CN107268453A - The whole Pin double-machine lifting cranes combination roller support installation engineering method of oblique parallel-chord truss - Google Patents

The whole Pin double-machine lifting cranes combination roller support installation engineering method of oblique parallel-chord truss Download PDF

Info

Publication number
CN107268453A
CN107268453A CN201710709467.7A CN201710709467A CN107268453A CN 107268453 A CN107268453 A CN 107268453A CN 201710709467 A CN201710709467 A CN 201710709467A CN 107268453 A CN107268453 A CN 107268453A
Authority
CN
China
Prior art keywords
truss
roller support
support
lifting
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710709467.7A
Other languages
Chinese (zh)
Other versions
CN107268453B (en
Inventor
李若辉
王永星
郭磊
张慧男
刘永胜
王惠荣
蔡涛
胡荣丽
王建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taihang Construction Development Co Ltd
Original Assignee
Shanxi Taihang Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taihang Construction Development Co Ltd filed Critical Shanxi Taihang Construction Development Co Ltd
Priority to CN201710709467.7A priority Critical patent/CN107268453B/en
Publication of CN107268453A publication Critical patent/CN107268453A/en
Application granted granted Critical
Publication of CN107268453B publication Critical patent/CN107268453B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to oblique parallel-chord truss hanging method, the specially oblique whole Pin double-machine lifting cranes combination roller support installation engineering method of parallel-chord truss, the engineering method uses 4 lifting methods of size tonnage crane two-shipper by truss integral hoisting.By the reasonable distribution to equipment hoisting weight between two loop wheel machines, make the weight that two loop wheel machines are born respectively in the performance range that respective lifting allows so as to complete truss lifting operation.When truss is fixed with roller support, the method that roller support is installed using decomposing.Before truss lifting, roller support is first placed in support capital, is consistent with stent strut apical axis line.After truss upper seat is lifted on roller support top plate, check roller support and truss integral position, it is errorless after be welded and fixed roller support bottom plate in the built-in fitting of support capital, be then welded and fixed roller support top plate and truss upper seat.Ensure that truss can discharge the horizontal force that truss structure passes to bearing after being fixed with roller support.

Description

The whole Pin double-machine lifting cranes combination roller support installation engineering method of oblique parallel-chord truss
Technical field
Roll shaft fabrication and installation method, the specially oblique whole Pin of parallel-chord truss are used the present invention relates to oblique parallel-chord truss Double-machine lifting crane combination roller support installation engineering method.
Background technology
In coal mining enterprise and large chemical complex, the coal transporting trestle of ground production system as transportation system carrying knot Structure is played an important role, and the structure type of oblique parallel-chord truss is used coal transporting trestle more.Due to the large-scale defeated oblique trestle of coal The upper lower fulcrum discrepancy in elevation is big, and truss monomer lifting weight is big, and setting height(from bottom) is high, so in trestle truss hoisting process, purlin The control of frame whole machine balancing turns into a difficult point;In order to ensure truss overall structure safety, roll shaft at the top of itself stress, truss is discharged It is again a priority control object that bearing, which is installed fixed,.The present invention arises at the historic moment in this context, devises a set of for tiltedly flat The whole Pin double-machine lifting cranes of row truss structure simultaneously combine the construction that roller support is installed.
The content of the invention
The invention provides the whole Pin double-machine lifting cranes combination roller support installation engineering method of oblique parallel-chord truss, solve Oblique parallel-chord truss uses balance difficulties during two-shipper integral hoisting, is installed while roller support is decomposed, discharges purlin Frame passes to the horizontal thrust of bearing, it is ensured that truss structure safety.
The present invention adopts the following technical scheme that realization:The whole Pin double-machine lifting cranes combination roller support of oblique parallel-chord truss Installation engineering method, including steel truss on-site consolidation, stent strut apical axis line, absolute altitude repetition measurement, roller support are installed, steel truss lifting Fixed and measurement correction;
Steel truss on-site consolidation comprises the following steps:Steel truss is processed into semi-finished product in processing factory, is divided into some per truss structure Shipped to erecting bed is assembled, and the lower edge H profile steel of a truss structure is levelling in mounting platform over-assemble, centering, inspection Look into size it is errorless after, be welded and fixed;Seating side steel truss and upper lower chord member, make single truss structure connect into one it is whole Body;Two temporary supports are placed on mattess, levelling capturing, single truss structure of the assembly welding after complete is hung to interim branch In support, truss support steel plate is allowed to be located in temporary support, control truss axis is mutually 90 degree with temporary support axis.In order to most Expand to limits the pre-splicing loading amount in ground, reduce work high above the ground, truss purlins, tie rod and truss side colored steel are installed on ground Cheng Houtong truss integral hoistings;
Stent strut apical axis line, absolute altitude repetition measurement comprise the following steps:Before steel truss installation, by absolute altitude pilot measurement is to support capital and does Mark, will be marked cross axis in length and breadth with theodolite on support capital, while on roller support and at truss support Four faces mark center line;
Roller support, which is installed, to be comprised the following steps:
Roller support bottom plate is made using steel plate, and the roller support bottom plate made is placed on the built-in fitting of support capital, Cross axis is mutually aligned, repetition measurement absolute altitude and center;
Roll shaft installation site line is finished in roller support bottom plate, roll shaft is 6 round steel, and the roll shaft made is placed on accordingly Position, the box bearing for making shaping is placed in roll shaft top, promotes bearing to check rolling effect, treats that truss installa-tion detection is errorless Roller support bottom plate is weldingly fixed on the built-in fitting of support capital afterwards, roller support is recovered into installment state, prepares truss and hangs Dress;
Steel truss lifting fixation comprises the following steps:The main hoisting machinery lifted using two loop wheel machines as truss, large tonnage crane rises The high pivot point bearing of hanging truss lower edge, the low fulcrum bearing of small tonnage crane lifting truss lower edge is double using size tonnage crane 4 lifting methods of machine are by truss integral installation;Truss upper seat is welded and fixed with roller support top plate;
Measurement correction comprises the following steps:After truss lifting is in place, repetition measurement is carried out to truss, with the positioning mark at truss lower edge two ends The axis markers of note and support capital are strictly positioned, and are welded and fixed lower seat after measurement is errorless, the horizontal force of whole truss It is released through the rolling regulation of roller support.
Oblique parallel-chord truss lifting is the main hoisting machinery lifted using two loop wheel machines as truss, large tonnage crane lifting purlin The high pivot point bearing of frame lower edge, the low fulcrum bearing of small tonnage crane lifting truss lower edge, using size tonnage crane two-shipper four Lifting method is put by truss integral installation.By the reasonable distribution to equipment hoisting weight between two loop wheel machines, two are made to hang The weight that machine is born is respectively so as to complete truss lifting operation in the performance range that respective lifting allows.Truss and roll shaft branch When seat is fixed, the method that roller support is installed using decomposing.Before truss lifting, roller support is first placed in support capital, with Stent strut apical axis line is consistent.After truss upper seat is lifted on roller support top plate, roller support is checked whole with truss Body position, it is errorless after be welded and fixed roller support bottom plate in the built-in fitting of support capital, be then welded and fixed roller support top plate With truss upper seat.Ensure that truss can discharge the horizontal force that truss structure passes to bearing after being fixed with roller support.
For the large-scale defeated oblique trestle two ends fulcrum discrepancy in elevation of coal is big, truss length length, monomer lifting weight are big, setting height(from bottom) is high Difficult point, the present invention to the selection of crane gear, the design of hanging method and decompose install roller support by way of, both solved The difficult point for oblique parallel chord truss lifting balance of having determined, while the method for decomposing installation roller support ensure that truss structure safety.
Embodiment
The whole Pin double-machine lifting cranes combination roller support installation engineering method of oblique parallel-chord truss, including steel truss scene are spelled Dress, stent strut apical axis line, absolute altitude repetition measurement, roller support are installed, steel truss lifting is fixed and measurement correction.
Steel truss on-site consolidation comprises the following steps:Steel truss is processed into semi-finished product in processing factory, is divided into per truss structure Some shippeds to erecting bed is assembled, and the lower edge H profile steel of a truss structure is looked in mounting platform over-assemble, centering It is flat, after checking that size is errorless, it is welded and fixed;Seating side steel truss and upper lower chord member, make single truss structure connect into one Individual entirety;Two temporary supports are placed on mattess, levelling capturing, single truss structure of the assembly welding after complete is hung to and faced When support on, allow truss support steel plate to be located in temporary support, control truss axis and temporary support axis are mutually 90 degree.For Expand the pre-splicing loading amount in ground to greatest extent, reduce work high above the ground, truss purlins, tie rod and truss side colored steel are pacified on ground With truss integral hoisting after the completion of dress;
Stent strut apical axis line, absolute altitude repetition measurement comprise the following steps:Before steel truss installation, by absolute altitude pilot measurement is to support capital and does Mark, will be marked cross axis in length and breadth with theodolite on support capital, while on roller support and at truss support Four faces mark center line;
Roller support, which is installed, to be comprised the following steps:
Roller support bottom plate is made using 20mm steel plates, and the roller support bottom plate made is placed in into support capital On built-in fitting, cross axis is mutually aligned, repetition measurement absolute altitude and center;
Roll shaft installation site line is finished in roller support bottom plate, roll shaft is 6 Φ 40mm round steel, and the roll shaft made is placed on Corresponding position, the box bearing for making shaping is placed in roll shaft top, promotes bearing to check rolling effect, treats that truss installa-tion is examined Roller support bottom plate is weldingly fixed on the built-in fitting of support capital after survey is errorless, roller support is recovered into installment state, is prepared Truss is lifted;
Roller support bottom plate is weldingly fixed on the built-in fitting of support capital after truss installa-tion detection is errorless, while by truss branch Seat is welded and fixed with roller support top plate;
Steel truss lifting fixation comprises the following steps:The main hoisting machinery lifted using two loop wheel machines as truss, large tonnage crane rises The high pivot point bearing of hanging truss lower edge, the low fulcrum bearing of small tonnage crane lifting truss lower edge is double using size tonnage crane 4 lifting methods of machine are by truss integral installation;
Measurement correction comprises the following steps:After truss lifting is in place, repetition measurement is carried out to truss, with the positioning mark at truss lower edge two ends The axis markers of note and support capital are strictly positioned, and are welded and fixed lower seat after measurement is errorless, the horizontal force of whole truss It is released through the rolling regulation of roller support.

Claims (1)

1. the oblique whole Pin double-machine lifting cranes combination roller support installation engineering method of parallel-chord truss, it is characterised in that including steel truss On-site consolidation, stent strut apical axis line, absolute altitude repetition measurement, roller support are installed, steel truss lifting is fixed and measurement correction;
Steel truss on-site consolidation comprises the following steps:Steel truss is processed into semi-finished product in processing factory, is divided into some per truss structure Shipped to erecting bed is assembled, and the lower edge H profile steel of a truss structure is levelling in mounting platform over-assemble, centering, inspection Look into size it is errorless after, be welded and fixed;Seating side steel truss and upper lower chord member, make single truss structure connect into one it is whole Body;Two temporary supports are placed on mattess, levelling capturing, single truss structure of the assembly welding after complete is hung to interim branch In support, truss support steel plate is allowed to be located in temporary support, control truss axis is mutually 90 degree with temporary support axis, in order to most Expand to limits the pre-splicing loading amount in ground, reduce work high above the ground, truss purlins, tie rod and truss side colored steel are installed on ground Cheng Houtong truss integral hoistings;
Stent strut apical axis line, absolute altitude repetition measurement comprise the following steps:Before steel truss installation, by absolute altitude pilot measurement is to support capital and does Mark, will be marked cross axis in length and breadth with theodolite on support capital, while on roller support and at truss support Four faces mark center line;
Roller support, which is installed, to be comprised the following steps:Roller support bottom plate is made using steel plate, by the roller support bottom plate made On the built-in fitting for being placed in support capital, cross axis is mutually aligned, repetition measurement absolute altitude and center;In roller support bottom plate Roll shaft installation site line is finished, roll shaft is 6 round steel, and the roll shaft made is placed on into corresponding position, the box of shaping is made Bearing is placed in roll shaft top, promotes bearing to check rolling effect, welds roller support bottom plate after truss installa-tion detection is errorless Connect and be fixed on the built-in fitting of support capital, roller support is recovered into installment state, prepare truss lifting;
Steel truss lifting fixation comprises the following steps:The main hoisting machinery lifted using two loop wheel machines as truss, large tonnage crane rises The high pivot point bearing of hanging truss lower edge, the low fulcrum bearing of small tonnage crane lifting truss lower edge is double using size tonnage crane 4 lifting methods of machine are by truss integral installation;Truss upper seat is welded and fixed with roller support top plate;
Measurement correction comprises the following steps:After truss lifting is in place, repetition measurement is carried out to truss, with the positioning mark at truss lower edge two ends The axis markers of note and support capital are strictly positioned, and are welded and fixed lower seat after measurement is errorless, the horizontal force of whole truss It is released through the rolling regulation of roller support.
CN201710709467.7A 2017-08-18 2017-08-18 The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss Active CN107268453B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710709467.7A CN107268453B (en) 2017-08-18 2017-08-18 The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710709467.7A CN107268453B (en) 2017-08-18 2017-08-18 The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss

Publications (2)

Publication Number Publication Date
CN107268453A true CN107268453A (en) 2017-10-20
CN107268453B CN107268453B (en) 2018-12-25

Family

ID=60079669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710709467.7A Active CN107268453B (en) 2017-08-18 2017-08-18 The whole Pin double-machine lifting crane combination roller support installation engineering method of oblique parallel-chord truss

Country Status (1)

Country Link
CN (1) CN107268453B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411946A (en) * 2021-12-21 2022-04-29 北京城建集团有限责任公司 Construction method of overlong inverted triangular arc-shaped pipe truss

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060022810A (en) * 2004-09-08 2006-03-13 건융건설 주식회사 A method of installation and dismantlement for a pipe which located in the downside of the upper part of the bridge and a equipment thereof
CN102635061A (en) * 2012-04-18 2012-08-15 中建二局第三建筑工程有限公司 Mountain stream river-crossing inclined zipper trestle and hoisting method thereof
CN104481148A (en) * 2014-12-11 2015-04-01 中国十七冶集团有限公司 Construction method of super-long thin-wall color steel tile roof
CN104532746A (en) * 2014-12-15 2015-04-22 中铁建大桥工程局集团第五工程有限公司 Construction method of upper structure of steel-concrete overlapping beam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060022810A (en) * 2004-09-08 2006-03-13 건융건설 주식회사 A method of installation and dismantlement for a pipe which located in the downside of the upper part of the bridge and a equipment thereof
CN102635061A (en) * 2012-04-18 2012-08-15 中建二局第三建筑工程有限公司 Mountain stream river-crossing inclined zipper trestle and hoisting method thereof
CN104481148A (en) * 2014-12-11 2015-04-01 中国十七冶集团有限公司 Construction method of super-long thin-wall color steel tile roof
CN104532746A (en) * 2014-12-15 2015-04-22 中铁建大桥工程局集团第五工程有限公司 Construction method of upper structure of steel-concrete overlapping beam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘亚琴: "大跨度钢桁架桥的施工与实践", 《四川水力发电》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411946A (en) * 2021-12-21 2022-04-29 北京城建集团有限责任公司 Construction method of overlong inverted triangular arc-shaped pipe truss
CN114411946B (en) * 2021-12-21 2023-09-12 北京城建集团有限责任公司 Construction method of ultra-long inverted triangle arc tube truss

Also Published As

Publication number Publication date
CN107268453B (en) 2018-12-25

Similar Documents

Publication Publication Date Title
CN107012949B (en) Lifting method of large-span steel corridor
CN104141383A (en) Bailey beam suspension formwork supporting system and construction method thereof
CN203947771U (en) A kind of Bailey beam pendent form support system
CN106120559B (en) A kind of bridge limited bracket construction method and bridge
CN201993278U (en) Special self-balancing horizontal loading testing device for buckling-restrained energy-dissipation braces
CN102587689B (en) Repairing and strengthening method for existing reinforced concrete beam-column joints
CN105442866B (en) Protective demolition and installation method for large-scale highrise steel structure
CN106930541A (en) Construction method of hanging type steel corridor
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN105649314A (en) Suspension platform for high and long-span corridor construction
CN107060070A (en) Load transfer device and construction method for hoisting steel gallery by using same
CN107476581A (en) A kind of steel construction bilayer cantilevered structure lifts installation method
CN104989111B (en) Steel construction high level construction method for hanging
CN107268453A (en) The whole Pin double-machine lifting cranes combination roller support installation engineering method of oblique parallel-chord truss
CN101109028A (en) Method of upside-down mounting hydraulic pressure lifting of converter shell
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN102877657B (en) Large-span H-shaped plane composite structure beam string upper-air cable replacement construction method
CN106049286B (en) A kind of prefabricated interim steel pipe support integral hoisting construction method of installation
CN205741942U (en) A kind of great cantilever chooses arm pier cap beam segmental timbering
CN101831916B (en) Method for mounting large-size sleeve bolt framework in combined type
CN109468420A (en) A kind of last furnace shell passage segmentation hydraulic synchronizing lifting assemble method
CN107299713A (en) A kind of circular cone roofing integrally-lifting steel truss and its construction
CN105970988B (en) The construction method of elevator sidewall reinforcing bar is installed in raft foundation
CN104416352B (en) Installed using radial type, remove the method that the constructing device of straddle truck is constructed
CN107217912A (en) It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction

Legal Events

Date Code Title Description