CN107401104A - Municipal concrete road surface slip form construction device and construction method - Google Patents

Municipal concrete road surface slip form construction device and construction method Download PDF

Info

Publication number
CN107401104A
CN107401104A CN201710803866.XA CN201710803866A CN107401104A CN 107401104 A CN107401104 A CN 107401104A CN 201710803866 A CN201710803866 A CN 201710803866A CN 107401104 A CN107401104 A CN 107401104A
Authority
CN
China
Prior art keywords
paver
level
road surface
level paver
concrete road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710803866.XA
Other languages
Chinese (zh)
Other versions
CN107401104B (en
Inventor
童晓曦
喻建胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Dongyi Park And Garden Construction Co Ltd
Original Assignee
Wenzhou Dongyi Park And Garden Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Dongyi Park And Garden Construction Co Ltd filed Critical Wenzhou Dongyi Park And Garden Construction Co Ltd
Priority to CN201710803866.XA priority Critical patent/CN107401104B/en
Publication of CN107401104A publication Critical patent/CN107401104A/en
Application granted granted Critical
Publication of CN107401104B publication Critical patent/CN107401104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
    • E01C19/4833Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ with tamping or vibrating means for consolidating or finishing, e.g. immersed vibrators, with or without non-vibratory or non-percussive pressing or smoothing means
    • E01C19/4853Apparatus designed for railless operation, e.g. crawler-mounted, provided with portable trackway arrangements
    • E01C19/486Apparatus designed for railless operation, e.g. crawler-mounted, provided with portable trackway arrangements with non-vibratory or non-percussive pressing or smoothing means; with supplemental elements penetrating the paving to work the material thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)

Abstract

The invention discloses a kind of municipal concrete road surface slip form construction device and construction method, including surveying setting-out, paver debugging with positioning, Slipform Paving, dock pave, flatten overlay film and road surface inspection maintenance, pass through the first opposite operation of one-level paver and two level paver, two level paver the preliminary of one-level paver complementation section is paved, both docking rear stage pavers two level paver is tentatively paved section progress it is secondary pave, the construction period that paves is greatly shortened.

Description

Municipal concrete road surface slip form construction device and construction method
Technical field
The present invention relates to a kind of road construction method, more particularly to a kind of municipal concrete road surface slip form construction device and apply Work method.
Background technology
Sliding formwork is the cast-in-place concrete structure for making template system be slided along concrete surface using a determined power and being molded Construction method general name.Sliding formwork logical construction in existing concrete road surface is using the realization of full automatic slip form paver, standard sliding formwork The sliding formwork speed of travel of paver is 0.5 ~ 3m/min, and determines to walk according to the thickness of concrete road surface during practice of construction Speed, road surface requires that the higher speed of travel of thickness is slower, and then is constructed at the larger section of construction requirement road surface thickness week Phase is just longer.
The content of the invention
First purpose of the present invention is to provide a kind of municipal concrete road surface slip form construction device, can shorten construction section The larger construction period of road surface thickness.
The present invention above-mentioned technical purpose technical scheme is that:
One-level paver, the one-level paver include frame, located at the anterior running gear of frame both sides and rear portion walking dress Put and be installed on successively in frame and be in reverse to the storage device of direction of advance, height control plate, smash the device that shakes, vibration bin, One is squeezed into template, flat-topped ridge and floating device are rubbed in vibration with the hands;
Two level paver, the two level paver is identical with one-level paver structure, including second is squeezed into template, and described second It is squeezed into vertical height of the template away from road surface and is squeezed into vertical height of the template away from road surface less than first;And docking mechanism, use In connection one-level paver and two level paver, including the first joint on one-level paver and located at two level paver On the second joint.
By using above-mentioned technical proposal, one-level is set to be worked in coordination with two level paver, one-level paver is used for Duan Lu The construction that paves of a part, two level paver are used for the construction that paves in remaining section, and one-level paver is according to section thickness requirement Normally paved, and two level paver completes the preliminary construction that paves in remaining section, make use of second to be squeezed into template Height is set to realize that the thickness in the section that paves is less than the section thickness after one-level paver paves so that the stand of two level paver The speed of travel that paves of one-level paver can be more than by spreading the speed of travel, and then can quickly finish the preliminary stand in remaining section Paving;Secondly two level paver can be achieved a butt joint using docking mechanism with one-level paver so that and both can keep synchronous walking, by The preliminary work that paves in remaining section is completed in two level paver so that as long as subsequently filling up the thickness in remaining section i.e. Can, and then after completing to dock, the speed of travel before the speed of travel that paves relative can dock can properly increase, and then accelerate whole Pave construction, shortens the construction period in section.
Preferably, first joint is included in the pre- locked groove of angular distribution and in three pre- locked groove lines The main locked groove of the heart;Second joint includes being connected in the pre- tapered end and can be connected in master that in prelock groove and end is spherical in shape Main tapered end in locked groove, wherein the depth of pre- locked groove is greater than the depth of main locked groove, the main tapered end can be along the axial direction of main locked groove It is subjected to displacement.
By using above-mentioned technical proposal, one-level paver with two level paver when achieving a butt joint, first with three Three pre- tapered end clampings of angle arrangement, which are entered in corresponding pre- locked groove, realizes preliminary docking, and what pre- tapered end was arranged with triangle Mode positions at 3 points and determines a face first, can ensure that both have certain docking fixing after completion is pre-locked, its Secondary docking uses the pre-locked precision for improving positioning, coordinates last main locking head block to connect and enters completion docking work in main locked groove Make so that the one-level paver after docking has higher connection fixing with two level paver.
Preferably, second joint also includes being used to drive main tapered end to be close to the/drive mechanism away from main locked groove, Leading screw, the nutplate being threadedly connected on leading screw and the driving leading screw that the drive mechanism includes being connected to main tapered end afterbody turn Dynamic motor.
By using above-mentioned technical proposal, after completing to dock with pre- locked groove, main tapered end is passed pre- tapered end using feed screw nut Dynamic pair is slowly close to main locked groove, by the high advantage of screw nut driven precision, improves last main tapered end and is docked with main locked groove Precision, while after docking using screw pair from the more preferable fixing for improving docking without hesitation.
Preferably, the head of the main tapered end is additionally provided with anterior micro- with rear portion running gear start and stop for controlling Dynamic switch.
By using above-mentioned technical proposal, main tapered end with main locked groove when being docked, the microswitch on main tapered end When touching on the cell wall of main locked groove, stop one-level and the front portion on two level paver and rear portion running gear, realize automation Docking, while avoid the excessive damage for causing docking mechanism of docking.
Preferably, the storage device includes two feed bins being horizontally arranged at interval, and is provided with and stirs in the feed bin Mix device, the discharge outlet of feed bin is connected with tremie pipe, and two tremie pipes are connected by a blow tank, the blow tank perpendicular to Direction of advance, the feed opening of strip is opened up in its bottom, spiral promoting shaft is additionally provided with the blow tank, the spiral pushes away Entering axle includes the first relative propulsion section of direction of propulsion and the second propulsion section.
By using above-mentioned technical proposal, two feed bins are set to improve the idle capacity of concrete first, concrete is stirring After mixing device stirring, out converged to from tremie pipe in blow tank, and by spiral promoting shaft by concrete from the side of blow tank Promote in the middle part of edge picture, concrete being come out from the feed opening below blow tank progressively so that concrete can be equal in paving process Even distribution, the time for subsequently spreading and operating is reduced, shorten construction period.
Preferably, the slip form construction device also includes the evener being connected with one-level paver, the evener Slid by the tractor drives on one-level paver along direction of advance.
By using above-mentioned technical proposal, evener completes what is paved using the driving of hauling machine by one-level paver Leveling construction is carried out on section again, improves construction precision.
Preferably, also there is side template the frame both sides of the one-level paver respectively, and the side template offers cunning Groove, the evener include the roller that multiple rollings are connected in chute.
By using above-mentioned technical proposal, side template plays position-limiting action first, ensures the construction width in section;Secondly side Guide rail of the template also as evener, evener is by roller in the slip of the scrolling realization evener in side template upper hopper chute.
Preferably, the evener also includes scraper plate, oscillating plate and the roller bearing set successively along direction of advance, institute State and vibrating motor is installed on oscillating plate, dustproof membrane is arranged with the roller bearing.
By using above-mentioned technical proposal, evener is when sliding, using scraper plate to complete the concrete road surface that paves Struck off, and drive oscillating plate road pavement to consolidate again using vibrating motor, dustproof membrane, which is routed on road surface, prevents road surface Superficial dust.
Second object of the present invention is to provide a kind of construction method of municipal concrete road surface slip form construction device, can contract The larger construction period of short construction section road surface thickness.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of construction method using the municipal concrete road surface slip form construction device, comprise the following steps:
Step 1, surveying setting-out:After carrying out quality examination to underlayment, surface surface dust and other debris are removed, survey is set in road Line, sideline, lay bench mark, and school is surveyed plan-position and the elevations such as the built road being connected with engineering, structures, spread out with lime Sideline paves the visible marking of scope as side form;
Step 2, paver debugging, positioning:Reach one-level and two level paver and respectively two of construction section so that side form Plate is located at edge positions;
Step 3, Slipform Paving:One-level and two level paver is respectively started so that both move toward one anothers simultaneously carry out sliding formwork stand respectively Paving, the pavement-height after wherein two level paver paves are less than the pavement-height after one-level paver paves;
Step 4, docking pave:Both are docked after one-level runs to certain distance with two level paver, and two level is spread out after docking Paving machine is synchronized with the movement with one-level paver, and continues to run with Slipform Paving along the former direction of advance of one-level paver;
Step 5, leveling overlay film:The hauling machine started on one-level paver causes evener to be close in one-level paver, to passing through Section after one-level paver Slipform Paving is flattened again, while unreels dustproof membrane, and dustproof membrane is routed into concrete road On face;
Maintenance is examined on step 6, road surface.
By using above-mentioned technical proposal, one-level paver and two level paver elder generation move toward one another, one-level paver are carried out The construction that paves of part way, two level paver carry out the preliminary of remaining section and paved, and both are docked after converging, two level stand Paving machine inverted running, the section that tentatively paves of completion is carried out by one-level paver it is secondary pave, shortening paves construction period, And the section after completing to pave flattens and then spreads dustproof membrane and conserved again, ensures construction quality.
Preferably, before step 4 docking, the speed of travel of two level paver is greater than the walking speed of one-level paver Degree;The speed of travel of one-level paver after step 4 docking is more than the speed of travel of the one-level paver before docking.
By using above-mentioned technical proposal, the preliminary speed of travel versus primary paver that paves of two level paver is fast, So that the road section length tentatively to pave is greater than the road section length that one-level paver paves, and both docking are quickly realized, and Subsequent stage paver carries out the secondary quickening that paves for the section after tentatively paving and paved the speed of travel, and shortening paves construction week Phase.
In summary, the invention has the advantages that:
1st, by one-level paver and two level paver, first opposite operation, two level paver are carried out to one-level paver complementation section It is preliminary pave, both dock, and section progress that rear stage paver tentatively paves to two level paver is secondary to pave, significantly Shorten the construction period that paves;
2nd, the section that paved by evener to completion is flattened and covers upper dustproof membrane again, improves slding form operation quality.
Brief description of the drawings
Fig. 1 is the structural representation of concrete road surface slip form construction device in embodiment one;
Fig. 2 is the connection for predominantly showing storage device and evener in embodiment one in the slip form construction device of concrete road surface Schematic diagram;
Fig. 3 is that two level paver is mainly the structural representation for showing storage device in embodiment one;
Fig. 4 is the structural representation of spiral promoting shaft in embodiment one;
Fig. 5 is the schematic diagram of discharging trench bottom in embodiment one;
Fig. 6 is the structural representation of the second joint in embodiment one;
Fig. 7 is the structural representation of the first joint in embodiment one;
Fig. 8 is the structural representation of evener in embodiment one.
In figure:10th, one-level paver;10a, side template;11st, frame;12a, anterior running gear;12b, rear portion walking dress Put;13rd, storage device;131st, feed bin;132nd, tremie pipe;133rd, blow tank;1331st, feed opening;134th, spiral promoting shaft; 1341st, first section is promoted;1342nd, second section is promoted;135th, motor;14th, height control plate;15th, the device that shakes is smash;16th, vibrate Storehouse;17a, first are squeezed into template;17b, second are squeezed into template;18th, flat-topped ridge is rubbed in vibration with the hands;19th, floating device;20th, two level paves Machine;30th, evener;31st, main body;32nd, scraper plate;33rd, oscillating plate;34th, vibrating motor;35th, roller;36th, roller bearing;37th, dustproof membrane; 40th, concrete road surface;50th, the first joint;51st, pre- tapered end;52nd, main tapered end;521st, microswitch;53rd, motor;54th, decelerator; 55th, leading screw;56th, nutplate;57th, limiting plate;60th, the second joint;61st, pre- locked groove;62nd, main locked groove;70th, hauling machine.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment one
Refer to Fig. 1 and Fig. 2, a kind of municipal concrete road surface slip form construction device, including the one-level that can be walked on road surface jointly Paver 10 and two level paver 20, both are identical in construction, including a frame 11 and are connected on the both sides of frame 11 Two anterior running gear 12a and two rear portion running gear 12b, its middle front part running gear 12a and rear portion running gear 12b It is cterpillar drive.Before the front side for defining the direction of travel in one-level paver 10 or operative orientation A herein is Portion running gear 12a, similarly with the direction of travel of two level paver 20 or operative orientation B front sides for anterior running gear 12a, Hereinafter, it is specifically described by taking one-level paver 10 as an example.
One-level paver 10 also includes the storage device 13 being fixed in frame 11, and the storage device 13 is used to store and shape Into going out flowable material(Especially concrete), and the storage device 13 is located at frame 11 close to anterior running gear 12a Side.
Refering to Fig. 3, storage device 13 has specifically included two feed bins 131 on the both sides of frame 11, and feed bin 131 is substantially In infundibulate, agitating device is provided with feed bin 131(Not shown in figure), agitating device can be for stirring slurry and to being stored in Material is stirred in feed bin 131.
Inclined tremie pipe 132 is connected with the feed opening 1331 of feed bin 131, two tremie pipes 132 are communicated to positioned at two On blow tank 133 between person.A spiral promoting shaft 134 is provided with blow tank 133, one end of spiral promoting shaft 134 connects Motor 135 is connected to, and there can be motor 135 to drive rotation.
Fig. 4 and Fig. 5 is referred to jointly, the bottom of blow tank 133 offers the feed opening 1331 of strip, feed opening 1331 The material that size is available for being stored in feed bin 131 especially concrete passes through.The spiral promoting shaft being contained in blow tank 133 134, which include length identical first, promotes section 1341 and second to promote section 1342, and first promotes section 1341 and second to promote section There is the opposite flight of the hand of spiral respectively on 1342, spiral promoting shaft 134 can be forced in rotation process and flowed into out Material in hopper 133 promotes toward middle part.
Fig. 1 is continued back at, height control plate 14 is also fixed with frame 11 successively, smashes the device 15 that shakes, first is squeezed into template 17a, vibration rub flat-topped ridge 18 and floating device 19 with the hands, and above-mentioned component arrangement direction is anterior running gear 12a to rear portion running gear 12b, it is in wherein smashing the device 15 that shakes in vibration bin 16, the first height control plate 14 is located at the rear side of storage device 13, herein rear side Using the direction of advance of the first paver or operative orientation A as reference direction.Hereinafter, to above-mentioned mentioned component function It is introduced.
Highly control for the material to get off out of storage device 13 to be entered in vibration bin 16, and on the basis of road surface The height that control material is entered in vibration bin 16;Smash the device 15 that shakes be provided with frame 11 it is multiple, and with perpendicular to advance side To or operative orientation A arrangement, for carrying out tamping operation to the material entered in vibration bin 16;First is squeezed into template 17a is used to extrude more closely knit by the material of tamping, while the standard section, smooth for smearing out concrete road surface 40 is dragged in extruding Outward appearance and good vertically and horizontally flatness;Vibration rubs flat-topped ridge 18 with the hands and is used to repairing defective concrete road surface 40 that to meet it smooth The requirement of degree;The defects of minute bubbles and stone dragging that last floating device 19 is used to eliminate on road surface are brought simultaneously can play warehouse Effect, ensure that road surface has excellent longitudinal flatness.
Common to refer to Fig. 2, Fig. 6 and Fig. 7, the slip form construction device also includes being used to connect one-level paver 10 and two level The docking mechanism of paver 20, the docking mechanism specifically include can clamping mutually the first joint 50 and the second joint 60, wherein First joint 50 is in the frame 11 of two level paver 20, and the second joint 60 is in the frame 11 of one-level paver 10.
Wherein, the first joint 50 includes the three pre- tapered ends 51 and a main tapered end 52 that are fixed on limiting plate 57, and three Individual pre- tapered end 51 is arranged in triangle, and main tapered end 52 is positioned at the line center of three pre- tapered ends 51, pre- tapered end 51 and main tapered end 52 End is set in bulb;One end of main tapered end 52 is also associated with a leading screw 55, and the threaded one end of leading screw 55 is connected to limiting plate On 57, while nutplate 56 is also threaded with leading screw 55, nutplate 56 is fixed in frame 11, and one end of leading screw 55 connects Decelerator 54 is connected to, decelerator 54 is connected with motor 53, and motor 53 drives silk after changing rotating speed and moment of torsion by decelerator 54 Thick stick 55 rotates.In addition, being additionally provided with microswitch 521 in the end of main tapered end 52, the microswitch 521 is used for anterior and rear portion Running gear 12b start and stop.
Second joint 60 includes opened up three pre- locked grooves 61 and a main locked groove 62, pre- locked groove 61 and main locked groove 62 The set location of pre- tapered end 51 and main tapered end 52 is corresponded to respectively, is set respectively for the card of pre- tapered end 51 and main tapered end 52.In addition, main lock The groove depth of groove 62 is less than the groove depth of pre- locked groove 61.
Fig. 2 and Fig. 8 finally is referred to jointly, the slip form construction device also includes an evener 30, the evener 30 and one-level Paver 10 connects, and the hauling machine 70 by being fixed on one-level paver 10 realizes connection.Evener 30 specifically includes One main body 31, the scraper plate 32 being fixed in main body 31, oscillating plate 33 and dustproof membrane 37, with the direction of advance of one-level paver 10 Or operative orientation A is reference, scraper plate 32, oscillating plate 33 and dustproof membrane 37 are arranged from the front side to rear side successively, wherein vibrating On be fixed with vibrating motor 34, for providing amplitude and frequency on the longitudinal direction of oscillating plate 33, the coiling of dustproof membrane 37 is in roller bearing 36 On, roller bearing 36 is in main body 31.
With being provided with side template 10a in the frame 11 of two level paver 20, side template 10a is offered one-level paver 10 One chute so that whole side template 10a sections are in " recessed " shape, and the lower section of main body 31 of evener 30 is additionally provided with multiple rollers 35, The roller 35 is embedded in side template 10a chute and is connected on the cell wall of chute.
Embodiment two
A kind of construction method of municipal concrete road surface sliding formwork, based on the slip form construction device in embodiment one, specifically include with Lower construction procedure:
Step 1, surveying setting-out
1)After carrying out quality examination to underlayment, remove surface surface dust and other debris, survey sets center line of road, sideline, school survey with Built road, plan-position and the elevation such as structures of this engineering linking.
2)Bench mark is laid, builds temporary bench mark with 100 meters, reconnaissance should consolidate, and broad view, intervisibility is good, no The position easily collided, and should meet that construction survey uses.
3)Carry out survey according to design cross-post outcome table, design drawing, the road axis set of confiding a technological secret and surveyed and set Side form sideline.Skirt piles are located at roadbed design width and widened at 50cm, to ensure one-level paver 10 and two level paver 20 Advance unobstructed;Surveyed at the starting point of side form, terminal, plane break, longitudinal break, straightway control point and set skirt piles;Skirt piles are pressed The control point such as every 5-20m points and curve terminal is surveyed and set;Should in time be carried out by repetition measurement, and filled in for bench mark, traverse point unwrapping wire Record;Sideline finally spread out as side form by the use of lime pave the visible marking of scope, to meet needs of constructing.
Step 2, paver debugging, positioning
1)By one-level and two level paver 10,20 and two adjustment for reaching construction section respectively it is in place, and associated component is entered Row elevation is examined, computer is debugged, is checked to ensure one-level and the elevation in the traveling process of two level paver 20 and direction regulation spirit It is quick effective.
2)Paver position is manually adjusted, is located at side template 10a both sides and spreads lime line position.
Step 3, Slipform Paving
1)Concrete is matched and launched and is entered in feed bin 131, starts agitating device and is stirred.
2)One-level and two level paver 10,20 is respectively started so that both move toward one anothers simultaneously carry out Slipform Paving respectively, control The speed of travel of two level paver 20 processed is greater than the speed of travel of one-level paver 10, while ready-mixed concrete is transported as early as possible It is live to sliding formwork, and the manually feeding into feed bin 131 at any time.
Step 4, docking pave
1)Both are docked after one-level runs to certain distance with two level paver 10,20, stop one in docking operation first The walking of level paver 10, and the speed of travel of two level paver 20 is reduced simultaneously, pre- tapered end 51 takes the lead in being caught in pre- locked groove 61 It is interior, while start motor 53, drive main tapered end 52 to be slowly caught in main locked groove 62, the microswitch on main tapered end 52 521 touch the automatic anterior running gear 12a and rear portion running gear for causing two level paver 20 after the cell wall of main locked groove 62 Mating operation is completed in 12b stopping.
2)One-level paver 10 and two level paver 20 are restarted, and adjusts the direction of travel and original of two level paver 20 First walking is in opposite direction, while manual control ensures that the speed of travel of one-level paver 10 and two level paver 20 keeps certain, But the speed of travel of one-level paver 10 before relative docking is quicker.
Step 5, leveling overlay film
Manually one side of dustproof membrane 37 is pulled on the road surface side with the completion that paves, starts the hauling machine on one-level paver 10 70 pulling eveners 30 enter line slip, while open vibrating motor 34, and evener 30 is progressively close to one-level paver 10 until two Cut-out hauling machine 70 after person is close, the overlay film on part road surface is completed, repeat step 5, which is realized, paves a section followed by overlay film all the way Section.
Maintenance is examined on step 6, road surface.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (10)

  1. A kind of 1. municipal concrete road surface slip form construction device, it is characterised in that including:
    One-level paver(10), the one-level paver(10)Including frame(11), located at frame(11)The anterior walking of both sides Device(12a)With rear portion running gear(12b)And frame is installed on successively(11)Storing dress that is upper and being in reverse to direction of advance Put(13), height control plate(14), smash the device that shakes(15), vibration bin(16), first be squeezed into template(17a), vibration rub with the hands flat-topped ridge (18)And floating device(19);
    Two level paver(20), the two level paver(20)With one-level paver(10)Structure is identical, including second is squeezed into Template(17b), described second is squeezed into template(17b)Vertical height away from road surface is squeezed into template less than first(17a)Away from road The vertical height in face;
    And docking mechanism, for connecting one-level paver(10)With two level paver(20), including located at one-level paver (10)On the first joint(50)And located at two level paver(20)On the second joint(60).
  2. 2. municipal concrete road surface slip form construction device according to claim 1, it is characterised in that first joint (50)Including the pre- locked groove in angular distribution(61)And positioned at three pre- locked grooves(61)The main locked groove at line center(62);It is described Second joint(60)Including prelock groove can be connected in(61)Interior and spherical in shape end pre- tapered end(51)And main lock can be connected in Groove(62)Interior main tapered end(52), wherein pre- locked groove(61)Depth be greater than main locked groove(62)Depth, the main tapered end (52)Can be along main locked groove(62)It is axially displaced.
  3. 3. municipal concrete road surface slip form construction device according to claim 2, it is characterised in that second joint (60)Also include being used to drive main tapered end(52)Be close to/away from main locked groove(62)Drive mechanism, the drive mechanism include connect It is connected to main tapered end(52)The leading screw of afterbody(55), be threadedly connected to leading screw(55)On nutplate(56)And driving leading screw(55) The motor of rotation(53).
  4. 4. municipal concrete road surface slip form construction device according to claim 2, it is characterised in that the main tapered end(52) Head be additionally provided with it is anterior with rear portion running gear for controlling(12a、12b)The microswitch of start and stop(521).
  5. 5. municipal concrete road surface slip form construction device according to claim 1, it is characterised in that the storage device (13)Including two feed bins being horizontally arranged at interval(131), the feed bin(131)Inside it is provided with agitating device, feed bin(131)'s Discharge outlet is connected with tremie pipe(132), two tremie pipes(132)Pass through a blow tank(133)Connection, the blow tank (133)Perpendicular to direction of advance, the feed opening of strip is opened up in its bottom(1331), the blow tank(133)Inside also set up There is spiral promoting shaft(134), the spiral promoting shaft(134)Including the first relative propulsion section of direction of propulsion(1341)With second Promote section(1342).
  6. 6. municipal concrete road surface slip form construction device according to claim 1, it is characterised in that the slding form operation dress Putting also includes and one-level paver(10)The evener of connection(30), the evener(30)By located at one-level paver(10) On hauling machine(70)Drives edge direction of advance slides.
  7. 7. municipal concrete road surface slip form construction device according to claim 6, it is characterised in that the one-level paver (10)Frame(11)Also there is side template both sides respectively(10a), the side template(10a)Offer chute, the evener (30)The roller being connected to including multiple rollings in chute(35).
  8. 8. municipal concrete road surface slip form construction device according to claim 7, it is characterised in that the evener(30) Also include the scraper plate set successively along direction of advance(32), oscillating plate(33)And roller bearing(36), the oscillating plate(33)Upper peace Equipped with vibrating motor(34), the roller bearing(36)On be arranged with dustproof membrane(37).
  9. 9. one kind utilizes the construction method of such as any one of claim 1 ~ 8 municipal concrete road surface slip form construction device, its It is characterised by, comprises the following steps:
    Step 1, surveying setting-out:After carrying out quality examination to underlayment, surface surface dust and other debris are removed, survey is set in road Line, sideline, lay bench mark, and school is surveyed plan-position and the elevations such as the built road being connected with engineering, structures, spread out with lime Sideline paves the visible marking of scope as side form;
    Step 2, paver debugging, positioning:By one-level and two level paver(10、20)And two of construction section is reached respectively, So that side template(10a)Positioned at edge positions;
    Step 3, Slipform Paving:One-level and two level paver is respectively started(10、20)So that both move toward one anothers are simultaneously carried out respectively Slipform Paving, wherein two level paver(20)Pavement-height after paving is less than one-level paver(10)Road surface after paving is high Degree;
    Step 4, docking pave:One-level and two level paver(10、20)Both are docked after running to certain distance, after docking Two level paver(20)With one-level paver(10)Paver is synchronized with the movement, and along one-level paver(10)Former direction of advance after Reforwarding row Slipform Paving;
    Step 5, leveling overlay film:Start one-level paver(10)On hauling machine(70)So that evener(30)It is close to and is spread out in one-level Paving machine(10), to passing through one-level paver(10)Section after Slipform Paving is flattened again, while unreels dustproof membrane(37), By dustproof membrane(37)It is routed to concrete road surface(40)On;
    Maintenance is examined on step 6, road surface.
  10. 10. the construction method of municipal concrete road surface slip form construction device according to claim 9, it is characterised in that Before step 4 docking, two level paver(20)The speed of travel be greater than one-level paver(10)The speed of travel;Step 4 is docked One-level paver afterwards(10)The speed of travel be more than docking before one-level paver(10)The speed of travel.
CN201710803866.XA 2017-09-08 2017-09-08 Municipal concrete road surface slip form construction device and construction method Active CN107401104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710803866.XA CN107401104B (en) 2017-09-08 2017-09-08 Municipal concrete road surface slip form construction device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710803866.XA CN107401104B (en) 2017-09-08 2017-09-08 Municipal concrete road surface slip form construction device and construction method

Publications (2)

Publication Number Publication Date
CN107401104A true CN107401104A (en) 2017-11-28
CN107401104B CN107401104B (en) 2019-04-30

Family

ID=60397827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710803866.XA Active CN107401104B (en) 2017-09-08 2017-09-08 Municipal concrete road surface slip form construction device and construction method

Country Status (1)

Country Link
CN (1) CN107401104B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108330786A (en) * 2018-05-17 2018-07-27 柴海英 One kind is repaired the roads divides device with cement mixing
CN108999149A (en) * 2018-07-23 2018-12-14 中国水利水电第五工程局有限公司 A kind of slope stone masonry raw material construction masonry integrated apparatus
CN110306399A (en) * 2019-05-14 2019-10-08 河北扶波机械制造有限公司 A kind of environmental protection hot recycling maintenance car in road surface stacked to be received and pavement maintenance method
CN110565487A (en) * 2019-09-29 2019-12-13 上海二十冶建设有限公司 Slipform paver for road construction
CN112442946A (en) * 2020-11-12 2021-03-05 张国彦 Concrete pouring device for bridge superstructure in road engineering and use method thereof
CN112482146A (en) * 2020-10-19 2021-03-12 王龙龙 Integrated concrete paving device
CN113356066A (en) * 2021-06-11 2021-09-07 中交一公局厦门检测技术有限公司 Rapid and efficient construction process for paving UHPC on steel bridge deck
CN113403916A (en) * 2021-05-26 2021-09-17 山东高速工程建设集团有限公司 Concrete pavement paver and concrete paving method
CN113585017A (en) * 2021-08-25 2021-11-02 中冶南方城市建设工程技术有限公司 Road cement concrete distributing, vibrating and paving integrated equipment and using method thereof
CN114808620A (en) * 2022-03-31 2022-07-29 北京科技大学 Front-mounted sensor embedding method based on sliding mode paving

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0598607A (en) * 1991-10-07 1993-04-20 Makoto Onozawa Road paving finisher and road paving method
CN204112195U (en) * 2014-09-11 2015-01-21 交通运输部公路科学研究所 The double-deck paving system in rigid pavement
CN104532711A (en) * 2014-12-20 2015-04-22 华南理工大学 Cement concrete pavement and dual-layer paving method
CN205152899U (en) * 2015-11-20 2016-04-13 中国水电建设集团十五工程局有限公司 Concrete face rockfill dam panel construction is with paving, level and wipe one's face integrated device
CN105755932A (en) * 2016-02-29 2016-07-13 中交第三公路工程局有限公司 Thickness control device of cement stabilized base double-layer continuous spreader

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0598607A (en) * 1991-10-07 1993-04-20 Makoto Onozawa Road paving finisher and road paving method
CN204112195U (en) * 2014-09-11 2015-01-21 交通运输部公路科学研究所 The double-deck paving system in rigid pavement
CN104532711A (en) * 2014-12-20 2015-04-22 华南理工大学 Cement concrete pavement and dual-layer paving method
CN205152899U (en) * 2015-11-20 2016-04-13 中国水电建设集团十五工程局有限公司 Concrete face rockfill dam panel construction is with paving, level and wipe one's face integrated device
CN105755932A (en) * 2016-02-29 2016-07-13 中交第三公路工程局有限公司 Thickness control device of cement stabilized base double-layer continuous spreader

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108330786A (en) * 2018-05-17 2018-07-27 柴海英 One kind is repaired the roads divides device with cement mixing
CN108999149A (en) * 2018-07-23 2018-12-14 中国水利水电第五工程局有限公司 A kind of slope stone masonry raw material construction masonry integrated apparatus
CN108999149B (en) * 2018-07-23 2024-03-12 中国水利水电第五工程局有限公司 Slope slurry stone raw material construction and masonry integrated device
CN110306399A (en) * 2019-05-14 2019-10-08 河北扶波机械制造有限公司 A kind of environmental protection hot recycling maintenance car in road surface stacked to be received and pavement maintenance method
CN110565487A (en) * 2019-09-29 2019-12-13 上海二十冶建设有限公司 Slipform paver for road construction
CN112482146A (en) * 2020-10-19 2021-03-12 王龙龙 Integrated concrete paving device
CN112442946A (en) * 2020-11-12 2021-03-05 张国彦 Concrete pouring device for bridge superstructure in road engineering and use method thereof
CN113403916A (en) * 2021-05-26 2021-09-17 山东高速工程建设集团有限公司 Concrete pavement paver and concrete paving method
CN113403916B (en) * 2021-05-26 2022-06-14 山东高速工程建设集团有限公司 Concrete pavement paver and concrete paving method
CN113356066A (en) * 2021-06-11 2021-09-07 中交一公局厦门检测技术有限公司 Rapid and efficient construction process for paving UHPC on steel bridge deck
CN113585017A (en) * 2021-08-25 2021-11-02 中冶南方城市建设工程技术有限公司 Road cement concrete distributing, vibrating and paving integrated equipment and using method thereof
CN114808620A (en) * 2022-03-31 2022-07-29 北京科技大学 Front-mounted sensor embedding method based on sliding mode paving

Also Published As

Publication number Publication date
CN107401104B (en) 2019-04-30

Similar Documents

Publication Publication Date Title
CN107401104A (en) Municipal concrete road surface slip form construction device and construction method
CN102535296B (en) Construction method of superheavy-load reinforcement-free large-area seamless epoxy self-leveling terrace
CN211772641U (en) Concrete paving device for building engineering
CN204781846U (en) Wall whitewashing machine
CN108118594A (en) A kind of asphalt paving device convenient for adjusting laying depth
CN210288031U (en) Asphalt concrete paver
US1782707A (en) Road-building apparatus
CN105926418A (en) Special control system and intelligent control method for thin-layer reactive powder concrete paver
CN107143115B (en) A kind of simple concrete wall surface trowelling machine
US20220098803A1 (en) Slip forming structures using multiple molds
CN109296184A (en) The joint filling of ceramic tile brickwork joint and pointing construction method in tunnel
CN103114509A (en) Slipform construction method for concrete side film of roadbase
EP2584115B1 (en) Spreading and screeding device for finishing a screed floor, and method therefor
CN111074787A (en) Ultrahigh-performance concrete distributing device and application method thereof
CN110424741A (en) A kind of indoor concrete method for constructing terrace
CN207143684U (en) A kind of paver of pre- cloth
CN206625517U (en) A kind of cement mortar paver and its elastic membrane pave mechanism
CN211689767U (en) Asphalt paver for road construction
CN209652716U (en) A kind of pavement of road concrete slip-form constructing device
CN208965374U (en) A kind of polyurethane concrete paver
CN106996108A (en) Based on 3D printing technique concrete dam building method and device
CN104389295B (en) The construction method of roller compacted asphalt concrete core
US1163770A (en) Laying or constructing concrete courses.
CN109024191A (en) Highway concrete stirs lying device and construction method
CN108867273A (en) A kind of concrete paver

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 325500 Room 101, Building 4, Shunxi Jiayuan, Luoyang Town, Taishun County, Wenzhou City, Zhejiang Province

Applicant after: Yuanxing Construction Co., Ltd.

Address before: 325500 Room 101, Building 4, Shunxi Jiayuan, Luoyang Town, Taishun County, Wenzhou City, Zhejiang Province

Applicant before: Wenzhou Dongyi Park and Garden Construction Co., Ltd.

GR01 Patent grant