sleeve 7-2 for the first connection sleeve 7-1 and connect sleeve 7-3 with third and link together.
Further, before energy consumption bar member 4 is installed, at the vertical plate 6-2 of beams of concrete and other positions of tongue and groove
One layer of elastic fluid of surface mount, on elastic fluid install first constraint steel plate 8-1, first constraint steel plate 8-1 include bottom
Portion's plate and two sides vertical plate.
Further, after energy consumption bar member 4 is installed, the hole of concrete restraining plate is corresponded into screw rod, is placed in tongue and groove
In, screw rod 8-3 passes through the surface of the second constraint steel plate 8-2, then uses nut tightening.
Further, the step of energy consumption stick is connect with the first screwed assembly is as follows: firstly, the 5th connection sleeve 10-1 rotation
Enter the first reinforcing bar, the 5th connection sleeve 10-1 third flange enters in the first position-limiting tube 9 until its gear conjunction portion connects with the first short beam
Touching, secondly, the 6th connection sleeve 10-2 is threaded on the 4th flange of the 5th connection sleeve 10-1, finally, will energy consumption
Bar member 4 is threaded in the 6th connection sleeve 10-2.
By adopting the above technical scheme, compared with prior art, advantage includes the following.
First, by installing energy consumption bar member in tongue and groove, in order to installation and replacement energy consumption bar member.
Second, energy consumption bar member connect with vertical muscle to be connected using the means for connecting sleeve, from one~embodiment of comparative example one,
It successively solves following problems: how to connect the end of energy consumption bar member, the stretching for how avoiding the first vertical muscle and the second vertical muscle
How buckling avoids the screw-in of sleeve from screwing out.
Block is arranged in third on concrete tongue-and-groove, is the positioning in order to limit the concrete in tongue and groove;And it will be in tongue and groove
It is concrete prefabricated connected at plate by bolt and nut, can easily install energy consumption bar member concrete constraint.
Detailed description of the invention:
Fig. 1: the first short beam of one~embodiment of comparative example one and the design drawing of the second beams of concrete.
Fig. 2: the vertical muscle of comparative example one connect design drawing with energy consumption bar member.
Fig. 3: the vertical muscle of comparative example two connect design drawing with energy consumption stick.
Fig. 4: the vertical muscle of comparative example three connect design drawing with energy consumption stick.
Fig. 5: the schematic diagram of the vertical plate 6-2 of comparative example three.
Fig. 6: the vertical muscle of embodiment one connect design drawing with energy consumption bar member.
Fig. 7: the schematic diagram of the first constraint steel plate 8-1 of embodiment one and the second constraint steel plate 8-2.
Fig. 8: the first short beam of embodiment two and the design drawing of the second beams of concrete.
Fig. 9: the limited block of the tongue and groove of the secondth beams of concrete of embodiment three and the design drawing of screw rod.
Appended drawing reference: 1 concrete column, the first short beam of 2-1, the second beams of concrete of 2-2,2-3 tongue and groove, 3-1 first indulge muscle, 3-
2 second vertical muscle, 4 energy consumption bar members, the first taper of 4-1 steel bushing, 4-2 the second taper steel bushing, the first connection component of 5-1,5-2
Second connection component, 5-2-1 energy consumption stick connect sleeve, and 5-2-2 indulges muscle connecting elements, 6-2 vertical plate, 6-3 through-hole, 7 second spiral shells
Line connection component, the connection sleeve of 7-1 first, the connection sleeve of 7-2 second, 7-3 third connect sleeve, the connection sleeve of 7-4 the 4th, 7-
The first flange of 4-1, the second flange of 7-4-2,8-1 first constrain steel plate, and 8-2 second constrains steel plate, 8-3 screw rod, 9 first limits
Pipe, 10 first screwed assemblies, the connection sleeve of 10-1 the 5th, the connection sleeve of 10-2 the 6th.
Specific embodiment
Comparative example one can consume for prefabricated assembled concrete beam-concrete column connecting node for the ease of replacement
Energy connection component, the first selection is the pre-buried fashioned iron in beam such as CN105780960A, and the fashioned iron of prominent beam is utilized to connect energy consumption
Component.This mode, can also apply and girder steel.Above scheme is excessive in the moment capacity decline of beam-ends, and only fashioned iron is held
Moment of flexure is carried on a shoulder pole, and concrete does not undertake moment of flexure.For this purpose, inventor, which has abandoned, utilizes the edge of a wing replacement dissipative member on structural steel connecting member
Thought.Second of selection is such as CN105525679A, the setting energy consumption stick between beams of concrete-column, using energy consumption stick come real
Now consume energy.But energy consumption stick is cast in composite beam, replaces inconvenience;And more importantly, in mechanical mechanism
On, energy consumption stick is in tension and compression Cyclic Loading, is actually the fixing iron member using energy consumption stick two sides when consuming energy stick tension
Shearing force between concrete transmits the pulling force of energy consumption stick, this is higher for the intensity requirement of concrete and fixing iron member,
And when consuming energy stick compressive buckling, it is also possible to generate destruction to concrete.
As shown in Figure 1, being the scheme of comparative example 1, comprising: concrete column 1, the second beams of concrete 2-2, concrete column 1
Cylinder has the first short beam 2-1, using Alveolus type or shaped-steel joint between the first short beam 2-1 and the second beams of concrete 2-2
Connection type connection;First short beam 2-1 is embedded with the first vertical muscle 3-1, the second beams of concrete 2- of prominent first end face short beam 2-1
The upper and lower side of 2 end is provided with tongue and groove 2-3, and the vertical muscle 3-2 of the second of the second beams of concrete 2-2 stretches out tongue and groove end face, and first is vertical
Muscle 3-1 is corresponded to each other with the second vertical muscle 3-2;Energy consumption bar member 4 is connected between the first vertical vertical muscle 3-2 of muscle 3-1 and second.
After energy consumption bar member 4 is installed, the fill concrete in tongue and groove;The concrete and the first short beam filled in tongue and groove
Flexible dielectric layer is provided between 2-1, the second beams of concrete 2-2.
As shown in Fig. 2, the first taper steel bushing is respectively adopted in energy consumption bar member 4 and the first vertical muscle 3-1, the second vertical muscle 3-2
4-1, the second taper steel bushing 4-2 connection;Consume energy bar member 4 both ends have shape of threads, sectional area muscle 3-1 vertical compared with first,
Second vertical muscle 3-2 is big;First taper steel bushing 4-1, the shape of the second taper steel bushing 4-2 are identical.When installation, first by the first cone
The vertical muscle of shape steel bushing 4-1 and first is threaded togather, the second taper steel bushing 4-2 and the second vertical muscle are threaded in one
It rises, and the second taper steel bushing 4-2 is first mobile to the direction of the second vertical muscle, it then will energy consumption bar member and the first taper steel bushing
The other end of 4-1 is threadedly coupled, and is then rotated the second taper steel bushing, is moved to the direction of dissipative member,
First, combine advantage of both CN105780960A, CN105525679A: the stick that will consume energy is directly vertical with beam
Muscle connection does not need the anchoring piece that energy consumption stick is arranged again.
Second, in the effect of the upper and lower surfaces setting tongue and groove of the second beams of concrete 2-2, first is that in order to weaken the anti-of beam-ends
Curved rigidity, so that plastic hinge moves on on beams of concrete from cylinder, so that energy consumption stick energy consumption;Second is that energy consumption stick is arranged in upper and lower table
In the tongue and groove in face, in order to the installation and replacement of the stick that consumes energy.
Third, energy consumption stick compressive buckling energy consumption, if the bending deformation of energy consumption stick is excessive, concrete can be also crushed.If
The concrete of energy consumption stick is connect with beams of concrete, is crushed meeting so that beams of concrete loses bearing capacity.And the application is to energy consumption stick
Anti-buckling concrete is not involved in stress, broken to have an impact to the bearing capacity of beams of concrete.And in order to mention energy consumption
Steel plate can be arranged in the outside of concrete in the anti-buckling performance of stick.
4th, the connection of energy consumption stick and the first vertical muscle, the second vertical muscle is a difficult point.Energy consumption stick and the first vertical muscle pass through first
After taper steel bushing is connected through a screw thread, energy consumption stick cannot rotate again, pass through second the preparatory second vertical muscle spiral shell of taper steel bushing
Line connection, and the second taper steel bushing screws in the second vertical muscle, after consume energy stick and the first taper steel bushing are installed, then by the
Two taper steel bushings reversely rotate, so that the second taper steel bushing links together with energy consumption stick.
