CN107355233A - A kind of underground chamber and Cavity Construction method - Google Patents

A kind of underground chamber and Cavity Construction method Download PDF

Info

Publication number
CN107355233A
CN107355233A CN201710763002.XA CN201710763002A CN107355233A CN 107355233 A CN107355233 A CN 107355233A CN 201710763002 A CN201710763002 A CN 201710763002A CN 107355233 A CN107355233 A CN 107355233A
Authority
CN
China
Prior art keywords
gallery
periphery
cavern
main cavern
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710763002.XA
Other languages
Chinese (zh)
Other versions
CN107355233B (en
Inventor
胡林江
冯树荣
胡育林
文学军
杨军
刑磊
吴书艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Original Assignee
PowerChina Zhongnan Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Zhongnan Engineering Corp Ltd filed Critical PowerChina Zhongnan Engineering Corp Ltd
Priority to CN201710763002.XA priority Critical patent/CN107355233B/en
Publication of CN107355233A publication Critical patent/CN107355233A/en
Application granted granted Critical
Publication of CN107355233B publication Critical patent/CN107355233B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to rich groundwater, the construction method of the large underground hole of wall rock geology condition difference, advance water discharge is carried out using underground gallery, the main surrounding rock of chamber of advance reinforcement, advance exploration, the multipurpose layout pattern and method monitored in advance, i.e. Main Underground cavern crown and with abutment wall periphery arranging multiplayer underground gallery, first constructed before main cavern excavation crown and the gallery on abutment wall periphery, main cavern periphery groundwater level is reduced in advance using the underground gallery after construction, preconsolidation grouting is carried out to main cavern's crown country rock using top layer gallery and abutment wall periphery gallery simultaneously, prestress anchorage cable drilling construction and monitoring instrument it is pre-buried.This layout pattern and method, both influence of the underground water to surrounding rock of chamber can effectively be reduced, again can be by carrying out consolidation by grouting country rock to main cavern in advance, shorten the performance anchor cable immediate support effect of anchor cable construction time, and pass through advanced pre-buried monitoring instrument, the deformation measurement data for promptly and accurately gathering and grasping country rock during main cavern excavation comes design and construction, the powerful guarantee safety and stability of Cavity Construction phase and runtime.

Description

A kind of underground chamber and Cavity Construction method
Technical field
The invention belongs to underground engineering field, is related to a kind of underground chamber and Cavity Construction method, more particularly to ground Lower water is abundant, the large underground hole and its construction method of wall rock geology condition difference.
Background technology
At present, for the poor Cavity Construction of rich groundwater, wall rock condition, mainly arranged on underground chamber periphery Underground gallery carries out permanent draining;In terms of supporting on the basis of using bolt-spary supports, it is also necessary to which arrangement prestress anchor cable is controlled The surrouding rock deformation of cavity preparation room.In conventional way, the arrangement of underground gallery is solely for permanent draining, and underground gallery construct it is past Toward main cavern con struction is lagged behind, do not consider to reduce the groundwater level on main cavern periphery in advance, construction time main surrounding rock of chamber is often Easily there is phenomena such as landslide due to being influenceed by underground water;Prestress anchorage cable uses end anchor cable, anchor cable construction and monitor more When device embedded will often wait main cavern excavation, then row construction, such cable bolting promptness is poor, the number that monitoring instrument is collected into According to hysteresis, it can not truly reflect the situation of surrouding rock deformation, cable bolting often occur not in time, cause to go out during main cavern excavation Existing surrouding rock deformation is excessive and the situation of unstability occurs, and also usually can not be grasped cavern in time due to the embedded hysteresis of monitoring instrument and be enclosed The deformation of rock, lead to not the stable case for prejudging surrounding rock of chamber, and landslide phenomenon occur, influence construction time safety, and Cause construction delay.
The content of the invention
In view of the shortcomings of the prior art, the present invention provides a kind of underground chamber and its construction method of stabilized structure.
The technical scheme is that:A kind of underground chamber, including main cavern, the vault of the main cavern are provided with grouting and added Gu Qu, the top in consolidation by grouting area are provided with the row's of filling gallery, prestress anchorage cable are provided between the row's of filling gallery and consolidation by grouting area; The both sides of the main cavern be respectively equipped with it is a plurality of be from top to bottom arranged in order periphery gallery, a plurality of periphery gallery and main cavern Abutment wall between be provided with prestress anchorage cable.
Usually, consolidation by grouting area, which points to, injects the materials such as Grouting Cement in the rock stratum of respective regions, be somebody's turn to do with playing to reinforce The effect in region.
In the present invention, pass through the setting in consolidation by grouting area, it is ensured that the intensity of main cavern crown area country rock, prevent out Occurs cave in accident during digging;Meanwhile the row's of filling gallery is set above consolidation by grouting area, on the one hand can conveniently it be in the milk to form grouting Stabilization zone, on the other hand, it is convenient to prestress anchorage cable is set between the row's of filling gallery and consolidation by grouting area, constrains corresponding country rock Deformation, improve the structural stability of main cavern, while prestress anchorage cable produces draw to consolidation by grouting area, reduces grouting Pressure of the stabilization zone to main cavern's abutment wall position;, can be to main cavern by the setting of periphery gallery and related prestress anchorage cable Country rock near abutment wall produces support action, limits surrouding rock deformation, with the soundness of the main cavern of comprehensive lifting, prevents main hole Excavate and subsequently cave in accident occur during use in room.
Further, two row's of filling gallerys are provided with above main cavern's vault, two row's of filling gallerys are set, it is corresponding can Two prestress anchorage cables are set, to increase the restraining force to vault country rock more.
Further, the row's of filling gallery is provided with the osculum curtain to extension above the row's of filling gallery.
Further, connected between the adjacent periphery gallery by osculum curtain.
By the setting of osculum curtain, main cavern periphery level of ground water can be reduced, reduces underground water to main cavern excavation Influence, it is stable beneficial to the excavation of main cavern;After the completion of excavation, main cavern can be played a protective role, reduce water to main cavern Infiltration.
Further, the main cavern includes Duo Gezi caverns, periphery gallery, this week being provided between the adjacent sub- cavern Prestress anchorage cable is respectively equipped between side corner road and the abutment wall of adjacent each sub- cavern, improves the stable degree of cavern's abutment wall.
Further, the prestress anchorage cable is prestressing force two-ended cables.
Further, the distance of the row's of filling gallery and main cavern's vault is 10 ~ 35m;The periphery gallery and main cavern The distance between abutment wall is 30 ~ 60m.Preferably, the distance of the row's of filling gallery and main cavern's vault is 20 ~ 30m;The periphery The distance between gallery and main cavern's abutment wall are 40 ~ 50m.
In order to obtain the information such as main surrounding rock of chamber deformation, monitoring is embedded between the periphery gallery and the abutment wall of main cavern Instrument;Monitor is embedded between the row's of filling gallery and main cavern's vault.Preferably, the monitor is multipoint displacement meter.
Based on same inventive concept, the present invention also provides a kind of construction method of underground chamber, comprised the following steps:
S1, before main cavern is excavated, filling row's gallery is dug above main cavern's vault waiting to excavate;Meanwhile waiting to excavate main hole The abutment wall both sides of room dig the 1st floor periphery gallery respectively, and the periphery gallery is located in the depth bounds that main cavern's vault is crossed over, Top layer gallery is dug above the periphery gallery;
S2, the draining extended to the rock stratum above corresponding gallery is set on each top layer gallery and the row's of filling gallery in step sl respectively Hole curtain, osculum curtain is set between top layer gallery and the 1st layer of periphery gallery;
S3, the country rock progress preconsolidation grouting construction excavated more than main cavern's vault excavation line is treated by the row's of filling gallery, in master Consolidation by grouting area is obtained above cavern's vault;
S4, treated by periphery gallery and the row's of filling gallery and to excavate pore-creating and prestressing force anchor pier that main cavern carries out prestress anchorage cable Construction;Then, start to excavate main cavern, after excavating and arriving prestress anchorage cable corresponding site, reeved and to prestress anchorage cable Carry out tensioning fixation;While excavating main cavern, the 2nd from top to bottom to arrange successively is dug below the 1st layer of periphery gallery Layer ... n-th layer periphery gallery, and osculum curtain is set between upper and lower adjacent periphery gallery;Wherein, N is not less than 2 Positive integer.
Further, when carrying out excavation construction to periphery gallery and the row's of filling gallery, carried by periphery gallery and the row's of filling gallery The preceding pre-buried monitor for being used to collect main surrounding rock of chamber geological information, such as multipoint displacement meter.So after main cavern excavation can and When collect the information such as surrouding rock deformation, can be to evaluate and adjustment support parameters and working measure provide foundation, effectively control and lead The surrouding rock deformation of cavern, it is ensured that the safety and stability of main cavern excavation.
Using the method for the present invention, advanced excavation fills row's gallery, top layer gallery and the 1st layer of periphery gallery in step S1, and Related drain hole curtain is set in step s 2, main cavern periphery level of ground water can be reduced in advance, reduces underground water to main cavern The influence of excavation, the excavation for being advantageous to main cavern are stable;In step S3, by grouting construction, main cavern's crown can be effectively improved The integrality and stability of country rock, crown country rock during main cavern excavation is avoided big landslide and chip off-falling occur;In step S4, opening Just the pore-creating and the construction of prestressing force anchor pier of prestress anchorage cable are carried out before Wa Zhu caverns, treats main cavern excavation to anchor cable corresponding site After certain distance, the tensioning fixation of anchor cable can be quickly reeved and carry out, the effect of anchor cable immediate support can be given full play to, in time about The deformation of beam country rock, the excavation to ensuring main cavern are stablized highly beneficial.
Behind the underground galleries such as periphery gallery, top layer gallery in advance construction, collect underground gallery and excavate the geology disclosed Situation, the country rock information of main cavern is deduced by this, is advantageous to check supporting parameter and arrangement and method for construction.
The present invention is constructed in advance in underground chamber building process using underground gallery, and combines advance water discharge, advanced right Main cavern's consolidation by grouting, advance exploration and the multipurpose layout pattern and construction method monitored in advance, are realized advanced to main cavern Draining, advance grouting reinforcing, advance exploration and advanced monitoring.This layout pattern and method utilize main cavern's crown and periphery cloth Put multi-layer underground gallery(Top layer gallery, the row's of filling gallery and periphery gallery)It is first sharp and construction is completed in advance before main cavern excavation The main cavern region of excavation is treated with the underground gallery after construction and neighbouring rock stratum carries out advance water discharge, i.e., is reduced and waited out by gallery The groundwater level on Wa Zhu caverns periphery, effectively reduce influence of the underground water to main cavern excavation, ensure the excavation of main cavern It is stable;Recycle the row's of filling gallery to carry out preconsolidation grouting advance reinforcement to main cavern, improve the integrality of main cavern's crown country rock And stability, avoid crown country rock during main cavern excavation from big landslide and chip off-falling occur;Then the underground corridor after construction is recycled Road drills to prestress anchorage cable in advance(Anchor pier)Construction, the promptness of cable bolting can be given full play to, constraint in time is enclosed The deformation of rock, it is ensured that the excavation of main cavern is stable;The related underground gallery after construction is finally recycled to collect geological information and carry Preceding pre-buried monitoring instrument, thus it is speculated that Chu Zhu caverns geological information and in time acquisition Monitoring Data can be evaluation and adjustment design of its support ginseng Number and working measure provide foundation, to efficiently control the surrouding rock deformation of main cavern and ensuring that the safety and stability of main cavern excavation carries It is provided with sharp guarantee.
The underground chamber stabilized structure of the present invention, runtime safety and stability;, can by the construction method of the offer of the present invention Realize and the safety and stability of main cavern is excavated, save the engineering time, the safety of effective guarantee Cavity Construction phase and runtime It is stable.
Brief description of the drawings
Fig. 1 is that the gallery of the first embodiment of the invention and osculum curtain put schematic diagram.
Fig. 2 is main cavern's crown preconsolidation grouting arrangement schematic diagram of the first embodiment of the invention.
Fig. 3 is the prestress anchorage cable arrangement schematic diagram of the first embodiment of the invention.
Fig. 4 is that the underground gallery monitor of the first embodiment of the invention buries situation schematic diagram.
Wherein:1-top layer gallery;2-the row of filling gallery;3-periphery gallery;4-osculum curtain;5-consolidation by grouting area; 6-prestress anchorage cable;7-monitoring instrument;8-main cavern;801st, the sub- caverns of 802-.
Embodiment
For sake of convenience, in the present invention as " on ", " under ", "left", "right" printed words occur, only represent with accompanying drawing in itself Upper and lower, left and right direction is consistent, does not play restriction effect to structure.
The present invention is further described by taking the underground chamber structure of certain hydroenergy storage station as an example below, the power station Underground Powerhouse condition is poor, and surrounding rock category is III~IV class, and local V class, country rock is relatively more broken, and underground water ten Divide abundant.
The underground chamber, including main cavern 8, the vault of the main cavern 8 are provided with consolidation by grouting area 5, consolidation by grouting area 5 Top is provided with the row's of filling gallery 2, and prestress anchorage cable 6 is provided between the row's of filling gallery 2 and consolidation by grouting area 5;The main cavern 8 Both sides are respectively equipped with 3 and are from top to bottom arranged in order periphery gallery 3, first layer and second layer periphery gallery 3 and the side of main cavern 8 Prestress anchorage cable 6 is provided between wall.
Wherein, the main cavern 8 includes cavern's 801 and sub- cavern 802, two rows of filling being provided with above each sub- cavern's vault Gallery 2(See Fig. 2).
The row's of filling gallery 2 is provided with the osculum curtain 4 to extension above the row's of filling gallery;The adjacent periphery gallery 3 it Between connected by osculum curtain 4(See Fig. 1).
Be provided with a periphery gallery 3 between the adjacent sub- cavern, the abutment wall of the periphery gallery 3 and adjacent each sub- cavern it Between be respectively equipped with prestress anchorage cable 6(See Fig. 3).
The prestress anchorage cable 6 is prestressing force two-ended cables.
Monitor 7 is embedded between the periphery gallery 3 and the abutment wall of main cavern 8;The row's of filling gallery 2 and main cavern 8 Monitor 7 is embedded between vault(See Fig. 4).
To improve the resistance to overturning of factory building surrounding rock of chamber, in factory building crown above 25m and away from abutment wall 45m peripheries arrangement 4 Layer underground gallery(From top to bottom it is followed successively by top layer gallery 1 and the filling concordant with top layer gallery row gallery 2, periphery gallery 3), underground Gallery arrangement, which takes into full account, reduces factory building underground water, can carry out preconsolidation grouting to main building and main transformer hole crown country rock not only but also Facilitate the rapid construction and many-sided comprehensive function such as pre-buried monitoring instrument in advance of prestress anchorage cable, in underground gallery layout design When take into full account that suitable elevation and the position of gallery, and top layer fill row's gallery cross dimensions etc., underground gallery arrangement should have The standby condition constructed in advance, possesses carry out carrying for preconsolidation grouting, prestress anchorage cable 6 and monitor 7 to main cavern's crown again The condition and method of preceding construction.The underground gallery multipurpose layout pattern and method, both successfully solved underground water and factory building had been opened The influence of digging, the whole digging process of factory building is substantially at dry environment construction, be in the milk further through preconsolidation, prestress anchorage cable Immediate support and monitoring instrument shift to an earlier date pre-buried accurate grasp factory building surrouding rock deformation data, adjust supporting parameter in time and construction is arranged Apply, efficiently control the deformation of factory building surrounding rock of chamber, smoothly ensure that the safety and stability of factory building cavern excavation process.Imitated from implementation From the point of view of fruit, effect is more satisfactory, and main cavern excavation process does not occur landslide, chip off-falling phenomenon, and engineering carries out very smooth;Runtime In, main cavern's structure performance is stable, does not occur anomaly.

Claims (10)

1. a kind of underground chamber, including main cavern(8), it is characterised in that the main cavern(8)Vault be provided with consolidation by grouting area (5), consolidation by grouting area(5)Top be provided with fill row gallery(2), the row's of filling gallery(2)With consolidation by grouting area(5)Between be provided with Prestress anchorage cable(6);The main cavern(8)Both sides be respectively equipped with and a plurality of be from top to bottom arranged in order periphery gallery(3), it is described A plurality of periphery gallery(3)With main cavern(8)Abutment wall between be provided with prestress anchorage cable(6).
2. underground chamber according to claim 1, it is characterised in that the main cavern(8)Two fillings are provided with above vault Arrange gallery(2).
3. underground chamber according to claim 1, it is characterised in that the row's of filling gallery(2)It is provided with to the row's of filling gallery The osculum curtain of top extension(4).
4. underground chamber according to claim 1, it is characterised in that the adjacent periphery gallery(3)Between pass through draining Hole curtain(4)Connection.
5. underground chamber according to claim 1, it is characterised in that the main cavern(8)Including Duo Gezi caverns(801; 802), the adjacent sub- cavern(801;802)Between be provided with periphery gallery(3), the periphery gallery(3)With adjacent each sub- cavern (801;802)Abutment wall between be respectively equipped with prestress anchorage cable(6).
6. according to the underground chamber described in any one of claim 1 ~ 5, it is characterised in that the prestress anchorage cable(6)In advance should Power two-ended cables.
7. according to the underground chamber described in any one of claim 1 ~ 5, it is characterised in that the row's of filling gallery(2)With main cavern (8)The distance of vault is 10 ~ 35m;The periphery gallery(3)With main cavern(8)The distance between abutment wall is 30 ~ 60m.
8. according to the underground chamber described in any one of claim 1 ~ 5, it is characterised in that the periphery gallery(3)With main cavern (8)Abutment wall between be embedded with monitor(7);The row's of filling gallery(2)With main cavern(8)Monitor is embedded between vault (7).
9. a kind of construction method of underground chamber, it is characterised in that comprise the following steps:
S1, before main cavern is excavated, filling row's gallery is dug above main cavern's vault waiting to excavate(2);Meanwhile waiting to excavate master The abutment wall both sides of cavern dig the 1st layer of periphery gallery respectively(3), the periphery gallery(3)The depth crossed over positioned at main cavern's vault In the range of degree, in the periphery gallery(3)Top dig top layer gallery(1);
S2, distinguish each top layer gallery in step sl(1)With the row's of filling gallery(2)On set to above corresponding gallery rock stratum extend Osculum curtain(4), in top layer gallery(1)With the 1st layer of periphery gallery(3)Between set osculum curtain(4);
S3, pass through the row's of filling gallery(2)Treat and excavate main cavern(8)Country rock more than vault excavation line carries out preconsolidation grouting and applied Work, consolidation by grouting area is obtained above main cavern's vault(5);
S4, treated by periphery gallery and the row's of filling gallery and to excavate pore-creating and prestressing force anchor pier that main cavern carries out prestress anchorage cable Construction;Then, start to excavate main cavern, after excavating and arriving prestress anchorage cable corresponding site, reeved and to prestress anchorage cable (6)Carry out tensioning fixation;While excavating main cavern, dig what is from top to bottom arranged successively below the 1st layer of periphery gallery 2nd layer ... n-th layer periphery gallery, and osculum curtain is set between upper and lower adjacent periphery gallery;Wherein, N be not less than 2 positive integer.
10. the construction method of underground chamber according to claim 9, it is characterised in that to periphery gallery and the row's of filling gallery When carrying out excavation construction, the pre-buried monitoring for being used to collect main surrounding rock of chamber geological information is shifted to an earlier date by periphery gallery and the row's of filling gallery Instrument.
CN201710763002.XA 2017-08-30 2017-08-30 A kind of underground chamber and Cavity Construction method Active CN107355233B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710763002.XA CN107355233B (en) 2017-08-30 2017-08-30 A kind of underground chamber and Cavity Construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710763002.XA CN107355233B (en) 2017-08-30 2017-08-30 A kind of underground chamber and Cavity Construction method

Publications (2)

Publication Number Publication Date
CN107355233A true CN107355233A (en) 2017-11-17
CN107355233B CN107355233B (en) 2019-03-22

Family

ID=60290351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710763002.XA Active CN107355233B (en) 2017-08-30 2017-08-30 A kind of underground chamber and Cavity Construction method

Country Status (1)

Country Link
CN (1) CN107355233B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184761A (en) * 2018-10-29 2019-01-11 河南大有能源股份有限公司耿村煤矿 A method of solving two sides rock mass deformation enhances country rock globality
CN112195883A (en) * 2020-07-02 2021-01-08 中国电建集团华东勘测设计研究院有限公司 Arrangement structure and construction method of pressure pipeline and drainage gallery suitable for TBM construction
CN112982371A (en) * 2021-02-08 2021-06-18 中国电建集团北京勘测设计研究院有限公司 Seepage-proofing method for large underground cavern by adopting advanced grouting sealing
CN113089705A (en) * 2021-04-21 2021-07-09 中国电建集团中南勘测设计研究院有限公司 Underground cavern drainage system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102654055A (en) * 2012-05-21 2012-09-05 乐贵平 Construction method for compound construction of large-scale underground space structure by holes, groove and piles
CN103306682A (en) * 2013-06-26 2013-09-18 中国水电顾问集团中南勘测设计研究院 Long-span and high-side-wall underground space building and excavation support method thereof
CN103321653A (en) * 2013-06-27 2013-09-25 中国水电顾问集团成都勘测设计研究院 Method of treating lining after collapse of underground cavern crown
CN104453950A (en) * 2014-12-29 2015-03-25 中国电建集团中南勘测设计研究院有限公司 Underground cavity hanging concrete structure
CN105201001A (en) * 2015-10-10 2015-12-30 中国电建集团贵阳勘测设计研究院有限公司 Composite seepage-proofing structure of large karst cave in karst region and construction method thereof
CN106640117A (en) * 2017-03-08 2017-05-10 中国电建集团中南勘测设计研究院有限公司 Underground cavern top arc structure, underground cavern and construction method of underground cavern
CN106640118A (en) * 2017-03-08 2017-05-10 中国电建集团中南勘测设计研究院有限公司 Underground cavity arch crown structure, underground cavity and underground cavity construction method
CN107044287A (en) * 2017-03-06 2017-08-15 刘冲 Colliery shaft station and the reinforcement means of track main entry

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102654055A (en) * 2012-05-21 2012-09-05 乐贵平 Construction method for compound construction of large-scale underground space structure by holes, groove and piles
CN103306682A (en) * 2013-06-26 2013-09-18 中国水电顾问集团中南勘测设计研究院 Long-span and high-side-wall underground space building and excavation support method thereof
CN103321653A (en) * 2013-06-27 2013-09-25 中国水电顾问集团成都勘测设计研究院 Method of treating lining after collapse of underground cavern crown
CN104453950A (en) * 2014-12-29 2015-03-25 中国电建集团中南勘测设计研究院有限公司 Underground cavity hanging concrete structure
CN105201001A (en) * 2015-10-10 2015-12-30 中国电建集团贵阳勘测设计研究院有限公司 Composite seepage-proofing structure of large karst cave in karst region and construction method thereof
CN107044287A (en) * 2017-03-06 2017-08-15 刘冲 Colliery shaft station and the reinforcement means of track main entry
CN106640117A (en) * 2017-03-08 2017-05-10 中国电建集团中南勘测设计研究院有限公司 Underground cavern top arc structure, underground cavern and construction method of underground cavern
CN106640118A (en) * 2017-03-08 2017-05-10 中国电建集团中南勘测设计研究院有限公司 Underground cavity arch crown structure, underground cavity and underground cavity construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184761A (en) * 2018-10-29 2019-01-11 河南大有能源股份有限公司耿村煤矿 A method of solving two sides rock mass deformation enhances country rock globality
CN109184761B (en) * 2018-10-29 2020-03-17 河南大有能源股份有限公司耿村煤矿 Method for solving problem of reinforcing integrity of surrounding rock by deformation of two rock masses
CN112195883A (en) * 2020-07-02 2021-01-08 中国电建集团华东勘测设计研究院有限公司 Arrangement structure and construction method of pressure pipeline and drainage gallery suitable for TBM construction
CN112982371A (en) * 2021-02-08 2021-06-18 中国电建集团北京勘测设计研究院有限公司 Seepage-proofing method for large underground cavern by adopting advanced grouting sealing
CN113089705A (en) * 2021-04-21 2021-07-09 中国电建集团中南勘测设计研究院有限公司 Underground cavern drainage system
CN113089705B (en) * 2021-04-21 2022-07-19 中国电建集团中南勘测设计研究院有限公司 Underground cavern drainage system

Also Published As

Publication number Publication date
CN107355233B (en) 2019-03-22

Similar Documents

Publication Publication Date Title
CN102606162B (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN102021911B (en) Side slope reinforcing method and structure
CN107355233B (en) A kind of underground chamber and Cavity Construction method
CN202969392U (en) Combined support for complex geological deep foundation pit
CN108487911A (en) The compound crossing method construction method of longspan tunnel bilateral wall under complex geological condition
CN201991017U (en) Subway large-span station body structure based on arch cover method construction forming
CN106988178A (en) A kind of subgrade in soft soil zone widened structure and its construction method
CN105257301A (en) Method for reinforcing collapse of weak surrounding rock of shallow embedded and mining tunnel
CN103821160B (en) Soft soil foundation combined pile net structure
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN107609241A (en) Weak rheology surrounding rock tunnel secondary liner structure rigidity and its decision design method for applying opportunity
CN108518229A (en) Large deformation weak broken wall rock outsized section tunnel excavation supporting structure and construction method
CN106246191B (en) A kind of hole body is dredged, fills plentiful large-scale karst cave treatment and tunnel excavation method deeply
CN203334300U (en) Root pile supporting structure
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN205805574U (en) A kind of super-span pile foundation joist carrying arch tunnel recombination liner structure
CN109441456A (en) A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN107327306A (en) Tunnel excavation construction method is superimposed under the conditions of the shallow embedding of city
CN107339122A (en) A kind of steel pipe column handles goaf engineering method
CN110206038A (en) Supporting construction and construction method at a kind of concave foundation pit external corner
CN104141500B (en) One hardens sand and gravel stratum cavern con struction method
CN208236427U (en) Large deformation weak broken wall rock outsized section tunnel excavation supporting structure
CN108914954A (en) Slope support method of the pre support in conjunction with permanent support
CN109056810A (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant