CN107246273A - Deep tunnel wire rope net rubber concrete spraying support structure and its construction method - Google Patents

Deep tunnel wire rope net rubber concrete spraying support structure and its construction method Download PDF

Info

Publication number
CN107246273A
CN107246273A CN201710635220.5A CN201710635220A CN107246273A CN 107246273 A CN107246273 A CN 107246273A CN 201710635220 A CN201710635220 A CN 201710635220A CN 107246273 A CN107246273 A CN 107246273A
Authority
CN
China
Prior art keywords
anchor
tunnel
deep
rubber concrete
rubber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710635220.5A
Other languages
Chinese (zh)
Other versions
CN107246273B (en
Inventor
翟新献
涂兴子
李如波
翟俨伟
黄广帅
李明远
张凤琴
肖同强
张海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201710635220.5A priority Critical patent/CN107246273B/en
Publication of CN107246273A publication Critical patent/CN107246273A/en
Application granted granted Critical
Publication of CN107246273B publication Critical patent/CN107246273B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Deep tunnel wire rope net rubber concrete spraying support structure, including be arranged in the twice pressure relief groove of roadway floor both sides and be injected in the wire rope net rubber concrete spray-up on roadway surrounding rock surface;Wire rope net rubber concrete spray-up includes the first rubber concrete layer and the second rubber concrete layer for being injected in deep laneway surrounding rock surface successively, and the first rubber concrete layer and the second rubber concrete layer are made by rubber grain by incorporation concrete;In summary, the present invention proposes a kind of anchor pole, wire rope net, rubber gunite concrete, and the construction method of the Deep Soft Rock Tunnel of wall rock grouting, the construction method is for the Deep Soft Rock Tunnel particularly length of service longer stone head and important chamber, to improve the self-supporting tendency and bolting with wire mesh performance of Deep Soft Rock Tunnel country rock, mitigate the labor intensity of workman, reduction roadway support and maintenance cost etc. bring good economic benefit and social benefit, and can further specification Deep Soft Rock Tunnel construction technology.

Description

Deep tunnel wire rope net rubber concrete spraying support structure and its construction method
Technical field
The invention belongs to colliery tunnel support technical field, and in particular to a kind of deep tunnel wire rope net rubber injection is mixed Solidifying soil supporting construction and its construction method.
Background technology
The China's coal-mine overwhelming majority is underground mine, needs to tunnel substantial amounts of stone head every year.As coal mining is deep The continuous deepening of degree, stone head country rock is gradated as deep soft rock.Because Deep Soft Rock Tunnel surrouding rock stress is high, country rock rock Property poor, intensity bottom, rock deformation is big, roadway's sides and crush, bottom plate distension rises, roadway deformation destruction is serious, or even goes out Now it is repeated several times and overhauls phenomenon.
After deep laneway surrounding rock rough section is excavated, concrete spraying support is implemented to newly exposed country rock first, utilized Concrete spray coating is reinforced and enclosing tunnel country rock.Gunite concrete is by the cement, sand, stone of certain match ratio, and speed The mix of solidifying agent, using compressed air as power, using concrete sprayer, is pipelined at lance outlet, with water After mixing, rock wall is ejected into higher speed layering and a kind of concrete formed after hardening is condensed.It is this traditional Concrete spraying support has filling fracture, the effect filled up depression, reinforce rock stratum, has become colliery Deep Soft Rock Tunnel Basic supporting.Conventional spray concrete is the main material of tunnel basic supporting.After current Deep Soft Rock Tunnel is excavated, first Anchor pole, close plating net, gunite concrete closing country rock are beaten country rock, grouting and reinforcing finally is implemented to country rock.Current deep soft rock Tunnel original design section is increasing, and supporting intensity is gradually stepped up, supporting expense also more and more higher.Using the totally-enclosed of routine U-shaped steel Yieldable steel support, high strength anchor bar(Sometimes anchor cable), wire netting(Sometimes bar-mat reinforcement)The anchor constituted with gunite concrete Net spray supporting, and the anchor pole wire netting wall rock grouting combined supporting abbreviation anchor net of wall rock grouting composition note combined supporting, sometimes Also it is difficult to ensure that the steady in a long-term of Deep Soft Rock Tunnel country rock, it is difficult to the need for meeting Safety of Coal Mine Production.Current deep soft rock Subject matter present in alley way anchor net note combined supporting:
(1)The gunite concrete overwhelming majority is common gunite concrete, common gunite concrete in existing anchor net note combined supporting It is that, by the mix of the cement, sand, stone of certain match ratio, and accelerator, cement, thick middle husky, the weight ratio of stone are 1:2:2, the wherein ratio of mud 0.4 ~ 0.5.Common gunite concrete has compression strength high, and tensile strength is low, the features such as fragility is big. When deflection is more than 50~100mm, there is crack, crushes, loosens and come off in the concrete spray coating that anchor net is noted in combined supporting Deformation failure phenomenon, concrete spraying support failure.After concrete spray coating is cracking loosely, easily concrete is caused to spray Layer interior metal net or bar-mat reinforcement corrosion cause concrete deterioration, and this is the main cause for causing anchor net to note supporting failure damage. Therefore existing common concrete spraying support has been difficult in adapt to the engineering of the large deformation of Deep Soft Rock Tunnel country rock and long-term rheology Geological conditions.
Compared with common gunite concrete, the steel fibrous shotcrete used sometimes, its tension, shearing resistance and bending strength Mechanical property has different degrees of raising, while adding the toughness properties of gunite concrete, changes Brittleness of Concrete and breaks Bad feature, rich in certain ductility while making it have higher-strength.But steel fibre and coagulation in steel fibrous shotcrete Soil matrix body bears external loads jointly, and the development of the presence of steel fibre to concrete tension fracture serves inhibition, but mixed Solidifying soil matrix body is the main undertaker of external force.Concrete microcrack can drastically be expanded in the presence of external force, but steel fibre is mixed Inhibition is played in solidifying native the ftracture bending resistance for remaining to keep higher later, shearing strength, the development to concrete tension fracture.But Steel fiber reinforced concrete remains as fragile material, is carried out in the deep weak surrounding rock, Swelling Rock that surrouding rock deformation is big, self-stability is poor When anchor net notes combined supporting, the application of steel fibrous shotcrete supporting is restricted.
(2)Existing anchor net notes the wire netting of supporting(Bar-mat reinforcement)It is difficult to closely connected with roadway surrounding rock, and wire netting mesh is less than normal, Concrete spray coating and roadway surrounding rock leakiness even absciss layer, the reduction of deep soft rock bolting with wire mesh performance.By wire netting barrier effect, Rebound of shotcrete rate is high, spray-up density is poor, or even cavity and ravel area occurs.Colliery anchor net notes the metal of combined supporting Net(Bar-mat reinforcement)Generally weave/be welded using mild steel wire, wire netting routine specification length is a width of:1×2m、2×4m、1× 3m, 2.0 ~ 6.5mm of steel wire diameter, mesh are generally 100 × 100mm, 120 × 120mm square holes.Tunnel is new sudden and violent after excavating The country rock section of dew is generally uneven, after using anchor pole, wire netting is hung up, and wire netting hinders the sunk area in country rock face Gear.When spray that pressure is smaller or jet length farther out when, gunite concrete is likely to accumulate in the outside of wire netting, in wire netting Inner face forms cavity or ravel area.When country rock is aqueous abundant, wire netting easily occurs corrosion and loses wall supporting performance.Work as injection Pressure is larger or during nearer jet length, by the small barrier effect of metal mesh opening, causes a large amount of resiliences of gunite concrete.
(3)Existing wall rock grouting anchor pole is general to be processed by common zinc-plated seamless steel pipe, and grouted anchor bar does not have pretension Power and anchor force, only play a part of grouting and reinforcing to country rock, do not have anchor rod anchored performance, are actually slip casting steel Pipe.
The content of the invention
The present invention in order to solve weak point of the prior art there is provided a kind of anchor net note supporting performance it is good, steady in a long-term, Support cost low deep tunnel wire rope net rubber concrete spraying support structure and its construction method.
In order to solve the above technical problems, the present invention is adopted the following technical scheme that:The injection of deep tunnel wire rope net rubber is mixed Solidifying soil supporting construction, including the twice pressure relief groove for being arranged in roadway floor both sides and the wire rope net for being injected in roadway surrounding rock surface Rubber concrete spray-up;Wire rope net rubber concrete spray-up includes the first rubber for being injected in deep laneway surrounding rock surface successively Concrete layer and the second rubber concrete layer, the first rubber concrete layer and the second rubber concrete layer by rubber grain by Incorporation concrete is made, using the length direction in tunnel as its axial direction, using the peripheral direction in tunnel as its ring direction, to hang down The straight direction in roadway surrounding rock surface is that some row's anchor metals layer is provided with its radial direction, the rock stratum in tunnel-surrounding deep, Some row's anchor metal layers are arranged side by side along the axial direction in tunnel, often arrange the ring that anchor metal layer includes some along tunnel The anchor metal that direction is evenly arranged, radial direction of the every anchor metal along tunnel is set, and the anchor tail end of anchor metal passes through Nut is fixed with is laminated the pallet being tight compact with the first rubber concrete;Side by side between the anchor tail end of two adjacent anchor metals Connected by main rope, king wire netting is formed between all main ropes, side by side between two adjacent main ropes Connected by secondary steel wire rope, secondary wire rope net is formed between all secondary steel wire ropes;
Twice pressure relief groove is symmetricly set on the left and right sides of roadway floor.
