CN107298343B - Cable coiling apparatus is used in power station construction - Google Patents
Cable coiling apparatus is used in power station construction Download PDFInfo
- Publication number
- CN107298343B CN107298343B CN201710499991.6A CN201710499991A CN107298343B CN 107298343 B CN107298343 B CN 107298343B CN 201710499991 A CN201710499991 A CN 201710499991A CN 107298343 B CN107298343 B CN 107298343B
- Authority
- CN
- China
- Prior art keywords
- shaft
- bottom plate
- bolted connection
- bearing seat
- gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 230000008878 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reaction Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 2
- 238000004804 winding Methods 0.000 abstract description 18
- 230000000694 effects Effects 0.000 abstract description 3
- 238000005096 rolling process Methods 0.000 abstract description 3
- 239000007787 solid Substances 0.000 description 4
- 230000005611 electricity Effects 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 229920000297 Rayon Polymers 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000006837 decompression Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H54/00—Winding, coiling, or depositing filamentary material
- B65H54/02—Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
- B65H54/40—Arrangements for rotating packages
- B65H54/54—Arrangements for supporting cores or formers at winding stations; Securing cores or formers to driving members
- B65H54/553—Both-ends supporting arrangements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H54/00—Winding, coiling, or depositing filamentary material
- B65H54/02—Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
- B65H54/40—Arrangements for rotating packages
- B65H54/44—Arrangements for rotating packages in which the package, core, or former is engaged with, or secured to, a driven member rotatable about the axis of the package
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H54/00—Winding, coiling, or depositing filamentary material
- B65H54/70—Other constructional features of yarn-winding machines
- B65H54/72—Framework; Casings; Coverings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
- B65H67/04—Arrangements for removing completed take-up packages and or replacing by cores, formers, or empty receptacles at winding or depositing stations; Transferring material between adjacent full and empty take-up elements
- B65H67/0405—Arrangements for removing completed take-up packages or for loading an empty core
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/34—Handled filamentary material electric cords or electric power cables
Landscapes
- Engineering & Computer Science (AREA)
- Textile Engineering (AREA)
- Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)
Abstract
The invention relates to a winding device, in particular to a cable winding device for power station construction. The invention aims to solve the technical problem of providing a cable winding device for power station construction, which is time-saving, labor-saving, flat in winding, capable of further enabling a cable to be well pulled out of a winding drum for use and improving working efficiency. In order to solve the technical problem, the invention provides a cable winding device for power station construction, which comprises a bottom plate, wheels, a push handle, a first fixing plate, a first bearing seat, a first rotating shaft and the like; the wheels are installed on the left side and the right side of the bottom plate in a bolt connection mode, the pushing hands are installed on the left side of the bottom plate in a bolt connection mode and are arranged obliquely, the moving device is arranged on the right side of the top of the bottom plate, and a first fixing plate is connected to a moving part of the moving device. The invention achieves the effects of saving time and labor, rolling smoothly, further enabling the cable to be pulled out from the winding drum for use and improving the working efficiency.
Description
Technical field
The present invention relates to a kind of wrap-up more particularly to a kind of power plant construction cable coiling devices.
Background technique
Substation changes the place of voltage.For electrical energy transportation that power plant is issued to farther away place, it is necessary to
Voltage increases, and becomes high-voltage electricity, nearby voltage is reduced as needed again to user, the work of this buck/boost comes by substation
It completes.The capital equipment of substation is switch and transformer.By scale difference, small is known as electric substation.Substation is greater than
Electric substation.Electric substation: being usually voltage class in 110KV step-down substation below;Substation: including various voltage class
" boosting, decompression " substation.
In the construction in power station, it all can't do without the installation to cable, and in order to facilitate the use of cable, it all can be by coil of cable
On reel, and then facilitate use of the people to cable, meanwhile, it can be reduced the parking space of cable, and manually cable is carried out
When winding, time-consuming and laborious, winding out-of-flatness, and then cause cable that cannot pull up out well from reel and use, and working efficiency
It is low, thus need to research and develop it is a kind of it is time saving and energy saving, winding is smooth, and then cable can be made to pull up out well from reel and used, improve
The power plant construction cable coiling device of working efficiency.
Summary of the invention
(1) technical problems to be solved
When the present invention manually winds cable to overcome, time-consuming and laborious, winding out-of-flatness, and then lead to cable not
It can pull up out and use from reel well, and ineffective disadvantage, the technical problem to be solved in the present invention is to provide one kind
It is time saving and energy saving, winding is smooth, and then cable can be made to pull up out well from reel and used, the power plant construction for improving working efficiency is used
Cable coiling device.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a power plant construction cable coiling devices, including
There are bottom plate, wheel, pushing hands, the first fixed plate, first bearing seat, first rotating shaft, riser, fixed column and mobile device, bottom plate bottom
Wheel is all installed by bolted connection at left and right sides of portion, bottom plate left side is equipped with by bolted connection to push away
Hand, pushing hands are to be obliquely installed, and bottom plate top right side is equipped with mobile device, and it is fixed that first is connected on the moving parts of mobile device
Plate, the first fixed plate middle part is Embedded to be equipped with first bearing seat, and first rotating shaft, first rotating shaft are equipped in first bearing seat
Bearing in such a way that interference connects and in first bearing seat connects, and bottom plate top left side is equipped with rotating device, rotating device
Rotary part on first rotating shaft left end be all connected with riser, riser is arranged symmetrically, left side riser right flank middle part and right
Fixed column is all installed by bolted connection in the middle part of the riser left side of side, fixed column is arranged symmetrically.
Preferably, mobile device includes sliding block and cylinder, and right side opening has sliding slot at the top of bottom plate, is equipped with sliding block in sliding slot,
It connect with the first fixed plate bottom among slider top, is connected in the middle part of left side by bolt in sliding slot by bolted connection
The mode connect is equipped with cylinder, cylinder in horizontally disposed, the telescopic rod of cylinder by bolted connection with sliding block left side
Middle part connection.
Preferably, rotating device includes first motor, first gear, the second fixed plate, second bearing seat, the second shaft
And second gear, bottom plate top left side are equipped with the second fixed plate, insertion in the middle part of the second fixed plate by bolted connection
Formula is equipped with second bearing seat, is equipped with the second shaft in second bearing seat, the second shaft in such a way that interference connects with
Bearing connection in second bearing seat, the second shaft left end is equipped with second gear, the second shaft by bolted connection
Right end is connect with left side riser left side middle part by bolted connection, and bottom plate top left side is by bolted connection
First motor is installed, first motor is in being horizontally disposed with, and first motor is located on the left of the second fixed plate, the output shaft of first motor
It is connected with first gear by shaft coupling, first gear is located at below second gear, and first gear is engaged with second gear.
It preferably, further include having guiding device, guiding device includes 7 templates, vertical bar, sliding sleeve, the first spring, third axis
Seat, third shaft and roller are held, bottom plate top left side is equipped with 7 templates by bolted connection, and 7 templates are located at the first electricity
On the left of machine, at left and right sides of 7 template inner tops vertical bar is all installed by bolted connection, sliding sleeve is installed on vertical bar, it is sliding
Set be slidably matched with vertical bar, sliding sleeve top and 7 template inner tops between be connected with the first spring, the first spring pocket on vertical bar,
Left side sliding sleeve right side and right side sliding sleeve left side are all equipped with 3rd bearing seat, the left and right sides by bolted connection
Third shaft is connected between three bearing blocks, third shaft connects in such a way that interference connects with the bearing in 3rd bearing seat
It connects, roller is installed in third shaft, roller is located at right above the riser of the left and right sides.
Preferably, further include having hydraulic cylinder and rubber block, all pacify by bolted connection at left and right sides of bottom base plate
Equipped with hydraulic cylinder, hydraulic cylinder is located at left and right sides of the wheel of the left and right sides, and in being vertically arranged, the telescopic rod of hydraulic cylinder passes through hydraulic cylinder
Bolted mode is equipped with rubber block.
Preferably, the material of bottom plate is Q235 steel.
Working principle: personnel are operated first and lie in a horizontal plane in reel between the riser of the left and right sides, then reel left end is covered
In the fixed column of left side, mobile device can be started, the moving parts of mobile device drives the first fixed plate to be moved to the left, in turn
Right side riser is driven to be moved to the left by first rotating shaft, right side riser is moved to the left drive right side fixed column and is moved to the left, in turn
Fixed column is moved to the left in reel, and left and right sides fixed column fixes reel, closes mobile device.Operator is by cable
Wherein one end is bundled on reel, can start rotating device, and rotating device rotation drives riser rotation, riser rotation band movable reel
Rotation, first bearing seat and first rotating shaft play the guiding role, so spool turns by cable winding on reel.When cable whole
When on reel, can by pushing hands and wheel by electric cable transporting to the place needed, restart the movement of mobile device
Component moves right, and can have the reel of cable to remove volume.In this way, operator is not necessarily to by coil of cable on reel, it is time saving
It is laborsaving.
Because mobile device includes sliding block and cylinder, right side opening has sliding slot at the top of bottom plate, is equipped with sliding block, sliding block in sliding slot
Top center is connect with the first fixed plate bottom by bolted connection, is bolted in the middle part of left side in sliding slot
Mode is equipped with cylinder, and cylinder is in being horizontally disposed with, and the telescopic rod of cylinder is by bolted connection and in the middle part of sliding block left side
Connection, when left side fixed column is located at left end in reel, the telescopic rod that operator can start cylinder shortens, and cylinder stretches
Bar shortened belt movable slider is moved to the left, and sliding block, which is moved to the left, drives the first fixed plate to be moved to the left, and then drives right side fixed column
It is moved to the left, right side fixed column is moved to the left the right end in reel, and then left and right sides fixed column fixes reel, closes gas
Cylinder can start rotating device for coil of cable on reel.Similarly, when reel needs to remove, the telescopic rod for starting cylinder is stretched
It is long, reel can be removed.In this way, firm volume cable can be carried out to reel different in size.
Because rotating device include first motor, first gear, the second fixed plate, second bearing seat, the second shaft and
Second gear, bottom plate top left side are equipped with the second fixed plate by bolted connection, and the second fixed plate middle part is embedded
Second bearing seat is installed, the second shaft is installed, the second shaft is in such a way that interference connects with the in second bearing seat
Bearing connection in two bearing bracket, the second shaft left end are equipped with second gear by bolted connection, and the second shaft is right
End is connect with left side riser left side middle part by bolted connection, and bottom plate top left side is pacified by bolted connection
Equipped with first motor, in being horizontally disposed with, first motor is located on the left of the second fixed plate first motor, and the output shaft of first motor is logical
It crosses shaft coupling and is connected with first gear, first gear is located at below second gear, and first gear is engaged with second gear, works as reel
When being fixed, and cable, when wherein one end is bundled on reel, operator can start first motor rotation, first motor rotation
First gear rotation is driven, first gear rotation drives second gear rotation, and second gear rotation drives the rotation of the second shaft, the
The rotation of two shafts drives riser rotation, and then drives spool turns, and spool turns are by coil of cable on reel.When cable quilt comprehensively
Volume closes first motor when on reel.In this way, rolling up cable on reel faster, work efficiency is high.
Because further including having guiding device, guiding device includes 7 templates, vertical bar, sliding sleeve, the first spring, 3rd bearing
Seat, third shaft and roller, bottom plate top left side are equipped with 7 templates by bolted connection, and 7 templates are located at first motor
Left side, the 7 template inner tops left and right sides are all equipped with vertical bar by bolted connection, sliding sleeve, sliding sleeve are equipped on vertical bar
It is slidably matched with vertical bar, is connected with the first spring between 7 template inner tops at the top of sliding sleeve, the first spring pocket is left on vertical bar
Sideslip set right side and right side sliding sleeve left side are all equipped with 3rd bearing seat, left and right sides third by bolted connection
Third shaft is connected between bearing block, third shaft is connect in such a way that interference connects with the bearing in 3rd bearing seat,
Roller is installed in third shaft, roller is located at right above the riser of the left and right sides, when spool turns by cable drum on reel
When, cable is contacted with reel, and as cable a little volume is on reel, cable drives roller to move up, and roller is upward
It is mobile that third shaft is driven to move up, and then sliding sleeve is driven to move up, the first spring-compressed, meanwhile, also drive roller turns
Dynamic, roller rotation keeps cable more smooth on reel, when volume has the reel of cable to be removed, because of the work of the first spring
With roller restores to original position.In this way, rotating by roller, cable can be made more smooth on reel, simultaneously, moreover it is possible to make
Reel is rolled up more steady when cable.
Because further including having hydraulic cylinder and rubber block, all it is equipped with by bolted connection at left and right sides of bottom base plate
Hydraulic cylinder, hydraulic cylinder are located at left and right sides of the wheel of the left and right sides, and for hydraulic cylinder in being vertically arranged, the telescopic rod of hydraulic cylinder passes through bolt
The mode of connection is equipped with rubber block, and when the present apparatus is located at beside cable, operator can start the telescopic rod of hydraulic cylinder
It moving down, the telescopic rod of hydraulic cylinder, which moves down, drives rubber block to move down, and rubber block moves down and ground face contact, into
And constantly moved down with the telescopic rod of this hydraulic cylinder, wheel is detached from ground, and hydraulic cylinder is propped up the present apparatus by rubber block, grasps
Cable can be wound by making personnel.When the present apparatus needs mobile, operator starts the telescopic rod of hydraulic cylinder to moving up
It is dynamic, when wheel when being contacted with ground, close hydraulic cylinder, i.e., the removable present apparatus.In this way, the present apparatus can be made to receive to cable
It is more firm when volume, the winding of cable is not influenced.
Because the material of bottom plate is Q235 steel, the load-bearing capacity of Q235 steel is strong, acidproof corrosion-resistant, increases the use of bottom plate
Service life.
(3) beneficial effect
Invention achieves time saving and energy saving, winding is smooth, and then cable can be made to pull up out well from reel and used, improved
The effect of working efficiency.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
The label in accompanying drawing is: 1- bottom plate, 2- wheel, 3- pushing hands, the first fixed plate of 4-, 5- first bearing seat, 6- first
Shaft, 7- riser, 8- fixed column, 9- mobile device, 91- sliding slot, 92- sliding block, 93- cylinder, 10- rotating device, 101- first
Motor, 102- first gear, the second fixed plate of 103-, 104- second bearing seat, the second shaft of 105-, 106- second gear, 11-
Guiding device, 111-7 template, 112- vertical bar, 113- sliding sleeve, the first spring of 114-, 115- 3rd bearing seat, 116- third turn
Axis, 117- roller, 12- hydraulic cylinder, 13- rubber block.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of power plant construction cable coiling device, as shown in Figure 1-3, include that bottom plate 1, wheel 2, pushing hands 3, first are solid
Fixed board 4, first bearing seat 5, first rotating shaft 6, riser 7, fixed column 8 and mobile device 9,1 bottom of the bottom plate left and right sides all pass through
Bolted mode is equipped with wheel 2, and 1 left side of bottom plate is equipped with pushing hands 3 by bolted connection, and pushing hands 3 is to incline
Tiltedly setting, 1 top right side of bottom plate are equipped with mobile device 9, are connected with the first fixed plate 4 on the moving parts of mobile device 9, and first
4 middle part of fixed plate is Embedded to be equipped with first bearing seat 5, and first rotating shaft 6 is equipped in first bearing seat 5, and first rotating shaft 6 is logical
The mode of interference connection is connect with the bearing in first bearing seat 5, and 1 top left side of bottom plate is equipped with rotating device 10, rotating dress
It sets and is all connected with riser 7 on 10 rotary part with 6 left end of first rotating shaft, riser 7 is arranged symmetrically, 7 right side of left side riser
Fixed column 8 is all installed by bolted connection in the middle part of middle part and 7 left side of right side riser, fixed column 8 is arranged symmetrically.
Embodiment 2
A kind of power plant construction cable coiling device, as shown in Figure 1-3, include that bottom plate 1, wheel 2, pushing hands 3, first are solid
Fixed board 4, first bearing seat 5, first rotating shaft 6, riser 7, fixed column 8 and mobile device 9,1 bottom of the bottom plate left and right sides all pass through
Bolted mode is equipped with wheel 2, and 1 left side of bottom plate is equipped with pushing hands 3 by bolted connection, and pushing hands 3 is to incline
Tiltedly setting, 1 top right side of bottom plate are equipped with mobile device 9, are connected with the first fixed plate 4 on the moving parts of mobile device 9, and first
4 middle part of fixed plate is Embedded to be equipped with first bearing seat 5, and first rotating shaft 6 is equipped in first bearing seat 5, and first rotating shaft 6 is logical
The mode of interference connection is connect with the bearing in first bearing seat 5, and 1 top left side of bottom plate is equipped with rotating device 10, rotating dress
It sets and is all connected with riser 7 on 10 rotary part with 6 left end of first rotating shaft, riser 7 is arranged symmetrically, 7 right side of left side riser
Fixed column 8 is all installed by bolted connection in the middle part of middle part and 7 left side of right side riser, fixed column 8 is arranged symmetrically.
Mobile device 9 includes sliding block 92 and cylinder 93, and 1 top right side of bottom plate is provided with sliding slot 91, is equipped with and slides in sliding slot 91
Block 92,92 top center of sliding block are connect with 4 bottom of the first fixed plate by bolted connection, in sliding slot 91 in the middle part of left side
Cylinder 93 is installed by bolted connection, cylinder 93 is in be horizontally disposed with, what the telescopic rod of cylinder 93 was bolted
It is connect in the middle part of mode and 92 left side of sliding block.
Embodiment 3
A kind of power plant construction cable coiling device, as shown in Figure 1-3, include that bottom plate 1, wheel 2, pushing hands 3, first are solid
Fixed board 4, first bearing seat 5, first rotating shaft 6, riser 7, fixed column 8 and mobile device 9,1 bottom of the bottom plate left and right sides all pass through
Bolted mode is equipped with wheel 2, and 1 left side of bottom plate is equipped with pushing hands 3 by bolted connection, and pushing hands 3 is to incline
Tiltedly setting, 1 top right side of bottom plate are equipped with mobile device 9, are connected with the first fixed plate 4 on the moving parts of mobile device 9, and first
4 middle part of fixed plate is Embedded to be equipped with first bearing seat 5, and first rotating shaft 6 is equipped in first bearing seat 5, and first rotating shaft 6 is logical
The mode of interference connection is connect with the bearing in first bearing seat 5, and 1 top left side of bottom plate is equipped with rotating device 10, rotating dress
It sets and is all connected with riser 7 on 10 rotary part with 6 left end of first rotating shaft, riser 7 is arranged symmetrically, 7 right side of left side riser
Fixed column 8 is all installed by bolted connection in the middle part of middle part and 7 left side of right side riser, fixed column 8 is arranged symmetrically.
Mobile device 9 includes sliding block 92 and cylinder 93, and 1 top right side of bottom plate is provided with sliding slot 91, is equipped with and slides in sliding slot 91
Block 92,92 top center of sliding block are connect with 4 bottom of the first fixed plate by bolted connection, in sliding slot 91 in the middle part of left side
Cylinder 93 is installed by bolted connection, cylinder 93 is in be horizontally disposed with, what the telescopic rod of cylinder 93 was bolted
It is connect in the middle part of mode and 92 left side of sliding block.
Rotating device 10 include first motor 101, first gear 102, the second fixed plate 103, second bearing seat 104,
Second shaft 105 and second gear 106,1 top left side of bottom plate are equipped with the second fixed plate 103 by bolted connection,
Second fixed plate, 103 middle part is Embedded to be equipped with second bearing seat 104, and the second shaft is equipped in second bearing seat 104
105, the second shaft 105 is connect in such a way that interference connects with the bearing in second bearing seat 104,105 left end of the second shaft
Second gear 106 is installed by bolted connection, 105 right end of the second shaft is perpendicular with left side by bolted connection
Connection, 1 top left side of bottom plate are equipped with first motor 101, first motor by bolted connection in the middle part of 7 left side of plate
101 in being horizontally disposed with, and first motor 101 is located at 103 left side of the second fixed plate, and the output shaft of first motor 101 passes through shaft coupling
It is connected with first gear 102, first gear 102 is located at 106 lower section of second gear, and first gear 102 is nibbled with second gear 106
It closes.
Embodiment 4
A kind of power plant construction cable coiling device, as shown in Figure 1-3, include that bottom plate 1, wheel 2, pushing hands 3, first are solid
Fixed board 4, first bearing seat 5, first rotating shaft 6, riser 7, fixed column 8 and mobile device 9,1 bottom of the bottom plate left and right sides all pass through
Bolted mode is equipped with wheel 2, and 1 left side of bottom plate is equipped with pushing hands 3 by bolted connection, and pushing hands 3 is to incline
Tiltedly setting, 1 top right side of bottom plate are equipped with mobile device 9, are connected with the first fixed plate 4 on the moving parts of mobile device 9, and first
4 middle part of fixed plate is Embedded to be equipped with first bearing seat 5, and first rotating shaft 6 is equipped in first bearing seat 5, and first rotating shaft 6 is logical
The mode of interference connection is connect with the bearing in first bearing seat 5, and 1 top left side of bottom plate is equipped with rotating device 10, rotating dress
It sets and is all connected with riser 7 on 10 rotary part with 6 left end of first rotating shaft, riser 7 is arranged symmetrically, 7 right side of left side riser
Fixed column 8 is all installed by bolted connection in the middle part of middle part and 7 left side of right side riser, fixed column 8 is arranged symmetrically.
Mobile device 9 includes sliding block 92 and cylinder 93, and 1 top right side of bottom plate is provided with sliding slot 91, is equipped with and slides in sliding slot 91
Block 92,92 top center of sliding block are connect with 4 bottom of the first fixed plate by bolted connection, in sliding slot 91 in the middle part of left side
Cylinder 93 is installed by bolted connection, cylinder 93 is in be horizontally disposed with, what the telescopic rod of cylinder 93 was bolted
It is connect in the middle part of mode and 92 left side of sliding block.
Rotating device 10 include first motor 101, first gear 102, the second fixed plate 103, second bearing seat 104,
Second shaft 105 and second gear 106,1 top left side of bottom plate are equipped with the second fixed plate 103 by bolted connection,
Second fixed plate, 103 middle part is Embedded to be equipped with second bearing seat 104, and the second shaft is equipped in second bearing seat 104
105, the second shaft 105 is connect in such a way that interference connects with the bearing in second bearing seat 104,105 left end of the second shaft
Second gear 106 is installed by bolted connection, 105 right end of the second shaft is perpendicular with left side by bolted connection
Connection, 1 top left side of bottom plate are equipped with first motor 101, first motor by bolted connection in the middle part of 7 left side of plate
101 in being horizontally disposed with, and first motor 101 is located at 103 left side of the second fixed plate, and the output shaft of first motor 101 passes through shaft coupling
It is connected with first gear 102, first gear 102 is located at 106 lower section of second gear, and first gear 102 is nibbled with second gear 106
It closes.
It further include having guiding device 11, guiding device 11 includes 7 templates 111, vertical bar 112, sliding sleeve 113, the first spring
114,3rd bearing seat 115, third shaft 116 and roller 117,1 top left side of bottom plate are equipped with 7 by bolted connection
111,7 template 111 of template is located at 101 left side of first motor, the side being all bolted at left and right sides of 7 template, 111 inner top
Formula is equipped with vertical bar 112, and sliding sleeve 113 is equipped on vertical bar 112, and sliding sleeve 113 is slidably matched with vertical bar 112, the top of sliding sleeve 113 with
The first spring 114 is connected between 7 template, 111 inner top, the first 114 sets of spring is on vertical bar 112,113 right side of left side sliding sleeve
Face and 113 left side of right side sliding sleeve are all equipped with 3rd bearing seat 115, left and right sides 3rd bearing by bolted connection
Third shaft 116, axis of the third shaft 116 in such a way that interference connects and in 3rd bearing seat 115 are connected between seat 115
Connection is held, roller 117 is installed in third shaft 116, roller 117 is located at right above left and right sides riser 7.
Further include having hydraulic cylinder 12 and rubber block 13, is all installed by bolted connection at left and right sides of 1 bottom of bottom plate
There is hydraulic cylinder 12, hydraulic cylinder 12 is located at 2 left and right sides of left and right sides wheel, and hydraulic cylinder 12 in being vertically arranged, stretch by hydraulic cylinder 12
Contracting bar is equipped with rubber block 13 by bolted connection.
The material of bottom plate 1 is Q235 steel.
Working principle: personnel are operated first and lie in a horizontal plane in reel between the riser 7 of the left and right sides, then reel left end is covered
In left side fixed column 8, mobile device 9 can be started, the moving parts of mobile device 9 drives the first fixed plate 4 to be moved to the left,
And then driving right side riser 7 to be moved to the left by first rotating shaft 6, right side riser 7 is moved to the left drive right side fixed column 8 to moving to left
It is dynamic, and then fixed column 8 is moved to the left in reel, left and right sides fixed column 8 fixes reel, closes mobile device 9.Operation
By cable, wherein one end is bundled on reel personnel, can start rotating device 10, and the rotation of rotating device 10 drives riser 7 to rotate,
The rotation of riser 7 drives spool turns, and first bearing seat 5 and first rotating shaft 6 play the guiding role, and then spool turns are by cable winding
On reel.When cable all on reel when, can by pushing hands 3 and wheel 2 by electric cable transporting to the place needed,
The moving parts for restarting mobile device 9 moves right, and can have the reel of cable to remove volume.In this way, being not necessarily to operator
It is time saving and energy saving by coil of cable on reel.
Because mobile device 9 includes sliding block 92 and cylinder 93,1 top right side of bottom plate is provided with sliding slot 91, sets in sliding slot 91
There is sliding block 92,92 top center of sliding block is connect with 4 bottom of the first fixed plate by bolted connection, left side in sliding slot 91
Middle part is equipped with cylinder 93 by bolted connection, and in being horizontally disposed with, the telescopic rod of cylinder 93 passes through bolt and connects cylinder 93
The mode connect and 92 left side of sliding block middle part are connect, and when left side fixed column 8 is located at left end in reel, operator can start
The telescopic rod of cylinder 93 shortens, and the telescopic rod shortened belt movable slider 92 of cylinder 93 is moved to the left, and sliding block 92 is moved to the left drive the
One fixed plate 4 is moved to the left, and then right side fixed column 8 is driven to be moved to the left, and right side fixed column 8 is moved to the left in reel right
End, and then left and right sides fixed column 8 fixes reel, closes cylinder 93, can start rotating device 10 for coil of cable in reel
On.Similarly, when reel needs to remove, the telescopic rod elongation of starting cylinder 93 can remove reel.In this way, can be to length
Different reel carries out firm volume cable.
Because rotating device 10 includes first motor 101, first gear 102, the second fixed plate 103, second bearing seat
104, the second shaft 105 and second gear 106,1 top left side of bottom plate are equipped with the second fixed plate by bolted connection
103,103 middle part of the second fixed plate is Embedded to be equipped with second bearing seat 104, and second turn is equipped in second bearing seat 104
Axis 105, the second shaft 105 are connect in such a way that interference connects with the bearing in second bearing seat 104, and the second shaft 105 is left
End is equipped with second gear 106 by bolted connection, 105 right end of the second shaft by bolted connection with left side
Connection, 1 top left side of bottom plate are equipped with first motor 101, first motor by bolted connection in the middle part of 7 left side of riser
101 in being horizontally disposed with, and first motor 101 is located at 103 left side of the second fixed plate, and the output shaft of first motor 101 passes through shaft coupling
It is connected with first gear 102, first gear 102 is located at 106 lower section of second gear, and first gear 102 is nibbled with second gear 106
It closes, when reel is fixed, and cable, when wherein one end is bundled on reel, operator can start the rotation of first motor 101,
The rotation of first motor 101 drives first gear 102 to rotate, and the rotation of first gear 102 drives second gear 106 to rotate, the second tooth
106 rotation of wheel drives the rotation of the second shaft 105, and the rotation of the second shaft 105 drives riser 7 to rotate, and then drives spool turns, volume
Cylinder rotation is by coil of cable on reel.When cable is rolled up on reel comprehensively, first motor 101 is closed.In this way, making electricity
Cable is rolled up on reel faster, and work efficiency is high.
Because further including having guiding device 11, guiding device 11 includes 7 templates 111, vertical bar 112, sliding sleeve 113, first
Spring 114,3rd bearing seat 115, third shaft 116 and roller 117,1 top left side of bottom plate are pacified by bolted connection
It is located at 101 left side of first motor equipped with 7 template, 111,7 template 111, is all bolted at left and right sides of 7 template, 111 inner top
Mode vertical bar 112 is installed, sliding sleeve 113 is installed on vertical bar 112, sliding sleeve 113 is slidably matched with vertical bar 112, sliding sleeve 113 push up
The first spring 114 is connected between 111 inner top of portion and 7 template, the first 114 sets of spring is on vertical bar 112, left side sliding sleeve 113
Right side and 113 left side of right side sliding sleeve are all equipped with 3rd bearing seat 115, left and right sides third by bolted connection
Third shaft 116 is connected between bearing block 115, third shaft 116 is in such a way that interference connects and in 3rd bearing seat 115
Bearing connection, roller 117 is installed, roller 117 is located at right above left and right sides riser 7, when reel turn in third shaft 116
It is dynamic by cable drum when on reel, cable is contacted with reel, and as cable a little volume is on reel, and cable, which drives, to be rolled
Cylinder 117 moves up, and roller 117, which moves up, drives third shaft 116 to move up, and then sliding sleeve 113 is driven to move up,
The compression of first spring 114, meanwhile, also drive roller 117 rotates, and the rotation of roller 117 keeps cable more smooth on reel,
When volume has the reel of cable to be removed, because of the effect of the first spring 114, roller 117 restores to original position.In this way, passing through roller
117 rotations, can make cable more smooth on reel, simultaneously, moreover it is possible to keep reel more steady when rolling up cable.
Because further including having hydraulic cylinder 12 and rubber block 13, at left and right sides of 1 bottom of bottom plate all by bolted connection
Hydraulic cylinder 12 is installed, hydraulic cylinder 12 is located at 2 left and right sides of left and right sides wheel, and hydraulic cylinder 12 is in be vertically arranged, hydraulic cylinder 12
Telescopic rod rubber block 13 is installed by bolted connection, when the present apparatus is located at beside cable, operator
The telescopic rod of starting hydraulic cylinder 12 moves down, and the telescopic rod of hydraulic cylinder 12, which moves down, drives rubber block 13 to move down, rubber
Blob of viscose 13 moves down and ground face contact, and then constantly moves down with the telescopic rod of this hydraulic cylinder 12, and wheel 2 is detached from ground,
Hydraulic cylinder 12 is propped up the present apparatus by rubber block 13, and operator can wind cable.When the present apparatus needs to move
When, operator start hydraulic cylinder 12 telescopic rod move up, when wheel 2 when being contacted with ground, close hydraulic cylinder 12
The mobile present apparatus.In this way, the present apparatus can be made when winding to cable, and it is more firm, the winding of cable is not influenced.
Because the material of bottom plate 1 is Q235 steel, the load-bearing capacity of Q235 steel is strong, acidproof corrosion-resistant, increases making for bottom plate 1
Use the service life.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (4)
1. a kind of power plant construction cable coiling device, which is characterized in that include bottom plate (1), wheel (2), pushing hands (3),
One fixed plate (4), first bearing seat (5), first rotating shaft (6), riser (7), fixed column (8) and mobile device (9), bottom plate (1)
It is all equipped with by bolted connection wheel (2) at left and right sides of bottom, bottom plate (1) left side is by bolted connection
It is equipped with pushing hands (3), pushing hands (3) is to be obliquely installed, and bottom plate (1) top right side is equipped with mobile device (9), mobile device (9)
It is connected on moving parts the first fixed plate (4), it is Embedded in the middle part of the first fixed plate (4) to be equipped with first bearing seat (5), the
It is equipped with first rotating shaft (6) in one bearing block (5), first rotating shaft (6) is in such a way that interference connects and in first bearing seat (5)
Bearing connection, bottom plate (1) top left side is equipped with rotating device (10), on the rotary part of rotating device (10) with first rotating shaft
(6) left end is all connected with riser (7), and riser (7) is arranged symmetrically, left side riser (7) right flank middle part and right side riser (7) left side
It is all equipped with by bolted connection fixed column (8) in the middle part of side, fixed column (8) is arranged symmetrically;Mobile device (9) packet
Sliding block (92) and cylinder (93) are included, bottom plate (1) top right side is provided with sliding slot (91), is equipped with sliding block (92) in sliding slot (91), sliding
Block (92) top center is connect with the first fixed plate (4) bottom by bolted connection, in the middle part of the interior left side of sliding slot (91)
It is equipped with by bolted connection cylinder (93), for cylinder (93) in being horizontally disposed with, the telescopic rod of cylinder (93) passes through bolt
It is connect in the middle part of the mode of connection and sliding block (92) left side;Rotating device (10) includes first motor (101), first gear
(102), the second fixed plate (103), second bearing seat (104), the second shaft (105) and second gear (106), bottom plate (1) top
It is equipped with by bolted connection the second fixed plate (103) on the left of portion, Embedded installation in the middle part of the second fixed plate (103)
Have second bearing seat (104), is equipped with the second shaft (105) in second bearing seat (104), the second shaft (105) passes through interference
The mode of connection is connect with the bearing in second bearing seat (104), and the second shaft (105) left end is pacified by bolted connection
Equipped with second gear (106), the second shaft (105) right end is by bolted connection and in the middle part of left side riser (7) left side
Connection, bottom plate (1) top left side are equipped with first motor (101) by bolted connection, and first motor (101) is in level
Setting, first motor (101) are located on the left of the second fixed plate (103), and the output shaft of first motor (101) is connected by shaft coupling
Have first gear (102), first gear (102) is located at below second gear (106), first gear (102) and second gear
(106) it engages.
2. a kind of power plant construction cable coiling device according to claim 1, which is characterized in that further include thering is guiding to fill
It sets (11), guiding device (11) includes 7 templates (111), vertical bar (112), sliding sleeve (113), the first spring (114), third axis
Seat (115), third shaft (116) and roller (117) are held, bottom plate (1) top left side is equipped with 7 types by bolted connection
Plate (111), 7 templates (111) are located on the left of first motor (101), are all connected by bolt at left and right sides of 7 templates (111) inner top
The mode connect is equipped with vertical bar (112), is equipped on vertical bar (112) sliding sleeve (113), and sliding sleeve (113) is matched with vertical bar (112) sliding
It closes, is connected with the first spring (114) between 7 templates (111) inner top at the top of sliding sleeve (113), the first spring (114) is covered perpendicular
On bar (112), sliding sleeve (113) right side in left side is all equipped with by bolted connection with right side sliding sleeve (113) left side
3rd bearing seat (115) is connected with third shaft (116) between left and right sides 3rd bearing seat (115), third shaft (116)
It is connect in such a way that interference connects with the bearing in 3rd bearing seat (115), third shaft is equipped with roller on (116)
(117), roller (117) is located at right above left and right sides riser (7).
3. a kind of power plant construction cable coiling device according to claim 2, which is characterized in that further include having hydraulic cylinder
(12) and rubber block (13) it, is all equipped with by bolted connection hydraulic cylinder (12) at left and right sides of bottom plate (1) bottom, it is hydraulic
Cylinder (12) is located at left and right sides of left and right sides wheel (2), and in being vertically arranged, the telescopic rod of hydraulic cylinder (12) passes through hydraulic cylinder (12)
Bolted mode is equipped with rubber block (13).
4. a kind of power plant construction cable coiling device according to claim 3, which is characterized in that the material of bottom plate (1)
For Q235 steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710499991.6A CN107298343B (en) | 2017-06-27 | 2017-06-27 | Cable coiling apparatus is used in power station construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710499991.6A CN107298343B (en) | 2017-06-27 | 2017-06-27 | Cable coiling apparatus is used in power station construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107298343A CN107298343A (en) | 2017-10-27 |
CN107298343B true CN107298343B (en) | 2019-06-07 |
Family
ID=60136002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710499991.6A Active CN107298343B (en) | 2017-06-27 | 2017-06-27 | Cable coiling apparatus is used in power station construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107298343B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110467024A (en) * | 2019-07-15 | 2019-11-19 | 叶琦淼 | A kind of winding plastic pipe device |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107777406A (en) * | 2017-10-31 | 2018-03-09 | 闫梦蝶 | A kind of food pack winder |
CN108116940A (en) * | 2017-11-06 | 2018-06-05 | 丽水遂智科技咨询有限公司 | A kind of Weaving device actinobacillus device with shock-absorbing function |
CN108275508A (en) * | 2018-03-02 | 2018-07-13 | 张广山 | A kind of fiber optic cable pay off rack easy to use |
CN108529324A (en) * | 2018-05-03 | 2018-09-14 | 钱立文 | A kind of big cutting side film wrap-up of film |
CN108584531A (en) * | 2018-05-11 | 2018-09-28 | 车秋玲 | A kind of cable unwinding device of the power construction with shock-absorbing function |
CN108439057A (en) * | 2018-05-17 | 2018-08-24 | 柴海英 | A kind of cable support device that electric power cable erection stability is good |
CN108861826A (en) * | 2018-08-31 | 2018-11-23 | 安徽高创光电通信技术有限公司 | Shaftless pneumatic pinch gathering and laying wire mechanism |
CN110467054B (en) * | 2019-08-20 | 2021-07-30 | 徐州顺泰纺织科技股份有限公司 | Thread clamping and cutting device for cotton sewing thread |
CN110980401B (en) * | 2019-12-09 | 2021-07-09 | 浙江巨丰管业有限公司 | Winding device for floor heating pipeline |
CN111703968A (en) * | 2020-06-05 | 2020-09-25 | 蓝远洋 | Winding device for cable |
CN111776852B (en) * | 2020-07-10 | 2022-01-25 | 青海方瑞工程咨询有限公司 | Special cable former for cables and cabling method using same |
CN111891848B (en) * | 2020-07-28 | 2022-05-17 | 万双霞 | Vegetable field watering water pipe coiling mechanism |
CN112278045A (en) * | 2020-11-03 | 2021-01-29 | 安徽西格玛服饰有限公司 | Textile processing and transferring device |
CN112623866A (en) * | 2020-12-31 | 2021-04-09 | 福建蓝海专用汽车制造有限公司 | Cable winding device convenient to locking is fixed |
CN113955581A (en) * | 2021-10-20 | 2022-01-21 | 贵州电网有限责任公司遵义供电局 | Can adjust portable cable coiling mechanism who tightens up |
CN117682382B (en) * | 2024-02-04 | 2024-07-05 | 国网山东省电力公司寿光市供电公司 | Cable winding device |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204607264U (en) * | 2015-04-11 | 2015-09-02 | 桂林电子科技大学 | A kind of communication cable winding apparatus |
CN204778075U (en) * | 2015-07-09 | 2015-11-18 | 国网重庆石柱县供电有限责任公司 | Modular cable drum |
CN106586675A (en) * | 2015-10-19 | 2017-04-26 | 国网山东省电力公司枣庄供电公司 | Special device for winding ground lead |
CN205855591U (en) * | 2016-07-29 | 2017-01-04 | 马鞍山和田电子智控***有限公司 | A kind of automatic winding former space adjusting device |
CN106144758A (en) * | 2016-08-18 | 2016-11-23 | 无锡飞达纺织印染机械有限公司 | A kind of weaving Winder |
CN206244174U (en) * | 2016-08-29 | 2017-06-13 | 广东琨正塑胶有限公司 | A kind of cable winding device |
-
2017
- 2017-06-27 CN CN201710499991.6A patent/CN107298343B/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110467024A (en) * | 2019-07-15 | 2019-11-19 | 叶琦淼 | A kind of winding plastic pipe device |
Also Published As
Publication number | Publication date |
---|---|
CN107298343A (en) | 2017-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107298343B (en) | Cable coiling apparatus is used in power station construction | |
CN207028878U (en) | A kind of movable fixture of charging pile | |
CN107116437A (en) | A kind of power station construction rust removing device for reinforcing steel bars | |
CN107381249A (en) | A kind of transforming plant cable wrap-up | |
CN107161786A (en) | A kind of construction is with the rope withdrawing apparatus for conveniently taking rope | |
CN109353954B (en) | Three-dimensional parking equipment installation device | |
CN201284190Y (en) | Apparatus for handling steel coil sleeve | |
CN112720514A (en) | Electric power intelligence patrols and examines robot with narrow space function of marcing | |
CN203638898U (en) | Electric steel cable take-up and pay-off device | |
CN210224793U (en) | Electric power construction draw gear | |
CN207596218U (en) | A kind of construction rope withdrawing apparatus for conveniently taking rope | |
CN111675045A (en) | Automatic cable coiling machine | |
CN217807694U (en) | Coiling mechanism of elastic cord production usefulness | |
CN107500024A (en) | A kind of Phase of Electric Power Projects lift well cable line automatic rolling device | |
CN207792371U (en) | A kind of liftable steel wire winding/unwinding device | |
CN206218968U (en) | A kind of storing structure of diaphragm slitting equipment | |
CN111807152B (en) | Large-scale cable coiling mechanism | |
CN212174327U (en) | Elevating gear is used in electromechanical installation | |
CN205838487U (en) | A kind of cold roll roll change hanging apparatus | |
CN205490018U (en) | Portable generator stator platform that rolls off production line | |
CN219585532U (en) | PVC steel wire reinforced hose winding equipment | |
CN219708781U (en) | Mining power supply trolley device | |
CN220950593U (en) | Copper wire winding mechanism | |
CN220519761U (en) | Transformer substation cable laying device | |
CN219406264U (en) | Electric power tool movement test detection vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190513 Address after: 518001 electric power dispatching and communication building, 4020 Shennan East Road, Luohu District, Shenzhen, Guangdong Applicant after: Shenzhen Power Supply Co.,Ltd. Applicant after: SHENZHEN COMTOP INFORMATION TECHNOLOGY Co.,Ltd. Address before: 150006 Harbin Institute of Technology, 92, West Da Zhi street, Nangang District, Harbin, Heilongjiang. Applicant before: Kong Junling |
|
GR01 | Patent grant | ||
GR01 | Patent grant |