The problem of comparative example one is: the second taper steel bushing needs mobile distance larger in connection, and the second cone
Shape steel bushing is moved on the second vertical muscle, and therefore, the distance that the second vertical muscle stretches out beams of concrete is also longer.
In view of the above deficiencies, comparative example two is proposed: as shown in figure 3, the first, second taper steel bushing is changed to
One, the second connection component 5-1, the structure of 5-2, the two are identical, are made of two components: energy consumption stick connection sleeve 5-2-1 and
Vertical muscle connecting elements 5-2-2, indulging muscle connecting elements is flanged screwed part, and the inner end and outer end of flange are equipped with screw thread,
The inner end of flange is threadedly coupled with the first or second vertical muscle, and the outer end of flange connect the inner end spiral shell of sleeve 5-2-1 with energy consumption stick
Line connection.When installation, energy consumption bar member is first connect with the first vertical muscle, first will consumption when the bar member that consumes energy is connect with the second vertical muscle
Energy stick connection sleeve 5-2-1 is threadedly coupled, and vertical muscle connecting elements 5-2-2 is rotated in advance on the second vertical muscle, in place in energy consumption stick
Afterwards, vertical muscle connecting elements 5-2-2 is rotated to energy consumption stick direction, so that the flange of vertical muscle connecting elements 5-2-2 and energy consumption stick connect
Female connector cylinder 5-2-1 links together, until energy consumption stick connection sleeve 5-2-1 encounters the gear conjunction portion of vertical muscle connecting elements 5-2-2.
The advantages of comparative example two, is, is set as 2 components for what the bar member that consumes energy was threadedly coupled with the second vertical muscle, can
Greatly facilitate the installation of energy consumption stick.But during the test, find: the end of the stretching of the first vertical muscle and the second vertical muscle has
There is buckling phenomenon.
Comparative example three: as illustrated in figures 4-5, vertical plate 6- is fixedly installed in the upper and lower tongue and groove of the second beams of concrete 2-2
2, in the first short beam 2-1 pre-buried first position-limiting tube 9, its use metal material and protrude from the first short beam 2-1, will when installation
Energy consumption bar member is threadedly coupled with the first connection component 5-1 of the first vertical muscle;It is arranged on vertical plate 6-2 corresponding with the second vertical muscle
Through-hole 6-3, when installation, energy consumption stick connection sleeve 5-2-1 is first screwed in into energy consumption bar member first, then by the second vertical muscle connection
The gear conjunction portion of component 5-2-2 is inserted into through-hole 6-3, and when the bar member that finally consumes energy positions, energy consumption stick connection sleeve 5-2-1 is screwed out,
With the threaded connection of the flange of the second vertical muscle connecting elements 5-2-2.The vertical muscle connecting elements of the through-hole 6-3 of vertical plate 6-2 and second
The gear conjunction portion of 5-2-2 is simultaneously not fixed, same to design, and the connection component 5-1 of the first vertical muscle is not also fixed with the first position-limiting tube 9,
So that energy consumption bar member is given in vertical muscle power transmission.
Embodiment one: although arriving several improvement of comparative example three by comparative example one, three schemes have one
Problem: being exactly the component screw-in back-out for being required to connection therein.Since above-mentioned component will play transmitting " drawing-pressure " load
Effect, it is general using being more closely threadedly coupled, that is, it is larger to screw in dynamics required for screwing out.On the basis of comparative example three
On, how to avoid screwing in back-out, is to continue with improved key point.
The first screwed assembly 10 for connecting with the first vertical muscle of energy consumption bar member 4 includes: the 5th to connect sleeve 10-1, the
Six connection sleeve 10-2, the 5th connection sleeve 10-1 include third flange, the 4th flange and gear conjunction portion, including third flange, the
Four flange inners have screw thread;There is screw thread on the inside of 6th connection sleeve, the outside spiral shell with energy consumption bar member 4 and the 4th flange
Line connection;When installation, the 5th connection sleeve 10-1 screws in the first reinforcing bar, the 5th connection sleeve 10-1 third flange enters the first limit
Until its gear conjunction portion is contacted with the first short beam in the pipe 9 of position, the 6th connection sleeve 10-2 is then threaded in the 5th connector sleeve
On the 4th flange of cylinder 10-1, then energy consumption bar member 4 is threaded in the 6th connection sleeve 10-2.
Energy consumption bar member 4 and the second vertical muscle 3-2 the second screwed assembly 7 connecting include: the first connection sleeve 7-1,
Second connection sleeve 7-2, third connection sleeve 7-3, the 4th connection sleeve 7-4;
4th connection sleeve 7-4 includes the first flange 7-4-1, the second flange and gear conjunction portion, the inside of the second flange 7-4-2
It is provided with screw thread and its through-hole 6-3 for being inserted into vertical plate 6-2, is arranged with screw thread in the surfaces externally and internally of the first flange;
The inner surface of third connection sleeve 7-3 is threadedly coupled the outer surface for the first flange for connecting sleeve 7-4 with the 4th;The
The inner surface of two connection sleeve 7-2 is threadedly coupled the end of energy consumption bar member 4;
The inner surface of first connection sleeve 7-1 is threadedly connected to the second connection sleeve 7-2 and third connection sleeve 7-3.
When installation, the first connection sleeve since its inner surface is not contacted with energy consumption bar member, do not need to need as comparative example 1-3 by
Sleeve, which screws in, to be screwed out.
The outer surface of second connection sleeve 7-2 is in step-like, and the inner surface of the first connection sleeve is in step-like.Step is set
Meter, the installation between component convenient for determining screwed assembly 7.
The installation steps of energy consumption bar member are as follows: first, the 4th connection sleeve 7-4 is passed through into the second vertical muscle 3-2 and entrance
In through-hole 6-3, third connection sleeve 7-3 is threaded on the first flange of the 4th connection sleeve 7-4, by the first connector sleeve
Cylinder set 7-1 covers on energy consumption bar member 4, in the second connection of end thread connection sleeve 7-2 of energy consumption stick;Second, by the stick that consumes energy
Component 4 is connect with the first screwed assembly;First connection sleeve 7-1 is connect sleeve 7-2 with second and connect with third by third
Sleeve 7-3 links together.
Before energy consumption bar member 4 is installed, on the surface at other positions of the vertical plate 6-2 and tongue and groove of beams of concrete
Paste one layer of elastic fluid, on elastic fluid install first constraint steel plate 8-1, first constraint steel plate 8-1 include bottom plate and
Two sides vertical plate constrains steel plate 8-1 after the first constraint steel plate 8-1 casting concrete, then by the second constraint steel plate 8-2 and first
Connection, so that the anti-buckling concrete to energy consumption bar member constrains.This design is similar to anti-buckling support.
The first short beam 2-1 in embodiment one is identical as the cross-sectional sizes shape of the second beams of concrete 2-2 and uses rectangle,
Its depth of section is h, and the length of the first short beam is between 0.5-0.7h, and the length of tongue and groove is between 0.15h-0.3h.It is above-mentioned to set
The purpose of meter is to limit the position of beam-ends plastic hinge, sufficiently to improve the ductility of bean column node.
Embodiment two: as shown in figure 8, the upper and lower sides of the first short beam are also provided with tongue and groove;First vertical muscle and the bar member that consumes energy
Connection type is identical as embodiment one.When using such design, the length of the first short beam is between 0.7-1.2h, the first short beam
And second beams of concrete tongue and groove total length between 0.15h-0.6h.
Embodiment three: the problem of embodiment one is, casting concrete in tongue and groove, and the bar member 4 that thus causes to consume energy is not easy
Transformation.For the ease of replacement, concrete in tongue and groove is using prefabricated, in order to the replacement for the board member 4 that consumes energy.As shown in figure 9,
The two sides of tongue and groove and the second beams of concrete 2-2 it is affixed have block 2-4;Spiral shell is connected on the bottom plate of the first constraint steel plate 8-1
Bar 8-3, the outside of the energy consumption bar member 4 in tongue and groove are provided with concrete restraining plate, and the second constraint steel plate 8-2 is arranged in coagulation
Concrete restraining plate and the second constraint steel plate 8-2 are provided with hole corresponding with screw rod 8-3 by the outside of native restraining plate;?
When installation, after energy consumption bar member is installed, the hole of concrete restraining plate is corresponded into screw rod, is placed in tongue and groove, screw rod 8-3
Across the surface of the second constraint steel plate 8-2, nut tightening is then used.
The preferred embodiment of present aspect has already been described in detail above, it is understood that having read of the invention above-mentioned say
After awarding content, those skilled in the art can make various modifications or changes to the present invention.Such equivalent forms equally fall into this Shen
It please be in the protection scope of the appended claims.