CN107257132A - 一种考虑风电弃用的电‑气互联***综合负荷削减模型构建方法 - Google Patents

一种考虑风电弃用的电‑气互联***综合负荷削减模型构建方法 Download PDF

Info

Publication number
CN107257132A
CN107257132A CN201710349563.5A CN201710349563A CN107257132A CN 107257132 A CN107257132 A CN 107257132A CN 201710349563 A CN201710349563 A CN 201710349563A CN 107257132 A CN107257132 A CN 107257132A
Authority
CN
China
Prior art keywords
mrow
msub
gas
msubsup
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710349563.5A
Other languages
English (en)
Other versions
CN107257132B (zh
Inventor
余娟
郭林
马梦楠
赵霞
颜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201710349563.5A priority Critical patent/CN107257132B/zh
Publication of CN107257132A publication Critical patent/CN107257132A/zh
Application granted granted Critical
Publication of CN107257132B publication Critical patent/CN107257132B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Other Investigation Or Analysis Of Materials By Electrical Means (AREA)

Abstract

本发明公开一种考虑风电弃用的电‑气互联***综合负荷削减模型构建方法,可广泛应用于电‑气互联***的综合负荷削减量计算,特别适用于风电新能源大规模接入电‑气互联***的情况。优化模型的目标函数中加入热负荷削减量、弃风量的变量,以电负荷、气负荷、热负荷削减量和弃风量之和最小为作为优化模型的目标函数;将P2G装置模型中的消耗电功率和注入气流变量加入优化模型的式约束中;在优化模型的不式约束中考虑热负荷削减量、弃风量的上下限约束,以及P2G装置消耗电功率的容量约束。

Description

一种考虑风电弃用的电-气互联***综合负荷削减模型构建 方法
技术领域
本发明属于综合能源***领域,目的是实现电-气互联***的综合负荷削减量计算,具体涉及考虑风电弃用的综合负荷削减优化模型。
背景技术
近年来,随着气电装机规模的不断提升以及电转气 (power-to-gas,P2G)技术的日趋成熟,电力、天然气***间的耦合关系愈加深化。P2G装置的引入不仅实现了电、气子***间能量的双向流动,而且为风电的大量存储与运输提供了新的解决思路。因此,含P2G的电-气互联***成为未来能源领域发展的重要趋势之一,其具有的规模大、设备类型繁多/运行特性各异、随机性强烈特征,大大增加了***可靠性评估的建模、计算复杂度。综合负荷削减计算是电-气互联***可靠性评估关键环节,构建准确的综合负荷削减模型是实现***可靠性合理、有效评估的重要基础。
目前,未有研究提出考虑P2G装置的电-气互联***综合负荷削减优化模型。现有负荷削减模型中以运行费用最小为优化目标,实现了电-气互联***(未考虑P2G装置)的电负荷、气负荷削减量计算,但未考虑实际***中存在的弃风问题,同时也未计及P2G装置在弃风时开启的实际运行特性,因此无法实现考虑P2G装置的电-气互联***综合负荷削减量的有效、准确计算。
综上所述,现有优化模型存在以下问题:一是忽略了实际***中存在的“弃风限电”现象,二是没有考虑P2G装置的实际运行特性,三是没有考虑燃气热电联产机组的热负荷削减情况。
发明内容
本发明的目的是针对现有技术中的问题,公开一种考虑风电弃用的电-气互联***综合负荷削减模型构建方法。
实现本发明目的之技术方案是:考虑P2G装置的电-气互联***综合负荷削减模型的建立和求解。首先,建立优化模型的目标函数,以电负荷、气负荷、热负荷削减量和弃风量之和最小作为目标函数;其次,考虑电负荷、气负荷、热负荷削减量和弃风量变量,基于电力***的节点有功平衡方程、无功功率平衡方程和天然气***的节点流量平衡方程,以及P2G装置和燃气热电联产机组方程,建立优化模型的式约束;再次,考虑电-气互联***中P2G装置和燃气机组的容量约束、电力***和天然气***中状态量的上下限约束,构建优化模型的不式约束;最后,在不同风电场出力和不同电转气装置容量的场景下,采用内点法对所建优化模型进行求解。其具体方法步骤如下:
(1)建立综合负荷削减优化模型的目标函数
电-气互联***的综合负荷削减优化模型以电负荷、气负荷、热负荷削减量和弃风量之和最小为优化目标,其模型可表示为:
式中,Ce,i是电负荷节点i的负荷削减变量;Cg,m是气负荷节点m的负荷削减变量;Ch,k是燃气热电联产机组k的热负荷削减变量;ΔPW,i是风电场i的弃风变量;Nd是电负荷节点的总数,Ng是气负荷节点的总数,Nw是风电场的总数,Nb是燃气热电联产机组的总数;λe,i为表征各电负荷重要性的权重因子,λg,m为表征各气负荷重要性的权重因子,λh,k为表征各热负荷重要性的权重因子,λw,i为表征各风电场弃风严重性的权重因子。
(2)建立式约束
考虑电负荷削减变量Ce,i、气负荷削减变量Cg,m、热负荷削减变量 Ch,k和弃风变量ΔPW,i,以及电转气装置的消耗电功率和注入气流变量,基于电力***中的节点有功平衡方程、无功功率平衡方程和天然气***中的节点流量平衡方程,以及燃气热电联产机组方程,建立如下式约束:
PG,i+PGAS,i+PCHP,i+PW,i+Ce,i-PP2G,i-ΔPW,i-PD,i-Pi=0,i=1,2,...,Ne (2)
QG,i+QGAS,i+QCHP,i+QC,i-QD,i+Ce,i(QD,i/PD,i)-Qi=0,i=1,2,...,Ne (3)
FG,m+FP2G,m+(Cg,m/GHV)-FGAS,m-FCHP,m-FD,m-Fm=0,m=1,2,...,Nm (4)
PCHP,k=(HCHP,k-Ch,k)/νCHP,k,k=1,2,...,Nb (5)
其中,式(2)是电力***节点有功平衡方程,式(3)是电力***节点无功平衡方程,式(4)是天然气***节点流量平衡方程,式(5) 是燃气热电联产机组方程。式中,PG,i、QG,i分别为电力***节点i 的非燃气常规机组的有功出力和无功出力;PGAS,i、QGAS,i分别为电力***节点i的燃气发电机组的有功出力和无功出力;PCHP,i、QCHP,i分别为电力***节点i的燃气热电联产机组的有功出力和无功出力; PD,i、QD,i分别为电力***节点i的有功负荷和无功负荷;Pi、Qi分别为电力***节点i的注入有功功率和无功功率;PW,i、ΔPW,i分别为电力***节点i的风电场的风电功率和弃风量;QC,i、PP2G,i分别为电力***节点i的无功电源功率和P2G装置消耗电功率;FGAS,m、FCHP,m分别为天然气***节点m的燃气发电机组的消耗气流和燃气热电联产机组的消耗气流;FP2G,m为天然气***节点m的P2G装置的注入气流;FG,m、FD,m分别为天然气***节点m的气源注入气流和节点气负荷;Fm为天然气***节点m的注入气流;GHV为天然气高热值;HCHP,k、 vCHP,k分别为燃气热电联产机组k的热负荷、热电比。Ne是电力***节点的总数,Nm是天然气***节点的总数,Nb是燃气热点联产机组的总数。以下是式约束中各耦合元件模型以及节点注入功率、气流方程。
①P2G装置模型
当电-气互联***中出现弃风现象时,通过开启P2G装置可将富余风电转化为天然气,注入天然气***的输气管道进行存储和运输。因此,P2G装置消耗电功率与注入气流之间的关系如下:
其中,PP2G,k、FP2G,k分别为P2G装置k的消耗电功率和注入气流,ηP2G,k为P2G装置k的转化效率;GHV为天然气高热值;ΔPW,i为风电场i 的弃风量。Nw、Nc分别为风电场和P2G装置的总数。
②燃气机组模型
燃气发电机组与燃气热电联产机组是电-气互联***中常见的燃气机组,均以天然气为燃料,向电力***提供所需电能。我国燃气热电联产机组一般采用“以热定电”的运行模式,根据热力需求和热电比来确定机组的输出电功率。以上两种燃气机组的消耗气流与输出电功率之间满足如下方程:
FGAS,k=(αg,kg,kPGAS,kg,k(PGAS,k)2)/GHV,k=1,2,...,Na (7)
FCHP,k=PCHP,k/(ηCHP,kGHV),k=1,2,...,Nb (8)
其中,PGAS,k、FGAS,k分别为燃气发电机组k的有功出力和消耗气流; PCHP,k、FCHP,k分别为燃气热电联产机组k的有功出力和消耗气流。αg,k、βg,k、γg,k为燃气发电机组k的耗量系数;ηCHP,k为燃气热电联产机组k 的转化效率。Na是燃气发电机组的总数。
③节点注入功率、气流方程
电力***节点i的注入有功功率Pi和注入无功功率Qi,以及天然气***节点m的注入气流Fm计算公式如下:
式中,Vi和Vj分别是电力***节点i和j的电压幅值;Gij和Bij分别为Ne×Ne阶节点导纳矩阵Y中第i行第j列元素的实部和虚部;θij是电力***节点i与j的电压相角差;Amr是节点-管道关联矩阵A中第m行第r列元素;Emq是节点-压缩机关联矩阵E中第m行第q列元素;Tmq是节点-压缩机入口节点关联矩阵T中第m行第q列元素。 Nl、Np分别为输气管道和压缩机支路的总数。Lr为流过天然气输气管道r(以下默认r为输气管道的序号)的流量,Cq为流过天然气压缩机支路q(以下默认q为压缩机支路的序号)的流量,τq为压缩机支路q消耗的流量,三者具体计算公式如下:
对于天然气***中输气管道r,稳态条件下管道流量Lr
式中,m和n分别为输气管道的首端节点和末端节点;πm、πn分别为节点m和n的气压;Kr为输气管道r的管道系数;smn表征气体流动方向。
天然气在管道输送的过程中,会存在一定的压力损失,因此***中常配置一定数量加压站。加压站较为经济选择是采用燃气压缩机来升高压力,其工作中消耗的气体流量取自支路,可效为压缩机进口节点的气负荷。燃气压缩机消耗的流量τq计算公式如下:
式中,m和n分别为压缩机支路的进口节点和出口节点;Hq为压缩机支路q消耗的电功率;Cq为流过压缩机支路q的流量;Bq为压缩机支路q的压缩机系数;Zq为压缩机支路q的进口气体压缩因子;α为绝热系数;αc,q、βc,q、γc,q为压缩机q的耗量系数。
(3)建立不式约束
电-气互联***的综合负荷削减优化模型的不式约束包括:式 (16)-(19)的电负荷、气负荷、热负荷削减变量和弃风变量的上下限约束;式(20)-(24)的电转气装置和燃气机组的容量约束;式(25)-(27)的天然气***节点气压约束、气源注气量约束、压缩机压缩比约束;式 (28)-(31)的电力***节点电压约束、非燃气常规机组出力约束、线路功率约束。
0≤Ce,i≤PD,i,i=1,2,...,Nd (16)
0≤Cg,m/GHV≤FD,m,m=1,2,...,Ng (17)
0≤Ch,k≤HCHP,k,k=1,2,...,Nb (18)
0≤ΔPW,i≤PW,i,i=1,2,...,Nw (19)
Vi min≤Vi≤Vi max,i=1,2,...,Ne (28)
-Tl min≤Tl≤Tl max,l=1,2,...,Nr (31)
式中,Tl是输电线路l流过的功率;Rq是压缩机支路q的压缩比;和 PminP2G分别为P2G装置消耗电功率的上限和下限;和PminGAS分别为燃气发电机组有功出力的上限和下限;和QminGAS分别为燃气发电机组无功出力的上限和下限;和PminCHP分别为燃气热点联产机组有功出力的上限和下限;和QminCHP分别为燃气热点联产机组无功出力的上限和下限;分别为天然气节点气压的上限和下限;和 FminG,m分别为天然气气源注入量的上限和下限;和Rminq分别为压缩机压缩比的上限和下限;和Vmini分别为节点电压幅值的上限和下限;和PminG,i分别为非燃气常规发电机组有功出力的上限和下限;和QminG,i为非燃气常规发电机组无功出力的上限和下限;和Tminl为输电线路传输功率的上限和下限。Nr是输电线路的总数,Nu是非燃气常规机组的总数,Ns是天然气气源的总数。
(4)综合负荷削减优化模型求解和***综合负荷削减量计算
基于第(1)步的目标函数和第(2)步的式约束以及第(3)步的不式约束,考虑电转气装置的电-气互联***综合负荷削减优化模型已建立完成。该模型为非线性优化问题,可采用内点法对其进行求解,本发明调用内点法求解器IPOPT求解该优化模型。
最后根据优化模型结果计算***的综合负荷削减量,***的电负荷削减量、气负荷削减量、热负荷削减量和弃风量的计算公式如下:
式中,Ce为***的电负荷削减量,Cg为***的气负荷削减量,Ch为***的热负荷削减量,ΔPW为***的弃风量。
至此,考虑电转气装置的电-气互联***综合负荷削减优化模型的求解步骤结束。
值得说明的是,本发明可广泛应用于电-气互联***的综合负荷削减量计算,特别适用于风电新能源大规模接入电-气互联***的情况。优化模型的目标函数中加入热负荷削减量、弃风量的变量,以电负荷、气负荷、热负荷削减量和弃风量之和最小为作为优化模型的目标函数;将P2G装置模型中的消耗电功率和注入气流变量加入优化模型的式约束中;在优化模型的不式约束中考虑热负荷削减量、弃风量的上下限约束,以及P2G装置消耗电功率的容量约束。
本发明采用上述技术方案后,主要有以下效果:
(1)在含P2G装置的电-气互联***负荷削减模型方面,本发明提出的模型不仅实现了***供电、供气、供热多种供能形式可靠性水平的有效评估,而且能够合理量化***弃风的严重程度。
(2)相比于现有电-气互联***的负荷削减模型,本发明所提的模型采用电力***交流模型和天然气***非线性模型,有效保留了电、气子***的实际运行特性,同时考虑***“弃风限电”现象以及P2G装置在弃风时的运行特性,使得***的负荷削减量计算、弃风量计算更为精确。
附图说明
本发明采用IEEE14-NGS10电-气互联***进行实施例的验证,该***由IEEE14节点电力***和NGS10节点天然气***两部分组成。
图1为IEEE14-NGS10电-气互联***;
图2为NGS10节点天然气***。
具体实施方式
下面结合实施例对本发明作进一步说明,但不应该理解为本发明上述主题范围仅限于下述实施例。在不脱离本发明上述技术思想的情况下,根据本领域普通技术知识和惯用手段,做出各种替换和变更,均应包括在本发明的保护范围内。
参见图1,本发明采用IEEE14-NGS10电-气互联***进行实施例的验证,该***由IEEE14节点电力***和NGS10节点天然气***两部分组成。
(1)基础数据准备
图1的IEEE14节点标准***中共有5台发电机,火电装机总容量为590MW,共有11个电负荷,电峰荷为570MW;节点6接入容量 250MW的风电场,同时配置容量10MW的P2G装置由天然气节点2 注入天然气***。图2的NGS10节点天然气***包括6条输气管道,3 个燃气压缩机,2个气源站,6个气负荷,共有3个自然气负荷,分别是节点6的180MMCFD、节点7的180MMCFD和节点10的298MMCFD;天然气***节点5、7、9分别提供电力***1、3、2节点处燃气发电机组G1、G3以及燃气热电联产机组G2的用气需求;燃气热电联产机组G2的热负荷为166.8MW。天然气***中管道***其他基础数据可参见文献[1]。
本实施例中假设电负荷、气负荷、热负荷的随机特性均服从正态分布,其标准差为各节点负荷期望值的5%;风速服从两参数威布尔分布,尺度参数为3.97,形状参数为10.7,采用恒功率1控制方式。其中风电转换模型如下:
式中,PW,i为风电场i的风电功率,Pr,i为风电场i的额定功率,vin,i,vr,i, vo,i分别为风电场i的切入风速、额定风速和切出风速。模型中的切入风速、切出风速和额定风速分别为3m/s、25m/s、15m/s。
其次,燃气发电机组、燃气热电联产机组和P2G装置的耦合元件模型中参数取值表1所示,天然气***中压缩机的控制方式和参数取值如表2所示:
表1耦合元件模型参数表
表2天然气压缩机参数表
(2)建立综合负荷削减优化模型的目标函数
电-气互联***的综合负荷削减优化模型以电负荷、气负荷、热负荷削减量和弃风量之和最小为优化目标。由于***中共有11个电负荷,3个自天然气负荷,1个热负荷,1个风电场,因此目标函数中电负荷、气负荷、热负荷削减变量和弃风变量共有15个,各节点的负荷削减、风电弃用权重因子均取1。
(3)建立式约束
考虑电负荷削减变量Ce,i、气负荷削减变量Cg,m、热负荷削减变量Ch,k和弃风变量ΔPW,i以及电转气装置,基于电力***中的节点有功、无功功率平衡方程和天然气***中的节点流量平衡方程,以及P2G 装置和燃气热电联产机组方程,建立式约束。由于***中共有14个电力***节点,10个天然气节点,1个燃气热电联产机组,因此根据所建模型要求,共有39个值约束,包括28个电力***有功平衡约束和28个无功平衡约束、10个天然气流量平衡约束和1个燃气热电联产机组运行约束。
(4)建立不式约束
基于第(2)步所建立的式约束,电-气互联***的综合负荷削减优化模型的不式约束包括:11个电负荷削减变量上下限约束、2个气负荷削减变量上下限约束、1个热负荷削减变量上下限约束和1个弃风变量上下限约束;1个P2G装置容量约束、4个燃气发电机组容量约束、 2个燃气热电联产机组容量约束;10个天然气***节点气压约束、2 个气源注气量约束、3个压缩机压缩比约束;14个电力***节点电压约束、2个非燃气常规机组出力约束、13个线路功率约束。
模型中变量的不式约束上下限如下表所示:
表3不式约束上下限表
(5)综合负荷削减优化模型求解和***综合负荷削减量计算
完成以上步骤的工作之后,可以进行电-气互联***综合负荷削减优化模型的求解,本发明调用内点法求解器IPOPT对该优化模型进行求解。设置几组不同的风电场出力和不同电转气装置容量的场景,观察风电渗透率和电转气装置容量对电负荷削减量、气负荷削减量、热负荷削减量和弃风量的影响。
1)风电场出力对***综合负荷削减量的影响
在***火电机组装机不变的情况下,电转气装置容量为10MW时,设置8组不同风电场出力情况的场景,观察电负荷削减量、气负荷削减量、热负荷削减量和弃风量的变化情况,其结果如下表所示:
表4不同风电场出力下***负荷削减情况
由表2可知,随着风电场出力的增加,燃气机组与非燃气常规机组的出力减小,因此发电机组用气需求减小,***切气负荷量减小。其次,***在风电场出力较小时不出现弃风情况,当风电场出力超过某一阈值的时候,由于风电外送通道功率和电源调节能力有限,输电线路无法传送出更多的风电场出力,使得***弃风量逐渐增大。
2)电转气装置对***综合负荷削减量的影响
在风电场出力为180MW的情况下,设置7组不同P2G装置容量的场景,观察电负荷削减量、气负荷削减量、热负荷削减量和弃风量的变化情况,其结果如下表所示:
表5不同电转气装置容量下***负荷削减情况
从表3可知,P2G装置容量的提升对***弃风和切气负荷量有显著的积极影响,而对切电负荷和热负荷没有影响。
从实验结果可知:通过求解本发明提出的负荷削减模型,可在考虑P2G装置的电-气互联***中,计及***弃风现象的条件下,得到***的电负荷削减量、气负荷削减量、热负荷削减量以及***弃风量。该模型为电-气互联***可靠性评估打好模型基础。
综上所述,本发明提出的一种考虑风电弃用的电-气互联***综合负荷削减模型。首先,建立优化模型的目标函数,以电负荷、气负荷、热负荷削减量和弃风量之和最小作为目标函数;其次,考虑电负荷、气负荷、热负荷削减量和弃风量变量,基于电力***的节点有功、无功功率平衡方程和天然气***的节点流量平衡方程,以及P2G装置和燃气热电联产机组方程,建立优化模型的式约束;再次,考虑电- 气互联***中P2G装置和燃气机组的容量约束、电力***和天然气***中状态量的上下限,构建优化模型的不式约束;最后,调用内点法求解器IPOPT实现该模型的计算求解,并在不同风电场出力和不同电转气装置容量的场景下实现仿真分析。本发明很好的考虑P2G装置在***中的实际运行特性,通过仿真结果发现P2G装置对***综合负荷削减量以及弃风量均有一定影响。

Claims (2)

1.一种考虑风电弃用的电-气互联***综合负荷削减模型构建方法,其特征在于,包括以下步骤:
(1)建立综合负荷削减优化模型的目标函数
电-气互联***的综合负荷削减优化模型以所述电负荷、气负荷、热负荷削减量和弃风量之和最小为优化目标,其模型可表示为:
<mrow> <mtable> <mtr> <mtd> <mi>min</mi> </mtd> <mtd> <mrow> <mi>f</mi> <mo>=</mo> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>d</mi> </msub> </munderover> <msub> <mi>&amp;lambda;</mi> <mrow> <mi>e</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <msub> <mi>C</mi> <mrow> <mi>e</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>+</mo> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>m</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>g</mi> </msub> </munderover> <msub> <mi>&amp;lambda;</mi> <mrow> <mi>g</mi> <mo>,</mo> <mi>m</mi> </mrow> </msub> <msub> <mi>C</mi> <mrow> <mi>g</mi> <mo>,</mo> <mi>m</mi> </mrow> </msub> <mo>+</mo> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>k</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>b</mi> </msub> </munderover> <msub> <mi>&amp;lambda;</mi> <mrow> <mi>h</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <msub> <mi>C</mi> <mrow> <mi>h</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>w</mi> </msub> </munderover> <msub> <mi>&amp;lambda;</mi> <mrow> <mi>w</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>W</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
式中,Ce,i是电负荷节点i的负荷削减变量;Cg,m是气负荷节点m的负荷削减变量;Ch,k是燃气热电联产机组k的热负荷削减变量;ΔPW,i是风电场i的弃风变量;Nd是电负荷节点的总数,Ng是气负荷节点的总数,Nw是风电场的总数,Nb是燃气热电联产机组的总数;λe,i为表征各电负荷重要性的权重因子,λg,m为表征各气负荷重要性的权重因子,λh,k为表征各热负荷重要性的权重因子,λw,i为表征各风电场弃风严重性的权重因子。
(2)建立式约束
考虑电负荷削减变量Ce,i、气负荷削减变量Cg,m、热负荷削减变量Ch,k和弃风变量ΔPW,i,以及电转气装置的消耗电功率和注入气流变量,基于电力***中的节点有功平衡方程、无功功率平衡方程和天然气***中的节点流量平衡方程,以及燃气热电联产机组方程,建立如下式约束:
PG,i+PGAS,i+PCHP,i+PW,i+Ce,i-PP2G,i-ΔPW,i-PD,i-Pi=0,i=1,2,...,Ne (2)
QG,i+QGAS,i+QCHP,i+QC,i-QD,i+Ce,i(QD,i/PD,i)-Qi=0,i=1,2,...,Ne (3)
FG,m+FP2G,m+(Cg,m/GHV)-FGAS,m-FCHP,m-FD,m-Fm=0,m=1,2,...,Nm (4)
PCHP,k=(HCHP,k-Ch,k)/νCHP,k,k=1,2,...,Nb (5)
其中,式(2)是电力***节点有功平衡方程,式(3)是电力***节点无功平衡方程,式(4)是天然气***节点流量平衡方程,式(5)是燃气热电联产机组方程。式中,PG,i、QG,i分别为电力***节点i的非燃气常规机组的有功出力和无功出力;PGAS,i、QGAS,i分别为电力***节点i的燃气发电机组的有功出力和无功出力;PCHP,i、QCHP,i分别为电力***节点i的燃气热电联产机组的有功出力和无功出力;PD,i、QD,i分别为电力***节点i的有功负荷和无功负荷;Pi、Qi分别为电力***节点i的注入有功功率和无功功率;PW,i、ΔPW,i分别为电力***节点i的风电场的风电功率和弃风量;QC,i、PP2G,i分别为电力***节点i的无功电源功率和P2G装置消耗电功率;FGAS,m、FCHP,m分别为天然气***节点m的燃气发电机组的消耗气流和燃气热电联产机组的消耗气流;FP2G,m为天然气***节点m的P2G装置的注入气流;FG,m、FD,m分别为天然气***节点m的气源注入气流和节点气负荷;Fm为天然气***节点m的注入气流;GHV为天然气高热值;HCHP,k、vCHP,k分别为燃气热电联产机组k的热负荷、热电比。Ne是电力***节点的总数,Nm是天然气***节点的总数,Nb是燃气热点联产机组的总数。以下是式约束中各耦合元件模型以及节点注入功率、气流方程。
①P2G装置模型
P2G装置消耗电功率与注入气流之间的关系如下:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>F</mi> <mrow> <mi>P</mi> <mn>2</mn> <mi>G</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>=</mo> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>&amp;eta;</mi> <mrow> <mi>P</mi> <mn>2</mn> <mi>G</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <msub> <mi>P</mi> <mrow> <mi>P</mi> <mn>2</mn> <mi>G</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>/</mo> <mi>G</mi> <mi>H</mi> <mi>V</mi> <mo>,</mo> </mrow> </mtd> <mtd> <mrow> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>w</mi> </msub> </munderover> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>W</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>&gt;</mo> <mn>0</mn> <mo>,</mo> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mn>0</mn> <mo>,</mo> </mrow> </mtd> <mtd> <mrow> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>w</mi> </msub> </munderover> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>W</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>=</mo> <mn>0</mn> <mo>,</mo> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>6</mn> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>k</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mn>...</mn> <mo>,</mo> <msub> <mi>N</mi> <mi>c</mi> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced>
其中,PP2G,k、FP2G,k分别为P2G装置k的消耗电功率和注入气流,ηP2G,k为P2G装置k的转化效率;GHV为天然气高热值;ΔPW,i为风电场i的弃风量。Nw、Nc分别为风电场和P2G装置的总数。
②燃气机组模型
燃气机组的消耗气流与输出电功率之间满足如下方程:
FGAS,k=(αg,kg,kPGAS,kg,k(PGAS,k)2)/GHV,k=1,2,...,Na (7)
FCHP,k=PCHP,k/(ηCHP,kGHV),k=1,2,...,Nb (8)
其中,PGAS,k、FGAS,k分别为燃气发电机组k的有功出力和消耗气流;PCHP,k、FCHP,k分别为燃气热电联产机组k的有功出力和消耗气流。αg,k、βg,k、γg,k为燃气发电机组k的耗量系数;ηCHP,k为燃气热电联产机组k的转化效率。Na是燃气发电机组的总数。
③节点注入功率、气流方程
电力***节点i的注入有功功率Pi和注入无功功率Qi,以及天然气***节点m的注入气流Fm计算公式如下:
<mrow> <msub> <mi>P</mi> <mi>i</mi> </msub> <mo>=</mo> <msub> <mi>V</mi> <mi>i</mi> </msub> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>e</mi> </msub> </munderover> <msub> <mi>V</mi> <mi>j</mi> </msub> <mrow> <mo>(</mo> <msub> <mi>G</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>cos&amp;theta;</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>B</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>sin&amp;theta;</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>)</mo> </mrow> <mo>,</mo> <mi>i</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>e</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>9</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>Q</mi> <mi>i</mi> </msub> <mo>=</mo> <msub> <mi>V</mi> <mi>i</mi> </msub> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>e</mi> </msub> </munderover> <msub> <mi>V</mi> <mi>j</mi> </msub> <mrow> <mo>(</mo> <mrow> <msub> <mi>G</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>sin&amp;theta;</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>B</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>cos&amp;theta;</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> </mrow> <mo>)</mo> </mrow> <mo>,</mo> <mi>i</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mn>...</mn> <mo>,</mo> <msub> <mi>N</mi> <mi>e</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>10</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>F</mi> <mi>m</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>r</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mn>1</mn> </msub> </munderover> <msub> <mi>A</mi> <mrow> <mi>m</mi> <mi>r</mi> </mrow> </msub> <msub> <mi>L</mi> <mi>r</mi> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>q</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>p</mi> </msub> </munderover> <msub> <mi>E</mi> <mrow> <mi>m</mi> <mi>q</mi> </mrow> </msub> <msub> <mi>C</mi> <mi>q</mi> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>q</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>p</mi> </msub> </munderover> <msub> <mi>T</mi> <mrow> <mi>m</mi> <mi>q</mi> </mrow> </msub> <msub> <mi>&amp;tau;</mi> <mi>q</mi> </msub> <mo>,</mo> <mi>m</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>m</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>11</mn> <mo>)</mo> </mrow> </mrow>
式中,Vi和Vj分别是电力***节点i和j的电压幅值;Gij和Bij分别为Ne×Ne阶节点导纳矩阵Y中第i行第j列元素的实部和虚部;θij是电力***节点i与j的电压相角差;Amr是节点-管道关联矩阵A中第m行第r列元素;Emq是节点-压缩机关联矩阵E中第m行第q列元素;Tmq是节点-压缩机入口节点关联矩阵T中第m行第q列元素。Nl、Np分别为输气管道和压缩机支路的总数。Lr为流过天然气输气管道r(以下默认r为输气管道的序号)的流量,Cq为流过天然气压缩机支路q(以下默认q为压缩机支路的序号)的流量,τq为压缩机支路q消耗的流量,三者具体计算公式如下:
对于天然气***中输气管道r,稳态条件下管道流量Lr
<mrow> <msub> <mi>L</mi> <mi>r</mi> </msub> <mo>=</mo> <msub> <mi>K</mi> <mi>r</mi> </msub> <msub> <mi>s</mi> <mrow> <mi>m</mi> <mi>n</mi> </mrow> </msub> <msqrt> <mrow> <msub> <mi>s</mi> <mrow> <mi>m</mi> <mi>n</mi> </mrow> </msub> <mrow> <mo>(</mo> <msubsup> <mi>&amp;pi;</mi> <mi>m</mi> <mn>2</mn> </msubsup> <mo>-</mo> <msubsup> <mi>&amp;pi;</mi> <mi>n</mi> <mn>2</mn> </msubsup> <mo>)</mo> </mrow> </mrow> </msqrt> <mo>,</mo> <mi>r</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mn>1</mn> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>12</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>s</mi> <mrow> <mi>m</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <mo>+</mo> <mn>1</mn> <mo>,</mo> <msub> <mi>&amp;pi;</mi> <mi>m</mi> </msub> <mo>-</mo> <msub> <mi>&amp;pi;</mi> <mi>n</mi> </msub> <mo>&amp;GreaterEqual;</mo> <mn>0</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>-</mo> <mn>1</mn> <mo>,</mo> <msub> <mi>&amp;pi;</mi> <mi>m</mi> </msub> <mo>-</mo> <msub> <mi>&amp;pi;</mi> <mi>n</mi> </msub> <mo>&lt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>13</mn> <mo>)</mo> </mrow> </mrow>
式中,m和n分别为输气管道的首端节点和末端节点;πm、πn分别为节点m和n的气压;Kr为输气管道r的管道系数;smn表征气体流动方向。
加压站燃气压缩机消耗的流量τq计算公式如下:
<mrow> <msub> <mi>&amp;tau;</mi> <mi>q</mi> </msub> <mo>=</mo> <msub> <mi>&amp;alpha;</mi> <mrow> <mi>c</mi> <mo>,</mo> <mi>q</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>&amp;beta;</mi> <mrow> <mi>c</mi> <mo>,</mo> <mi>q</mi> </mrow> </msub> <msub> <mi>H</mi> <mi>q</mi> </msub> <mo>+</mo> <msub> <mi>&amp;gamma;</mi> <mrow> <mi>c</mi> <mo>,</mo> <mi>q</mi> </mrow> </msub> <msubsup> <mi>H</mi> <mi>q</mi> <mn>2</mn> </msubsup> <mo>,</mo> <mi>q</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>p</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>14</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>H</mi> <mi>q</mi> </msub> <mo>=</mo> <msub> <mi>B</mi> <mi>q</mi> </msub> <msub> <mi>C</mi> <mi>q</mi> </msub> <mo>&amp;lsqb;</mo> <msup> <mrow> <mo>(</mo> <mfrac> <msub> <mi>&amp;pi;</mi> <mi>n</mi> </msub> <msub> <mi>&amp;pi;</mi> <mi>m</mi> </msub> </mfrac> <mo>)</mo> </mrow> <mrow> <msub> <mi>Z</mi> <mi>q</mi> </msub> <mrow> <mo>(</mo> <mi>&amp;alpha;</mi> <mo>-</mo> <mn>1</mn> <mo>/</mo> <mi>&amp;alpha;</mi> <mo>)</mo> </mrow> </mrow> </msup> <mo>-</mo> <mn>1</mn> <mo>&amp;rsqb;</mo> <mo>,</mo> <mi>q</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>p</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>15</mn> <mo>)</mo> </mrow> </mrow>
式中,m和n分别为压缩机支路的进口节点和出口节点;Hq为压缩机支路q消耗的电功率;Cq为流过压缩机支路q的流量;Bq为压缩机支路q的压缩机系数;Zq为压缩机支路q的进口气体压缩因子;α为绝热系数;αc,q、βc,q、γc,q为压缩机q的耗量系数。
(3)建立不式约束
电-气互联***的综合负荷削减优化模型的不式约束包括:式(16)-(19)的电负荷、气负荷、热负荷削减变量和弃风变量的上下限约束;式(20)-(24)的电转气装置和燃气机组的容量约束;式(25)-(27)的天然气***节点气压约束、气源注气量约束、压缩机压缩比约束;式(28)-(31)的电力***节点电压约束、非燃气常规机组出力约束、线路功率约束。
0≤Ce,i≤PD,i,i=1,2,...,Nd (16)
0≤Cg,m/GHV≤FD,m,m=1,2,...,Ng (17)
0≤Ch,k≤HCHP,k,k=1,2,...,Nb (18)
0≤ΔPW,i≤PW,i,i=1,2,...,Nw (19)
<mrow> <msubsup> <mi>P</mi> <mrow> <mi>P</mi> <mn>2</mn> <mi>G</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>P</mi> <mrow> <mi>P</mi> <mn>2</mn> <mi>G</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>P</mi> <mrow> <mi>P</mi> <mn>2</mn> <mi>G</mi> <mo>,</mo> <mi>k</mi> </mrow> <mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> </mrow> </msubsup> <mo>,</mo> <mi>k</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>c</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>20</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msubsup> <mi>P</mi> <mrow> <mi>G</mi> <mi>A</mi> <mi>S</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>P</mi> <mrow> <mi>G</mi> <mi>A</mi> <mi>S</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>P</mi> <mrow> <mi>G</mi> <mi>A</mi> <mi>S</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>max</mi> </msubsup> <mo>,</mo> <mi>k</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>a</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>21</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msubsup> <mi>Q</mi> <mrow> <mi>G</mi> <mi>A</mi> <mi>S</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>Q</mi> <mrow> <mi>G</mi> <mi>A</mi> <mi>S</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>Q</mi> <mrow> <mi>G</mi> <mi>A</mi> <mi>S</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>max</mi> </msubsup> <mo>,</mo> <mi>k</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>a</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>22</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msubsup> <mi>P</mi> <mrow> <mi>C</mi> <mi>H</mi> <mi>P</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>P</mi> <mrow> <mi>C</mi> <mi>H</mi> <mi>P</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>P</mi> <mrow> <mi>C</mi> <mi>H</mi> <mi>P</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>max</mi> </msubsup> <mo>,</mo> <mi>k</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>b</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>23</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msubsup> <mi>Q</mi> <mrow> <mi>C</mi> <mi>H</mi> <mi>P</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>Q</mi> <mrow> <mi>C</mi> <mi>H</mi> <mi>P</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>Q</mi> <mrow> <mi>C</mi> <mi>H</mi> <mi>P</mi> <mo>,</mo> <mi>k</mi> </mrow> <mi>max</mi> </msubsup> <mo>,</mo> <mi>k</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>b</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>24</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msubsup> <mi>&amp;pi;</mi> <mi>m</mi> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>&amp;pi;</mi> <mi>m</mi> </msub> <mo>&amp;le;</mo> <msubsup> <mi>&amp;pi;</mi> <mi>m</mi> <mi>max</mi> </msubsup> <mo>,</mo> <mi>m</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>m</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>25</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msubsup> <mi>F</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>m</mi> </mrow> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>F</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>m</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>F</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>m</mi> </mrow> <mi>max</mi> </msubsup> <mo>,</mo> <mi>m</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>s</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>26</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msubsup> <mi>R</mi> <mi>q</mi> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>R</mi> <mi>q</mi> </msub> <mo>&amp;le;</mo> <msubsup> <mi>R</mi> <mi>q</mi> <mi>max</mi> </msubsup> <mo>,</mo> <mi>q</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>p</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>27</mn> <mo>)</mo> </mrow> </mrow>
Vi min≤Vi≤Vi max,i=1,2,...,Ne (28)
<mrow> <msubsup> <mi>P</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>i</mi> </mrow> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>P</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>P</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>i</mi> </mrow> <mi>max</mi> </msubsup> <mo>,</mo> <mi>i</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>u</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>29</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msubsup> <mi>Q</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>i</mi> </mrow> <mi>min</mi> </msubsup> <mo>&amp;le;</mo> <msub> <mi>Q</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>Q</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>i</mi> </mrow> <mi>max</mi> </msubsup> <mo>,</mo> <mi>i</mi> <mo>=</mo> <mn>1</mn> <mo>,</mo> <mn>2</mn> <mo>,</mo> <mo>...</mo> <mo>,</mo> <msub> <mi>N</mi> <mi>u</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>30</mn> <mo>)</mo> </mrow> </mrow>
-Tl min≤Tl≤Tl max,l=1,2,...,Nr (31)
式中,Tl是输电线路l流过的功率;Rq是压缩机支路q的压缩比;和PminP2G分别为P2G装置消耗电功率的上限和下限;和PminGAS分别为燃气发电机组有功出力的上限和下限;和QminGAS分别为燃气发电机组无功出力的上限和下限;和PminCHP分别为燃气热点联产机组有功出力的上限和下限;和QminCHP分别为燃气热点联产机组无功出力的上限和下限;分别为天然气节点气压的上限和下限;和FminG,m分别为天然气气源注入量的上限和下限;和Rminq分别为压缩机压缩比的上限和下限;和Vmini分别为节点电压幅值的上限和下限;和PminG,i分别为非燃气常规发电机组有功出力的上限和下限;和QminG,i为非燃气常规发电机组无功出力的上限和下限;和Tminl为输电线路传输功率的上限和下限。Nr是输电线路的总数,Nu是非燃气常规机组的总数,Ns是天然气气源的总数。
2.根据权利要求1所述的方法,其特征在于:综合负荷削减优化模型求解和***综合负荷削减量计算如下:
采用内点法对其进行求解,调用内点法求解器IPOPT求解该优化模型。
最后根据优化模型结果计算***的综合负荷削减量,***的电负荷削减量、气负荷削减量、热负荷削减量和弃风量的计算公式如下:
<mrow> <msub> <mi>C</mi> <mi>e</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>d</mi> </msub> </munderover> <msub> <mi>C</mi> <mrow> <mi>e</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>32</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>C</mi> <mi>g</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>m</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>g</mi> </msub> </munderover> <msub> <mi>C</mi> <mrow> <mi>g</mi> <mo>,</mo> <mi>m</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>33</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>C</mi> <mi>h</mi> </msub> <mo>=</mo> <munderover> <mi>&amp;Sigma;</mi> <mrow> <mi>k</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>b</mi> </msub> </munderover> <msub> <mi>C</mi> <mrow> <mi>h</mi> <mo>,</mo> <mi>k</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>34</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>&amp;Delta;P</mi> <mi>W</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>w</mi> </msub> </munderover> <msub> <mi>&amp;Delta;P</mi> <mrow> <mi>W</mi> <mo>,</mo> <mi>i</mi> </mrow> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>35</mn> <mo>)</mo> </mrow> </mrow>
式中,Ce为***的电负荷削减量,Cg为***的气负荷削减量,Ch为***的热负荷削减量,ΔPW为***的弃风量。
CN201710349563.5A 2017-05-17 2017-05-17 一种考虑风电弃用的电-气互联***综合负荷削减模型构建方法 Expired - Fee Related CN107257132B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710349563.5A CN107257132B (zh) 2017-05-17 2017-05-17 一种考虑风电弃用的电-气互联***综合负荷削减模型构建方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710349563.5A CN107257132B (zh) 2017-05-17 2017-05-17 一种考虑风电弃用的电-气互联***综合负荷削减模型构建方法

Publications (2)

Publication Number Publication Date
CN107257132A true CN107257132A (zh) 2017-10-17
CN107257132B CN107257132B (zh) 2020-04-21

Family

ID=60027255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710349563.5A Expired - Fee Related CN107257132B (zh) 2017-05-17 2017-05-17 一种考虑风电弃用的电-气互联***综合负荷削减模型构建方法

Country Status (1)

Country Link
CN (1) CN107257132B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108964041A (zh) * 2018-07-23 2018-12-07 燕山大学 一种电-互联综合能源***最大负荷供应能力的控制方法
CN109325679A (zh) * 2018-09-11 2019-02-12 浙江大学 考虑综合需求响应的综合能源***线性化随机调度方法
CN109409705A (zh) * 2018-10-11 2019-03-01 河海大学 一种区域综合能源***的多目标优化调度方法
CN109524959A (zh) * 2018-11-22 2019-03-26 重庆大学 一种计及天然气网故障的发输电***充裕性评估方法
CN109685397A (zh) * 2019-01-31 2019-04-26 武汉理工大学 一种计及直接负荷控制下电气耦合***可靠性评估方法
EP3582359A4 (en) * 2018-04-20 2020-02-12 Northeastern University STABILITY EVALUATION AND STATIC CONTROL METHOD FOR AN INTEGRATED ELECTRICITY-HEAT-GAS-ENERGY SYSTEM
CN112529251A (zh) * 2020-11-16 2021-03-19 广西大学 一种天然气发电机组选址定容优化规划方法及***

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473446A (zh) * 2013-08-29 2013-12-25 国家电网公司 用于有源配电网可靠性评估的负荷削减模型及其实现方法
CN105320796A (zh) * 2014-08-04 2016-02-10 国家电网公司 一种建立电力***负荷模型的方法及其控制***模型
CN106096777A (zh) * 2016-06-12 2016-11-09 清华大学 一种电‑气耦合多能流***的优化调度方法
CN106208157A (zh) * 2016-07-19 2016-12-07 河海大学 基于电转气的电‑气互联综合能源***削峰填谷方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473446A (zh) * 2013-08-29 2013-12-25 国家电网公司 用于有源配电网可靠性评估的负荷削减模型及其实现方法
CN105320796A (zh) * 2014-08-04 2016-02-10 国家电网公司 一种建立电力***负荷模型的方法及其控制***模型
CN106096777A (zh) * 2016-06-12 2016-11-09 清华大学 一种电‑气耦合多能流***的优化调度方法
CN106208157A (zh) * 2016-07-19 2016-12-07 河海大学 基于电转气的电‑气互联综合能源***削峰填谷方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3582359A4 (en) * 2018-04-20 2020-02-12 Northeastern University STABILITY EVALUATION AND STATIC CONTROL METHOD FOR AN INTEGRATED ELECTRICITY-HEAT-GAS-ENERGY SYSTEM
CN108964041A (zh) * 2018-07-23 2018-12-07 燕山大学 一种电-互联综合能源***最大负荷供应能力的控制方法
CN109325679A (zh) * 2018-09-11 2019-02-12 浙江大学 考虑综合需求响应的综合能源***线性化随机调度方法
CN109325679B (zh) * 2018-09-11 2022-04-05 浙江大学 考虑综合需求响应的综合能源***线性化随机调度方法
CN109409705A (zh) * 2018-10-11 2019-03-01 河海大学 一种区域综合能源***的多目标优化调度方法
CN109409705B (zh) * 2018-10-11 2021-11-23 河海大学 一种区域综合能源***的多目标优化调度方法
CN109524959A (zh) * 2018-11-22 2019-03-26 重庆大学 一种计及天然气网故障的发输电***充裕性评估方法
CN109524959B (zh) * 2018-11-22 2022-03-25 重庆大学 一种计及天然气网故障的发输电***充裕性评估方法
CN109685397A (zh) * 2019-01-31 2019-04-26 武汉理工大学 一种计及直接负荷控制下电气耦合***可靠性评估方法
CN112529251A (zh) * 2020-11-16 2021-03-19 广西大学 一种天然气发电机组选址定容优化规划方法及***

Also Published As

Publication number Publication date
CN107257132B (zh) 2020-04-21

Similar Documents

Publication Publication Date Title
CN107257132A (zh) 一种考虑风电弃用的电‑气互联***综合负荷削减模型构建方法
CN106208157B (zh) 基于电转气的电-气互联综合能源***削峰填谷方法
CN109524957B (zh) 考虑碳交易机制和柔性负荷的综合能源***优化调度方法
CN107194055B (zh) 考虑电转气装置的电-气互联***可靠性建模及其评估方法
CN104734155B (zh) 一种获取电‑气互联能源***可用输电能力的方法
CN104734147B (zh) 一种综合能源***概率能量流分析方法
CN105046369B (zh) 一种基于能源中心的电气混联***建模和优化调度方法
CN107808216B (zh) 电-气-热互联***弃风弃光和电气热负荷削减综合最小优化模型构建方法
CN106096269B (zh) 一种电-气耦合***中天然气网的区间潮流计算方法
CN103699941B (zh) 一种电力***调度运行年方案的制定方法
CN108846507A (zh) 基于混合整数二阶锥规划的电-气耦合***日前经济调度方法
CN107730129A (zh) 考虑光热热电联产与电锅炉的电‑气‑热互联***风险评估方法
CN110866627A (zh) 一种考虑阶梯气价的多区域电-气耦合综合能源***优化调度方法
CN109245183A (zh) 一种基于负荷控制的高风光渗透率地区电网调峰方法
CN104092241B (zh) 一种考虑备用需求的风电消纳能力分析方法
CN104573875B (zh) 一种低碳化的电源电网优化规划的方法
CN105958496B (zh) 基于连续潮流的含vsc***最大输电能力计算方法
CN105305419A (zh) 一种含有压缩空气储能的独立微网容量优化配置方法
CN105005940A (zh) 计及相关性的电-气互联***概率最优潮流计算方法
CN106447152A (zh) 基于能源中心的电‑气‑热***协同调度方法和***
CN113554296A (zh) 园区综合能源***规划的多指标评价方法
CN109523076A (zh) 一种储能参与下的综合能源***日前稳态优化分析方法
CN107947245A (zh) 考虑天然气***约束的等值最优潮流模型构建方法
CN107394828A (zh) 一种基于概率潮流的电气互联综合能源***优化运行分析方法
CN110707755A (zh) 一种考虑非理想通信条件下基于能量枢纽的综合能源***超短期调度方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421