CN107305654A CN201710410946.9A CN201710410946A CN107305654A CN 107305654 A CN107305654 A CN 107305654A CN 201710410946 A CN201710410946 A CN 201710410946A CN 107305654 A CN107305654 A CN 107305654A
Authority
CN
China
Prior art keywords
relay
common equipment
public
information
data analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710410946.9A
Other languages
Chinese (zh)
Inventor
翁毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710410946.9A priority Critical patent/CN107305654A/en
Publication of CN107305654A publication Critical patent/CN107305654A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Big data analysis system is managed the invention provides a kind of common equipment, including:Common equipment;First relay, each first relay is provided with corresponding compass of competency, and first relay connects the common equipment in its compass of competency, and receives the detection information;Second relay, each second relay is provided with corresponding compass of competency, and the second processing strategy is used to parse the detection information with generating run information, and the operation information reflects the running status of corresponding common equipment;Processing end, the processing end connects each first relay and second relay, and the processing end receives the detection information by the first relay or the second relay;Manage database, processing end described in the managed database, for storing the detection information.

Description

A kind of common equipment manages big data analysis system
Technical field
The present invention relates to common equipment administrative skill field, a kind of common equipment management big data analysis system is specifically related to System.
Background technology
During municipal administration, the utilization and management of common equipment are always more important factor, general communal facility Refer to various public characters, the service equipment that Public Service Product is provided for citizen, can be divided into religion according to specific project characteristic Educate, health care, entertainment, traffic, physical culture, social welfare and guarantee, administration and community service, post and telecommunications and business Industry financial service etc..Including public administration facility, public information facility, public health infrastructure, Public Physical Education facility, Public Culture Facility, public transit facility, public education facility, public greening facility, public housing estate etc..It is public that urban public utilities are different from rural area Common facility, specifically, urban public utilities refer to urban sewage treatment system, municipal refuse(Including excrement)Processing system, Speedily carry out rescue work maintenance, city square, city street lamp, road sign guideboard, city air defence sky of urban road, Urban Bridge, harbour, urban operating mechanism is set Apply, urban afforestation, townscape Scenic Area, Urban Parks etc., and such as Urban Parks, showplace scenic spot is this large-scale public to be built Build, have a personal management, and other small-sized communal facilitys, such as dustbin, street lamp, communal facility will be because being managed without special messenger Reason, causes to be particularly easy to damage or lose, and is only safeguarded by offence reporting system, and less efficient, response speed is slower, existing Artificial monitoring cost it is higher.
The content of the invention
For the above-mentioned problems in the prior art, a kind of common equipment management big data analysis system is now aimed to provide System, to realize that the very first time for damaging information feeds back by Internet of Things technology.
Concrete technical scheme is as follows:
A kind of common equipment manages big data analysis system, including:
Common equipment, the common equipment is connected with detection unit, and the detection unit is used to detect corresponding common equipment State simultaneously exports detection information, and the common equipment also includes communication unit, and the communication unit is used to send the detection letter Breath, the detection information includes failure situation and running status;
First relay, each first relay is provided with corresponding compass of competency, and first relay connects its pipe The common equipment in the domain of area under one's jurisdiction, and the detection information is received, first relay is configured with the first processing strategy, institute Stating the first processing strategy is used to parse the detection information to generate fault message, and the fault message reflects the corresponding public affairs The failure situation of common equipment;
Second relay, each second relay is provided with corresponding compass of competency, and second relay connects its pipe The common equipment in the domain of area under one's jurisdiction, second hop connects the corresponding common equipment, and receives the detection letter Breath, second relay is configured with second processing strategy, and the second processing strategy is used to parse the detection information with life Into operation information, the operation information reflects the running status of corresponding common equipment;
Processing end, the processing end connects each first relay and second relay, and the processing end passes through the One relay or the second relay receive the detection information;
Manage database, processing end described in the managed database, for storing the detection information.
Further, the first relay connecting fault information bank, the fault message storehouse preset process instruction with And corresponding failure situation, when a fault message is generated, first relay according to corresponding failure situation from described therefore Corresponding process instruction is obtained in barrier information bank, first relay performs the process instruction.
Further, in addition to common equipment maintenance station, the common equipment maintenance station connects first relay simultaneously For receiving the process instruction.
Further, in addition to background end, the background end connects the processing end, and the background end reception processing end is anti- The fault message of feedback, back-stage management personnel can be shown the fault message by background end and input corresponding process instruction, And sent by the processing end to arbitrary first relay.
Further, when the first relay described in one receives a process instruction, locate described in the fault message library storage Reason instruction and corresponding fault message.
Further, the second link terminal connection Maintenance Information Base, the Maintenance Information Base presets maintenance instruction And corresponding running status, when an operation information is generated, second relay is according to corresponding running status from described Corresponding maintenance instruction is obtained in Maintenance Information Base, second relay performs the maintenance instruction.
Further, in addition to common equipment all-in-service station, the common equipment all-in-service station connects second relay simultaneously For receiving the maintenance instruction.
Further, in addition to background end, the background end connects the processing end, and the background end receives the processing The operation information of feedback is held, back-stage management personnel, which can be shown the operation information by background end and input corresponding maintenance, to be referred to Order.
Further, the common equipment includes public garbage bin, the corresponding detection unit of the public garbage bin Including video camera, the corresponding failure situation of the public garbage bin includes breakage failure and displacement failure, described public The corresponding running status of dustbin includes capacity status.
Further, the common equipment includes public street lamp, and the corresponding failure situation of the public street lamp includes circuit Failure and breakage failure, the corresponding running status of the public street lamp include working condition.
The good effect of above-mentioned technical proposal is:
Above-mentioned common equipment management big data analysis system, by this way, the situation of common equipment passes through two relayings End is acquired, and the information handled by different relay is different, and the information of output is also otherwise varied, and two relay roots Factually the situation on border is analyzed, collection, improves the effect and reliability used, meanwhile, the collection of data passes through collecting unit Realize, and the factor of the physical location considered, so the classifying rationally of physical location is carried out by two relays, will be different Information is transmitted with highest efficiency, it is ensured that Information Security and reliability, it is ensured that data it is rich.
Brief description of the drawings
Fig. 1 manages the Organization Chart of big data analysis system for a kind of common equipment of the present invention;
In accompanying drawing:100th, common equipment;201st, the first relay;202nd, common equipment maintenance station;203rd, fault message storehouse;301、 Second relay;302nd, common equipment all-in-service station;303rd, Maintenance Information Base;400th, processing end;401st, database is managed;500th, after You.
Embodiment
In order that the technical means, the inventive features, the objects and the advantages of the present invention are easy to understand, it is real below The technical scheme that 1 couple of present invention of example combination accompanying drawing provides is applied to be specifically addressed, but herein below is not as limiting to the invention.
A kind of common equipment 100 manages big data analysis system, including:
Common equipment 100, the common equipment 100 is connected with detection unit, and the detection unit is used to detect corresponding public The state of equipment 100 simultaneously exports detection information, and the common equipment 100 also includes communication unit, and the communication unit is used to send out The detection information is sent, the detection information includes failure situation and running status;
Because the species of common equipment 100 is more, so embodiments of the invention 1 are by taking public garbage bin as an example, detailed Jie is made Continue, the common equipment 100 includes public garbage bin, the corresponding detection unit of the public garbage bin includes video camera, The corresponding failure situation of the public garbage bin includes breakage failure and displacement failure, and the public garbage bin is corresponding Running status includes capacity status.For public garbage bin, involved failure includes two aspects, is public on one side Dustbin is moved altogether, and this problem can be fed back by shifting failure, specifically can by following several detection modes, the First, displacement judgement, the position letter that the detection information so fed back can be with public garbage bin are carried out by GPS positioning system Breath, data are more enriched, and need to install a GPS locator on each public garbage bin, are positioned, risen by locator The effect judged to displacement, offsets once position location exists with actual position, then be judged as shifting failure.Secondth, By being positioned from group locator, locator can be two inductors, be preset when the distance of two inductor separation exceedes Apart from when, be judged as shift failure, in use, just can by an inductor be arranged on wall or ground, by another Inductor is arranged on public garbage bin body, thus can send fault-signal in displacement, and inductor directly passes through Communication unit exports the fault-signal to two corresponding relays;3rd, IMAQ is carried out by camera, will taken the photograph first As head is in the case of the pose, is recognized in advance by image processing algorithm and position the public garbage bin, then pass through figure The collection content of picture, if dustbin can not be positioned, then it represents that occur in that displacement, the information of output displacement failure.Likewise, another One kind damages failure, is also to be realized by IMAQ and processing, if original characteristic edge frame occurs in that obvious difference, that IMAQ and the algorithm of processing can just realize according to corresponding image, and such it may determine that whether shape becomes Change, so as to judge whether dustbin has damage, export corresponding damage failure.And in operation information, dustbin just corresponds to rubbish The capacity status information of bucket, if capacity is full, can remind attendant to clear up in time, in order to avoid causing health impact, and have Whether body can thus be blocked by setting multiple infrared sensors inside the staving of public garbage bin according to rubbish Corresponding infrared sensor tentatively judges the capacity of dustbin, can thus feed back the capacity information of dustbin.
First relay 201, each first relay 201 is provided with corresponding compass of competency, first relaying End 201 connects the common equipment 100 in its compass of competency, and receives the detection information, and first relay 201 is matched somebody with somebody The first processing strategy is equipped with, the first processing strategy is used to parse the detection information to generate fault message, the failure The failure situation of the corresponding common equipment 100 of message reflection;The connecting fault information bank 203 of first relay 201, institute State fault message storehouse 203 and preset process instruction and corresponding failure situation, when a fault message is generated, in described first Corresponding process instruction, first relaying are obtained from the fault message storehouse 203 according to corresponding failure situation after end 201 End 201 performs the process instruction.For public garbage bin, at the personnel such as the processing of failure needs to change, repaired Reason, once and if signal feedback not in time, is easily caused and is worse off, local hygienic issues are influenceed, so first terminal Can preset corresponding processing strategy, processing in time, a public garbage bin on such as A ground occurs in that damage failure, according to damaging therefore The situation of barrier, if necessary to change, then correspondence will export the process instruction for needing to change, and repair if desired, then The process instruction needed repairing can be exported with regard to correspondence, and during process instruction execution, corresponding personnel can receive process instruction, so that Instruction is performed, and it should be noted that the mode of the division compass of competency of the first relay 201, more preferred scheme is logical Maintenance Resource division is crossed, because the Maintenance Resource in a city is limited, so the first relay 201 can be with corresponding maintenance station Centered on point, it is designed, centered on a maintenance website, all public affairs formed in compass of competency, compass of competency covering Dustbin, is all the public garbage bin that corresponding first relay 201 is managed altogether, if the maintenance responsibility of maintenance website is certainly By other model splits, for example, divided by street difference, so, the compass of competency of the first relay 201 It can be divided with street difference, and correspondence repairs the dividing mode of website, can improve treatment effeciency, meanwhile, for not Same failure situation, can be handled the very first time, and by the division of compass of competency, by all public garbage bins point For different partitions, the difficulty of line arrangement is reduced, communications cost is saved.
Second relay 301, each second relay 301 is provided with corresponding compass of competency, second relaying End 301 connects the common equipment 100 in its compass of competency, and second hop connects the corresponding common equipment 100, and the detection information is received, second relay 301 is configured with second processing strategy, and the second processing strategy is used In parsing the detection information with generating run information, the operation information reflects the running status of corresponding common equipment 100; Second link terminal connects Maintenance Information Base 303, and the Maintenance Information Base 303 presets maintenance instruction and corresponding fortune Row state, when an operation information is generated, second relay 301 is according to corresponding running status from the Maintenance Information Base Corresponding maintenance instruction is obtained in 303, second relay 301 performs the maintenance instruction.Second relay 301 it is main Function is the function in order to carry out management, safeguard, and is realized when managing, safeguarding by the running status of common equipment 100, if The public garbage bin of location A be in bucketful state, then expression need cleanup crew to clear up in time, if so can be with first when Between feed back this information, the cleaning of cleanup crew just can be at the right time effectively and corresponding, health would not be produced larger Influence, if limited duration, then will cause very unfavorable situation, so, will lead to sanitary condition Cause hygienic state not good.And if cleared up by the second relay 301 to all websites, then it can just play one The effect of overall management, for example, the public garbage bin saturation state of B location is more than 60%, then now just can enter clear in advance Manage sequence, thus can the second relay 301 formed one cleaning route, it is preferentially higher to capacity saturation degree, closer to Public garbage bin is cleared up, and the relation of maintenance instruction and running status, can be pre-set by expert, and follow-up fortune Make, avoid the need for thinking to intervene.
Processing end 400, the processing end 400 connects each first relay 201 and second relay 301, The processing end 400 receives the detection information by the first relay 201 or the second relay 301;Processing end 400 is set Put, more analyses for being incorporated in data, screen, excavate, the work such as statistics, so, all local information all can Be aggregate to processing end 400, the mode collected can by periodically upload can also real-time update, do not do and limit to, it is necessary to illustrate , what the first relay 201 and the second relay 301 were received is identical detection signal, but the area of the first relay 201 Domain, which is divided, to be divided according to the website of common equipment maintenance station 202, and the region division of the second relay 301 is according to public What the website at plant maintenance station 302 was divided, distribution and circuit are all independently arranged, so the first relay 201 and the Two relays 301 are connected with processing end 400, and advantage is, when exception occurs in a relay, and another relay still can be with Data are sent, such processing end 400 can judge that exception occurs for a relay with timely, and on the other hand, processing end 400 The data of two relays can be verified, again for the detection information of A equipment, the first relay 201 feedback Whether signal can be different from the signal that the second relay 301 is fed back, and thus can decide whether other abnormal conditions occur.
Database 401 is managed, the management database 401 connects the processing end 400, for storing the detection letter Breath.The setting of database 401 is managed, it, in order to preserve detection information, is that data analysis and data mining provide possibility to be.
Common equipment maintenance station 202, the common equipment maintenance station 202 connects first relay 201 and for connecing Receive the process instruction.The setting of common equipment maintenance station 202, can pass through interface by traditional common equipment maintenance station 202 Mode and corresponding first relay 201 dock, you can with play instruction transfer management effect.
Common equipment all-in-service station 302, the common equipment all-in-service station 302 connects second relay 301 and for connecing Receive the maintenance instruction.The setting of common equipment all-in-service station 302, can pass through interface by traditional common equipment all-in-service station 302 Mode and corresponding second relay 301 dock, you can with play instruction transmission effect.
Background end 500, the background end 500 connects the processing end 400, and the reception processing end 400 of background end 500 is anti- The fault message of feedback, back-stage management personnel, which can be shown the fault message by background end 500 and input corresponding processing, to be referred to Order, and sent by the processing end 400 to arbitrary first relay 201.When the first relay 201 described in one is received at one During reason instruction, the fault message storehouse 203 stores the process instruction and corresponding fault message.The background end 500 connects The operation information that the processing end 400 is fed back is received, back-stage management personnel can show the operation information simultaneously by background end 500 Corresponding maintenance instruction is inputted, Maintenance Information Base 303 can just store the maintenance instruction and corresponding operation information.Backstage The setting at end 500, in order to meet the situation that preset information is not enough, the failure that can not be for example handled if there is some relays or It is the failure dealt with improperly, then just corresponding instruction can be directly inputted by background end 500, meanwhile, corresponding database Instruction and corresponding information are preserved, so, it is possible to play the effect that a data update, raising instruction performs accurate Property, it is ensured that efficiency.
Embodiment 2, the common equipment 100 includes public street lamp, and the corresponding failure situation of the public street lamp includes electricity Road failure and breakage failure, the corresponding running status of the public street lamp include working condition.For public street lamp, meeting There is damaged or fault, both Breakdown Maintenances personnel are different, so, it is possible to generated by different situations Different fault-signals, and likewise, the first relay 201 can just be timely responded to.And working condition just include operating current, The various factors such as operating voltage, operating power, electric energy loss, and these factors can not be directly judged as exception, but these Maintenance of the data to street lamp is extremely important, and the second relay 301 can just be safeguarded according to these data to street lamp, it is ensured that and Shi Xing.
Common equipment 100 can also include the equipment such as traffic lights, public roadblock, public faucet, can equally lead to The mode for crossing fault detect is judged, and so can just greatly save the human cost of inspection, and detection unit Set-up mode is realized by existing detection device, and running status is returned by built-in communication unit.
Preferred embodiments of the present invention are these are only, embodiments of the present invention and protection domain is not thereby limited, it is right For those skilled in the art, it should can appreciate that all utilization description of the invention and being equal made by diagramatic content replace Change and obviously change resulting scheme, should be included in protection scope of the present invention.

Claims (10)

1. a kind of common equipment manages big data analysis system, it is characterised in that including:
Common equipment (100), the common equipment (100) is connected with detection unit, and the detection unit is used to detect corresponding The state of common equipment (100) simultaneously exports detection information, and the common equipment (100) also includes communication unit, the communication list Member is used to send the detection information, and the detection information includes failure situation and running status;
First relay (201), each first relay (201) is provided with corresponding compass of competency, first relaying End (201) connects the common equipment (100) in its compass of competency, and receives the detection information, first relay (201) the first processing strategy is configured with, the first processing strategy is used to parse the detection information to generate fault message, institute State the failure situation that fault message reflects the corresponding common equipment (100);
Second relay (301), each second relay (301) is provided with corresponding compass of competency, second relaying End (301) connects the common equipment (100) in its compass of competency, and the second hop connection is corresponding described public to be set Standby (100), and the detection information is received, second relay (301) is configured with second processing strategy, the second processing Strategy is used to parse the detection information with generating run information, and the operation information reflects corresponding common equipment (100) Running status;
Processing end (400), the processing end (400) connects each first relay (201) and second relay (301), the processing end (400) receives the detection information by the first relay (201) or the second relay (301);
Database (401) is managed, the management database (401) connects the processing end (400), for storing the detection letter Breath.
2. a kind of common equipment management big data analysis system according to claim 1, it is characterised in that in described first After end (201) connecting fault information bank (203), the fault message storehouse (203) presets process instruction and corresponding failure Situation, when a fault message is generated, first relay (201) is according to corresponding failure situation from the fault message storehouse (203) corresponding process instruction is obtained in, first relay (201) performs the process instruction.
3. a kind of common equipment management big data analysis system according to claim 2, it is characterised in that also including public Maintenance of equipment station (202), the common equipment maintenance station (202) connects first relay (201) and described for receiving Process instruction.
4. a kind of common equipment management big data analysis system according to claim 2, it is characterised in that also including backstage Hold (500), the background end (500) connects the processing end (400), background end (500) reception processing end (400) feedback Fault message, back-stage management personnel, which can be shown the fault message by background end (500) and input corresponding processing, to be referred to Order, and sent by the processing end (400) to arbitrary first relay (201).
5. a kind of common equipment management big data analysis system according to claim 4, it is characterised in that when described in one the When one relay (201) receives a process instruction, the fault message storehouse (203) stores the process instruction and corresponding event Hinder information.
6. a kind of common equipment management big data analysis system according to claim 1, it is characterised in that in described second After terminal connection Maintenance Information Base (303), the Maintenance Information Base (303) presets maintenance instruction and corresponding operation shape State, when an operation information is generated, second relay (301) is according to corresponding running status from the Maintenance Information Base (303) corresponding maintenance instruction is obtained in, second relay (301) performs the maintenance instruction.
7. a kind of common equipment management big data analysis system according to claim 6, it is characterised in that also including public Plant maintenance station (302), the common equipment all-in-service station (302) connects second relay (301) and described for receiving Maintenance instruction.
8. a kind of common equipment management big data analysis system according to claim 7, it is characterised in that also including backstage Hold (500), the background end (500) connects the processing end (400), the background end (500) receives the processing end (400) The operation information of feedback, back-stage management personnel can be shown the operation information by background end (500) and input corresponding dimension Finger shield makes.
9. a kind of common equipment management big data analysis system according to claim 1, it is characterised in that described public to set Standby (100) include public garbage bin, and the corresponding detection unit of the public garbage bin includes video camera, the public rubbish The corresponding failure situation of bucket includes breakage failure and displacement failure, and the corresponding running status of the public garbage bin includes Capacity status.
10. a kind of common equipment management big data analysis system according to claim 1, it is characterised in that described public Equipment (100) includes public street lamp, and the corresponding failure situation of the public street lamp includes fault and breakage failure, described The corresponding running status of public street lamp includes working condition.
CN201710410946.9A 2017-06-04 2017-06-04 A kind of common equipment manages big data analysis system Pending CN107305654A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710410946.9A CN107305654A (en) 2017-06-04 2017-06-04 A kind of common equipment manages big data analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710410946.9A CN107305654A (en) 2017-06-04 2017-06-04 A kind of common equipment manages big data analysis system

Publications (1)

Publication Number Publication Date
CN107305654A true CN107305654A (en) 2017-10-31

Family

ID=60150641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710410946.9A Pending CN107305654A (en) 2017-06-04 2017-06-04 A kind of common equipment manages big data analysis system

Country Status (1)

Country Link
CN (1) CN107305654A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112678381A (en) * 2020-11-05 2021-04-20 徐州胤新矿业科技有限公司 Underground pipe network system for urban garbage transportation
CN112926856A (en) * 2021-02-24 2021-06-08 中煤科工集团重庆智慧城市科技研究院有限公司 Equipment management system and method for smart city

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103200731A (en) * 2012-01-09 2013-07-10 中华电信股份有限公司 Street lamp monitoring and management system
KR101372937B1 (en) * 2013-01-08 2014-03-12 (주)이피에스코리아 Monitoring device for dlp projection system
CN105391800A (en) * 2015-12-11 2016-03-09 四川信息职业技术学院 Internet plus-based medical equipment fault self checking and repairing system
CN105530741A (en) * 2015-11-11 2016-04-27 浙江科技学院 Networked monitoring-based LED road lighting system
CN106128019A (en) * 2016-08-19 2016-11-16 江苏爱可青实业有限公司 Road traffic guardrail fault fast positioning safeguards system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103200731A (en) * 2012-01-09 2013-07-10 中华电信股份有限公司 Street lamp monitoring and management system
KR101372937B1 (en) * 2013-01-08 2014-03-12 (주)이피에스코리아 Monitoring device for dlp projection system
CN105530741A (en) * 2015-11-11 2016-04-27 浙江科技学院 Networked monitoring-based LED road lighting system
CN105391800A (en) * 2015-12-11 2016-03-09 四川信息职业技术学院 Internet plus-based medical equipment fault self checking and repairing system
CN106128019A (en) * 2016-08-19 2016-11-16 江苏爱可青实业有限公司 Road traffic guardrail fault fast positioning safeguards system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112678381A (en) * 2020-11-05 2021-04-20 徐州胤新矿业科技有限公司 Underground pipe network system for urban garbage transportation
CN112926856A (en) * 2021-02-24 2021-06-08 中煤科工集团重庆智慧城市科技研究院有限公司 Equipment management system and method for smart city

Similar Documents

Publication Publication Date Title
CN102407867B (en) Urban rail transit signal maintenance supporting system
CN103274143B (en) Intelligent trash can management system
CN201179877Y (en) Remote monitoring and failure processing apparatus for railway electricity
CN204858607U (en) Mobile payment intelligent charging stake with networking function
CN106971587B (en) A kind of traffic information management big data analysis system
CN102571865A (en) Monitoring method and monitoring system
CN104301377A (en) City cloud based intelligent street lamp and interconnection and interworking control system
CN105429297A (en) Multi-operation mode controlling and switching method for micro-grid
CN107305654A (en) A kind of common equipment manages big data analysis system
CN102665365A (en) Coming vehicle video detection based streetlamp control and management system
Pargaien et al. Smart waste collection monitoring system using IoT
CN203332754U (en) Management system of intelligent garbage cans
CN203851320U (en) Urban lighting control system based on MESH network
CN202243555U (en) Maintenance support system for urban track traffic signal
CN201430715Y (en) Main filament acquisition device of railway signal lighting unit
CN107368013A (en) Building energy consumption management system and method based on Internet of things
CN109712027A (en) A kind of management system based on building decoration rubbish
KR20130141170A (en) Life garbage integrated management system and method
CN105953868A (en) Accumulated water monitor system based on street lamp internet of things
CN108494095A (en) Bus power supply range based automatic identification and display method
CN105469350A (en) Security joint service and linkage system
CN103747589A (en) Intelligent road lamp management system
CN104507234A (en) Lighting control system and lighting control method for tramcar station
CN113928754A (en) Garbage collection and transportation supervision system based on Internet of vehicles technology
CN103857119A (en) Full-automatic street lamp control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171031

RJ01 Rejection of invention patent application after publication