CN107268453B - The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss - Google Patents

The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss Download PDF

Info

Publication number
CN107268453B
CN107268453B CN201710709467.7A CN201710709467A CN107268453B CN 107268453 B CN107268453 B CN 107268453B CN 201710709467 A CN201710709467 A CN 201710709467A CN 107268453 B CN107268453 B CN 107268453B
Authority
CN
China
Prior art keywords
truss
roller support
lifting
steel
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710709467.7A
Other languages
Chinese (zh)
Other versions
CN107268453A (en
Inventor
李若辉
王永星
郭磊
张慧男
刘永胜
王惠荣
蔡涛
胡荣丽
王建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taihang Construction Development Co Ltd
Original Assignee
Shanxi Taihang Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taihang Construction Development Co Ltd filed Critical Shanxi Taihang Construction Development Co Ltd
Priority to CN201710709467.7A priority Critical patent/CN107268453B/en
Publication of CN107268453A publication Critical patent/CN107268453A/en
Application granted granted Critical
Publication of CN107268453B publication Critical patent/CN107268453B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to oblique parallel-chord truss hanging method, the specially oblique whole Pin double-machine lifting crane combination roller support installation engineering method of parallel-chord truss, the engineering method uses 4 lifting methods of size tonnage crane two-shipper by truss integral hoisting.By the reasonable distribution to equipment hoisting weight between two loop wheel machines, the weight for bearing two loop wheel machines is respectively to complete truss lifting operation in the performance range that respective lifting allows.When truss and fixed roller support, roller support is using the method for decomposing installation.Before truss lifting, roller support is first placed in bracket capital, is consistent with stent strut apical axis line.After truss upper seat is lifted on roller support top plate, review roller support and truss integral position are welded and fixed roller support bottom plate in the built-in fitting of bracket capital, roller support top plate and truss upper seat are then welded and fixed after errorless.Guarantee that the horizontal force that truss structure passes to support can be discharged after truss and roller support are fixed.

Description

The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss
Technical field
The present invention relates to oblique parallel-chord trusses to use roll shaft fabrication and installation method, the specially oblique whole Pin of parallel-chord truss Double-machine lifting crane combination roller support installation engineering method.
Background technique
In coal mining enterprise and large chemical complex, carrying knot of the coal transporting trestle of ground production system as transportation system Structure plays an important role, and coal transporting trestle mostly uses the structure type of oblique parallel-chord truss.Due to the large-scale defeated oblique trestle of coal Upper lower fulcrum height difference is big, and truss monomer lifting weight is big, and mounting height is high, so in trestle truss hoisting process, purlin The control of frame whole machine balancing becomes a difficult point;In order to guarantee truss overall structure safety, itself stress, roll shaft at the top of truss are discharged Fixed support installation is again a priority control object.The present invention comes into being in this context, devises a set of for tiltedly flat The whole Pin double-machine lifting crane of row truss structure and the construction for combining roller support installation.
Summary of the invention
The present invention provides the whole Pin double-machine lifting crane combination roller support installation engineering methods of oblique parallel-chord truss, solve Oblique parallel-chord truss uses balance difficulties when two-shipper integral hoisting, while roller support decomposes installation, discharges purlin Frame passes to the horizontal thrust of support, guarantees truss structure safety.
The present invention is achieved by the following technical scheme: the whole Pin double-machine lifting crane combination roller support of oblique parallel-chord truss Installation engineering method, including the installation of steel truss on-site consolidation, stent strut apical axis line, absolute altitude repetition measurement, roller support, steel truss lifting Fixed and measurement correction;
The following steps are included: steel truss is processed into semi-finished product in processing factory, every truss structure is divided into steel truss on-site consolidation Several shippeds to erecting bed is assembled, and the lower edge H profile steel of a truss structure is looked in mounting platform over-assemble, centering It is flat, after checking that size is errorless, it is welded and fixed;Seating side steel truss and upper lower chord member, make single truss structure connect into one A entirety;Two temporary supports are placed on mattess, levelling capturing, single truss structure of the assembly welding after complete is hung to and is faced When support on, allow truss support steel plate to be located in temporary support, control truss axis and temporary support axis be mutually 90 degree.For Expand the pre-splicing loading amount in ground to the maximum extent, reduce high altitude operation, truss purlins, tie rod and truss side colored steel are pacified on ground With truss integral hoisting after the completion of dress;
Stent strut apical axis line, absolute altitude repetition measurement the following steps are included: steel truss installation before, by absolute altitude pilot measurement to bracket capital And make marks, it will be marked cross axis in length and breadth on bracket capital with theodolite, while on roller support and truss support Four faces at place mark center line;
Roller support installation the following steps are included:
Roller support bottom plate is made of steel plate, and the roller support bottom plate made is placed in the built-in fitting of bracket capital On, cross axis is mutually aligned, repetition measurement absolute altitude and center;
Roll shaft installation site line is finished in roller support bottom plate, roll shaft is 6 round steel, and the roll shaft made is placed on phase The position answered, the box support for making forming are placed in roll shaft top, support are pushed to check rolling effect, detect to truss installa-tion Roller support bottom plate is weldingly fixed on the built-in fitting of bracket capital after errorless, roller support is restored into installation condition, prepares purlin Frame lifting;
Steel truss lifting is fixed the following steps are included: using the main hoisting machinery that two loop wheel machines are lifted as truss, large-tonnage is hung The high pivot point support of vehicle lifting truss lower edge, the low pivot bearing of small tonnage crane lifting truss lower edge, is hung using size tonnage 4 lifting methods of vehicle two-shipper are by truss integral installation;Truss upper seat is welded and fixed with roller support top plate;
After measurement correction is the following steps are included: truss lifting is in place, repetition measurement is carried out to truss, with determining for truss lower edge both ends Position label and the axis markers of bracket capital strictly position, and lower seat are welded and fixed after measurement is errorless, the water of entire truss The rolling that flat power is released through roller support is adjusted.
Oblique parallel-chord truss lifting is the main hoisting machinery lifted using two loop wheel machines as truss, and large tonnage crane lifts by crane purlin The high pivot point support of frame lower edge, the low pivot bearing of small tonnage crane lifting truss lower edge, using size tonnage crane two-shipper four Lifting method is put by truss integral installation.By the reasonable distribution to equipment hoisting weight between two loop wheel machines, two are made to hang The weight that machine is born is respectively to complete truss lifting operation in the performance range that respective lifting allows.Truss and roll shaft branch When seat is fixed, roller support is using the method for decomposing installation.Before truss lifting, roller support is first placed in bracket capital, with Stent strut apical axis line is consistent.After truss upper seat is lifted on roller support top plate, checks roller support and truss is whole Body position is welded and fixed roller support bottom plate in the built-in fitting of bracket capital, roller support top plate is then welded and fixed after errorless With truss upper seat.Guarantee that the horizontal force that truss structure passes to support can be discharged after truss and roller support are fixed.
For the large-scale defeated oblique trestle both ends fulcrum height difference of coal is big, truss length is long, monomer lifting weight is big, mounting height is high Difficult point, the present invention the design of selection, hanging method to lifting equipment and decompose installation roller support by way of, both solved The difficult point for oblique parallel chord truss lifting balance of having determined, while the method for decomposing installation roller support ensure that truss structure safety.
Specific embodiment
The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss, including steel truss scene are spelled Dress, the installation of stent strut apical axis line, absolute altitude repetition measurement, roller support, steel truss lifting is fixed and measurement corrects.
The following steps are included: steel truss is processed into semi-finished product in processing factory, every truss structure is divided into steel truss on-site consolidation Several shippeds to erecting bed is assembled, and the lower edge H profile steel of a truss structure is looked in mounting platform over-assemble, centering It is flat, after checking that size is errorless, it is welded and fixed;Seating side steel truss and upper lower chord member, make single truss structure connect into one A entirety;Two temporary supports are placed on mattess, levelling capturing, single truss structure of the assembly welding after complete is hung to and is faced When support on, allow truss support steel plate to be located in temporary support, control truss axis and temporary support axis be mutually 90 degree.For Expand the pre-splicing loading amount in ground to the maximum extent, reduce high altitude operation, truss purlins, tie rod and truss side colored steel are pacified on ground With truss integral hoisting after the completion of dress;
Stent strut apical axis line, absolute altitude repetition measurement the following steps are included: steel truss installation before, by absolute altitude pilot measurement to bracket capital And make marks, it will be marked cross axis in length and breadth on bracket capital with theodolite, while on roller support and truss support Four faces at place mark center line;
Roller support installation the following steps are included:
Roller support bottom plate is used to be made of 20mm thick steel plate, and the roller support bottom plate made is placed in stent strut On the built-in fitting on top, cross axis is mutually aligned, repetition measurement absolute altitude and center;
Roll shaft installation site line is finished in roller support bottom plate, roll shaft is 6 Φ 40mm round steel, the roll shaft that will be made It is placed on corresponding position, the box support for making forming is placed in roll shaft top, and support is pushed to check rolling effect, pacifies to truss Roller support bottom plate is weldingly fixed on the built-in fitting of bracket capital after dress detection is errorless, roller support is restored into installation condition, Prepare truss lifting;
Roller support bottom plate is weldingly fixed on the built-in fitting of bracket capital after truss installa-tion detection is errorless, while by purlin Frame support is welded and fixed with roller support top plate;
Steel truss lifting is fixed the following steps are included: using the main hoisting machinery that two loop wheel machines are lifted as truss, large-tonnage is hung The high pivot point support of vehicle lifting truss lower edge, the low pivot bearing of small tonnage crane lifting truss lower edge, is hung using size tonnage 4 lifting methods of vehicle two-shipper are by truss integral installation;
After measurement correction is the following steps are included: truss lifting is in place, repetition measurement is carried out to truss, with determining for truss lower edge both ends Position label and the axis markers of bracket capital strictly position, and lower seat are welded and fixed after measurement is errorless, the water of entire truss The rolling that flat power is released through roller support is adjusted.

Claims (1)

1. the oblique whole Pin double-machine lifting crane combination roller support installation engineering method of parallel-chord truss, it is characterised in that including steel truss On-site consolidation, stent strut apical axis line, absolute altitude repetition measurement, roller support installation, steel truss lifting is fixed and measurement corrects;
The following steps are included: steel truss is processed into semi-finished product in processing factory, every truss structure is divided into several steel truss on-site consolidation Shipped to erecting bed is assembled, and the lower edge H profile steel of a truss structure is levelling in mounting platform over-assemble, centering, inspection Look into size it is errorless after, be welded and fixed;Seating side steel truss and upper lower chord member, make single truss structure connect into one it is whole Body;Two temporary supports are placed on mattess, levelling capturing, single truss structure of the assembly welding after complete is hung to interim branch In support, truss support steel plate is allowed to be located in temporary support, control truss axis and temporary support axis are mutually 90 degree, in order to most Expand to limits the pre-splicing loading amount in ground, reduces high altitude operation, truss purlins, tie rod and truss side colored steel install on ground Cheng Houtong truss integral hoisting;
Stent strut apical axis line, absolute altitude repetition measurement to bracket capital and do absolute altitude pilot measurement the following steps are included: before steel truss installation Label, will be marked cross axis on bracket capital in length and breadth with theodolite, while on roller support and at truss support Four faces mark center line;
Roller support installation the following steps are included: roller support bottom plate using steel plate production, the roller support bottom plate that will be made It is placed on the built-in fitting of bracket capital, cross axis is mutually aligned, repetition measurement absolute altitude and center;In roller support bottom plate Roll shaft installation site line is finished, roll shaft is 6 round steel, and the roll shaft made is placed on corresponding position, makes the box of forming Support is placed in roll shaft top, and box support is pushed to check rolling effect, by roller support bottom after truss installa-tion detection is errorless Plate is weldingly fixed on the built-in fitting of bracket capital, and roller support is restored installation condition, prepares truss lifting;
Steel truss lifting is fixed the following steps are included: using the main hoisting machinery that two loop wheel machines are lifted as truss, and large tonnage crane rises The high pivot point support of hanging truss lower edge, the low pivot bearing of small tonnage crane lifting truss lower edge are double using size tonnage crane 4 lifting methods of machine are by truss integral installation;Truss upper seat is welded and fixed with roller support top plate;
After measurement correction is the following steps are included: truss lifting is in place, repetition measurement is carried out to truss, with the positioning mark at truss lower edge both ends The axis markers of note and bracket capital strictly position, and lower seat are welded and fixed after measurement is errorless, the horizontal force of entire truss The rolling for being released through roller support is adjusted.
CN201710709467.7A 2017-08-18 2017-08-18 The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss Active CN107268453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710709467.7A CN107268453B (en) 2017-08-18 2017-08-18 The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710709467.7A CN107268453B (en) 2017-08-18 2017-08-18 The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss

Publications (2)

Publication Number Publication Date
CN107268453A CN107268453A (en) 2017-10-20
CN107268453B true CN107268453B (en) 2018-12-25

Family

ID=60079669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710709467.7A Active CN107268453B (en) 2017-08-18 2017-08-18 The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss

Country Status (1)

Country Link
CN (1) CN107268453B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411946B (en) * 2021-12-21 2023-09-12 北京城建集团有限责任公司 Construction method of ultra-long inverted triangle arc tube truss

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060022810A (en) * 2004-09-08 2006-03-13 건융건설 주식회사 A method of installation and dismantlement for a pipe which located in the downside of the upper part of the bridge and a equipment thereof
CN102635061A (en) * 2012-04-18 2012-08-15 中建二局第三建筑工程有限公司 Mountain stream river-crossing inclined zipper trestle and hoisting method thereof
CN104481148A (en) * 2014-12-11 2015-04-01 中国十七冶集团有限公司 Construction method of super-long thin-wall color steel tile roof
CN104532746A (en) * 2014-12-15 2015-04-22 中铁建大桥工程局集团第五工程有限公司 Construction method of upper structure of steel-concrete overlapping beam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060022810A (en) * 2004-09-08 2006-03-13 건융건설 주식회사 A method of installation and dismantlement for a pipe which located in the downside of the upper part of the bridge and a equipment thereof
CN102635061A (en) * 2012-04-18 2012-08-15 中建二局第三建筑工程有限公司 Mountain stream river-crossing inclined zipper trestle and hoisting method thereof
CN104481148A (en) * 2014-12-11 2015-04-01 中国十七冶集团有限公司 Construction method of super-long thin-wall color steel tile roof
CN104532746A (en) * 2014-12-15 2015-04-22 中铁建大桥工程局集团第五工程有限公司 Construction method of upper structure of steel-concrete overlapping beam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大跨度钢桁架桥的施工与实践;刘亚琴;《四川水力发电》;20010331;第20卷(第1期);全文 *

Also Published As

Publication number Publication date
CN107268453A (en) 2017-10-20

Similar Documents

Publication Publication Date Title
CN107012949B (en) Lifting method of large-span steel corridor
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN203947771U (en) A kind of Bailey beam pendent form support system
CN106120559B (en) A kind of bridge limited bracket construction method and bridge
CN204781881U (en) Elevartor shaft structure construction handling frame
CN107476581A (en) A kind of steel construction bilayer cantilevered structure lifts installation method
CN104828758A (en) Thermal power generating unit draught fan structure support overall transfer device and transfer method
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN106522101A (en) Construction method of superlong cable beam-free sections of cable-stayed bridge
CN105003090A (en) Temporary support frame for mounting assembly type steel structure
CN107268453B (en) The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss
CN104989111B (en) Steel construction high level construction method for hanging
CN203922433U (en) The top cover suspender of water turbine overflowing component
CN101109028A (en) Method of upside-down mounting hydraulic pressure lifting of converter shell
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN102877657B (en) Large-span H-shaped plane composite structure beam string upper-air cable replacement construction method
CN202963332U (en) Device for manufacturing pile foundation reinforcement cage by using simple portal frame
CN204876631U (en) Assembled steel structure installation uses interim support frame
CN109468420A (en) A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN101831916A (en) Method for mounting large-size sleeve bolt framework in combined type
CN204081548U (en) Cantilever frame temporary support and main couple joint portion device
CN104416352B (en) Installed using radial type, remove the method that the constructing device of straddle truck is constructed
CN106869324A (en) Crane beam modularization installation method
CN203188123U (en) Hydraulic jack device for lowering whole bridge anticollision steel cofferdam synchronously

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant