CN1073501A - 水力膨胀式锚杆防采煤面片帮冒顶 - Google Patents
水力膨胀式锚杆防采煤面片帮冒顶 Download PDFInfo
- Publication number
- CN1073501A CN1073501A CN 91107964 CN91107964A CN1073501A CN 1073501 A CN1073501 A CN 1073501A CN 91107964 CN91107964 CN 91107964 CN 91107964 A CN91107964 A CN 91107964A CN 1073501 A CN1073501 A CN 1073501A
- Authority
- CN
- China
- Prior art keywords
- anchor pole
- roof fall
- expansion type
- hydraulic expansion
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及煤矿井下开采工艺,进一步讲是回采
工作面防止片帮冒顶的一种方法。该方法通过在工
作面煤壁或顶板上打孔,在钻孔***水力膨胀式锚
杆,利用支架液压***的乳化液作为压力液,经操作
阀、高压胶管、注液器注入锚杆内腔,使锚杆杆体膨
胀,挤紧钻孔孔壁,锚固煤体,达到防止工作面片帮冒
顶的目的。本发明工艺简单,操作方便,基本不增加
设备,节省人员、时间,成本低,而效果却十分显著,是
采煤面防片帮冒顶行之有效的方法。
Description
本发明涉及煤矿井下开采工艺,进一步讲是煤矿回采工作面防止片邦冒顶的一种方法。
国际上利用化学方法(用聚氨脂)加固煤体防止片帮冒顶,开始于七十年代初、西德煤矿。这是一种较成熟的防止采面煤层片帮冒顶的方法。八三年我国开始研究这项技术,先后在开滦、大同、徐州、兖州等局进行试验,取得了较好效果。化学方法加固煤体有泵注法和木锚杆药包法两种工艺。泵注法要用专用压注泵,要打40~50米深的钻孔,在压注前还要进行封孔,压注后要对泵和管路专门清洗,安装压注泵要占据上下顺槽或工作面的空间,压注浆液运输量大,注浆材料要严格按比例配用,操作十分复杂,必须在停产班进行,至少要六人操作,停泵10分钟不清洗树脂就会在管路内堵塞,注浆后要等20分钟以上加固才起作用。木锚杆药包法,操作也较复杂,需在地面分别装两种药包,分别存放,存放期不得超过三个月,要分别运往井下,两种药包交替送入钻孔,然后用电煤钻加专用套筒带动削尖的木锚杆旋转,将两种药包搅破混合后3~5分钟开始化学反应,20分钟后固化起作用,孔口要用炮泥或棉纱封堵,木锚杆的强度较低。用化学方法加固煤体存在的共同缺点是材料用量大、成本高、工艺复杂。
水力膨胀式管子锚杆,或称胀管式锚杆,是用无缝钢管加工成双层异形管状杆体1,杆体一端焊接上端套2,另一端焊接上挡圈4和注液嘴3,注液嘴上的水孔连通杆体内腔。杆体安装时,将锚杆后端的注液嘴装上注液器,然后将高压水泵提供的高压水(30MPa),通过注液器送入注液嘴,从而进入锚杆内腔,在高压水的作用下杆体膨胀,随着钻孔的轮廓而变形,与孔壁产生很大的挤压力,把片状的岩体锚固在一起。在已有技术中,这种锚杆是用于巷道的支护,使用的长度为1.5m、管壁厚度2mm。而无应用于采煤工作面加固煤壁、防止煤壁片邦冒顶的先例。
本发明的目的在于克服现有技术中的不足之处,而提供一种工艺简单、操作方便、成本低、材料来源方便的回采工作面防煤壁片邦冒顶的新方法。
为实现上述目的,本发明可以通过以下措施来达到:
在井下回采工作面的煤壁上,也可以在工作面煤壁上方的顶板上打钻孔,在钻孔中***水力膨胀式锚杆,用注液器经锚杆的注液咀注入高压的压力液,使锚杆的杆体膨胀,挤紧钻孔孔壁,锚固煤壁或顶板。
本发明的目的还可以通过以下措施来达到:
把液压支架的操作阀作为控制阀,用支架液压***的乳化液作为高压压力液,通过换接到操作阀上的高压胶管,以及高压胶管端头带的注液器,经锚杆的注液咀注入锚杆内腔。
水力膨胀式锚杆的长度可扩展为2.0~3.0m、管壁厚度可扩展为1.0~1.8mm。
本发明与已有技术相比具有如下优点:
1、用水力膨胀式管子锚杆能把节理发育的煤壁很好地锚固成整体,有效地防止回采工作面片帮冒顶,效果十分显著。而且,这种锚杆在煤壁中不会影响采煤机采煤。
2、工艺简单,操作方便,节省时间。只需用煤电钻打眼,不用新安装高压水泵,利用液压支架的操作阀和管路,只需加工一个注液器,就能安装水力膨胀式管子锚杆,基本不增加设备。由于利用液压支架的乳化液注液,泵站的流量大,比原用的高压小水泵供液快得多,安装一根锚杆的注液时间不超过10秒钟,基本不占用生产时间。锚杆安装后立即达到初锚力80kN以上。用人少,两人能够完成全部操作过程。泵注法、木锚杆药包法都存在工艺复杂,操作不便,费时费工的问题。
3.利用液压支架管路***的乳化液作锚杆的压力液,可使防片帮工作非常灵活机动,发现片帮可随时安装使用。现场只需储备锚杆、电煤钻和注液器。锚杆长期存放井下不变质。泵注法,设备安装后要事先进行加固,机动性小。
4.用化学方法加固煤体材料用量大成本高。相同条件下,用水力膨胀式管子锚杆,成本低5~10倍。
5.用水力膨胀式管子锚杆对环境无污染。用化学方法,如用脲醛树脂等材料,有刺激性气味,有腐蚀性,对环境有一定污染,操作人员要带眼镜和乳胶手套,化学材料溅到皮肤上要及时清洗。对煤质也有影响。
6.用化学方法,如用聚氨脂等,材料比较短缺。用水力膨胀式锚杆不存在此类问题。
附图的图面说明如下:
图1:水力膨胀式管子锚杆在注液膨胀前的结构示意图
图2:水力膨胀式管子锚杆在岩石内注液膨胀后的示意图
图3:水力膨胀式管子锚杆在煤壁内注液膨胀后的示意图
图4:在工作面煤壁上安装水力膨胀式管子锚杆示意图
图5:在工作面煤壁上方的顶板上安装水力膨胀式管子锚杆示意图
本发明下面结合附图和实施例作进一步详述:
图1示出了水力膨胀式管子锚杆的结构。其中:1-杆体,2-端套,3-注液嘴,4-挡圈,5-锚盘。举例的水力膨胀式管子锚杆外径为29mm
、长度为2.5m。用φ48×1.5mm的无缝钢管加工成双层异形管状杆体。适于回采工作面防片邦冒顶的水力膨胀式管子锚杆的长度可以是1.8~3.0m、无缝钢管管壁厚度可以从2mm扩展至1mm的范围。
图2示出了水力膨胀式管子锚杆注液膨胀后的情况。锚杆杆体膨胀,可以与孔壁产生很大的挤压力,挤紧钻孔孔壁,并随着钻孔的轮廓而变形,挤满钻孔全断面,把节理发育的煤壁锚固成整体。把节理发育的煤壁锚固成整体。
图3示出了水力膨胀式管子锚杆在工作面煤壁上安装布置的情况。其安装方法与操作步骤如下:
①用煤电钻在煤壁11的上方距顶板0.5米左右,每隔1~1.5米打一个φ42mm的钻孔,孔深大于锚杆长度2.5米,钻孔相互平行;
②把液压支架10的片阀或转阀-在此统称操作阀9,拔出一根管接头,换上一根相同直径、长20~30米端头带注液器7的高压胶管8,用支架的操作阀9作为控制阀,用液压***的乳化液作为水力膨胀式管子锚杆的压力液,为安装锚杆做好准备;
③让锚杆带注液嘴3和挡圈4的一端向外,将锚杆串上锚盘5和木托板6,然后***钻孔中;
④把注液器7装到锚杆的注液嘴3上,然后控制操作阀,让高压乳化液,经注液器7和注液嘴3的小孔进入锚杆内腔,使杆体膨胀,挤满钻孔,把煤壁锚固。在径向膨胀的同时,因变形长度将缩短1~4mm,使锚盘5和托板6压紧在煤壁11上,防止煤体片帮;
⑤关闭操作阀9,取下注液器7,进行另一根锚杆的操作,每根锚杆的注液时间不超过10秒钟。
锚杆间距的确定:
①一般不片帮或片帮不严重就不打水力膨胀式锚杆。
②片帮不甚严重时,可加大锚杆间距在1.5米或者1.5米以上。
③片帮比较严重时,可把锚杆间距适当缩小在1.0~1.5米。
④当周期来压或迂有地质构造,或仰斜上坡采煤造成片帮特别严重时,可把锚杆加密在1米以内,或打双排三花眼布置的钻孔,此时能将锚杆上边的煤留住,把支架顶梁降在锚杆以下以降低采高,待情况好转后再把采高复原。在锚杆长2.5m,滚筒13的宽度为0.6m时,每推进四刀打一次锚杆孔。
在因片邦出现局部冒顶或情况需要时,可在煤壁上方顶板12上打钻,安装水力膨胀式管子锚杆,如图4所示。此时,锚杆孔一般用风钻打眼,钻孔与顶板12的仰角α为30~45度,在顶板上打锚杆可按排在整休班进行。
Claims (3)
1、一种用于井下回采工作面防止煤壁片邦冒顶的方法,在工作面煤壁上以及煤壁上方的顶板上打钻,其特征在于在钻孔中***水力膨胀式锚杆,用注液器经锚杆的注液咀注入压力液,使锚杆的杆体膨胀,挤紧钻孔孔壁。
2、根据权利要求1所述的回采工作面防止煤壁片邦冒顶的方法,其特征在于所说的用注液器经锚杆的注液咀注入压力液,是把液压支架的操作阀作为控制阀,用支架液压***的乳化液作为压力液,通过换接到操作阀上的高压胶管,以及高压胶管端头带的注液器经注液咀注入锚杆内腔。
3、根据权利要求1所述的回采工作面防止煤壁片邦冒顶的方法,其特征在于所说的水力膨胀式锚杆,其长度为2.0~3.0m,管壁厚度1.0~1.8mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 91107964 CN1073501A (zh) | 1991-12-19 | 1991-12-19 | 水力膨胀式锚杆防采煤面片帮冒顶 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 91107964 CN1073501A (zh) | 1991-12-19 | 1991-12-19 | 水力膨胀式锚杆防采煤面片帮冒顶 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1073501A true CN1073501A (zh) | 1993-06-23 |
Family
ID=4908961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 91107964 Pending CN1073501A (zh) | 1991-12-19 | 1991-12-19 | 水力膨胀式锚杆防采煤面片帮冒顶 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1073501A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1788140B (zh) * | 2003-05-12 | 2010-08-11 | 阿特拉斯科普科凿岩机股份公司 | 可扩张岩栓及岩石锚杆*** |
CN102213102A (zh) * | 2011-06-07 | 2011-10-12 | 中国矿业大学 | 一种大倾角工作面倒架扶架方法 |
CN1791734B (zh) * | 2003-05-12 | 2012-10-10 | 阿特拉斯科普科凿岩机股份公司 | 岩栓的受控扩张 |
CN102733835A (zh) * | 2012-07-03 | 2012-10-17 | 四川伯源岩土工程有限公司 | 水涨锚杆、配套连接头及连接方法 |
CN102852532A (zh) * | 2012-10-09 | 2013-01-02 | 冀中能源股份有限公司东庞矿 | 一种防止煤壁片帮的注浆方法 |
CN110080678A (zh) * | 2019-04-19 | 2019-08-02 | 徐建忠 | 一种煤岩体高分子材料加固注浆打眼布置法 |
CN115045697A (zh) * | 2022-05-13 | 2022-09-13 | 中国科学院武汉岩土力学研究所 | 套筒膨胀式大变形预应力水力膨胀注浆锚杆的使用方法 |
-
1991
- 1991-12-19 CN CN 91107964 patent/CN1073501A/zh active Pending
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1788140B (zh) * | 2003-05-12 | 2010-08-11 | 阿特拉斯科普科凿岩机股份公司 | 可扩张岩栓及岩石锚杆*** |
CN1791734B (zh) * | 2003-05-12 | 2012-10-10 | 阿特拉斯科普科凿岩机股份公司 | 岩栓的受控扩张 |
CN102213102A (zh) * | 2011-06-07 | 2011-10-12 | 中国矿业大学 | 一种大倾角工作面倒架扶架方法 |
CN102213102B (zh) * | 2011-06-07 | 2013-04-24 | 中国矿业大学 | 一种大倾角工作面倒架扶架方法 |
CN102733835A (zh) * | 2012-07-03 | 2012-10-17 | 四川伯源岩土工程有限公司 | 水涨锚杆、配套连接头及连接方法 |
CN102852532A (zh) * | 2012-10-09 | 2013-01-02 | 冀中能源股份有限公司东庞矿 | 一种防止煤壁片帮的注浆方法 |
CN102852532B (zh) * | 2012-10-09 | 2015-06-17 | 冀中能源股份有限公司东庞矿 | 一种防止煤壁片帮的注浆方法 |
CN110080678A (zh) * | 2019-04-19 | 2019-08-02 | 徐建忠 | 一种煤岩体高分子材料加固注浆打眼布置法 |
CN115045697A (zh) * | 2022-05-13 | 2022-09-13 | 中国科学院武汉岩土力学研究所 | 套筒膨胀式大变形预应力水力膨胀注浆锚杆的使用方法 |
CN115045697B (zh) * | 2022-05-13 | 2023-10-24 | 中国科学院武汉岩土力学研究所 | 套筒膨胀式大变形预应力水力膨胀注浆锚杆的使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104747075B (zh) | 松软煤层喷浆防塌钻进方法 | |
CN105507940A (zh) | 一种割封压一体化强化瓦斯抽采装置及方法 | |
CN105134127B (zh) | 一种防坍塌注浆固结装置及其使用方法 | |
CN1073501A (zh) | 水力膨胀式锚杆防采煤面片帮冒顶 | |
US5374140A (en) | Drillable ground support bolt | |
CN112179702A (zh) | 一种定点取煤样装置 | |
CN113653531B (zh) | 一种疏放低渗透顶板水的方法 | |
CN101672191A (zh) | 一种机械化安装树脂锚杆的方法 | |
CN207673287U (zh) | 一种喷气式高效螺旋钻具 | |
CN108867639A (zh) | 全长充气式临时支护可更换锚杆 | |
CN111894598A (zh) | 竖井加固方法 | |
US4278363A (en) | Rock bolt and installation system | |
CN109595019A (zh) | 一种高压注浆与锚固一体化的锚杆及其使用方法 | |
CN214303884U (zh) | 用于隧道原位扩建工程的预设内部锚杆结构 | |
CN1085981A (zh) | 胶囊密封灌浆法及其密封装置 | |
CN214697891U (zh) | 煤矿用自钻进注射式锚管锚固装置 | |
CN204419106U (zh) | 帷幕注浆钻孔封套 | |
CN112160766B (zh) | 机械-化学腐蚀-水力切割联合掘进施工设备、工作方法 | |
CN112160767B (zh) | 一种隧道机械-化学腐蚀-水力切割联合掘进施工方法 | |
CN2903182Y (zh) | 自钻式预应力锚杆 | |
CN200968218Y (zh) | 矿用锚固剂安装器 | |
CN1110754A (zh) | 大头锚杆施工方法及其使用的专用钻机 | |
CN103306280A (zh) | 一种钻杆内孔植入搅拌式锚桩及锚固方法 | |
CN204532397U (zh) | 新型带孔口应力集中限制环的注浆锚杆 | |
JPS60199198A (ja) | 土砂の輸送装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C01 | Deemed withdrawal of patent application (patent law 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |