CN107229271A - A kind of intelligent transportation development platform method for diagnosing faults and device - Google Patents
A kind of intelligent transportation development platform method for diagnosing faults and device Download PDFInfo
- Publication number
- CN107229271A CN107229271A CN201710447049.5A CN201710447049A CN107229271A CN 107229271 A CN107229271 A CN 107229271A CN 201710447049 A CN201710447049 A CN 201710447049A CN 107229271 A CN107229271 A CN 107229271A
- Authority
- CN
- China
- Prior art keywords
- unit
- fault diagnosis
- test
- intelligent transportation
- diagnostic result
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0208—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
- G05B23/0213—Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24065—Real time diagnostics
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Debugging And Monitoring (AREA)
Abstract
The application is related to the technical field of intelligent transportation development platform, more particularly to a kind of intelligent transportation development platform method for diagnosing faults and device, corresponding test script is loaded into by each functional unit in intelligent transportation development platform and platform integrated testability stage, realize the overall automatic test of each functional unit and platform to intelligent transportation development platform, testing efficiency is improved, testing cost is reduced;In addition, determining the test pattern of function joint debugging test and fault diagnosis stage according to the number of faults of unit and type, the flexibility of test is substantially increased;Finally, analysis is not only estimated to the result that single is tested, perpendicular evaluation analysis also is carried out to the result repeatedly tested, testing efficiency is further increased, the work for being efficiently completed exploitation test phase for developer provides powerful guarantee.
Description
Technical field
The application is related to the technical field of intelligent transportation development platform, more particularly to a kind of intelligent transportation development platform failure
Diagnostic method and device.
Background technology
With the fast development of technology of Internet of things, relative software and hardware technology is also fast-developing, and application field also constantly expands
Exhibition, intelligent transportation system is exactly typical case's application of technology of Internet of things development.So-called intelligent transportation system (Intelligent
Transportation System, abbreviation ITS) be future transportation system developing direction, it be by advanced information technology,
Data communication transmission technology, Electronic transducer technology, control technology and computer technology etc., which are effectively integrated, applies to whole ground
Traffic control system and set up it is a kind of in a wide range of, it is comprehensive play a role, in real time, accurately and efficiently comprehensive traffic
Transportation management system intelligent transportation system is the developing direction of future transportation system, and it is to lead to advanced information technology, data
News transmission technology, Electronic transducer technology, control technology and computer technology etc., which are effectively integrated, applies to whole traffic above-ground pipe
Reason system and set up it is a kind of in a wide range of, it is comprehensive play a role, in real time, accurately and efficiently composite communications transport pipe
Reason system.The construction of high-tech traffic system requirement planned according to " 12 ", intelligent transportation facility type and quantity are sharply increased.
Intelligent transportation facility is mainly flowed into as the most direct expression meanses and form of traffic administration from room and time to traffic
Row management and adjust, it is ensured that road traffic it is safe and smooth.The management of means of transportation is for the safe and orderly unimpeded of road traffic
There is very direct influence.Traditional means of transportation management merely relies on personnel's registration management, and way to manage falls behind, efficiency
Low, supervision scope is limited, and facility operation maintenance condition is opaque, operation monitoring, operation management, computer lab management, outfield maintenance, achievement
Imitate examination, construction, using department, be all barrier between different departments management, directly result in fault discovery and exclude not in time, O&M letter
Breath is not shared, and very big influence is brought to urban transportation efficiency.
In the prior art, it was also proposed that some are for above-mentioned intelligent transportation system performance improvement, troubles diagnosis and fixing
Method.However, these methods are both for the diagnostic method implemented during actual popularization and application.And intelligent transportation system exists
Generally require to carry out the previous works such as debugging and Performance Evaluation, the fault diagnosis of a series of development phase before dispatching from the factory, only pass through
Cross these work and could smoothly produce in batches, put goods on the market application.In the prior art, exploitation of the intelligent transportation system before dispatching from the factory
The previous work such as the debugging in stage and Performance Evaluation, fault diagnosis is generally all to be debugged each mould manually by means of developer
Block, combines by modules, realizes final systemic-function combined debugging, is finally reached test request, then could
Batch production.
However, although the above method realizes the various functions requirement in debugging stage, but the side of manual debugging, fault diagnosis
The problem of method has inefficiency, influenceed larger by the personal technical merit of developer, is unfavorable for standardization, mass and is opened
Hair test, therefore, need to be proposed a kind of automation, the development phase that efficient intelligent transportation system is before dispatching from the factory debugging with
The method of Performance Evaluation, fault diagnosis.
The content of the invention
A kind of intelligent transportation development platform method for diagnosing faults, methods described comprises the following steps:
S1, the platform for configuring the intelligent transportation development platform is constituted, and the platform of the intelligent transportation development platform, which is constituted, to be included:
Main control unit, power subsystem, level conversion unit, display unit, interface unit, bus unit, key control unit, channel radio
Believe unit, voice-input unit;The main control unit respectively with the power subsystem, the level conversion unit, the display
Unit, the interface unit, the bus unit, the key control unit, the wireless communication unit and the voice are defeated
Enter unit and set up communication connection;The key control unit respectively with the power subsystem, the display unit, the channel radio
Believe that unit and the voice-input unit set up communication connection;The level conversion unit is used for level conversion between different units
Need;The display unit is used for the information for showing the intelligent transportation development platform in real time;The interface unit is used to realize
Interface conversion between unit;The data communication that the bus unit is used between unit;It is described to press key control list
Member is used for the break-make for controlling unit signal;The wireless communication unit is used to realize the intelligent transportation development platform and remote
The radio communication of end equipment;The voice-input unit is used for the input for realizing voice signal;
S2, is the main control unit, the power subsystem, the level conversion unit, the display unit, the interface list
First, described bus unit, the key control unit, the wireless communication unit, the voice-input unit write list respectively
Member test and fault diagnosis script;For the intelligent transportation development platform system for writing and compiling function joint debugging test and fault diagnosis pin
This;
S3, according to the unit testing and fault diagnosis script successively to the main control unit, the power subsystem, the level
Converting unit, the display unit, the interface unit, the bus unit, the key control unit, the radio communication
Unit, the voice-input unit are tested and fault diagnosis, obtain unit testing and diagnostic result;Joined according to the function
Commissioning is tried to test and fault diagnosis the intelligent transportation development platform with fault diagnosis script, obtains function joint debugging test
With diagnostic result;
S4, is uploaded to analysis system, institute by the unit testing and diagnostic result with the function joint debugging test and diagnostic result
State analysis system and analysis and evaluation is carried out with the function joint debugging test and diagnostic result to the unit testing and diagnostic result, obtain
Go out assessment result, improved for developer's reference of corresponding authority.
As a preferred embodiment, the step S3 is specifically included:According to the unit testing and fault diagnosis
Script is successively to the main control unit, the power subsystem, the level conversion unit, the display unit, the interface list
First, described bus unit, the key control unit, the wireless communication unit, the voice-input unit carry out test with
Fault diagnosis, obtains unit testing and diagnostic result;If the test and diagnostic result of unit is normal, according to described
Function joint debugging test is tested and fault diagnosis the intelligent transportation development platform with fault diagnosis script, obtains function connection
Commissioning is tried and diagnostic result;If the test and diagnostic result of unit is abnormal for part, by abnormal unit carry out every
From being surveyed according to the function joint debugging test with fault diagnosis script to the unit of the intelligent transportation development platform non-isolated
Examination and fault diagnosis, obtain function joint debugging test and diagnostic result;If the test and diagnostic result of unit is all different
Often, then the function joint debugging test is skipped to examine intelligent transportation development platform progress test with failure with fault diagnosis script
Disconnected step.
As a preferred embodiment, the test can individually be write, store and be called with fault diagnosis script;
The test can also individually be write with fault diagnosis script, in the function code section that unit is inserted after writing;It is described to survey
Try directly to write in the function code section of unit with fault diagnosis script.
As a preferred embodiment, the step S4 also includes:Statistic unit is set;By the unit testing with
Diagnostic result is uploaded to analysis system with the function joint debugging test and diagnostic result, and the analysis system is to the unit testing
Analysis and evaluation is carried out with diagnostic result and the function joint debugging test and diagnostic result, assessment result is drawn, described assess is tied
Fruit imported into statistic unit, and the statistic unit carries out horizontal analysis to multiple assessment results, obtains the horizontal stroke of unit
To analysis result and the horizontal analysis result of function joint debugging, improved for developer's reference of corresponding authority.
Alternatively embodiment, the present invention provides a kind of intelligent transportation development platform trouble-shooter, described
Device includes following module:
Configuration module, the platform for configuring the intelligent transportation development platform is constituted, the intelligent transportation development platform it is flat
Platform, which is constituted, to be included:Main control unit, power subsystem, level conversion unit, display unit, interface unit, bus unit, by key control
Unit, wireless communication unit, voice-input unit;The main control unit respectively with the power subsystem, the level conversion list
First, described display unit, the interface unit, the bus unit, the key control unit, the wireless communication unit and
The voice-input unit sets up communication connection;The key control unit respectively with the power subsystem, the display unit,
The wireless communication unit and the voice-input unit set up communication connection;The level conversion unit be used for different units it
Between level conversion need;The display unit is used for the information for showing the intelligent transportation development platform in real time;The interface list
Member is used to realize the interface conversion between unit;The data communication that the bus unit is used between unit;It is described
Key control unit is used for the break-make for controlling unit signal;The wireless communication unit is used to realize that the intelligent transportation is opened
Send out the radio communication of platform and remote equipment;The voice-input unit is used for the input for realizing voice signal;
Script edit module, for for the main control unit, the power subsystem, the level conversion unit, the display list
First, described interface unit, the bus unit, the key control unit, the wireless communication unit, the phonetic entry list
Member writes unit testing and fault diagnosis script respectively;For the intelligent transportation development platform system for writing and compiling function joint debugging test with
Fault diagnosis script;
Test and fault diagnosis module, for according to the unit testing and fault diagnosis script successively to the main control unit,
The power subsystem, the level conversion unit, the display unit, the interface unit, the bus unit, the button
Control unit, the wireless communication unit, the voice-input unit are tested and fault diagnosis, obtain unit testing with examining
Disconnected result;If the test and diagnostic result of unit is normal, according to the function joint debugging test and fault diagnosis pin
This is tested and fault diagnosis the intelligent transportation development platform, obtains function joint debugging test and diagnostic result;If each
The test and diagnostic result of individual unit is abnormal for part, then is isolated abnormal unit, is tested according to the function joint debugging
The unit of the intelligent transportation development platform non-isolated is tested and fault diagnosis with fault diagnosis script, function connection is obtained
Commissioning is tried and diagnostic result;If the test and diagnostic result of unit is all abnormal, skips the function joint debugging and survey
Examination carries out the step of test and fault diagnosis with fault diagnosis script to the intelligent transportation development platform;
Interpretation of result module, for setting statistic unit;The unit testing and diagnostic result are tested with the function joint debugging
Analysis system is uploaded to diagnostic result, the analysis system is surveyed to the unit testing and diagnostic result with the function joint debugging
Examination carries out analysis and evaluation with diagnostic result, draws assessment result, the assessment result is imported into statistic unit, the statistics list
Member carries out horizontal analysis to multiple assessment results, obtains the horizontal analysis result of unit and the transverse direction point of function joint debugging
Result is analysed, is improved for developer's reference of corresponding authority.
The present invention proposes a kind of intelligent transportation development platform method for diagnosing faults and device, by being developed in intelligent transportation
Each functional unit of platform and platform integrated testability stage are loaded into corresponding test script, realize and develop flat to intelligent transportation
The overall automatic test of each functional unit and platform of platform, improves testing efficiency, reduces testing cost;In addition,
The test pattern of function joint debugging test and fault diagnosis stage is determined according to the number of faults of unit and type, is greatly improved
The flexibility of test;Finally, analysis is not only estimated to the result that single is tested, also the result repeatedly tested is carried out horizontal
To analysis and assessment, testing efficiency is further increased, the work for being efficiently completed exploitation test phase for developer is provided
Powerful guarantee.
Brief description of the drawings
Fig. 1 is a kind of intelligent transportation development platform trouble-shooter schematic diagram of the present invention.
Embodiment
Embodiments of the invention are further illustrated below in conjunction with accompanying drawing.
Embodiment one:
The present invention provides a kind of intelligent transportation development platform method for diagnosing faults, and methods described comprises the following steps:
S1, the platform for configuring the intelligent transportation development platform is constituted, and the platform of the intelligent transportation development platform, which is constituted, to be included:
Main control unit, power subsystem, level conversion unit, display unit, interface unit, bus unit, key control unit, channel radio
Believe unit, voice-input unit;The main control unit respectively with the power subsystem, the level conversion unit, the display
Unit, the interface unit, the bus unit, the key control unit, the wireless communication unit and the voice are defeated
Enter unit and set up communication connection;The key control unit respectively with the power subsystem, the display unit, the channel radio
Believe that unit and the voice-input unit set up communication connection;The level conversion unit is used for level conversion between different units
Need;The display unit is used for the information for showing the intelligent transportation development platform in real time;The interface unit is used to realize
Interface conversion between unit;The data communication that the bus unit is used between unit;It is described to press key control list
Member is used for the break-make for controlling unit signal;The wireless communication unit is used to realize the intelligent transportation development platform and remote
The radio communication of end equipment;The voice-input unit is used for the input for realizing voice signal;
S2, is the main control unit, the power subsystem, the level conversion unit, the display unit, the interface list
First, described bus unit, the key control unit, the wireless communication unit, the voice-input unit write list respectively
Member test and fault diagnosis script;For the intelligent transportation development platform system for writing and compiling function joint debugging test and fault diagnosis pin
This;
S3, according to the unit testing and fault diagnosis script successively to the main control unit, the power subsystem, the level
Converting unit, the display unit, the interface unit, the bus unit, the key control unit, the radio communication
Unit, the voice-input unit are tested and fault diagnosis, obtain unit testing and diagnostic result;Joined according to the function
Commissioning is tried to test and fault diagnosis the intelligent transportation development platform with fault diagnosis script, obtains function joint debugging test
With diagnostic result;
S4, is uploaded to analysis system, institute by the unit testing and diagnostic result with the function joint debugging test and diagnostic result
State analysis system and analysis and evaluation is carried out with the function joint debugging test and diagnostic result to the unit testing and diagnostic result, obtain
Go out assessment result, improved for developer's reference of corresponding authority.
As a preferred embodiment, the step S3 is specifically included:According to the unit testing and fault diagnosis
Script is successively to the main control unit, the power subsystem, the level conversion unit, the display unit, the interface list
First, described bus unit, the key control unit, the wireless communication unit, the voice-input unit carry out test with
Fault diagnosis, obtains unit testing and diagnostic result;If the test and diagnostic result of unit is normal, according to described
Function joint debugging test is tested and fault diagnosis the intelligent transportation development platform with fault diagnosis script, obtains function connection
Commissioning is tried and diagnostic result;If the test and diagnostic result of unit is abnormal for part, by abnormal unit carry out every
From being surveyed according to the function joint debugging test with fault diagnosis script to the unit of the intelligent transportation development platform non-isolated
Examination and fault diagnosis, obtain function joint debugging test and diagnostic result;If the test and diagnostic result of unit is all different
Often, then the function joint debugging test is skipped to examine intelligent transportation development platform progress test with failure with fault diagnosis script
Disconnected step.