The thickness of first rubber concrete layer is 80mm, and the thickness of the second rubber concrete layer is 120mm.
Spacing between the anchor tail end of two adjacent anchor metals is 700mm, and anchor metal is screw-thread steel, screw-thread steel A diameter of 22mm, the length of screw-thread steel is 2400mm.
The cross sectional shape of pressure relief groove is rectangle, and the width of the square-section of pressure relief groove is 800mm, and depth is 2000mm.
The construction method of deep tunnel wire rope net rubber concrete spraying support structure, comprises the following steps:
(1)Roadway construction is carried out into lane using photoface exploision method, the rough section of Deep Soft Rock Tunnel is formed;
(2)Prepare rubber concrete:Junked tire is made to 0.9 ~ 2.0mm of diameter rubber grain, then by rubber grain Mix in concrete admixture, as rubber concrete admixture;
(3)First injection rubber concrete is carried out to roadway surrounding rock, the first rubber concrete layer, the first rubber concrete layer is formed Thickness be 80mm;
(4)Along the axial direction in tunnel construct successively anchor metal layer:Bolthole is beaten along the radial direction in tunnel, then by resin Anchor Agent is put into anchor pole aperture, and anchor metal and the Anchor Agent of front end are together sent into bolthole bottom using jumbolter and revolved Turn, the body of rod of anchor metal is anchored using resin anchoring agent, the anchor tail end of anchor metal is installed by pallet and is pressed on first On rubber concrete layer;
(5)The anchor tail end of two adjacent side by side anchor metals is connected by main rope, will side by side by secondary steel wire rope Adjacent two main ropes connection, circumferential direction of the which part pair steel wire rope along tunnel is set, and the secondary steel wire rope in part is along lane The axial direction in road is set;
(6)The second rubber concrete layer is sprayed in the outer surface of the first rubber concrete layer, wherein the second rubber concrete layer Thickness is 120mm;
(7)Dig out twice pressure relief groove:Along the axial direction in tunnel, using pneumatic pick one is dug out respectively in the bottom plate left and right sides in tunnel The pressure relief groove of bar strip, pressure relief groove is using the boundary line of the lateral wall of tunnel one as line of symmetry, and the cross section of pressure relief groove is rectangle, wherein The depth of the rectangular cross section of pressure relief groove is 2000mm, and width is 800mm;
(8)After pressure relief groove is excavated, roadway surrounding rock deforms, after country rock release in 10-15 days, utilizes common injection coagulation Soil carries out Concrete Filled to twice pressure relief groove;
(9)After roadway floor release, grouting and reinforcing is carried out to roadway surrounding rock and bottom plate using hollow grouted anchor bar.
Step(9)In, it is to the grouting method of roadway surrounding rock using grouted anchor bar:
a)Shallow injected hole is beaten along the radial direction of roadway surrounding rock, the hole depth of shallow injected hole is 2000 ~ 2500mm, adjacent side by side The spacing of two shallow injected holes is 1500mm, and shallow grouted anchor bar is inserted in shallow injected hole, and shallow grouted anchor bar is hollow structure, A diameter of 22mm of shallow grouted anchor bar, length is 1800mm, and shallow-layer country rock note is carried out to shallow injected hole by shallow grouted anchor bar Slurry;
b)Deep injected hole is beaten along the radial direction of roadway surrounding rock, the hole depth of deep injected hole is 2500 ~ 3500mm, adjacent side by side The spacing of two deep injected holes is 1500mm, and deep grouted anchor bar is inserted in deep injected hole, and deep grouted anchor bar is hollow structure, A diameter of 22mm of deep grouted anchor bar, length is 2200mm, and deep-level country rock note is carried out to deep injected hole by deep grouted anchor bar Slurry.
Above-mentioned technical proposal is used, the invention has the advantages that:
(1)Between colliery is scrapped between pit rope after non-oil ultra high vacuum system and working process, for replacing traditional anchor net branch Wire netting in shield(Bar-mat reinforcement).After the concrete spraying support of tunnel, wire rope net and gunite concrete constitute steel wire rope Net gunite concrete, the overall performance of gunite concrete is improved.
After the pit rope scrapped is handled through non-oil ultra high vacuum system, cut is carried out according to certain length, afterwards to whole steel wire Rope is split according to single, double stock.Steel wire rope is axially laid along tunnel with ring, array pitch and spacing respectively for 200 ~ 800mm not Deng;Wire rope net is the graticules worked out by the single, double strand steel wire rope along tunnel axial direction, ring direction arrangement.Wherein 8 ~ 20mm of the diameter phi that is connected with anchor pole steel wire rope is referred to as main rope, is generally made up of twin cable.Not directly with anchor pole phase Connection, the steel wire rope for playing wall supporting effect is referred to as secondary rope, and pair rope is made up of single-strand rope.Steel wire rope host restricts through anchor pole bar Body, and anchor rod pallet board compacting.The lap of splice between major-minor rope cannot be less than 400mm;Tunnel axial direction major-minor rope length degree is not small In 10m, tunnel ring direction major-minor rope length degree is that drift section girth subtracts roadway floor width.
(2)Appropriate rubber grain is mixed in common gunite concrete, the compression strength and bullet of gunite concrete is reduced Property modulus, increase ultimate deformation amount, common gunite concrete is modified as flexible gunite concrete, to adapt to Deep Soft Rock Tunnel The requirement of large deformation.
Common gunite concrete be by the mix of the cement, sand, stone of certain match ratio, and accelerator, cement, The weight ratio of husky, stone is 1 in thick:2:2, the wherein ratio of mud 0.4 ~ 0.5.Common gunite concrete has compression strength high, resists Tensile strength is low, the features such as fragility is big.
Junked tire is made to 0.9 ~ 2.0mm of diameter rubber grain(Powder), then with suitable volume(About 150kg/ m3)Add in normal concrete, as rubberized concrete, with relatively low modulus of elasticity and larger ultimate tensile strength, Therefore rubber concrete belongs to flexible concrete, the larger deformation of roadway surrounding rock is adapted to without ftractureing, so rubber coagulation Soil will have broad application prospects in China's deep tunnel bolt-mesh-spurting supporting;
The present invention has relatively low modulus of elasticity and larger ultimate tensile strength amount using rubber concrete, can adapt to larger change Shape is without ftractureing.So existing normal concrete is modified as into flexible concrete, colliery Deep Soft Rock Tunnel is applied to In anchor net note combined supporting, not only cost-effective but also realization environmental protection, it is possible to achieve the green tunneling construction of Deep Soft Rock Tunnel.
(3)The present invention replaces existing slip casting steel pipe using ordinary hollow grouted anchor bar, and in-site installation is convenient, realizes pressure Slip casting;The body of rod property placed in the middle of the grouted anchor bar is good, realize and wrap up body of rod total length after total length slip casting, it is to avoid body of rod corrosion Possibility, reaches the purpose of long-term anchoring support.Noted during wall rock grouting using ordinary hollow grouted anchor bar instead of existing country rock Steel pipe is starched, the double action with slip casting steel pipe and Bolt further improves the anchoring property of anchor pole.
Ordinary hollow grouted anchor bar mainly has hollow bolt body, stop grouting plug, backing plate, nut and anchor head(Drill bit)Composition, can To realize wall rock grouting and anchor rod anchored integration.Roadway surrounding rock is noted(Pressure)The body of rod, grouting pressure can not only be anchored after slurries Around one timing fraction slurries infiltration anchor hole in crack, play a part of reinforcing country rock.
In summary, for Deep Soft Rock Tunnel surrouding rock stress height, Surrounding Rock Strength bottom, rock deformation be big, supporting expense High Deep Soft Rock Tunnel support technology problem, from improvement roadway surrounding rock stress state, raising rock encloses rock mass strength and change is enclosed The angle of rock mass physical mechanical property is set out, and the present invention proposes a kind of anchor pole, wire rope net, rubber gunite concrete, and The construction method of the Deep Soft Rock Tunnel of wall rock grouting, the construction method is longer for the Deep Soft Rock Tunnel particularly length of service Stone head and important chamber, for improve Deep Soft Rock Tunnel country rock self-supporting tendency and bolting with wire mesh performance, mitigate workman Labor intensity, reduction roadway support and maintenance cost etc. brings good economic benefit and social benefit, and can be further The construction technology of specification Deep Soft Rock Tunnel.
Brief description of the drawings
Fig. 1 is that the present invention is located at supporting section structure schematic diagram in Deep Soft Rock Tunnel;
Fig. 2 is the mounting structure schematic diagram of anchor metal in the present invention;
Fig. 3 is the structure section figure of king wire netting and secondary wire rope net in the first rubber concrete layer in the present invention;
Fig. 4 is grouting and reinforcing Deep Soft Rock Tunnel supporting sectional drawing in the present invention.
Embodiment
As Figure 1-4, deep tunnel wire rope net rubber concrete spraying support structure of the invention, including be arranged in The twice pressure relief groove 2 of the both sides of roadway floor 1 and the wire rope net rubber concrete spray-up for being injected in roadway surrounding rock surface;Steel wire rope The the first rubber concrete layer 3 and the second rubber that net rubber concrete spray-up includes being injected in deep laneway surrounding rock surface successively are mixed Solidifying soil layer 4, the first rubber concrete layer 3 and the second rubber concrete layer 4 are made by rubber grain by incorporation concrete, with The length direction in tunnel is its axial direction, using the peripheral direction in tunnel as its ring direction, with perpendicular to roadway surrounding rock surface Direction be its radial direction, provided with some row's anchor metals layer in the rock stratum in tunnel-surrounding deep, some row's anchor metals layer It is arranged side by side along the axial direction in tunnel, often arranging anchor metal layer includes some gold being evenly arranged along the ring direction in tunnel Belong to anchor pole 5, radial direction of the every anchor metal 5 along tunnel is set, the anchor tail end of anchor metal 5 is fixed with and the by nut One rubber concrete layer 3 compresses the pallet 6 of compacting, and the rubber concrete of pallet 6 and first layer 3 compresses compacting;Side by side adjacent two Connected between the anchor tail end of root anchor metal 5 by main rope 7, king wire netting is formed between all main ropes 7, and Connected between two adjacent main ropes 7 of row by secondary steel wire rope 8, secondary wire rope net is formed between all secondary steel wire ropes 8;
Twice pressure relief groove 2 is symmetricly set on the left and right sides of roadway floor 1.
The thickness of first rubber concrete layer 3 is 80mm, and the thickness of the second rubber concrete layer 4 is 120mm.
Spacing between the anchor tail end of two adjacent anchor metals 5 is 700mm, and anchor metal 5 is screw-thread steel, screw-thread steel A diameter of 22mm, the length of screw-thread steel is 2400mm.
The cross sectional shape of pressure relief groove 2 is rectangle, and the width of the square-section of pressure relief groove 2 is 800mm, and depth is 2000mm.
The construction method of deep tunnel wire rope net rubber concrete spraying support structure, comprises the following steps:
(1)Roadway construction is carried out into lane using photoface exploision method, the rough section of Deep Soft Rock Tunnel is formed;
(2)Prepare rubber concrete:Junked tire is made to 0.9 ~ 2.0mm of diameter rubber grain, then by rubber grain Mix in concrete admixture, as rubber concrete admixture;
(3)First injection rubber concrete is carried out to roadway surrounding rock, the first rubber concrete layer 3, the first rubber concrete is formed The thickness of layer 3 is 80mm;
(4)Constructed successively 5 layers of anchor metal along the axial direction in tunnel:Bolthole is beaten along the radial direction in tunnel, then will tree Fat Anchor Agent is put into anchor pole aperture, and anchor metal 5 and the Anchor Agent of front end are together sent into bolthole bottom simultaneously using jumbolter Rotation, the body of rod of anchor metal 5 is anchored using resin anchoring agent, is installed the anchor tail end of anchor metal 5 by pallet 6 and is pressed on On first rubber concrete layer 3;
(5)The anchor tail end of two adjacent side by side anchor metals 5 is connected by main rope 7, will simultaneously by secondary steel wire rope 8 Two adjacent main ropes 7 of row are connected, and circumferential direction of the which part pair steel wire rope 8 along tunnel is set, the secondary steel wire rope 8 in part Set along the axial direction in tunnel;
(6)The second rubber concrete layer 4 is sprayed in the outer surface of the first rubber concrete layer 3, wherein the second rubber concrete layer 4 Thickness be 120mm;
(7)Dig out twice pressure relief groove 2:Along the axial direction in tunnel, dug out respectively using pneumatic pick in the left and right sides of bottom plate 1 in tunnel The pressure relief groove 2 of one strip, pressure relief groove 2 is using the boundary line of the lateral wall of tunnel one as line of symmetry, and the cross section of pressure relief groove 2 is square Shape, the wherein depth of the rectangular cross section of pressure relief groove 2 are 2000mm, and width is 800mm;
(8)After pressure relief groove 2 is excavated, roadway surrounding rock deforms, after country rock release in 10-15 days, mixed using common injection Solidifying soil carries out Concrete Filled to twice pressure relief groove 2 and tamped;
(9)After the release of roadway floor 1, grouting and reinforcing is carried out to roadway surrounding rock and bottom plate 1 using hollow grouted anchor bar.
Step(9)In, it is to the grouting method of roadway surrounding rock using grouted anchor bar:
a)Shallow injected hole is beaten along the radial direction of roadway surrounding rock, the hole depth of shallow injected hole is 2000 ~ 2500mm, adjacent side by side The spacing of two shallow injected holes is 1500mm, and shallow grouted anchor bar is inserted in shallow injected hole, and shallow grouted anchor bar is hollow structure, A diameter of 22mm of shallow grouted anchor bar, length is 1800mm, and shallow-layer country rock note is carried out to shallow injected hole by shallow grouted anchor bar Slurry;
b)Deep injected hole is beaten along the radial direction of roadway surrounding rock, the hole depth of deep injected hole is 2500 ~ 3500mm, adjacent side by side The spacing of two deep injected holes is 1500mm, and deep grouted anchor bar is inserted in deep injected hole, and deep grouted anchor bar is hollow structure, A diameter of 22mm of deep grouted anchor bar, length is 2200mm, and deep-level country rock note is carried out to deep injected hole by deep grouted anchor bar Slurry.
The present embodiment not makees any formal limitation to shape, material, structure of the present invention etc., every according to this hair Any simple modification, equivalent variations and modification that bright technical spirit is made to above example, belong to the technology of the present invention side The protection domain of case.

Claims (6)

1. deep tunnel wire rope net rubber concrete spraying support structure, it is characterised in that:Including being arranged in roadway floor two The twice pressure relief groove of side and the wire rope net rubber concrete spray-up for being injected in roadway surrounding rock surface;Wire rope net rubber concrete Spray-up includes the first rubber concrete layer and the second rubber concrete layer for being injected in deep laneway surrounding rock surface successively, the first rubber Glue concrete layer and the second rubber concrete layer by rubber grain by incorporation concrete be made, using the length direction in tunnel as Its axial direction, using the peripheral direction in tunnel as its ring direction, using the direction perpendicular to roadway surrounding rock surface as its radial direction side To, provided with some row's anchor metals layer in the rock stratum in tunnel-surrounding deep, axial direction of some row's anchor metal layers along tunnel It is arranged side by side, often arranging anchor metal layer includes some anchor metals being evenly arranged along the ring direction in tunnel, every metal Radial direction of the anchor pole along tunnel is set, and the anchor tail end of anchor metal is fixed with by nut to be laminated tightly with the first rubber concrete The pallet of compacting;Connected side by side between the anchor tail end of two adjacent anchor metals by main rope, all main ropes Between formed king wire netting, connected side by side between two adjacent main ropes by secondary steel wire rope, all secondary steel wire ropes Between form secondary wire rope net;
Twice pressure relief groove is symmetricly set on the left and right sides of roadway floor.
2. deep tunnel wire rope net rubber concrete spraying support structure according to claim 1, it is characterised in that:The The thickness of one rubber concrete layer is 80mm, and the thickness of the second rubber concrete layer is 120mm.
3. deep tunnel wire rope net rubber concrete spraying support structure according to claim 1, it is characterised in that:Phase Spacing between the anchor tail end of two adjacent anchor metals is 700mm, and anchor metal is screw-thread steel, screw-thread steel it is a diameter of 22mm, the length of screw-thread steel is 2400mm.
4. deep tunnel wire rope net rubber concrete spraying support structure according to claim 1, it is characterised in that:Unload The cross sectional shape of indent is rectangle, and the width of the square-section of pressure relief groove is 800mm, and depth is 2000mm.
5. the construction method of deep tunnel wire rope net rubber concrete spraying support structure according to claim 1, its It is characterised by:Comprise the following steps:
(1)Roadway construction is carried out into lane using photoface exploision method, the rough section of Deep Soft Rock Tunnel is formed;
(2)Prepare rubber concrete:Junked tire is made to 0.9 ~ 2.0mm of diameter rubber grain, then by rubber grain Mix in concrete admixture, as rubber concrete admixture;
(3)First injection rubber concrete is carried out to roadway surrounding rock, the first rubber concrete layer, the first rubber concrete layer is formed Thickness be 80mm;
(4)Along the axial direction in tunnel construct successively anchor metal layer:Bolthole is beaten along the radial direction in tunnel, then by resin Anchor Agent is put into anchor pole aperture, and anchor metal and the Anchor Agent of front end are together sent into bolthole bottom using jumbolter and revolved Turn, the body of rod of anchor metal is anchored using resin anchoring agent, the anchor tail end of anchor metal is installed by pallet and is pressed on first On rubber concrete layer;
(5)The anchor tail end of two adjacent side by side anchor metals is connected by main rope, will side by side by secondary steel wire rope Adjacent two main ropes connection, circumferential direction of the which part pair steel wire rope along tunnel is set, and the secondary steel wire rope in part is along lane The axial direction in road is set;
(6)The second rubber concrete layer is sprayed in the outer surface of the first rubber concrete layer, wherein the second rubber concrete layer Thickness is 120mm;
(7)Dig out twice pressure relief groove:Along the axial direction in tunnel, using pneumatic pick one is dug out respectively in the bottom plate left and right sides in tunnel The pressure relief groove of bar strip, pressure relief groove is using the boundary line of the lateral wall of tunnel one as line of symmetry, and the cross section of pressure relief groove is rectangle, wherein The depth of the rectangular cross section of pressure relief groove is 2000mm, and width is 800mm;
(8)After pressure relief groove is excavated, roadway surrounding rock deforms, after country rock release in 10-15 days, utilizes common injection coagulation Soil carries out Concrete Filled to twice pressure relief groove;
(9)After roadway floor release, grouting and reinforcing is carried out to roadway surrounding rock and bottom plate using hollow grouted anchor bar.
6. the construction method of deep tunnel wire rope net rubber concrete spraying support structure according to claim 5, its It is characterised by:Step(9)In, it is to the grouting method of roadway surrounding rock using grouted anchor bar:
a)Shallow injected hole is beaten along the radial direction of roadway surrounding rock, the hole depth of shallow injected hole is 2000 ~ 2500mm, adjacent side by side The spacing of two shallow injected holes is 1500mm;Shallow grouted anchor bar is inserted in shallow injected hole, shallow grouted anchor bar is hollow structure, A diameter of 22mm of shallow grouted anchor bar, length is 1800mm, and shallow-layer country rock note is carried out to shallow injected hole by shallow grouted anchor bar Slurry;
b)Deep injected hole is beaten along the radial direction of roadway surrounding rock, the hole depth of deep injected hole is 2500 ~ 3500mm, adjacent side by side The spacing of two deep injected holes is 1500mm;Deep grouted anchor bar is inserted in deep injected hole, deep grouted anchor bar is hollow structure, A diameter of 22mm of deep grouted anchor bar, length is 2200mm, and deep-level country rock note is carried out to deep injected hole by deep grouted anchor bar Slurry.
CN201710635220.5A 2017-07-30 2017-07-30 Deep roadway steel wire rope net rubber sprayed concrete supporting structure and construction method thereof Active CN107246273B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710635220.5A CN107246273B (en) 2017-07-30 2017-07-30 Deep roadway steel wire rope net rubber sprayed concrete supporting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710635220.5A CN107246273B (en) 2017-07-30 2017-07-30 Deep roadway steel wire rope net rubber sprayed concrete supporting structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN107246273A true CN107246273A (en) 2017-10-13
CN107246273B CN107246273B (en) 2023-02-24

Family

ID=60012992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710635220.5A Active CN107246273B (en) 2017-07-30 2017-07-30 Deep roadway steel wire rope net rubber sprayed concrete supporting structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN107246273B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316947A (en) * 2017-12-22 2018-07-24 浙江交工集团股份有限公司 A kind of tunnel structure being suitable for strong expansion potentiality fault belt
CN108595807A (en) * 2018-04-15 2018-09-28 西安科技大学 A kind of computational methods of roadway floor release well width
CN108979666A (en) * 2018-07-11 2018-12-11 河北工程大学 A kind of method of steel tube concrete pile control Floor Heave in Roadway
CN109320157A (en) * 2018-09-13 2019-02-12 太原理工大学 A kind of coal mine gob filling lotion and preparation method thereof for dividing material to prepare using waste tire of automobile
CN109404007A (en) * 2018-11-22 2019-03-01 浙江大学 A kind of underground engineering support antiknock integration composite construction
CN109578026A (en) * 2018-11-02 2019-04-05 郑州工程技术学院 Safeguard structure is supported for rock soil anchor
CN109765108A (en) * 2019-01-22 2019-05-17 山东科技大学 A kind of bolt-spary supports measure of merit device and method of assembly simulation country rock
CN109944619A (en) * 2019-04-15 2019-06-28 辽宁工程技术大学 A kind of Support Method for high ground stress soft rock stress tunnel
CN110159311A (en) * 2019-06-20 2019-08-23 济宁学院 A kind of roadway support concrete ejection anchor
CN112228101A (en) * 2020-09-28 2021-01-15 中煤科工开采研究院有限公司 Spraying-based roadway support forming method and system
CN113863951A (en) * 2021-09-16 2021-12-31 平顶山天安煤业股份有限公司八矿 Large-section roadway supporting technology based on stack dynamic pressure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR628983A (en) * 1927-02-11 1927-11-02 New pavement manufacturing process
CN202787334U (en) * 2012-07-16 2013-03-13 杭州萧宏建设集团有限公司 Sealing structure of deep well casing used during tunnel construction
CN106401609A (en) * 2016-11-10 2017-02-15 河南理工大学 Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN106522991A (en) * 2016-11-10 2017-03-22 河南理工大学 Roadway anchoring and shotcreting support flexible integrated concrete spraying layer and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR628983A (en) * 1927-02-11 1927-11-02 New pavement manufacturing process
CN202787334U (en) * 2012-07-16 2013-03-13 杭州萧宏建设集团有限公司 Sealing structure of deep well casing used during tunnel construction
CN106401609A (en) * 2016-11-10 2017-02-15 河南理工大学 Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN106522991A (en) * 2016-11-10 2017-03-22 河南理工大学 Roadway anchoring and shotcreting support flexible integrated concrete spraying layer and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李大伟: "软岩巷道锚喷支护破坏分析与对策", 《河南理工大学学报(自然科学版)》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316947A (en) * 2017-12-22 2018-07-24 浙江交工集团股份有限公司 A kind of tunnel structure being suitable for strong expansion potentiality fault belt
CN108595807A (en) * 2018-04-15 2018-09-28 西安科技大学 A kind of computational methods of roadway floor release well width
CN108979666A (en) * 2018-07-11 2018-12-11 河北工程大学 A kind of method of steel tube concrete pile control Floor Heave in Roadway
CN108979666B (en) * 2018-07-11 2024-04-02 河北工程大学 Method for controlling tunnel floor heave by concrete filled steel tube pile
CN109320157A (en) * 2018-09-13 2019-02-12 太原理工大学 A kind of coal mine gob filling lotion and preparation method thereof for dividing material to prepare using waste tire of automobile
CN109320157B (en) * 2018-09-13 2021-06-08 太原理工大学 Coal mine goaf filling paste prepared from waste automobile tires by materials and preparation method thereof
CN109578026B (en) * 2018-11-02 2023-10-10 郑州工程技术学院 Supporting and protecting structure for rock and soil anchor rod
CN109578026A (en) * 2018-11-02 2019-04-05 郑州工程技术学院 Safeguard structure is supported for rock soil anchor
CN109404007A (en) * 2018-11-22 2019-03-01 浙江大学 A kind of underground engineering support antiknock integration composite construction
CN109765108A (en) * 2019-01-22 2019-05-17 山东科技大学 A kind of bolt-spary supports measure of merit device and method of assembly simulation country rock
CN109765108B (en) * 2019-01-22 2024-05-07 山东科技大学 Anchor spraying supporting effect testing device and method for combined body simulation surrounding rock
CN109944619A (en) * 2019-04-15 2019-06-28 辽宁工程技术大学 A kind of Support Method for high ground stress soft rock stress tunnel
CN110159311A (en) * 2019-06-20 2019-08-23 济宁学院 A kind of roadway support concrete ejection anchor
CN112228101B (en) * 2020-09-28 2023-01-10 中煤科工开采研究院有限公司 Roadway support forming method and system based on spraying
CN112228101A (en) * 2020-09-28 2021-01-15 中煤科工开采研究院有限公司 Spraying-based roadway support forming method and system
CN113863951B (en) * 2021-09-16 2024-02-09 平顶山天安煤业股份有限公司八矿 Large-section roadway support technology based on superposition dynamic pressing
CN113863951A (en) * 2021-09-16 2021-12-31 平顶山天安煤业股份有限公司八矿 Large-section roadway supporting technology based on stack dynamic pressure

Also Published As

Publication number Publication date
CN107246273B (en) 2023-02-24

Similar Documents

Publication Publication Date Title
CN107246273A (en) Deep tunnel wire rope net rubber concrete spraying support structure and its construction method
CN207261019U (en) Deep Soft Rock Tunnel double-layer rubber gunite concrete sprinkler body supporting construction
CN102493821B (en) Support method for high stress roadway coal-rock mass
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN103410161B (en) Oblique control slip casting steel anchor tube framework and construction method thereof
CN102562093B (en) Full-length anchoring supporting method with intensive resin anchor rod and anchor-shotcrete net
CN105178981A (en) Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
CN101338679B (en) Deep well great section loose wall rock laneway support method
CN103321653B (en) Method of treating lining after collapse of underground cavern crown
CN111119935B (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
CN101967984A (en) Deep well tunnel cable anchor rigid-flexible coupling support and surrounding rock overall reinforced support method
CN2878511Y (en) Tensile compression combined self-anchored rock anchor rod
CN106321119A (en) Double-layer anchor net cable supporting structure for controlling mining roadway surrounding rock deformation and method thereof
CN108194100A (en) A kind of accurate three-dimensional prestress strengthening method of crack coal and rock
CN103603675A (en) Supporting method of permeable soft broken rock stratum roadway
CN109736850B (en) Roadway shell and arch combined strong bearing structure and construction method thereof
CN110905555A (en) UHPC lining structure for tunnel and construction method thereof
CN104895581A (en) Tunnel lining rapid repair structure based on carbon fiber woven mesh and repair method thereof
CN203321531U (en) Lining processing structure for underground cavern after collapse of top arch
CN206205915U (en) A kind of flexible entirety concrete spray-up structure of deep tunnel bolt-spary supports
CN106522991B (en) Roadway anchor-shotcrete support flexible integral concrete shotcrete layer and construction method thereof
CN105350993B (en) A kind of roadway full-fracture-surfacanchoring-rod anchor cable beam spray Combined Support Technology
CN101235721A (en) Reasonable replacement homogeneous wall rock soft rock laneway support construction technology
CN104453914B (en) The construction method of ingate anti-impact shock-absorbing supporting construction
CN205012333U (en) Recoverable FRP stock with enlarged footing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant