CN107245998B CN201710519398.3A CN201710519398A CN107245998B CN 107245998 B CN107245998 B CN 107245998B CN 201710519398 A CN201710519398 A CN 201710519398A CN 107245998 B CN107245998 B CN 107245998B
Authority
CN
China
Prior art keywords
vacuum
cocoanut shell
laid
filling
film
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710519398.3A
Other languages
Chinese (zh)
Other versions
CN107245998A (en
Inventor
高盟
石传志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Rui Hsi Technology Co ltd
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201710519398.3A priority Critical patent/CN107245998B/en
Publication of CN107245998A publication Critical patent/CN107245998A/en
Application granted granted Critical
Publication of CN107245998B publication Critical patent/CN107245998B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to a kind of methods of cocoanut shell filling combined vacuum prepressing blowing filling soil base.This method process includes: 1) to admix cocoanut shell in storing bin;2) by the mixture hydraulic reclamation of barged-in fill and cocoanut shell to designed elevation;3) it is laid with one layer of 20cm sand bedding course above and sets drain bar;4) middle layer 30cm sand bedding course and embedded vacuum pipe network are laid with;5) sealing ditch is excavated, sealing film is laid with;6) examination vacuumizes and checks whether gas leakage;7) pumping continues to be pumped to settlement stability under stablizing;8) it mends and bankets to design altitude.It is an advantage of the current invention that having recycled cocoanut shell as packing material, cocoanut shell has the performances such as intensity highly corrosion resistant, mixes the stability and intensity that soil is increased in filling soil, and a large amount of uses that filling soil can be reduced using cocoanut shell are conducive to save the cost.

Description

A kind of method of cocoanut shell filling combined vacuum prepressing blowing filling soil base
Technical field
The present invention relates to a kind of methods of cocoanut shell filling combined vacuum prepressing blowing filling soil base, are primarily adapted for use in barged-in fill The processing of ground belongs to Soft Ground field.
Background technique
Marine reclamation land, which refers to, is changed into land by artificial technology's means original sea area, lake region or riverbank.To Yushan Hill Mostly few coastal cities, marine reclamation land are a kind of methods that the development for the city confined space plays an important role.Holland is certainly It begins to enclose extra large made ground on a large scale from 13rd century, nowadays the 20% of Dutch territory is manually filled out sea and created." hills is all dug Go to fill out sea and go, Fu Laifulan, which is saved, almost to be createed ", therefore have the title of " god makes sea, Dutchman's epeirogenetic ".Japan is Archipelago country, territory is narrow, populous.After World War II between more than 50 years, Japanese's reclaiming land around sea reaches 200km2, phase When in the area of 2.6 Hong Kong Islands.China's Perioperative cardiac events activity since last century five, the sixties, to last century Mo, littoral Area's Perioperative cardiac events make ground area up to 1.2 ten thousand km2, every year on average Perioperative cardiac events 230 to 240km2.The more level lands in Hong Kong mountain are few, perfume (or spice) in 1842 The sandstone for building queen main road are promoted sea for the first time by port, and the just continuous marine reclamation land of later Hong Kong over more than 100 years, fills out sea product 67km2 is reached, accounting for Hong Kong gross area is more than 6%.
The primary raw material of sea reclamation is sandstone, and significant wastage consumes substantial contribution, the especially Nanhai area, sandstone money Source is extremely limited, and the Nanhai area generates a large amount of cocoanut shells every year, and has intensity height, and compressive property is good.The present invention applies coconut palm Sub- shell filling barged-in fill carrys out sea reclamation, not only saves great amount of cost, but also cocoanut shell is distributed in filling soil that soil can be improved Shearing strength.
Summary of the invention
The object of the present invention is to provide a kind of method of cocoanut shell filling combined vacuum prepressing blowing filling soil base, the party Method has many advantages, such as low cost, construction is simple.
The present invention is realized by the following technical scheme.A kind of cocoanut shell filling combined vacuum prepressing blowing filling soil The method of base, it is characterised in that including following procedure: 1) cocoanut shell is admixed in feeding chamber;2) by the mixed of barged-in fill and cocoanut shell Object hydraulic reclamation is closed to designed elevation;3) it is laid with one layer of 20cm sand bedding course above designed elevation in step 2 and sets drain bar;4) It is laid with the middle layer 30cm sand bedding course and embedded vacuum pipe network;5) sealing ditch is excavated, sealing film is laid with;6) examination is vacuumized and is checked whether Gas leakage;7) pumping continues to be pumped to settlement stability under stablizing;8) it mends and bankets to design altitude.
The present invention has the advantages that construction is simple, saves a large amount of sandstones, meet engineering construction needs, saves construction Cost, while greatly strengthening foundation strength.
Detailed description of the invention
Fig. 1 is cocoanut shell of the invention and barged-in fill conveying arrangement figure;Fig. 2 is that vacuum pre-press reinforcing of the invention is arranged Figure;In figure: 1- sand carrier, 2- hydraulic reclamation sandy soil, 3- conveyance conduit, 4- barged-in fill delivery pump, 5- feeding chamber, 6- hydraulic reclamation soil block, 7- Lower layer's sand bedding course, the upper layer 8- sand bedding course, 9- vacuum diaphragm, 10- seal ditch, 11- vertical drainage plate.
Specific embodiment
Cocoanut shell is admixed in storing bin.
By the mixture hydraulic reclamation of barged-in fill and cocoanut shell to designed elevation.
It being laid with above and one layer of 20cm sand bedding course and sets drain bar, plastic draining board uses Type B plate, construction depth 20m, Spacing 1.2m, equilateral triangle arrangement.Perpendicularity deviation control is set in ± 1.5%, every rewinds of length no more than 50cm, no Then immersed tube plate, plastic strip plate top embedment sand bedding course length it should be not less than 0.3m again.
It is laid with the middle layer 30cm sand bedding course and embedded vacuum pipe network, vacuum tube is selected reinforcement PVC plastic pipe, be responsible for as φ 75mm, branch pipe are φ 50mm, it is desirable that the intensity of PVC pipe can bear the pressure of 400kPa.It is responsible for spacing 25m, filter pipe array pitch 6m, distance of the outermost layer filter pipe away from place side are 2~5m.Supervisor is connected between branch chimney filter with reducing tee with four-way.
Sealing ditch is excavated, sealing film is laid with.(1) sealing film is fixed in advance by manufacturer according to vacuum preloading area size It processes, the size of whole picture sealing film is wanted to guarantee disposable all entire vacuum preloading areas of covering.The size of film when processing The part for considering embedment sealing ditch, there are enough more than needed.Sealing film seam is firmly bonded, and flat lap side seam width is met in double heat seals It cannot be less than 15mm.(2) sand bedding course surface is answered smooth before vacuum preloading, and surface is without sharp stone, lump and other sharp sundries.Sealing When film is laid with, the particles such as sand, stone for not cleaning out between film when need to prevent from vacuumizing, which wear out film, causes gas leakage.(3) in order to Vacuum diaphragm is protected, is respectively laid with one layer of 250g/m2 acupuncture nonwoven geotextiles up and down in vacuum diaphragm.To vacuum line, vacuum probe and After other observation instruments have been buried, be laid with first layer non-woven geotextile on it, the first layer non-woven geotextile receive side 2~ 3m is laid with area and is less than sealing film, is laid with range and is greater than stabilization zone, 1m is widened on every side.
Examination vacuumizes and checks whether gas leakage.After every vaccum-pumping equipment placement is in place, start try vacuumizing.Start The rate of stage control vacuum pressed, to extract the air in sand bedding course out, vacuum pressure increases step by step from 20kPa, under film The discharge of air and the raising of soil layer discharging consolidation degree, vacuum degree is gradually increased and stablizes on 80kPa in film.Starting to take out Vacuum stages check sealing film comprehensively and seal the sealing state of ditch, if any gas leakage, to gas leakage with the discharge of air and water Part repairing in time and sealing, prevent from influencing vacuum effectiveness.
Pumping continues to be pumped to settlement stability under stablizing.Under conditions of under-membrance vacuum degree is stably maintained at 80kPa or more, Continuous air extraction, after the completion of roadbed filling, the actual measurement continuous 10d average settlement amount of surface subsidence rate is less than or equal to 2mm/d Termination of pumping unloading.
Benefit is banketed to design altitude.

Claims (4)

1. a kind of method of cocoanut shell filling combined vacuum prepressing blowing filling soil base, it is characterised in that: be mixed in cocoanut shell and fill In banketing, the mixture of cocoanut shell and filling soil is fills up to design altitude, and carry out discharging consolidation with vacuum method, led It wants step to have: 1) admixing cocoanut shell in storing bin;2) by the mixture hydraulic reclamation of barged-in fill and cocoanut shell to designed elevation;3) exist It is laid with one layer of 20cm sand bedding course above designed elevation in step 2 and sets drain bar, sand bedding course sand material uses medium coarse sand, described For fine grain clay content of the partial size of medium coarse sand less than 0.075mm less than 5%, infiltration coefficient is not less than 2 × 10-2Cm/s guarantees Horizontal drainage effect, plastic draining board use Type B plate, construction depth 20m, spacing 1.2m, and equilateral triangle arrangement sets verticality Deviation controls in ± 1.5%, and every rewinds of length no more than 50cm, otherwise should be embedded in immersed tube plate, plastic strip plate top again Sand bedding course length is not less than 0.3m;4) it is laid with the middle layer 30cm sand bedding course and embedded vacuum pipe network, vacuum tube selects reinforcement PVC plastic Pipe;5) sealing ditch is excavated, being laid with sealing film need to be vacuumized when sealing film is laid with, and make to seal film vacuum diaphragm, in vacuum Film is respectively laid with one layer of 250g/m2 acupuncture nonwoven geotextiles up and down;6) examination vacuumizes and checks whether gas leakage;7) pumping stablize under after It is continuous to be pumped to settlement stability;8) it mends and bankets to design altitude.
2. the method for cocoanut shell filling combined vacuum prepressing blowing filling soil base according to claim 1, it is characterised in that: step 4) supervisor of vacuum tube is φ 75mm in, and branch pipe is φ 50mm, it is desirable that the intensity of PVC pipe can bear the pressure of 400kPa, step It is rapid 5) in non-woven geotextile, the thickness, permeability, tensile strength, type, specification and the performance that seal film should meet design and want It asks, sealing ditch has to comply with epiphragma and holds one's breath requirements in step 5), using hand fit's excavator excavation, ditch 0.8~1.0m of bottom width, Ditch depth 1.5m~2.0m is that a work section successively promotes with the long 20m of ditch with digging with paving with filling out, and when excavation prevents side slope from collapsing Just, the mound dug out when plastic film mulch on sidewalk, must not pile up on sand bedding course on the outside, avoid sand grains from sliding into ditch, backfill in ditch Clay wants closely knit and is not mingled with sandstone, if sealing bottom of trench or two sides with the presence of rubble or the interlayer of layer of sand good penetrability, by this Interlayer is excavated completely, and backfills weak soil.
3. the method for cocoanut shell filling combined vacuum prepressing blowing filling soil base according to claim 1, it is characterised in that: it is described Step 5) is respectively laid with one layer of 250g/m in order to protect vacuum diaphragm, in vacuum diaphragm up and down2Acupuncture nonwoven geotextiles, to vacuum line, After vacuum probe and other observation instruments have been buried, first layer non-woven geotextile, the first layer nonwoven are laid on sealing film Geotextiles receive 2~3m of side, are laid with area and are less than sealing film, are laid with range and are greater than stabilization zone, 1m is widened on every side, according to place feelings Non-woven geotextile is unfolded in certain direction and is laid with smooth by condition, and for non-woven geotextile overlapping part using sewing up processing, use is portable Sewing machine is sewed up, and lap width is no less than 30mm when sewing up.
4. the method for cocoanut shell filling combined vacuum prepressing blowing filling soil base according to claim 1, it is characterised in that: it is described Examination is carried out in step 6) to vacuumize, the incipient stage controls vacuum pressed rate, to extract the air in sand bedding course out, vacuum pressure from 20kPa increases step by step, and with the discharge of air under film and the raising of soil layer discharging consolidation degree, vacuum degree is gradually increased simultaneously steady in film It is scheduled on 80kPa, is starting vacuumizing phase, with the discharge of air and water, check sealing film comprehensively and seal the close of ditch Envelope state is repaired and is sealed in time to gas leakage part if any gas leakage, prevents from influencing vacuum effectiveness, in step 7) under film vacuum Degree is stably maintained under conditions of 80kPa or more, continuous air extraction, after the completion of roadbed filling, surveys the continuous 10d of surface subsidence rate Average settlement amount is less than or equal to 2mm/d, can termination of pumping unloading.
CN201710519398.3A 2017-06-30 2017-06-30 A kind of method of cocoanut shell filling combined vacuum prepressing blowing filling soil base Active CN107245998B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710519398.3A CN107245998B (en) 2017-06-30 2017-06-30 A kind of method of cocoanut shell filling combined vacuum prepressing blowing filling soil base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710519398.3A CN107245998B (en) 2017-06-30 2017-06-30 A kind of method of cocoanut shell filling combined vacuum prepressing blowing filling soil base

Publications (2)

Publication Number Publication Date
CN107245998A CN107245998A (en) 2017-10-13
CN107245998B true CN107245998B (en) 2019-10-18

Family

ID=60014683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710519398.3A Active CN107245998B (en) 2017-06-30 2017-06-30 A kind of method of cocoanut shell filling combined vacuum prepressing blowing filling soil base

Country Status (1)

Country Link
CN (1) CN107245998B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776877A (en) * 2012-08-22 2012-11-14 吉林大学 Stepped vacuum drainage consolidation method for ultra-soft soil foundation
CN103388330A (en) * 2013-07-31 2013-11-13 河海大学 Pump drainage type vacuum preloading soft foundation strengthening method
CN103643672A (en) * 2013-11-12 2014-03-19 浙江江南春建设集团有限公司 Vacuum preloading foundation treatment construction method
CN104047281A (en) * 2014-06-30 2014-09-17 洛阳广鑫建设集团有限公司 Construction method for vacuum combined preloading consolidated foundation
CN106048886A (en) * 2016-07-19 2016-10-26 广东浚丰华科技有限公司 Plant-fiber ecological felt and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102776877A (en) * 2012-08-22 2012-11-14 吉林大学 Stepped vacuum drainage consolidation method for ultra-soft soil foundation
CN103388330A (en) * 2013-07-31 2013-11-13 河海大学 Pump drainage type vacuum preloading soft foundation strengthening method
CN103643672A (en) * 2013-11-12 2014-03-19 浙江江南春建设集团有限公司 Vacuum preloading foundation treatment construction method
CN104047281A (en) * 2014-06-30 2014-09-17 洛阳广鑫建设集团有限公司 Construction method for vacuum combined preloading consolidated foundation
CN106048886A (en) * 2016-07-19 2016-10-26 广东浚丰华科技有限公司 Plant-fiber ecological felt and preparation method thereof

Also Published As

Publication number Publication date
CN107245998A (en) 2017-10-13

Similar Documents

Publication Publication Date Title
CN100549304C (en) A kind of nothing sealing fast vacuum prepressing method
CN100554596C (en) Vacuum preloading method for non-water discharge sand cushion
CN110306616A (en) A kind of construction method of sewage conduct
CN104088208B (en) A kind of wet and soft earth foundation processing method
CN103628468B (en) A kind of water penetration pile combined vacuum prepressing ground foundation treatment method
CN104120710B (en) A kind of highway on soft ground method of vacuum pre-pressed joint serous fluid of dredger fill
CN108468325B (en) Large-area coastal beach sea mud rapid curing construction method
CN102926376B (en) One is reclaimed fields from the sea region soft-soil foundation treatment method
CN105780754A (en) Sand-bed-free vacuum preloading and water bag heaped loading combined reinforcing device and method for soft soil foundation
CN106284081A (en) A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method
CN108385701A (en) Road Protection of Expansive Soil structure and its construction method
CN112411518A (en) Soft foundation section vacuum combined surcharge preloading construction method
CN111733792A (en) Foundation treatment method and system for soft soil foundation vacuum preloading and power consolidation drainage
CN205399440U (en) Inflation dirt road moat structure
CN102943423A (en) Construction technology for clay roadbed with high liquid limit
CN102704458A (en) Sand-free cushion layer vacuum-surcharge preloading reinforcement device and method for soft ground
CN104711968A (en) Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method
CN101591906A (en) The method for processing foundation of intubate, multipass vacuum well-point dewatering dynamic consolidation
CN109235469A (en) A kind of Cut Slopes of Expansive Soil structure and its construction method
CN109083100A (en) A kind of channel excavation construction technology for blowing mud Cheng Luhou
CN107245998B (en) A kind of method of cocoanut shell filling combined vacuum prepressing blowing filling soil base
CN209412838U (en) A kind of Cut Slopes of Expansive Soil structure
CN108265700A (en) A kind of piling prepressing treatment of soft foundation structure and method
CN212452584U (en) Foundation treatment system combining vacuum preloading of soft soil foundation with power consolidation drainage
CN201317936Y (en) Drainage structure for vacuum preloading ground treatment in sand drain method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240103

Address after: 251200 east of Yingbin Avenue, national high tech Industrial Development Zone, Dezhou City (Yucheng), Shandong Province

Patentee after: Shandong Rui HSI Technology Co.,Ltd.

Address before: 266590 No. 579, Qian Wan Gang Road, Qingdao economic and Technological Development Zone, Shandong

Patentee before: SHANDONG University OF SCIENCE AND TECHNOLOGY