CN107332352B - A kind of judgment method and device switching non-three phase separating brake - Google Patents
A kind of judgment method and device switching non-three phase separating brake Download PDFInfo
- Publication number
- CN107332352B CN107332352B CN201710751784.5A CN201710751784A CN107332352B CN 107332352 B CN107332352 B CN 107332352B CN 201710751784 A CN201710751784 A CN 201710751784A CN 107332352 B CN107332352 B CN 107332352B
- Authority
- CN
- China
- Prior art keywords
- switch
- separating brake
- current
- phase separating
- phase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000006073 displacement reaction Methods 0.000 claims abstract description 23
- 239000003990 capacitor Substances 0.000 claims description 29
- 230000005540 biological transmission Effects 0.000 claims description 4
- 238000010586 diagram Methods 0.000 description 7
- 230000005611 electricity Effects 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000002845 discoloration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000000819 phase cycle Methods 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- H02J13/0006—
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
Abstract
The present invention discloses a kind of judgment method for switching non-three phase separating brake, comprising: the real-time running data of acquisition power network switch equipment, wherein real-time running data includes the displacement information of switchgear;If receive switchgear displacement information be quartile, judge this switch quartile operation whether be dispatching automation main website remote control operation;If being judged as the non-remote control operation of dispatching automation main website, the separating brake information of current switch device type and opening time as current switch equipment is recorded, and is deposited into switch separating brake queue;If the opening time of current switch equipment continues to pre-established threshold, the judgement of switch non-three phase separating brake is opened;If judging current switch equipment to switch non-three phase separating brake, the switch non-three phase separating brake bulletin of current switch equipment, and alarm display are generated.The invention also discloses a kind of judgment means for switching non-three phase separating brake, for realizing the above method.The present invention has effectively prevented the electric power accident for the on-load broaching tool lock for switching non-three phase separating brake.
Description
Technical field
The present invention relates to dispatching of power netwoks technical field, in particular to a kind of judgment method and dress for switching non-three phase separating brake
It sets.
Background technique
With the completion for county's integration reform that lands, Chaozhou dispatch automated system access plant stand is more and more, dispatching and monitoring
Compass of competency covers the whole city, and split-phase mechanism applies more and more, and the breaker non-three phase separating brake problem generated therewith also should
Cause the attention for dispatching related personnel.
In current scheduling automated system, 220KV and the above position of the switch remote signals have Switch Three-Phase to merge position
Signal and single-phase position, 110KV and following position of the switch remote signals only have Switch Three-Phase to merge position signal.Three-phase merges position
Remote signals are set using sending in two point remote signalling, " coincidence " (normal opened contact) is obtained using "AND" logical operation, and " quartile " is (normally closed to connect
Point) it is obtained using "or" logical operation.As shown in Figure 1, automated system signal " coincidence ", which is in, divides shape when switching separating brake
State, " quartile " are in conjunction state.As soon as automated system signal shows that " coincidence " is in as long as it is separating brake that threephase switch, which has phase,
Isloation state, " quartile " are in conjunction state, are that three-phase whole separating brake or individual phase separating brakes can not identify for switch.But in power grid
In actual motion, due to manufacturing quality, later maintenance shortcoming of switch operating mechanism etc., it sometimes appear that switch non-three phase
Separating brake phenomenon.If switch non-three phase separating brake cannot be found in time, it would be possible to the electric power accident of on-load broaching tool lock occur.
Although tie lines figure has the three-phase current of mark route to monitor switch non-three phase separating brake phenomenon for dispatcher, when operating busy
This phenomenon may be ignored.In addition, having the three-phase current of mark route by tie lines figure when AVC system automatically controls capacitor
Capacitance switch non-three phase separating brake phenomenon can not be found in time.
In view of the above-mentioned problems, research is switched the difference of normal separating brake, non-three phase separating brake by this project, it is automatic to determine that switch is non-
Full phase separating brake situation simultaneously provides warning information, and dispatcher is reminded to pay attention to the switch non-three phase separating brake.
Summary of the invention
The main object of the present invention is to propose a kind of judgment method for switching non-three phase separating brake, it is intended to overcome the above problem.
To achieve the above object, a kind of judgment method switching non-three phase separating brake proposed by the present invention, includes the following steps:
S10 acquires the real-time running data of the various switchgears of each application system of power grid, wherein in real-time running data
Displacement information including various switchgears;
If S20 receive switchgear displacement information be quartile when, judge this switch quartile operation whether be scheduling
Automate the remote control operation of main website;
If the judgement of S30 S20 is the non-remote control operation of dispatching automation main website, current switch device type and separating brake are recorded
Separating brake information of the time as current switch equipment, and be deposited into switch separating brake queue;
If the opening time of S40 current switch equipment continues to pre-established threshold, the judgement of switch non-three phase separating brake is opened;
If S50 S40 judges current switch equipment to switch non-three phase separating brake, the switch non-three phase of current switch equipment is generated
Separating brake bulletin, and alarm display.
Preferably, after the S30, before the S40 further include:
S60 judges the type of current switch equipment, wherein switchgear type includes that capacitor switch and non-electrical container are opened
It closes.
Preferably, the S40 includes:
If S401 S60 judges that current switch device type for capacitor switch, is obtained and respectively mutually opened in the pre-established threshold period
Real-time current value is closed, if wherein the absolute value of phase switch real-time current is greater than the empirical value of the full phase separating brake of capacitor switch,
Judge current switch equipment then to switch non-three phase separating brake;
If S402 S60 judges that current switch device type for non-electrical container valve, obtains each phase in the pre-established threshold period
Switch real-time current value, if the sum of each phase switching current absolute value greater than the empirical value of the full phase separating brake of non-electrical container valve,
Current switch equipment is judged to switch non-three phase separating brake.
Preferably, the S50 includes:
If S501 S40 judges current switch equipment to switch non-three phase separating brake, the switch for generating current switch equipment is non-complete
Phase separating brake bulletin;
The alarm window that S502 sends switch non-three phase separating brake bulletin to the dispatch automated system of current switch equipment is shown;
Either, the switch non-three phase separating brake bulletin of current switch equipment is sent to dispatching workstations play system phonic warning.
Preferably, after the S10 further include:
If S70 receive current switch equipment displacement information be coincidence when, judge current switch equipment whether there is in
It switchs in separating brake queue;
If the above-mentioned judgement current switch equipment of S80 is present in switch separating brake queue, deleted in switch separating brake queue
The separating brake information of current switch equipment.
The present invention also proposes a kind of judgment means for switching non-three phase separating brake, including acquisition module, first judgment module, enters
Column module, the second judgment module and alarm module, in which:
Acquisition module, the real-time running data of the various switchgears for acquiring each application system of power grid, wherein in real time
It include the displacement information of various switchgears in operation data;
First judgment module judges this switch quartile if the displacement information for receiving switchgear is quartile
Operation whether be dispatching automation main website remote control operation;
Fall in lines module, if the judgement for first judgment module is the non-remote control operation of dispatching automation main website, record is worked as
The separating brake information of preceding switch device type and opening time as current switch equipment, and be deposited into switch separating brake queue;
It is non-to open switch if the opening time for current switch equipment continues to pre-established threshold for second judgment module
The judgement of full phase separating brake;
Alarm module generates current if judging current switch equipment for the second judgment module to switch non-three phase separating brake
The switch non-three phase separating brake bulletin of switchgear, and alarm display.
It preferably, further include third judgment module, third judgment module, for judging the type of current switch equipment,
In, switchgear type includes capacitor switch and non-electrical container valve.
Preferably, second judgment module includes:
Capacitor switch judging unit, if judging that current switch device type is opened for capacitor for third judgment module
It closes, each mutually switch real-time current value in the pre-established threshold period is obtained, if wherein the absolute value of phase switch real-time current is greater than
The empirical value of the full phase separating brake of capacitor switch judges current switch equipment then to switch non-three phase separating brake;
Non-electrical container valve judging unit, if judging current switch device type for non-electrical container for third judgment module
Switch obtains each mutually switch real-time current value in the pre-established threshold period, if each phase switching current absolute value and be greater than non-electrical
The empirical value of the full phase separating brake of container valve judges current switch equipment then to switch non-three phase separating brake.
Preferably, the alarm module includes:
Generation unit generates current if judging current switch equipment for the second judgment module to switch non-three phase separating brake
The switch non-three phase separating brake bulletin of switchgear;
Transmission unit, for sending the switch non-three phase separating brake bulletin of current switch equipment to the announcement of dispatch automated system
Alert window show, either, the switch non-three phase separating brake bulletin of transmission current switch equipment to dispatching workstations recording playing system
Phonic warning.
Preferably, further includes:
4th judgment module judges current switch if the displacement information for receiving current switch equipment is coincidence
Equipment whether there is in switch separating brake queue;
Removing module, if being present in switch separating brake queue for above-mentioned judgement current switch equipment, in switch separating brake
The separating brake information of current switch equipment is deleted in queue.
Technical solution of the present invention issues switch non-three phase separating brake alarm by power dispatching automation main station system in time, from
And dispatcher is reminded to pay attention to the switch, prevent the electric power accident of on-load broaching tool lock, avoids causing to switch because of on-load broaching tool lock
Direct economic loss, safety problem caused by explosion, to indirect losses problems such as economy, the societies such as client's cut-off electricity.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is 110KV and following Switch Three-Phase merges position view;
Fig. 2 is a kind of method flow diagram of an embodiment of the judgment method for switching non-three phase separating brake of the present invention;
Fig. 3 is a kind of method flow diagram of another embodiment for the judgment method for switching non-three phase separating brake of the present invention;
Fig. 4 is the process refinement figure of S50 of the present invention;
Fig. 5 is a kind of method flow diagram of the another embodiment for the judgment method for switching non-three phase separating brake of the present invention;
Fig. 6 is a kind of functional block diagram of an embodiment of the judgment means for switching non-three phase separating brake of the present invention;
Fig. 7 is a kind of functional block diagram of another embodiment for the judgment means for switching non-three phase separating brake of the present invention;
Fig. 8 is that the functional module of second judgment module refines figure;
Fig. 9 is that the functional module of the alarm module refines figure;
Figure 10 is a kind of functional block diagram of the another embodiment for the judgment means for switching non-three phase separating brake of the present invention,
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its
His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that if relating to directionality instruction (such as up, down, left, right, before and after ...) in the embodiment of the present invention,
Then directionality instruction be only used for explain under a certain particular pose (as shown in the picture) between each component relative positional relationship,
Motion conditions etc., if the particular pose changes, directionality instruction is also correspondingly changed correspondingly.
In addition, being somebody's turn to do " first ", " second " etc. if relating to the description of " first ", " second " etc. in the embodiment of the present invention
Description be used for description purposes only, be not understood to indicate or imply its relative importance or implicitly indicate indicated skill
The quantity of art feature." first " is defined as a result, the feature of " second " can explicitly or implicitly include at least one spy
Sign.It in addition, the technical solution between each embodiment can be combined with each other, but must be with those of ordinary skill in the art's energy
It is enough realize based on, will be understood that the knot of this technical solution when conflicting or cannot achieve when occurs in the combination of technical solution
Conjunction is not present, also not the present invention claims protection scope within.
To achieve the above object, as Figure 1-10 shows, a kind of judgment method switching non-three phase separating brake proposed by the present invention,
Include the following steps:
S10 acquires the real-time running data of the various switchgears of each application system of power grid, wherein in real-time running data
Displacement information including various switchgears;
If S20 receive switchgear displacement information be quartile when, judge this switch quartile operation whether be scheduling
Automate the remote control operation of main website;
If the judgement of S30 S20 is the non-remote control operation of dispatching automation main website, current switch device type and separating brake are recorded
Separating brake information of the time as current switch equipment, and be deposited into switch separating brake queue;
If the opening time of S40 current switch equipment continues to pre-established threshold, the judgement of switch non-three phase separating brake is opened;
If S50 S40 judges current switch equipment to switch non-three phase separating brake, the switch non-three phase of current switch equipment is generated
Separating brake bulletin, and alarm display.
Preferably, after the S30, before the S40 further include:
S60 judges the type of current switch equipment, wherein switchgear type includes that capacitor switch and non-electrical container are opened
It closes.
Preferably, the S40 includes:
If S401 S60 judges that current switch device type for capacitor switch, is obtained and respectively mutually opened in the pre-established threshold period
Real-time current value is closed, if wherein the absolute value of phase switch real-time current is greater than the empirical value of the full phase separating brake of capacitor switch,
Judge current switch equipment then to switch non-three phase separating brake;
If S402 S60 judges that current switch device type for non-electrical container valve, obtains each phase in the pre-established threshold period
Switch real-time current value, if the sum of each phase switching current absolute value greater than the empirical value of the full phase separating brake of non-electrical container valve,
Current switch equipment is judged to switch non-three phase separating brake.
Preferably, the S50 includes:
If S501 S40 judges current switch equipment to switch non-three phase separating brake, the switch for generating current switch equipment is non-complete
Phase separating brake bulletin;
The alarm window of switch non-three phase separating brake bulletin to dispatch automated system that S502 sends current switch equipment shows,
Either, the switch non-three phase separating brake bulletin of current switch equipment is sent to dispatching workstations recording playing system phonic warning.
Preferably, after the S10 further include:
If S70 receive current switch equipment displacement information be coincidence when, judge current switch equipment whether there is in
It switchs in separating brake queue;
If the above-mentioned judgement current switch equipment of S80 is present in switch separating brake queue, deleted in switch separating brake queue
The separating brake information of current switch equipment.
In embodiments of the present invention, the present invention is to increase a kind of switch non-three phase separating brake in electric power scheduling automatization system
Judgment method, borrow rule judgement and establish the reasoning from logic of computer, and will finally sentence intelligent decision result and be generated as image
Intuitive switch non-three phase separating brake bulletin carries out alarm display.
The S10: data source, the auxiliary related fortune for judging to need to obtain each application system of power grid of switch non-three phase separating brake are obtained
Data source of the row data as switch non-three phase separating brake judgement comprising the quartile or the displacement information of coincidence, switch of switch are distant
Operation information, real-time telemetry data etc. are controlled, the present invention passes through preprocessing process: electric power scheduling automatization system monitors switch in real time
Information is conjugated, program is established individually switch non-three phase separating brake auxiliary judgment thread and monitored, executes one within timer 5 seconds
It is secondary, scan the 10KV switchgear state of the whole network.
The S20: if the displacement information for receiving switchgear is quartile, the first judgement of starting, first is judged as this
It is secondary switch quartile operation whether be dispatching automation main website remote control operation, then terminate to judge if it is remote control operation, if non-
Remote control operation, opens the S30, then the separating brake for recording current switch device type and opening time as current switch equipment is believed
Breath, and be deposited into switch separating brake queue.
After the S30, before the S40 further include: S60, S60 are the selecting steps of object before intelligent decision, are opened
Closing non-three phase separating brake judges thread according to pretreated as a result, acquisition carries out intelligence to the switchgear type of triggering judgement respectively
It can judgement.Switchgear is divided into different type by electric power scheduling automatization system, such as sets the switch that operation of power networks monitors in real time
Back-up is capacitor switch, on-load switch, line switching, transformer side switch, bus connection switch etc..Switch non-three phase separating brake is sentenced
It is disconnected, it needs the switch to the whole network 10KV above to distinguish, is generally divided into capacitor switch and non-electrical container valve
Two major classes.
The S40: if the opening time of the current switch equipment in the real-time telemetry data of current switch equipment continue to
When pre-established threshold, the second judgement is opened, second is judged as the intelligent decision of switch non-three phase separating brake, the intelligent decision, with electricity
For container valve, capacitor switch obtains each phase real-time current value in this interval after switch quartile continues two minutes, if
There is a phase current absolute value to be greater than 20 (setting 50 originally) A, then the reasoning results are this switch non-three phase separating brake, and it is non-to generate switch
Full phase separating brake bulletin.Intelligent decision foundation: when the full phase separating brake of switchgear, theoretically the current value of each phase of switchgear is 0,
If non-three phase separating brake, at least phase switch is "on" position, then the current value of this phase of "on" position is necessarily greater than
0, in the ideal situation, it is assumed that theoretical current value 0 is used as decision condition, it is contemplated that in actual dispatching automation
System data acquisition process will appear the disturbing factors such as error, drift, can go out if using theoretical current value 0 as decision condition
Now judge by accident, it is contemplated that the influence of above-mentioned disturbing factor, electric power scheduling automatization system Telemetry Data Acquisition allowable error ± 3%,
By taking the electric system of Chaozhou power supply bureau as an example, the maximum capacitor 9.75Mvar of Chaozhou power supply bureau electric system at present, corresponding mutually electricity
532A, the smallest capacitor 0.45Mvar, corresponding phase current 25A are flowed, is calculated by 3%, maximum error is about 16A, so setting
Determine 20A to be empirically worth, does not influence the non-three phase separating brake judgement of minimum capacity again under the influence of avoiding disturbing factor, guarantee final
The accuracy rate of judging result.By taking non-electrical container valve as an example, non-electrical container valve after switch quartile continues two minutes, work as by acquisition
Preceding switch three-phase real-time current value, if there is three-phase current absolute value and be greater than 10A, then the reasoning results be this switch non-three phase
Separating brake, and generate switch non-three phase separating brake bulletin.The judgement of capacitor switch non-three phase and the judgement of non-electrical container valve non-three phase
Difference is that electric current is electric current when non-electrical container valve (such as line switching) closes a floodgate at full capacity when capacitor switch closes a floodgate
Amplitude is 0 at full capacity, so going judge to switch whether the threshold value of non-three phase is had any different by phase current.Non-electrical container valve
Using three-phase current absolute value and be greater than 10A as Rule of judgment, this 10A is similarly an empirical value, similarly, it is contemplated that electric
Power dispatch automated system data acquisition will appear error, the factor of drift, and the also free induced voltage for filling route causes
The disturbing factors such as induced current, such as the route where switch be it is unloaded, when sky fills route, can switch is non-three phase
Because of the too small judgement that pre-established threshold is not achieved and misses non-three phase of electric current.It is that the pre-established threshold is with needing to add explanation
Current switch equipment conjugates the lasting critical period of information, and in embodiment, for two minutes, this can also be managed for two minutes
Solution is empirical value, it is not limited here.
The S50 provides the step of a variety of alarm modes show the reasoning results for switch non-three phase separating brake auxiliary judgment, accuses
Police's formula relies on original dispatch automated system alarm function, i.e., in the place display such as alarm window;Either, it is sent to scheduling
The recording playing system phonic warning etc. of member's work station.Outdoor scene operation has and is not limited to following several:
A) window is alerted on warning information;
B) newest warning information presenting bank;
C) sound equipment, voice prompting;
D) automatic/hand pushes away figure, i.e., releases or manually have access to failure plant stand main wiring diagram automatically;
E) figure discoloration or flashing;
F) it is prompted by mobile phone short message;
G) acknowledged alarm.
Switch the alarm format of non-three phase separating brake bulletin: " station XX XX switchs non-three phase separating brake ".
It further include that S70 and S80 check that this sets if the displacement information for receiving switchgear is coincidence after the S10
It is standby to whether there is in switch separating brake queue, if it is present deleting the facility information in switch separating brake queue, terminate to sentence
It is disconnected.
The present invention is applied to dispatching automation of electric power systems main website, can be to power train when open-phase operation occurs for switch
System operation generates very big harmfulness.Switch open-phase operation can make power grid generate negative phase-sequence and zero-sequence current (voltage), make power grid
Hair, it is defeated, match, electrical equipment is damaged, and not only causes economic loss to client and society, also relate to safety problem, disconnected
Powerup issue.Power dispatching automation main station system issues switch non-three phase separating brake alarm in time, so that dispatcher be reminded to pay attention to
The switch prevents the electric power accident of on-load broaching tool lock, avoids directly passing through caused by causing switch to explode because of on-load broaching tool lock
Help loss, safety problem, to indirect losses problems such as economy, the societies such as client's cut-off electricity.
The present invention also proposes that a kind of judgment means for switching non-three phase separating brake, the judgment means of the switch non-three phase separating brake are used
In the judgment method for realizing above-mentioned switch non-three phase separating brake, since the judgment means of this switch non-three phase separating brake use above-mentioned side
Whole technical solutions of all embodiments of method, thus it is at least all beneficial brought by the technical solution with above-described embodiment
Effect, this is no longer going to repeat them.Wherein, including acquisition module 10, first judgment module 20, module of falling in lines 30, second judge
Module 40 and alarm module 50, in which:
Acquisition module 10, the real-time running data of the various switchgears for acquiring each application system of power grid, wherein real
When operation data in include various switchgears displacement information;
First judgment module 20 judges this switch point if the displacement information for receiving switchgear is quartile
Bit manipulation whether be dispatching automation main website remote control operation;
Module of falling in lines 30, if the judgement for first judgment module 20 is the non-remote control operation of dispatching automation main website, note
The separating brake information of current switch device type and opening time as current switch equipment is recorded, and is deposited into switch separating brake queue
In;
Second judgment module 40 opens switch if the opening time for current switch equipment continues to pre-established threshold
The judgement of non-three phase separating brake;
Alarm module 50 generates if judging current switch equipment for the second judgment module 40 to switch non-three phase separating brake
The switch non-three phase separating brake bulletin of current switch equipment, and alarm display.
It preferably, further include third judgment module 60, third judgment module 60, for judging the class of current switch equipment
Type, wherein switchgear type includes capacitor switch and non-electrical container valve.
Preferably, second judgment module 40 includes:
Capacitor switch judging unit 401, if judging current switch device type for capacitor for third judgment module
Switch obtains each mutually switch real-time current value in the pre-established threshold period, if wherein the absolute value of phase switch real-time current is big
In the empirical value of the full phase separating brake of capacitor switch, then current switch equipment is judged to switch non-three phase separating brake;
Non-electrical container valve judging unit 402, if judging current switch device type for non-electrical for third judgment module
Container valve obtains each mutually switch real-time current value in the pre-established threshold period, if the sum of each phase switching current absolute value is greater than
The empirical value of the full phase separating brake of non-electrical container valve judges current switch equipment then to switch non-three phase separating brake.
Preferably, the alarm module 50 includes:
Generation unit 501, if judging current switch equipment for the second judgment module to switch non-three phase separating brake, generation is worked as
The switch non-three phase separating brake bulletin of preceding switch equipment;
Transmission unit 502, for sending the switch non-three phase separating brake bulletin of current switch equipment to dispatch automated system
Alarm window show;Either, the switch non-three phase separating brake bulletin of current switch equipment is sent to dispatching workstations recording broadcasting
System voice alarm.
Preferably, further includes:
4th judgment module 70, if the displacement information for receiving current switch equipment is coincidence, judgement is currently opened
Closing equipment whether there is in switch separating brake queue;
Removing module 80, if being present in switch separating brake queue for above-mentioned judgement current switch equipment, in switch point
The separating brake information of current switch equipment is deleted in lock queue.
The above description is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all at this
Under the inventive concept of invention, using equivalent structure transformation made by description of the invention and accompanying drawing content, or directly/use indirectly
It is included in other related technical areas in scope of patent protection of the invention.
Claims (8)
1. a kind of judgment method for switching non-three phase separating brake, which comprises the steps of:
S10 acquires the real-time running data of the various switchgears of each application system of power grid, wherein includes in real-time running data
The displacement information of various switchgears;
If S20 receives the displacement information of switchgear when being quartile, judge whether this switch quartile operation is that scheduling is automatic
Change the remote control operation of main website;
If the judgement of S30 S20 is the non-remote control operation of dispatching automation main website, current switch device type and opening time are recorded
As the separating brake information of current switch equipment, and it is deposited into switch separating brake queue;
If the opening time of S40 current switch equipment continues to pre-established threshold, the judgement of switch non-three phase separating brake is opened, it is described
S40 includes:
If S401 current switch device type is capacitor switch, each mutually switch real-time current in the pre-established threshold period is obtained
Value, if wherein the absolute value of phase switch real-time current is greater than the empirical value of the full phase separating brake of capacitor switch, judgement is current
Switchgear is switch non-three phase separating brake;
If S402 current switch device type is non-electrical container valve, each mutually switch real-time current in the pre-established threshold period is obtained
Value, if the sum of each phase switching current absolute value judges current switch greater than the empirical value of the full phase separating brake of non-electrical container valve
Equipment is switch non-three phase separating brake;
If S50 S40 judges current switch equipment to switch non-three phase separating brake, the switch non-three phase separating brake of current switch equipment is generated
Bulletin, and alarm display.
2. the judgment method of switch non-three phase separating brake as described in claim 1, which is characterized in that described after the S30
Before S40 further include:
S60 judges the type of current switch equipment, wherein switchgear type includes capacitor switch and non-electrical container valve.
3. the judgment method of switch non-three phase separating brake as described in claim 1, which is characterized in that the S50 includes:
If S501 S40 judges current switch equipment to switch non-three phase separating brake, the switch non-three phase point of current switch equipment is generated
Lock bulletin;
The alarm window that S502 sends switch non-three phase separating brake bulletin to the dispatch automated system of current switch equipment is shown;Or
It is to send the switch non-three phase separating brake bulletin of current switch equipment to dispatching workstations play system phonic warning.
4. it is as described in any one of claims 1-3 switch non-three phase separating brake judgment method, which is characterized in that the S10 it
Afterwards further include:
If S70 receive current switch equipment displacement information be coincidence when, judge current switch equipment whether there is in switch
In separating brake queue;
If the above-mentioned judgement current switch equipment of S80 is present in switch separating brake queue, deleted in switch separating brake queue current
The separating brake information of switchgear.
5. a kind of judgment means for switching non-three phase separating brake, which is characterized in that including acquisition module, first judgment module, fall in lines
Module, the second judgment module and alarm module, in which:
Acquisition module, the real-time running data of the various switchgears for acquiring each application system of power grid, wherein real time execution
It include the displacement information of various switchgears in data;
First judgment module judges this switch quartile operation if the displacement information for receiving switchgear is quartile
Whether be dispatching automation main website remote control operation;
Module of falling in lines is recorded and is currently opened if the judgement for first judgment module is the non-remote control operation of dispatching automation main website
The separating brake information of device type and opening time as current switch equipment is closed, and is deposited into switch separating brake queue;
Second judgment module opens switch non-three phase if the opening time for current switch equipment continues to pre-established threshold
The judgement of separating brake, second judgment module include:
Capacitor switch judging unit, if judging that current switch device type for capacitor switch, obtains for third judgment module
Each mutually switch real-time current value in the pre-established threshold period is taken, if wherein the absolute value of phase switch real-time current is greater than capacitor
The empirical value of the full phase separating brake of switch judges current switch equipment then to switch non-three phase separating brake;
Non-electrical container valve judging unit, if judging that current switch device type is opened for non-electrical container for third judgment module
Close, obtain each mutually switch real-time current value in the pre-established threshold period, if each phase switching current absolute value and be greater than noncapacitive
The empirical value of the full phase separating brake of device switch judges current switch equipment then to switch non-three phase separating brake;
Alarm module generates current switch if judging current switch equipment for the second judgment module to switch non-three phase separating brake
The switch non-three phase separating brake bulletin of equipment, and alarm display.
6. the judgment means of switch non-three phase separating brake as claimed in claim 5, which is characterized in that further include that third judges mould
Block, third judgment module, for judging the type of current switch equipment, wherein switchgear type include capacitor switch and
Non-electrical container valve.
7. the judgment means of switch non-three phase separating brake as claimed in claim 5, which is characterized in that the alarm module includes:
Generation unit generates current switch if judging current switch equipment for the second judgment module to switch non-three phase separating brake
The switch non-three phase separating brake bulletin of equipment;
Transmission unit, for sending the switch non-three phase separating brake bulletin of current switch equipment to the alarm window of dispatch automated system
Display either sends the switch non-three phase separating brake bulletin of current switch equipment to dispatching workstations play system phonic warning.
8. such as the judgment means of the described in any item switch non-three phase separating brakes of claim 5-7, which is characterized in that further include:
4th judgment module judges current switch equipment if the displacement information for receiving current switch equipment is coincidence
With the presence or absence of in switch separating brake queue;
Removing module, if being present in switch separating brake queue for above-mentioned judgement current switch equipment, in switch separating brake queue
The middle separating brake information for deleting current switch equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710751784.5A CN107332352B (en) | 2017-08-28 | 2017-08-28 | A kind of judgment method and device switching non-three phase separating brake |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710751784.5A CN107332352B (en) | 2017-08-28 | 2017-08-28 | A kind of judgment method and device switching non-three phase separating brake |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107332352A CN107332352A (en) | 2017-11-07 |
CN107332352B true CN107332352B (en) | 2019-10-29 |
Family
ID=60203842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710751784.5A Active CN107332352B (en) | 2017-08-28 | 2017-08-28 | A kind of judgment method and device switching non-three phase separating brake |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107332352B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114295977B (en) * | 2022-03-09 | 2022-05-27 | 广东电网有限责任公司佛山供电局 | Monitoring system for non-full-phase opening of circuit breaker and construction method thereof |
CN117767559A (en) * | 2023-12-22 | 2024-03-26 | 海南电网有限责任公司三亚供电局 | Method for intelligently monitoring unbalance of three-phase switch and application system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203787951U (en) * | 2014-04-11 | 2014-08-20 | 国家电网公司 | Three-phase inconsistent protective circuit of circuit breaker |
CN105406447A (en) * | 2015-11-20 | 2016-03-16 | 河南平芝高压开关有限公司 | Closing coil protection apparatus |
CN106019137A (en) * | 2016-07-19 | 2016-10-12 | 南宏电力科技有限公司 | Switch state detecting circuit of protective relaying device |
CN106291342A (en) * | 2016-07-19 | 2017-01-04 | 南宏电力科技有限公司 | The on off state detection method of a kind of protective relaying device and device |
CN205882721U (en) * | 2016-08-05 | 2017-01-11 | 南京鼎牌电器有限公司 | Electric wire netting three -phase balance control system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102611086B (en) * | 2012-03-27 | 2015-01-07 | 许继电气股份有限公司 | Centralized protection system and method for region distribution network |
-
2017
- 2017-08-28 CN CN201710751784.5A patent/CN107332352B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203787951U (en) * | 2014-04-11 | 2014-08-20 | 国家电网公司 | Three-phase inconsistent protective circuit of circuit breaker |
CN105406447A (en) * | 2015-11-20 | 2016-03-16 | 河南平芝高压开关有限公司 | Closing coil protection apparatus |
CN106019137A (en) * | 2016-07-19 | 2016-10-12 | 南宏电力科技有限公司 | Switch state detecting circuit of protective relaying device |
CN106291342A (en) * | 2016-07-19 | 2017-01-04 | 南宏电力科技有限公司 | The on off state detection method of a kind of protective relaying device and device |
CN205882721U (en) * | 2016-08-05 | 2017-01-11 | 南京鼎牌电器有限公司 | Electric wire netting three -phase balance control system |
Also Published As
Publication number | Publication date |
---|---|
CN107332352A (en) | 2017-11-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106680634B (en) | A kind of intelligent early-warning method of intelligent substation relay protection safety measure | |
CN107884707A (en) | High-voltage circuit-breaker switching on-off time on-Line Monitor Device and method | |
CN105974267B (en) | A kind of small current grounding fault positioning system and its method based on IEC 61850 | |
CN102355056B (en) | Method for improving closing reliability of remote-terminal-unit-architecture-based substation | |
CN107332352B (en) | A kind of judgment method and device switching non-three phase separating brake | |
CN101752909B (en) | Remote checking method of operation circuit | |
CN110086251A (en) | A kind of monitoring method and system improving electric grid operating safety | |
CN104967216B (en) | A kind of substation and its monitoring system and its monitoring method | |
CN106451384A (en) | Power grid self-healing decision support system based on scheduling emergency plan | |
CN106487004B (en) | One electrical secondary system of intelligent substation runs hidden danger Intelligent drainage checking method | |
CN102184203B (en) | Method for constructing network reconfiguration database | |
CN111007352A (en) | Method for reading accurate event time in low-voltage distribution line based on Beidou time service technology | |
CN104882795A (en) | Power distribution network ring main unit control circuit having broken line monitoring function | |
CN110829351A (en) | Intelligent control system and method for primary and secondary fusion circuit breaker | |
KR102678704B1 (en) | Fault management system for power distribution management system | |
CN205070616U (en) | Supervision return circuit of trip(ping) circuit | |
CN202333998U (en) | Intelligent recloser | |
CN207082902U (en) | A kind of neutral point of main transformer grounding switch remote control circuit | |
CN112769228A (en) | Sequence control operation order verification method based on dynamic simulation data | |
CN112632779A (en) | Panoramic display method for running state of total station protection equipment based on primary equipment wiring diagram | |
CN104111988A (en) | Building method of alarm reasoning knowledge base of intelligent transformer substation | |
CN204740965U (en) | Alarm device when isolator three -phase position is inconsistent | |
Sulaiman | Using the real-time island detection and network colouring application in electrical systems | |
CN114498368B (en) | High-voltage distribution room fault alarm system | |
US2280144A (en) | Signaling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |