A kind of vertical shaft for mine explosion well completion method Download PDFInfo
- Publication number
- CN107270791A CN107270791A CN201710384750.7A CN201710384750A CN107270791A CN 107270791 A CN107270791 A CN 107270791A CN 201710384750 A CN201710384750 A CN 201710384750A CN 107270791 A CN107270791 A CN 107270791A
- Authority
- CN
- China
- Prior art keywords
- light
- quick
- layer control
- keyhole
- vertical shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/08—Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
Landscapes
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Abstract
The invention belongs to mining blasting technical field, it is related to a kind of vertical shaft for mine explosion well completion method.The present invention ignites the pack in keyhole and is superimposed to form the light blast hole scope of freedom so as to produce down funnel structure successively, resynchronisation ignites the pack in the quick-fried layer control hole of light to form vertical shaft for mine, while demolition effect is ensured, a section dose can be reduced, reduce blasting vibration and presss from both sides stagnant effect, improve the height of shaft formatting by one blasting, construction quality and efficiency of construction.
Description
Technical field
The invention belongs to mining blasting technical field, it is related to a kind of vertical shaft for mine explosion well completion method.
Background technology
It is general to use inverse Construction method or deep hole blasting simultaneous shaft sin king construction method during traditional Construction of Silo, instead
What well construction method needed first from bottom to top construction minor diameter slips slag well, then from top to bottom expands and help into well, and quantities is big, difficulty of construction
Greatly, progress is slow, unsafe factor is more;And deep hole blasting simultaneous shaft sin king construction method, using tunneling boring Drilling deep hole and detonation is segmented,
The explosion scope of freedom is generally used as using emptying aperture, although increase into well efficiency, but explosion Free Face Conditions are poor, detonation section dose
Greatly, blasting vibration and the stagnant effect of folder are obvious, and simultaneous shaft sin king is highly small, and borehole wall shaping control difficulty is big.
The content of the invention
The purpose of the present invention is that a kind of vertical shaft for mine explosion well completion method is provided the problem of presence for prior art.
The present invention comprises the following steps:
A, setting slotting bore region and the quick-fried layer control bore region of light, the slotting bore region between drilling drift and tunnel of slagging tap
In the quick-fried layer control bore region of light, slotting bore region is vertically arranged by four and the keyhole of square arrangement is constituted,
The quick-fried layer control bore region of light is made up of the quick-fried layer control hole of multiple light being vertically arranged, and the quick-fried layer control hole of light surrounds slotting porose area
The rounded arrangement in domain;
B, carry out charging in keyhole and the quick-fried layer control hole of light, the keyhole uses section gap coupling charging, phase
Pack in adjacent keyhole is interspersed, and the quick-fried layer control hole of light, which is used, does not couple continuous charging;
C, progress explosion are first detonated successively from the bottom to top into well operations to the pack in keyhole, then in the quick-fried layer control hole of light
Pack simultaneous initiation, formed vertical shaft for mine.
The spacing of adjacent pack is 2m in the keyhole;
Clearance space in the keyhole between adjacent pack couples filling using yellow mud;
The keyhole aperture is 1.5m;
Coefficient of decoupling charge in the quick-fried layer control hole of light is 1.4-1.6.
The invention has the advantages that:
The present invention ignites the pack in keyhole and is superimposed to form the light blast hole scope of freedom so as to produce down funnel structure successively, resynchronizes
Ignite the pack in the quick-fried layer control hole of light so as to forming vertical shaft for mine, while demolition effect is ensured, can reduce a section dose,
Reduce blasting vibration and press from both sides stagnant effect, improve the height of shaft formatting by one blasting, construction quality and efficiency of construction.
Brief description of the drawings
Fig. 1 is the sectional view of hole packed plane of the present invention;
Fig. 2 is the top view of hole packed plane of the present invention.
In figure:The quick-fried layer control hole of 1- keyholes, 2- light, 3- packs, 4- vertical shaft for mine.
Embodiment
A kind of vertical shaft for mine explosion well completion method as depicted in figs. 1 and 2, it is characterised in that comprise the following steps:
A, setting slotting bore region and the quick-fried layer control bore region of light, the slotting bore region between drilling drift and tunnel of slagging tap
In the quick-fried layer control bore region of light, slotting bore region is vertically arranged by four and the keyhole 1 of square arrangement is constituted,
The quick-fried layer control bore region of light is made up of the quick-fried layer control hole 2 of multiple light being vertically arranged, and the quick-fried layer control hole 2 of light surrounds keyhole
The rounded arrangement in region;
B, carry out charging in keyhole and the quick-fried layer control hole of light, the keyhole 1 uses section gap coupling charging, phase
Pack 3 in adjacent keyhole 1 is interspersed, and the quick-fried layer control hole 2 of light, which is used, does not couple continuous charging;
C, progress explosion are first detonated successively from the bottom to top into well operations to the pack 3 in keyhole 1, then to the quick-fried layer control hole 2 of light
The interior simultaneous initiation of pack 3, forms vertical shaft for mine 4.
The spacing of adjacent pack 3 is the clearance space between adjacent pack 3 in 2m, the keyhole 1 in the keyhole 1
Coupled and clogged using yellow mud, the aperture of keyhole 1 is that the coefficient of decoupling charge in 1.5m, the quick-fried layer control hole 2 of light is
1.4-1.6。
During explosion, the pack in keyhole and the quick-fried layer control hole of light is detonated by msdelayed light emission blasting circuit, drawn
Pack in slotted eye detonates successively from the bottom to top, and Initiation time interval is 200ms, produces funnel structure and is superimposed to form light blast hole
The scope of freedom, then detonation is synchronized to the medicine in the quick-fried layer control hole of light, so as to form vertical shaft for mine 4.
Claims (5)
1. a kind of vertical shaft for mine explosion well completion method, it is characterised in that comprise the following steps:
Slotting bore region and the quick-fried layer control bore region of light, the slotting bore region position are set between drilling drift and tunnel of slagging tap
In in the quick-fried layer control bore region of light, slotting bore region is vertically arranged by four and the keyhole of square arrangement is constituted, light
Quick-fried layer control bore region is made up of the quick-fried layer control hole of multiple light being vertically arranged, and the quick-fried layer control hole of light surrounds slotting bore region
Rounded arrangement;
Charging is carried out in keyhole and the quick-fried layer control hole of light, the keyhole uses section gap coupling charging, adjacent
Pack in keyhole is interspersed, and the quick-fried layer control hole of light, which is used, does not couple continuous charging;
Explosion is carried out into well operations, first the pack in keyhole is detonated successively from the bottom to top, then in the quick-fried layer control hole of light
Pack simultaneous initiation, forms vertical shaft for mine.
2. a kind of vertical shaft for mine explosion well completion method as claimed in claim 1, it is characterised in that:Adjacent medicine in the keyhole
The spacing of bag is 2m.
3. a kind of vertical shaft for mine explosion well completion method as claimed in claim 1, it is characterised in that:Adjacent medicine in the keyhole
Clearance space between bag couples filling using yellow mud.
4. a kind of vertical shaft for mine explosion well completion method as claimed in claim 1, it is characterised in that:The keyhole aperture is
1.5m。
5. a kind of vertical shaft for mine explosion well completion method as claimed in claim 1, it is characterised in that:In the quick-fried layer control hole of light
Coefficient of decoupling charge be 1.4-1.6.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710384750.7A CN107270791B (en) | 2017-05-26 | 2017-05-26 | A kind of vertical shaft for mine explosion well completion method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710384750.7A CN107270791B (en) | 2017-05-26 | 2017-05-26 | A kind of vertical shaft for mine explosion well completion method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107270791A true CN107270791A (en) | 2017-10-20 |
CN107270791B CN107270791B (en) | 2019-04-26 |
Family
ID=60064613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710384750.7A Active CN107270791B (en) | 2017-05-26 | 2017-05-26 | A kind of vertical shaft for mine explosion well completion method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107270791B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110196002A (en) * | 2019-05-28 | 2019-09-03 | 三明学院 | A kind of safe and efficient blasting construction method of shaft wall hitch |
CN112097579A (en) * | 2020-08-14 | 2020-12-18 | 首钢集团有限公司 | One-time blasting well completion method and double-cut layered hole distribution method thereof |
CN112664172A (en) * | 2020-12-21 | 2021-04-16 | 石家庄铁道大学 | Blasting infiltration method for ground immersion |
CN113863243A (en) * | 2021-10-23 | 2021-12-31 | 中电建十一局工程有限公司 | Construction method for quickly excavating underground powerhouse of hydropower station |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130039845A (en) * | 2011-10-13 | 2013-04-23 | 전남대학교산학협력단 | Explosive tube assembly and controlled blasting method with the same |
CN103940309A (en) * | 2014-03-26 | 2014-07-23 | 南京梅山冶金发展有限公司 | Underground-blasting shaft forming method |
CN104266557A (en) * | 2014-07-31 | 2015-01-07 | 山东华联矿业股份有限公司 | Precontrol roof sublevel ore breaking once shaft forming method |
CN106225613A (en) * | 2016-08-25 | 2016-12-14 | 中铁十局集团第三工程有限公司 | A kind of efficient segmentation method of ignition in tunnel excavating process |
-
2017
- 2017-05-26 CN CN201710384750.7A patent/CN107270791B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130039845A (en) * | 2011-10-13 | 2013-04-23 | 전남대학교산학협력단 | Explosive tube assembly and controlled blasting method with the same |
CN103940309A (en) * | 2014-03-26 | 2014-07-23 | 南京梅山冶金发展有限公司 | Underground-blasting shaft forming method |
CN104266557A (en) * | 2014-07-31 | 2015-01-07 | 山东华联矿业股份有限公司 | Precontrol roof sublevel ore breaking once shaft forming method |
CN106225613A (en) * | 2016-08-25 | 2016-12-14 | 中铁十局集团第三工程有限公司 | A kind of efficient segmentation method of ignition in tunnel excavating process |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110196002A (en) * | 2019-05-28 | 2019-09-03 | 三明学院 | A kind of safe and efficient blasting construction method of shaft wall hitch |
CN110196002B (en) * | 2019-05-28 | 2021-11-02 | 三明学院 | Safe and efficient blasting construction method for vertical shaft wall beam nest |
CN112097579A (en) * | 2020-08-14 | 2020-12-18 | 首钢集团有限公司 | One-time blasting well completion method and double-cut layered hole distribution method thereof |
CN112664172A (en) * | 2020-12-21 | 2021-04-16 | 石家庄铁道大学 | Blasting infiltration method for ground immersion |
CN113863243A (en) * | 2021-10-23 | 2021-12-31 | 中电建十一局工程有限公司 | Construction method for quickly excavating underground powerhouse of hydropower station |
Also Published As
Publication number | Publication date |
---|---|
CN107270791B (en) | 2019-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107270791B (en) | A kind of vertical shaft for mine explosion well completion method | |
CN101738148B (en) | Tunnel medium-length hole smooth blasting method | |
CN105569659B (en) | A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method | |
CN103278055B (en) | Roof-cutting pressure relief method in hard-roof deep-hole pre-splitting blasting | |
CN101338999B (en) | Method for blasting seepage enhancement for low infiltration sandrock -type uranium deposit | |
CN103244180B (en) | Gob-side entry driving surrounding rock control method using remaining small pillars | |
CN102678120A (en) | Method for releasing pressure and removing danger of rock burst | |
CN104266557B (en) | Pre-control roof paragraphs ore deposit simultaneous shaft sin king method | |
RU2498075C1 (en) | Method to install blast expansion anchor | |
CN104048570A (en) | Deep hole blasting filling method | |
CN102494572A (en) | Blasting method for undermining and tunnelling in mode of distributing hollow holes at periphery and solid hole in center | |
CN110067558A (en) | A kind of severe inclined thick coal seam stope drift active workings joint release prevention and treatment impulsion pressure method | |
CN102080545B (en) | High-risk pillar open-air deep hole collaborative stoping method | |
CN113107490A (en) | Roof cutting and pressure relief method for high-ground-stress hard roof of coal mine | |
CN103206903A (en) | Hard roof directional pressure-bearing blasting control method | |
CN107328327A (en) | The soft or hard blast hole loading structure and its method for being mingled with beded rock mass Long-hole Bench Blasting | |
CN104296609B (en) | Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting | |
CN106643355B (en) | A kind of overhead caving method of the huge thick tight roof of deep coalmine | |
CN106839911A (en) | The blasting method of the laddering secondary efficient demolition set in axial direction and device | |
CN106288991B (en) | A kind of underground mining cuts kerve method of going up a hill | |
CN107339091A (en) | A kind of artificial method built oil shale underground and crush body | |
CN110725685A (en) | Hydraulic fracturing combined hydraulic blasting roadway large-footage tunneling method and fracturing device | |
CN202255143U (en) | Spaced loading structure of blasthole | |
CN203083466U (en) | Low-boulder-yield waterpower supercharging blasting charging structure | |
CN104879128B (en) | Severe inclined thick coal seam coal winning technology based on the advanced pre- quick-fried reduction of top coal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |