CN107386240A CN201710598954.0A CN201710598954A CN107386240A CN 107386240 A CN107386240 A CN 107386240A CN 201710598954 A CN201710598954 A CN 201710598954A CN 107386240 A CN107386240 A CN 107386240A
Authority
CN
China
Prior art keywords
levelling
natural gas
build
liquefied natural
absolute altitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710598954.0A
Other languages
Chinese (zh)
Inventor
邓推
张艳芳
李凡
单吉华
唐健
徐善辉
田旺生
王永兴
姜维
孙丕松
马飞翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201710598954.0A priority Critical patent/CN107386240A/en
Publication of CN107386240A publication Critical patent/CN107386240A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/025Reinforced concrete structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/38Foundations for large tanks, e.g. oil tanks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of levelling technique of the non-slideway area build the side of large-scale liquefied natural gas module, using following steps:One:Strong rammer is carried out to build the side;Two:Datum mark is established, then, measurement;Three:Determine levelling benchmark point;Four:Remeasure, and according to the levelling benchmark point newly measured;Five:Determine the target face of concreting;Six:One-time-concreting is carried out according to measurement result;Seven:Embedded ground anchor bolt;Eight:Measure the absolute altitude of pad pier upper surface;Nine:Lift simultaneously first layer deck plate in place, and after regulation, loop wheel machine decoupling device;Ten:Concrete surface is cleaned out, progress is secondary to be poured, to ensure that the grouting material poured is full of space.The present invention can carry out levelling, the adjustment work of vertical error after solving first layer deck plate in place to multiple little module build the sides simultaneously;Large-scale liquefied natural gas module construction cost is greatly reduced, ensure that the construction precision of large-scale liquefied natural gas module.

Description

The levelling technique of the large-scale non-slideway area build the side of liquefied natural gas module
Technical field
The present invention relates to liquefied natural gas module, more particularly to a kind of non-slideway area of large-scale liquefied natural gas module to build field The levelling technique on ground, belong to ocean and build engineering field.
Background technology
In the building course of large-scale liquefied natural gas (LNG) module, it is often necessary to which the pipeline of several modules is connected Afterwards, then carry out multimode and unify pressure testing.Therefore, it is necessary to ensure that each module is in one plane built, typically require several Different module column elevation of bottom deviations are within ± 3mm.
Because large-scale liquefied natural gas module is usually to be built in non-slideway area, rather than how uneven the ground in slideway area is Whole, the level difference at diverse location is larger.Consequently, it is desirable to take steps to levelling to build the side progress.Typically for small The module of type, fine sand and the middle husky part that carries out can be used levelling, but for large-scale liquefied natural gas module, this levelling technique It is inapplicable.Simultaneously as the method for large-scale liquefied natural gas module generally use stratified construction, general its first layer deck plate peace It is undesirable in vertical direction error after due to column construction error the first Rotating fields piece being caused to install after being attached to position, because This, after usually being jacked using jack, then the method for choker block piece solves.But above method has the disadvantage that:
1. carrying out floor leveling using sand, for large-scale liquefied natural gas module, levelling difficulty of construction is very big, therefore, The method does not apply to.
2. floor leveling is carried out using sand, because the support reaction of the large-scale single column of liquefied natural gas module is very big, after Phase settles very risky.
3. if carry out floor leveling using sand, the error transfer factor after first layer deck plate is installed, it is common practice that adopt Choker block piece again after being jacked with jack, therefore, it is necessary to prepare the pad and jack of various different sizes, expend a large amount of things Power.
4th, because large-scale liquefied natural gas module is made up of numerous little modules, joint is needed to build often, and it is each small Module needs are levelling according to a reference plane, therefore, the method that floor leveling is carried out using sand, are only applicable to single little module It is levelling, it is levelling to multiple little modules difficult to realize.
The content of the invention
It is a primary object of the present invention to overcome disadvantages mentioned above existing for prior art, and provide a kind of large-scale liquefaction day combustion The levelling technique of the non-slideway area build the side of gas module, it, can not only in large-scale liquefied natural gas module building course Simultaneously multiple little module build the sides are carried out with levelling, the adjustment work of vertical error after solving first layer deck plate in place, Taken a firm foundation for project;It can also enough reducing the usage amount of jack and pad, large-scale liquefaction is greatly reduced Natural gas module construction cost, it ensure that the construction precision of large-scale liquefied natural gas module.
The purpose of the present invention is realized by following technical scheme:
A kind of levelling technique of the non-slideway area build the side of large-scale liquefied natural gas module, it is characterised in that:Using following Step:
The first step:Strong rammer is carried out to build the side, and the build the side after compacting is cleaned up;
Second step:Establish datum mark, then, measure the placement area of all pad piers, and using the measurement data as Select the foundation of levelling benchmark point;
3rd step:At the placement area of measurement absolute altitude maximum pad pier, levelling benchmark point is determined;
4th step:Basic unit's surface dust of pad pier placement area is cleaned out, and after tamping foundation ditch surface dust, mark post moved to newly Plane, remeasure;And according to the levelling benchmark point newly measured, mark the position at absolute altitude;
5th step:According to the position of levelling benchmark point absolute altitude, horizontal line is arranged, to establish the levelling benchmark face of absolute altitude;From And determine the target face of concreting;
6th step:According to measurement result, branch concrete blinding carries out one-time-concreting;
7th step:By in the basic unit of the concreting being stirred to concrete blinding, and vibrate in time and floating, coagulation Native surface carries out plucking;And ground anchor bolt is accurately buried as requested;
8th step:Put pad pier it is in place after, the absolute altitude of measurement pad pier upper surface, and by control errors allowed band with It is interior;
9th step:Simultaneously first layer deck plate in place is lifted, loop wheel machine temporarily not decoupling device, examines all bottoms for being hung structural upright Portion's size, if exceeding error requirements, it is adjusted, after regulation, loop wheel machine decoupling device;
Tenth step:Concrete surface is cleaned out, and soaked, to ensure the adhesive strength of grouting material and concrete;Branch Grouting template progress is secondary to be poured, and the grouting material for ensureing to pour is full of space.
In 3rd step, levelling benchmark point is 0mm absolute altitudes;Wherein, at absolute altitude consider concrete minimum pour height and Grouting height.
In 5th step, when establishing the levelling benchmark face of absolute altitude, it need to ensure that the bottom surface of concrete upper surface and pad pier is stayed There is certain gap, so that follow-up grouting works there are enough spaces.
In 8th step, if the absolute altitude appearance of pad pier upper surface is overproof, adjusted by bottom ground anchor bolt It is whole.
Beneficial effects of the present invention:The present invention is because using above-mentioned technical proposal, it is to large-scale liquefied natural gas module In building course, can not only simultaneously to multiple little module build the sides carry out it is levelling, solve first layer deck plate it is in place after The adjustment work of vertical error, taken a firm foundation for project;It can also enough reduce the use of jack and pad Amount, greatly reduces large-scale liquefied natural gas module construction cost, ensure that the construction precision of large-scale liquefied natural gas module.
Brief description of the drawings
Fig. 1 is overall structure floor map of the present invention.
Fig. 2 is structural profile illustration of the present invention.
Fig. 3 is structure use state diagram of the present invention.
Major Symbol explanation in figure:
1. build the side, 2. pad piers, 3. structural uprights, 4. grouting materials, 5. concrete, 6. ground anchor bolts, 7. grouting observations Hole.
Embodiment
As shown in Fig. 1-Fig. 3, the present invention uses following steps:
The first step:Strong rammer is carried out to build the side 1, and the build the side after compacting is cleaned up;
Second step:Establish datum mark, then, measure the placement area of all pad piers 2, and using the measurement data as Select the foundation of levelling benchmark point;
3rd step:At the placement area of measurement absolute altitude maximum pad pier 2, levelling benchmark point, (levelling benchmark now are determined Point is 0mm absolute altitudes);Wherein, consider that concrete minimum pours height and grouting height at absolute altitude.
4th step:After basic unit's surface dust of the placement area of pad pier 2 is cleaned out, then foundation ditch surface dust is cleared up, and further rammed It is real;Now, mark post is moved into new plane to be remeasured, according to the levelling benchmark point newly measured, marked at 0mm absolute altitudes Position;
5th step:According to levelling benchmark point:The position of 0mm absolute altitudes, horizontal line is arranged, to establish the levelling base of 0mm absolute altitudes Quasi- face;So that it is determined that the target face of concreting;Now, it need to ensure that the bottom surface of the upper surface of concrete 5 and pad pier 2 is left necessarily Gap, so that follow-up grouting works have enough spaces;
6th step:According to measurement result, branch concrete blinding carries out one-time-concreting;
7th step:Strength grade of concrete is done into trial by design requirement, then, then the pea gravel concreten 5 that will be stirred It is poured into the basic unit of concrete blinding, and vibrates in time and floating, the surface of concrete 5 progress plucking;It is and accurate as requested Embedded ground anchor bolt 6;
8th step:By ground anchor bolt 6 put pad pier 2 it is in place after, with the absolute altitude of the upper surface of level measurement pad pier 2, and By the absolute altitude control errors of the upper surface of pad pier 2 within allowed band, if overproof appearance, then pass through bottom ground anchor bolt 6 To be adjusted;
9th step:Lift and first layer deck plate in place, loop wheel machine temporarily not decoupling device, examine all structural uprights 3 of being hung Bottom size, if exceeding error requirements, after loop wheel machine raising is energetic, it is adjusted by twisting ground anchor bolt 6, after regulation, Loop wheel machine decoupling device;
Tenth step:The removing surface of concrete 5 is clean, and soak, to ensure the adhesive strength of grouting material 4 and concrete 5; Branch grouting template progress is secondary to pour grouting material 4, and by the situation for the observation grouting of peep hole 7 of being in the milk, to ensure the filling poured Slurry 4 is full of space.
The above described is only a preferred embodiment of the present invention, any formal limitation not is made to the present invention, it is all It is any simple modification, equivalent change and modification made according to the technical spirit of the present invention to above example, still falls within In the range of technical solution of the present invention.

Claims (4)

  1. A kind of 1. levelling technique of the non-slideway area build the side of large-scale liquefied natural gas module, it is characterised in that:Using following step Suddenly:
    The first step:Strong rammer is carried out to build the side, and the build the side after compacting is cleaned up;
    Second step:Datum mark is established, then, measures the placement area of all pad piers, and by the measurement data alternatively The foundation of levelling benchmark point;
    3rd step:At the placement area of measurement absolute altitude maximum pad pier, levelling benchmark point is determined;
    4th step:Basic unit's surface dust of pad pier placement area is cleaned out, and after tamping foundation ditch surface dust, mark post moved to new flat Face, remeasure;And according to the levelling benchmark point newly measured, mark the position at absolute altitude;
    5th step:According to the position of levelling benchmark point absolute altitude, horizontal line is arranged, to establish the levelling benchmark face of absolute altitude;So as to really Determine the target face of concreting;
    6th step:According to measurement result, branch concrete blinding carries out one-time-concreting;
    7th step:By in the basic unit of the concreting being stirred to concrete blinding, and vibrate in time and floating, concrete table Face carries out plucking;And ground anchor bolt is accurately buried as requested;
    8th step:Put pad pier it is in place after, the absolute altitude of measurement pad pier upper surface, and by control errors within allowed band;
    9th step:Simultaneously first layer deck plate in place is lifted, loop wheel machine temporarily not decoupling device, examines all bottom chis for being hung structural upright It is very little, if exceeding error requirements, it is adjusted, after regulation, loop wheel machine decoupling device;
    Tenth step:Concrete surface is cleaned out, and soaked, to ensure the adhesive strength of grouting material and concrete;Branch is in the milk Template progress is secondary to be poured, and the grouting material for ensureing to pour is full of space.
  2. 2. the levelling technique of the non-slideway area build the side of large-scale liquefied natural gas module according to claim 1, its feature It is:In 3rd step, levelling benchmark point is 0mm absolute altitudes;Wherein, consider that concrete minimum pours height and grouting at absolute altitude Highly.
  3. 3. the levelling technique of the non-slideway area build the side of large-scale liquefied natural gas module according to claim 1, its feature It is:In 5th step, when establishing the levelling benchmark face of absolute altitude, it need to ensure that the bottom surface of concrete upper surface and pad pier leaves one Fixed gap, so that follow-up grouting works have enough spaces.
  4. 4. the levelling technique of the non-slideway area build the side of large-scale liquefied natural gas module according to claim 1, its feature It is:In 8th step, if the absolute altitude appearance of pad pier upper surface is overproof, it is adjusted by bottom ground anchor bolt.
CN201710598954.0A 2017-07-21 2017-07-21 The levelling technique of the large-scale non-slideway area build the side of liquefied natural gas module Pending CN107386240A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710598954.0A CN107386240A (en) 2017-07-21 2017-07-21 The levelling technique of the large-scale non-slideway area build the side of liquefied natural gas module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710598954.0A CN107386240A (en) 2017-07-21 2017-07-21 The levelling technique of the large-scale non-slideway area build the side of liquefied natural gas module

Publications (1)

Publication Number Publication Date
CN107386240A true CN107386240A (en) 2017-11-24

Family

ID=60336536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710598954.0A Pending CN107386240A (en) 2017-07-21 2017-07-21 The levelling technique of the large-scale non-slideway area build the side of liquefied natural gas module

Country Status (1)

Country Link
CN (1) CN107386240A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070243024A1 (en) * 2004-09-07 2007-10-18 Offshore Technology Development Pte Ltd Jackup Oil Rig And Similar Platforms
CN101804852A (en) * 2010-04-15 2010-08-18 南通中远船务工程有限公司 Sliding plate for marine products sliding and sling plate type sliding method
CN102337736A (en) * 2011-07-06 2012-02-01 中国海洋石油总公司 Installation process of upper module on offshore oil platform
KR20150131488A (en) * 2014-05-15 2015-11-25 주식회사 아이랜드 Floating type public toilet

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070243024A1 (en) * 2004-09-07 2007-10-18 Offshore Technology Development Pte Ltd Jackup Oil Rig And Similar Platforms
CN101804852A (en) * 2010-04-15 2010-08-18 南通中远船务工程有限公司 Sliding plate for marine products sliding and sling plate type sliding method
CN102337736A (en) * 2011-07-06 2012-02-01 中国海洋石油总公司 Installation process of upper module on offshore oil platform
KR20150131488A (en) * 2014-05-15 2015-11-25 주식회사 아이랜드 Floating type public toilet

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
田旺生: "建造场地的地面找平及沉降调平方案", 《绿色环保建材》 *
石继程等: "非滑道区LNG组块建造地基不均匀沉降分析", 《海岸工程》 *

Similar Documents

Publication Publication Date Title
CN108061687B (en) Geotechnical engineering simulation test platform for researching potential failure surface
CN104674945B (en) Tree-like steel pipe column structure and construction method thereof
CN102943565B (en) Construction method of large-sized arc-shaped wall
CN108343102A (en) Jacking leveling structure and its construction method are reinforced in a kind of sedimentation of pile foundation
CN101666081A (en) Abrupt slope bare rock drilling platform and technology in huge reservoir
CN103757993A (en) System and method for high-speed railway subgrade settlement restoration
CN102808383A (en) Construction process for back-sloping and jacking curved bridge
CN103469732B (en) Construction method of preformed holes for foundation bolts of bridge support
CN105839985A (en) Hydropower station rectangular high tower hydraulic climb slip form system and construction method
CN105953078A (en) Protection device and protection method of high-pressure gas pipeline
CN109537616A (en) A kind of the CFG stake device and its construction method of spiral-digging pore
CN109489622A (en) Model production method and settlement prediction device
CN107489161A (en) Immersed tube joint basis post-grouting method
CN201502056U (en) Bare rock drilling platform for steep slope of deep reservoir area
CN106759270A (en) A kind of prefabricated reinforced concrete resistance to plucking pile construction method with ribbing
CN102587386A (en) Reverse HPE (hydraulic perpendicular embedding) construction method for steel pipe columns in basement
CN106284085A (en) It is close to the most wired deep water foundation Large-Span Continuous beam construction method
CN112431225A (en) Top-down construction method for pipe-jacking brick-built working well
CN105241648A (en) Loading device simulating loess tunnel lock foot anchor pipe end stress and use method thereof
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN107386240A (en) The levelling technique of the large-scale non-slideway area build the side of liquefied natural gas module
CN111794256A (en) Construction method of underwater pile cap in river flood discharge area
CN104964674A (en) Control net used for large structure building size
CN107083726A (en) The plate-type fragment-free track slab self-compacting concretes four of CRTS III connect block constructing device and method
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: Offshore Oil Engineering (Qingdao) Co., Ltd.

Applicant after: Offshore Oil Engineering Co., Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Applicant before: China National Offshore Oil Corporation

Applicant before: Offshore Oil Engineering (Qingdao) Co., Ltd.

Applicant before: Offshore Oil Engineering Co., Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171124