If in addition, abnormal unit is functionally associated with non-abnormal unit, in function joint debugging test with examining
Faulted-stage section is equally isolated the associated non-anomaly unit, to avoid the function joint debugging test and diagnostic stage by its shadow
Ring.For example, if wireless communication unit detection is broken down, isolation simultaneously communicates with the bus unit of connection, to avoid
The function joint debugging test and diagnostic stage is affected by it.Further, if bus unit has multiple, only isolate and channel radio
Believe the part bus unit of unit connection, and the situation that other units are communicated to connect with other parts bus unit is not then by rear
Continuous test influence.
As a preferred embodiment, the test can individually be write, store and be called with fault diagnosis script;
The test can also individually be write with fault diagnosis script, in the function code section that unit is inserted after writing;It is described to survey
Try directly to write in the function code section of unit with fault diagnosis script.Test and the volume of fault diagnosis script
WriteMode can flexibly be set according to actual testing requirement, can also be adjusted flexibly according to testing requirement, herein as just
Exemplary embodiment, is not limited.
As a preferred embodiment, the step S4 also includes:Statistic unit is set;By the unit testing with
Diagnostic result is uploaded to analysis system with the function joint debugging test and diagnostic result, and the analysis system is to the unit testing
Analysis and evaluation is carried out with diagnostic result and the function joint debugging test and diagnostic result, assessment result is drawn, described assess is tied
Fruit imported into statistic unit, and the statistic unit carries out horizontal analysis to multiple assessment results, obtains the horizontal stroke of unit
To analysis result and the horizontal analysis result of function joint debugging, improved for developer's reference of corresponding authority.
Embodiment two:
Alternatively embodiment, is filled as shown in figure 1, the present invention provides a kind of intelligent transportation development platform fault diagnosis
Put, described device includes following module:
Configuration module, the platform for configuring the intelligent transportation development platform is constituted, the intelligent transportation development platform it is flat
Platform, which is constituted, to be included:Main control unit, power subsystem, level conversion unit, display unit, interface unit, bus unit, by key control
Unit, wireless communication unit, voice-input unit;The main control unit respectively with the power subsystem, the level conversion list
First, described display unit, the interface unit, the bus unit, the key control unit, the wireless communication unit and
The voice-input unit sets up communication connection;The key control unit respectively with the power subsystem, the display unit,
The wireless communication unit and the voice-input unit set up communication connection;The level conversion unit be used for different units it
Between level conversion need;The display unit is used for the information for showing the intelligent transportation development platform in real time;The interface list
Member is used to realize the interface conversion between unit;The data communication that the bus unit is used between unit;It is described
Key control unit is used for the break-make for controlling unit signal;The wireless communication unit is used to realize that the intelligent transportation is opened
Send out the radio communication of platform and remote equipment;The voice-input unit is used for the input for realizing voice signal;
Script edit module, for for the main control unit, the power subsystem, the level conversion unit, the display list
First, described interface unit, the bus unit, the key control unit, the wireless communication unit, the phonetic entry list
Member writes unit testing and fault diagnosis script respectively;For the intelligent transportation development platform system for writing and compiling function joint debugging test with
Fault diagnosis script;
Test and fault diagnosis module, for according to the unit testing and fault diagnosis script successively to the main control unit,
The power subsystem, the level conversion unit, the display unit, the interface unit, the bus unit, the button
Control unit, the wireless communication unit, the voice-input unit are tested and fault diagnosis, obtain unit testing with examining
Disconnected result;If the test and diagnostic result of unit is normal, according to the function joint debugging test and fault diagnosis pin
This is tested and fault diagnosis the intelligent transportation development platform, obtains function joint debugging test and diagnostic result;If each
The test and diagnostic result of individual unit is abnormal for part, then is isolated abnormal unit, is tested according to the function joint debugging
The unit of the intelligent transportation development platform non-isolated is tested and fault diagnosis with fault diagnosis script, function connection is obtained
Commissioning is tried and diagnostic result;If the test and diagnostic result of unit is all abnormal, skips the function joint debugging and survey
Examination carries out the step of test and fault diagnosis with fault diagnosis script to the intelligent transportation development platform;
Interpretation of result module, for setting statistic unit;The unit testing and diagnostic result are tested with the function joint debugging
Analysis system is uploaded to diagnostic result, the analysis system is surveyed to the unit testing and diagnostic result with the function joint debugging
Examination carries out analysis and evaluation with diagnostic result, draws assessment result, the assessment result is imported into statistic unit, the statistics list
Member carries out horizontal analysis to multiple assessment results, obtains the horizontal analysis result of unit and the transverse direction point of function joint debugging
Result is analysed, is improved for developer's reference of corresponding authority.
The present invention proposes a kind of intelligent transportation development platform method for diagnosing faults and device, by being developed in intelligent transportation
Each functional unit of platform and platform integrated testability stage are loaded into corresponding test script, realize and develop flat to intelligent transportation
The overall automatic test of each functional unit and platform of platform, improves testing efficiency, reduces testing cost;In addition,
The test pattern of function joint debugging test and fault diagnosis stage is determined according to the number of faults of unit and type, is greatly improved
The flexibility of test;Finally, analysis is not only estimated to the result that single is tested, also the result repeatedly tested is carried out horizontal
To analysis and assessment, testing efficiency is further increased, the work for being efficiently completed exploitation test phase for developer is provided
Powerful guarantee.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair
Equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills
Art field, is included within the scope of the present invention.
Claims (5)
1. a kind of intelligent transportation development platform method for diagnosing faults, it is characterised in that methods described comprises the following steps:
S1, the platform for configuring the intelligent transportation development platform is constituted, and the platform of the intelligent transportation development platform, which is constituted, to be included:
Main control unit, power subsystem, level conversion unit, display unit, interface unit, bus unit, key control unit, channel radio
Believe unit, voice-input unit;The main control unit respectively with the power subsystem, the level conversion unit, the display
Unit, the interface unit, the bus unit, the key control unit, the wireless communication unit and the voice are defeated
Enter unit and set up communication connection;The key control unit respectively with the power subsystem, the display unit, the channel radio
Believe that unit and the voice-input unit set up communication connection;The level conversion unit is used for level conversion between different units
Need;The display unit is used for the information for showing the intelligent transportation development platform in real time;The interface unit is used to realize
Interface conversion between unit;The data communication that the bus unit is used between unit;It is described to press key control list
Member is used for the break-make for controlling unit signal;The wireless communication unit is used to realize the intelligent transportation development platform and remote
The radio communication of end equipment;The voice-input unit is used for the input for realizing voice signal;
S2, is the main control unit, the power subsystem, the level conversion unit, the display unit, the interface list
First, described bus unit, the key control unit, the wireless communication unit, the voice-input unit write list respectively
Member test and fault diagnosis script;For the intelligent transportation development platform system for writing and compiling function joint debugging test and fault diagnosis pin
This;
S3, according to the unit testing and fault diagnosis script successively to the main control unit, the power subsystem, the level
Converting unit, the display unit, the interface unit, the bus unit, the key control unit, the radio communication
Unit, the voice-input unit are tested and fault diagnosis, obtain unit testing and diagnostic result;Joined according to the function
Commissioning is tried to test and fault diagnosis the intelligent transportation development platform with fault diagnosis script, obtains function joint debugging test
With diagnostic result;
S4, is uploaded to analysis system, institute by the unit testing and diagnostic result with the function joint debugging test and diagnostic result
State analysis system and analysis and evaluation is carried out with the function joint debugging test and diagnostic result to the unit testing and diagnostic result, obtain
Go out assessment result, improved for developer's reference of corresponding authority.
2. according to the method described in claim 1, it is characterised in that the step S3 is specifically included:According to the unit testing
With fault diagnosis script successively to the main control unit, the power subsystem, the level conversion unit, the display unit,
The interface unit, the bus unit, the key control unit, the wireless communication unit, the voice-input unit
Tested and fault diagnosis, obtain unit testing and diagnostic result;If the test and diagnostic result of unit is normal,
Then the intelligent transportation development platform is tested and fault diagnosis according to the function joint debugging test and fault diagnosis script,
Obtain function joint debugging test and diagnostic result;If the test and diagnostic result of unit is abnormal for part, by exception
Unit is isolated, according to the function joint debugging test and fault diagnosis script to the intelligent transportation development platform non-isolated
Unit is tested and fault diagnosis, obtains function joint debugging test and diagnostic result;If the test and diagnostic knot of unit
Fruit is all abnormal, then skips the function joint debugging test and the intelligent transportation development platform is surveyed with fault diagnosis script
The step of examination and fault diagnosis.
3. according to the method described in claim 1, it is characterised in that the test can individually write with fault diagnosis script,
Store and call;The test can also individually be write with fault diagnosis script, and the function code of unit is inserted after writing
Duan Zhong;The test directly can also write with fault diagnosis script in the function code section of unit.
4. according to the method described in claim 1, it is characterised in that the step S4 also includes:Statistic unit is set;Will be described
Unit testing is uploaded to analysis system with diagnostic result and the function joint debugging test and diagnostic result, and the analysis system is to institute
State unit testing and carry out analysis and evaluation with the function joint debugging test and diagnostic result with diagnostic result, draw assessment result, will
The assessment result imported into statistic unit, and the statistic unit carries out horizontal analysis to multiple assessment results, obtains each
The horizontal analysis result of individual unit and the horizontal analysis result of function joint debugging, are improved for developer's reference of corresponding authority.
5. a kind of intelligent transportation development platform trouble-shooter, it is characterised in that described device includes following module:
Configuration module, the platform for configuring the intelligent transportation development platform is constituted, the intelligent transportation development platform it is flat
Platform, which is constituted, to be included:Main control unit, power subsystem, level conversion unit, display unit, interface unit, bus unit, by key control
Unit, wireless communication unit, voice-input unit;The main control unit respectively with the power subsystem, the level conversion list
First, described display unit, the interface unit, the bus unit, the key control unit, the wireless communication unit and
The voice-input unit sets up communication connection;The key control unit respectively with the power subsystem, the display unit,
The wireless communication unit and the voice-input unit set up communication connection;The level conversion unit be used for different units it
Between level conversion need;The display unit is used for the information for showing the intelligent transportation development platform in real time;The interface list
Member is used to realize the interface conversion between unit;The data communication that the bus unit is used between unit;It is described
Key control unit is used for the break-make for controlling unit signal;The wireless communication unit is used to realize that the intelligent transportation is opened
Send out the radio communication of platform and remote equipment;The voice-input unit is used for the input for realizing voice signal;
Script edit module, for for the main control unit, the power subsystem, the level conversion unit, the display list
First, described interface unit, the bus unit, the key control unit, the wireless communication unit, the phonetic entry list
Member writes unit testing and fault diagnosis script respectively;For the intelligent transportation development platform system for writing and compiling function joint debugging test with
Fault diagnosis script;
Test and fault diagnosis module, for according to the unit testing and fault diagnosis script successively to the main control unit,
The power subsystem, the level conversion unit, the display unit, the interface unit, the bus unit, the button
Control unit, the wireless communication unit, the voice-input unit are tested and fault diagnosis, obtain unit testing with examining
Disconnected result;If the test and diagnostic result of unit is normal, according to the function joint debugging test and fault diagnosis pin
This is tested and fault diagnosis the intelligent transportation development platform, obtains function joint debugging test and diagnostic result;If each
The test and diagnostic result of individual unit is abnormal for part, then is isolated abnormal unit, is tested according to the function joint debugging
The unit of the intelligent transportation development platform non-isolated is tested and fault diagnosis with fault diagnosis script, function connection is obtained
Commissioning is tried and diagnostic result;If the test and diagnostic result of unit is all abnormal, skips the function joint debugging and survey
Examination carries out the step of test and fault diagnosis with fault diagnosis script to the intelligent transportation development platform;
Interpretation of result module, for setting statistic unit;The unit testing and diagnostic result are tested with the function joint debugging
Analysis system is uploaded to diagnostic result, the analysis system is surveyed to the unit testing and diagnostic result with the function joint debugging
Examination carries out analysis and evaluation with diagnostic result, draws assessment result, the assessment result is imported into statistic unit, the statistics list
Member carries out horizontal analysis to multiple assessment results, obtains the horizontal analysis result of unit and the transverse direction point of function joint debugging
Result is analysed, is improved for developer's reference of corresponding authority.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710447049.5A CN107229271A (en) | 2017-06-14 | 2017-06-14 | A kind of intelligent transportation development platform method for diagnosing faults and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710447049.5A CN107229271A (en) | 2017-06-14 | 2017-06-14 | A kind of intelligent transportation development platform method for diagnosing faults and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107229271A true CN107229271A (en) | 2017-10-03 |
Family
ID=59936352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710447049.5A Pending CN107229271A (en) | 2017-06-14 | 2017-06-14 | A kind of intelligent transportation development platform method for diagnosing faults and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107229271A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102183951A (en) * | 2011-03-25 | 2011-09-14 | 同济大学 | Device for monitoring state of rotary bearing and diagnosing fault based on laboratory virtual instrument engineering workbench (Lab VIEW) |
CN103345207A (en) * | 2013-05-31 | 2013-10-09 | 北京泰乐德信息技术有限公司 | Mining analyzing and fault diagnosis system of rail transit monitoring data |
-
2017
- 2017-06-14 CN CN201710447049.5A patent/CN107229271A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102183951A (en) * | 2011-03-25 | 2011-09-14 | 同济大学 | Device for monitoring state of rotary bearing and diagnosing fault based on laboratory virtual instrument engineering workbench (Lab VIEW) |
CN103345207A (en) * | 2013-05-31 | 2013-10-09 | 北京泰乐德信息技术有限公司 | Mining analyzing and fault diagnosis system of rail transit monitoring data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10127740B2 (en) | Inspection apparatus, inspection system, and inspection method | |
CN103502947B (en) | System for diagnosing faults of component in vehicle | |
CN103744784B (en) | Mobile phone application automated testing method and system | |
CN102023922B (en) | System and method for testing automotive electronic diagnostic software | |
CN102141962A (en) | Safety distributed test framework system and test method thereof | |
CN105223843A (en) | A kind of re-entry space vehicle combination property verification system based on data sharing | |
CN106230903A (en) | Air conditioning unit solution lock control method and system | |
US11442095B2 (en) | Cable harness test system and test method for checking cable harnesses | |
CN107562038A (en) | A kind of Vehicle Controller Auto-Test System | |
US8504344B2 (en) | Interface between a verification environment and a hardware acceleration engine | |
CN105759150B (en) | A kind of test system and method for substation secondary device prefabricated cabin | |
CN108228465A (en) | A kind of Software function test method and device | |
CN101945017A (en) | Testing platform for train-ground transmission protocol in train operation control system and construction method thereof | |
CN114816980A (en) | Automatic testing device and method for embedded communication system | |
CN108989060A (en) | The method and detection system of a kind of pair of operator's charge on traffic detection accuracy | |
CN107204887A (en) | A kind of SCD file and protection device CID file consistences test system and method | |
KR100794130B1 (en) | Automatic Function Testing Equipment for Application Software and Additional Service of Mobile Communication Terminal | |
CN112925705B (en) | Unmanned-duty-based carrier rocket flight software acceptance method and system | |
CN113340613A (en) | Automatic testing system, method and device for vehicle-mounted terminal module and storage medium | |
CN102201877B (en) | Method and apparatus for testing air interface of TTCN (Testing and Test Control Notation)-3-based digital interphone | |
CN107229271A (en) | A kind of intelligent transportation development platform method for diagnosing faults and device | |
US20040268318A1 (en) | Expert system for intelligent testing | |
CN106612215A (en) | Integrated remote detection device and method based on Ethernet | |
CN104678292B (en) | A kind of complex programmable logic device (CPLD) test method and device | |
CN107170218A (en) | A kind of remote assistance method debugged for fire protection alarm system and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171003 |