CN105759150B - A kind of test system and method for substation secondary device prefabricated cabin - Google Patents
A kind of test system and method for substation secondary device prefabricated cabin Download PDFInfo
- Publication number
- CN105759150B CN105759150B CN201610219510.7A CN201610219510A CN105759150B CN 105759150 B CN105759150 B CN 105759150B CN 201610219510 A CN201610219510 A CN 201610219510A CN 105759150 B CN105759150 B CN 105759150B
- Authority
- CN
- China
- Prior art keywords
- test
- secondary device
- prefabricated cabin
- network
- substation secondary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 226
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000013307 optical fiber Substances 0.000 claims abstract description 22
- 238000010998 test method Methods 0.000 claims abstract description 19
- 238000012795 verification Methods 0.000 claims description 29
- 238000011056 performance test Methods 0.000 claims description 27
- 230000006870 function Effects 0.000 claims description 25
- 238000004458 analytical method Methods 0.000 claims description 22
- 241000272814 Anser sp. Species 0.000 claims description 21
- 230000004044 response Effects 0.000 claims description 18
- 230000006854 communication Effects 0.000 claims description 15
- 238000004891 communication Methods 0.000 claims description 12
- 238000007689 inspection Methods 0.000 claims description 12
- 238000012544 monitoring process Methods 0.000 claims description 12
- 238000010606 normalization Methods 0.000 claims description 10
- 230000003993 interaction Effects 0.000 claims description 9
- 238000005070 sampling Methods 0.000 claims description 9
- 230000011664 signaling Effects 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 8
- 230000001276 controlling effect Effects 0.000 claims description 7
- 238000013499 data model Methods 0.000 claims description 6
- 230000001681 protective effect Effects 0.000 claims description 6
- 238000004088 simulation Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 5
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 238000013507 mapping Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 230000001105 regulatory effect Effects 0.000 claims description 3
- 230000007781 signaling event Effects 0.000 claims description 3
- 238000010200 validation analysis Methods 0.000 claims description 3
- 230000008859 change Effects 0.000 claims description 2
- 238000012545 processing Methods 0.000 claims description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 claims 1
- 240000002853 Nelumbo nucifera Species 0.000 claims 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0823—Errors, e.g. transmission errors
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/08—Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
- H04L43/0823—Errors, e.g. transmission errors
- H04L43/0829—Packet loss
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a kind of test system and methods for substation secondary device prefabricated cabin, system includes integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network messages analyzer and tested substation secondary device prefabricated cabin, integrated testing platform is connected by optical fiber interface with tested substation secondary device prefabricated cabin, tested substation secondary device prefabricated cabin is connected by interchanger with IEC61850 network message analyzers, and integrated testing platform is also connected by testing workstation with IEC61850 network message analyzers.The present invention can accurate, reliable, quickly realize the efficient test to substation secondary device prefabricated cabin, it is narrow to solve secondary device prefabricated cabin internal volume, the problem of lacking test method, meet the Large scale construction testing requirement that modularization builds substation, testing efficiency is improved, is had a good application prospect.
Description
Technical field
The present invention relates to a kind of test system and methods for substation secondary device prefabricated cabin, belong to intelligent substation
Modularization construction technique field.
Background technology
Substation's modularization construction is one of the important model that New Generation of Intelligent substation builds, by using prefabricated group
Equipment is closed, a whole set of secondary device may be implemented and be integrated in prefabricated cabin by producer, maximizes and realizes batch production processing, in factory
It completes work, the secondary device prefabricated cabins such as relevant configuration, wiring, debugging and is integrally distributed to substation field, be arranged in match nearby
Near electric installation, field connection is reduced, reduces design, construction workload, effective lifting process quality shortens the construction period, carries
High substation's construction efficiency.
Currently, the debugging of secondary device prefabricated cabin is generally divided into the inline reconciliation field adjustable of factory, joint debugging refers to secondary in factory
Equipment carries out intelligence before being transported to substation field and being installed, in equipment manufacturer or the third-party authentication mechanism to satisfy the requirements
The function and performance verification of secondary device are tested.Joint debugging connects according to the practical networking situation of substation in the factory of usual secondary device
Connect, sampled, functions of the equipments verification, interoperability verification etc. various experiments.The main contents of joint debugging include that whole station is matched in factory
Set the contents such as inspection, the inspection of SCD file normalization, sampled value inspection, functions of the equipments verification, interoperability verification test.
However, due to the Highgrade integration of secondary device prefabricated cabin, inner space is narrow, and the difficulty tested in cabin is big, with
The debud mode of conventional substation, which is compared, has larger difference, does not play the advantage of intelligent station well, therefore, having must
The advantage of intelligent substation is played, design meets the debud mode of secondary device prefabricated cabin, improves its debugging efficiency, be current
Urgent problem.
Invention content
The invention aims to overcome the Highgrade integration of existing secondary device prefabricated cabin, inner space is narrow, cabin
The difficulty of interior experiment is big, has the problem of larger difference compared with the debud mode of conventional substation.The present invention's is used for power transformation
The test system and method for secondary device prefabricated cabin of standing accurate, reliable, can be realized quickly pre- to substation secondary device
The efficient test in cabin processed solves the problem of the narrow shortage test method of secondary device prefabricated cabin internal volume, meets intelligent change
Power station modularization builds the testing requirement of large-scale promotion, improves testing efficiency, has a good application prospect.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of test system for substation secondary device prefabricated cabin, it is characterised in that:Including integrated testing platform,
Optical fiber interface, testing workstation, interchanger, IEC61850 network messages analyzer and tested substation secondary device prefabricated cabin,
The tested substation secondary device prefabricated cabin is measurand, and secondary set is received by its internal fine interface cabinet
Voltage signal, current signal, primary equipment status signal needed for received shipment row and external control signal;
The integrated testing platform, the control of tested person work station, the electric current of simulated grid operation and are once set voltage
Standby status signal gives tested substation secondary device prefabricated cabin to provide simulation running environment, while passing through light by optical fiber interface
Fine interface is tested the feedback data of substation secondary device prefabricated cabin;
The optical fiber interface is connected with the optical fiber interface cabinet in tested substation secondary device prefabricated cabin, will be integrated
The signal of test platform is input to the secondary device in tested substation secondary device prefabricated cabin;
The testing workstation, for integrated testing platform transmission data emulator command, and to IEC61850 networks
Message analysis instrument sends start and stop instruction, and the Test Strategy of configuration testing system receives the test number of integrated testing platform feedback
According to according to Test Strategy and feedback data, analysis obtains test result;
The IEC61850 network messages analyzer, the start and stop for receiving testing workstation instruct, and pass through network monitoring
Mode records the network message of interchanger, analyzes network message and generates analysis report, and by analysis report data feedback to survey
Try work station;
Disparate networks message concentration in tested substation secondary device prefabricated cabin is sent to by the interchanger
IEC61850 network message analyzers;
The integrated testing platform is connected by optical fiber interface with tested substation secondary device prefabricated cabin, the quilt
It surveys substation secondary device prefabricated cabin by interchanger to be connected with IEC61850 network message analyzers, the integrated testing
Platform is also connected by testing workstation with IEC61850 network message analyzers.
It is previously described for the test system of substation secondary device prefabricated cabin, it is characterised in that:The analysis report is XML
File.
It is previously described for the test system of substation secondary device prefabricated cabin, it is characterised in that:The integrated testing is flat
Platform, the control of tested person work station, simulated grid operation electric current, voltage and primary equipment status signal, signal simulation
Scale can be extended or be reduced according to actual conditions.
Test method based on the above-mentioned test system for substation secondary device prefabricated cabin, it is characterised in that:Packet
Include following steps,
Step(1), by integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network messages
Analyzer and tested substation secondary device prefabricated cabin are attached, and testing workstation executes its test content;
Step(2)If the test content of testing workstation can not be completed, according to IEC61850 network message analyzers
Analysis report, testing workstation, which obtains, is tested the prefabricated interior problem equipment of substation secondary device, and is carried out to problem device single
Unit check, process problem equipment prepare its performance test again;
Step(3), after the test content for completing testing workstation, testing workstation executes the performance of entire test system
Test, IEC61850 network message analyzers generate analysis report, and are sent to testing workstation, and testing workstation is analyzed
Report is handled, and is outputed test result, and test is completed.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:Step
(1), testing workstation executes its test content, including the test of GOOSE message normalization, SV message specifications are tested, input
With the verification of output virtual terminator and relay protection function test.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:It is described
GOOSE message normalization is tested, and using message analysis software test there is the tested secondary device of GOOSE transmitting capacities to generate
GOOSE messages integrality, correctness, normalization;
The SV message specifications test, testing workstation are imitative by its internal benchmark combining unit or combining unit
True device meets DL/T860 standards to protection equipment, measurement and control unit and the transmission of other secondary devices with SV ability to accepts
SV messages examine the SV of equipment under test to receive ability, and carry out sampled value accuracy test;
It is described to output and input virtual terminator verification, including verification device configuration file and version;Data model;It is tested to set
The standby correctness for sending and receiving GOOSE displacements;Equipment under test receives the correctness of SV samplings;The above verification has one not conform to
Lattice, then it is unqualified that this, which outputs and inputs virtual terminator validation test,;
The relay protection function test includes functional verification and the every definite value school protected of protective relaying device
It tests.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:Step
(2), single device inspection is carried out to problem device, including single device uniformity test and communication function are examined,
The single device uniformity test, including device configuration file and version it is whether effective;Whether data model is correct;
Whether model is normal with mapping mode;
The communication function is examined, including normally whether device receive and send messages;Data transmission correctness;Communication function is normal
Whether;Whether communication process has disruption.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:Step
(3), testing workstation executes the performance test of entire test system, including equipment information interaction is tested, relay protection whole group
Behavior and time test, automated system performance test, snowslide inspection and applied in network performance test.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:It is described to set
Standby information interaction is tested, including the start failure protection between verification protective relaying device, lock-reclosing lock, the response of shunt tripping information exchange
Correctness;Verify the correctness of five anti-block signal interactions of monitoring system;
During the relay protection whole group behavior and time test, including the system failure, work(between verification protection equipment
It can the correctness of cooperation and the correctness of sequence of movement;Test sends out entirely mistake since failure to relay protection trip signal
The time of journey, as relay protection whole group actuation time;
The automated system performance test, including telemetering, remote signalling, distant control function verification of correctness, telemetering accuracy test,
Remote signalling SOE time tests;System response time:Telemetering changes the time for being transferred to station level, and control of arriving at a station is transmitted in quantity of state variation
The time of layer, remote control execute the time;System loading rate index test:CPU normal duty rates, cpu load rate under accident, network is just
Normal rate of load condensate, accident lower network rate of load condensate;
The snowslide is examined, in the case where setting fault mode, progress snowslide inspection, and acquisition network load rate, cpu load rate,
Sequence of events recording situation, telemetering, remote signalling, remote regulating, remote control executive condition;
The applied in network performance test, including GOOSE message applied in network performance test are surveyed under given network load flow
Tripping, the correctness closed a floodgate and response time between examination protection measuring and controlling equipment and intelligent terminal, and a certain two in analog network
Secondary device goes wrong, in the case of mistake sends GOOSE message, the response condition and property of other secondary devices in test network
Energy;
Sampled value applied in network performance test, under different background flow, whether test SV packet samplings value has packet loss or mistake
Sequence, Telemetry, function of measuring sampling precision;
Station level applied in network performance test, under heterogeneous networks flow, between test protection measuring and controlling equipment and monitoring backstage
Communication performance, including the delay of MMS messages, the packet loss of protection or remote signalling event MMS, monitoring backstage transmitting order to lower levels are protected
Protect correctness and response time of the measure and control device to command response.
The beneficial effects of the invention are as follows:The test system and method for substation secondary device prefabricated cabin of the present invention,
The efficient test to substation secondary device prefabricated cabin can accurate, reliable, be quickly realized, secondary device prefabricated cabin is solved
The problem of internal volume is narrow, shortage test method meets the Large scale construction testing requirement that modularization builds substation, carries
High testing efficiency, has a good application prospect.
Description of the drawings
Fig. 1 is the system block diagram of the test system for substation secondary device prefabricated cabin of the present invention.
Fig. 2 is the flow chart of the test method for substation secondary device prefabricated cabin of the present invention.
Specific implementation mode
Below in conjunction with Figure of description, the present invention will be further described.Following embodiment is only used for clearly
Illustrate technical scheme of the present invention, and not intended to limit the protection scope of the present invention.
The test system and method for substation secondary device prefabricated cabin of the present invention, can be accurate, reliable, quick
The efficient test to substation secondary device prefabricated cabin is realized, solution secondary device prefabricated cabin internal volume is narrow, lacks and surveys
The problem of method for testing, meets the testing requirement that intelligent substation modularization builds large-scale promotion, improves testing efficiency, such as
Shown in Fig. 1, including
Including integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network message analyzers
With tested substation secondary device prefabricated cabin,
The tested substation secondary device prefabricated cabin is measurand, and secondary set is received by its internal fine interface cabinet
Voltage signal, current signal, primary equipment status signal needed for received shipment row and external control signal;
The integrated testing platform, the control of tested person work station, the electric current of simulated grid operation and are once set voltage
Standby status signal gives tested substation secondary device prefabricated cabin to provide simulation running environment, while passing through light by optical fiber interface
Fine interface is tested the feedback data of substation secondary device prefabricated cabin;
The optical fiber interface is connected with the optical fiber interface cabinet in tested substation secondary device prefabricated cabin, will be integrated
The signal of test platform is input to the secondary device in tested substation secondary device prefabricated cabin;
The testing workstation, for integrated testing platform transmission data emulator command, and to IEC61850 networks
Message analysis instrument sends start and stop instruction, and the Test Strategy of configuration testing system receives the test number of integrated testing platform feedback
According to according to Test Strategy and feedback data, analysis obtains test result;
The IEC61850 network messages analyzer, the start and stop for receiving testing workstation instruct, and pass through network monitoring
Mode records the network message of interchanger, analyzes network message and generates analysis report, and by analysis report data feedback to survey
Try work station;
Disparate networks message concentration in tested substation secondary device prefabricated cabin is sent to by the interchanger
IEC61850 network message analyzers;
The integrated testing platform is connected by optical fiber interface with tested substation secondary device prefabricated cabin, the quilt
It surveys substation secondary device prefabricated cabin by interchanger to be connected with IEC61850 network message analyzers, the integrated testing
Platform is also connected by testing workstation with IEC61850 network message analyzers.
The analysis report is XML file.
The integrated testing platform, the control of tested person work station, the electric current of simulated grid operation and are once set voltage
Standby status signal, signal simulation scale can extend or reduce according to actual conditions.
As shown in Fig. 2, the test method based on the above-mentioned test system for substation secondary device prefabricated cabin, including
Following steps,
Step(1), by integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network messages
Analyzer and tested substation secondary device prefabricated cabin are attached(Optical fiber, cable or conducting wire etc. may be selected to be attached), survey
Examination work station executes its test content, wherein testing workstation executes its test content, including GOOSE message normalization
Test, outputs and inputs virtual terminator verification and relay protection function test at the test of SV message specifications.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:It is described
GOOSE message normalization is tested, and using message analysis software test there is the tested secondary device of GOOSE transmitting capacities to generate
GOOSE messages integrality, correctness, normalization;
The SV message specifications test, testing workstation are imitative by its internal benchmark combining unit or combining unit
True device meets DL/T860 standards to protection equipment, measurement and control unit and the transmission of other secondary devices with SV ability to accepts
SV messages examine the SV of equipment under test to receive ability, and carry out sampled value accuracy test;
It is described to output and input virtual terminator verification, including verification device configuration file and version;Data model;It is tested to set
The standby correctness for sending and receiving GOOSE displacements;Equipment under test receives the correctness of SV samplings;The above verification has one not conform to
Lattice, then it is unqualified that this, which outputs and inputs virtual terminator validation test,;
The relay protection function test includes functional verification and the every definite value school protected of protective relaying device
It tests;
Step(2)If the test content of testing workstation can not be completed, according to IEC61850 network message analyzers
Analysis report, testing workstation, which obtains, is tested the prefabricated interior problem equipment of substation secondary device, and is carried out to problem device single
Unit check, process problem equipment prepare its performance test again, wherein single device inspection is carried out to problem device, including
Single device uniformity test and communication function are examined,
The single device uniformity test, including device configuration file and version it is whether effective;Whether data model is correct;
Whether model is normal with mapping mode;
The communication function is examined, including normally whether device receive and send messages;Data transmission correctness;Communication function is normal
Whether;Whether communication process has disruption;
Step(3), after the test content for completing testing workstation, testing workstation executes the performance of entire test system
Test, IEC61850 network message analyzers generate analysis report, and are sent to testing workstation, and testing workstation is analyzed
Report is handled, and is outputed test result, and test is completed, and wherein testing workstation executes the performance test of entire test system, including
The test of equipment information interaction, the behavior of relay protection whole group and time test, automated system performance test, snowslide inspection and net
Network performance test.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:It is described to set
Standby information interaction is tested, including the start failure protection between verification protective relaying device, lock-reclosing lock, the response of shunt tripping information exchange
Correctness;Verify the correctness of five anti-block signal interactions of monitoring system;
During the relay protection whole group behavior and time test, including the system failure, work(between verification protection equipment
It can the correctness of training and the correctness of sequence of movement;Test sends out entirely mistake since failure to relay protection trip signal
The time of journey, as relay protection whole group actuation time;
The automated system performance test, including telemetering, remote signalling, distant control function verification of correctness, telemetering accuracy test,
Remote signalling SOE time tests;System response time:Telemetering changes the time for being transferred to station level, and control of arriving at a station is transmitted in quantity of state variation
The time of layer, remote control execute the time;System loading rate index test:CPU normal duty rates, cpu load rate under accident, network is just
Normal rate of load condensate, accident lower network rate of load condensate;
The snowslide is examined, in the case where setting fault mode, progress snowslide inspection, and acquisition network load rate, cpu load rate,
Sequence of events recording situation, telemetering, remote signalling, remote regulating, remote control executive condition;
The applied in network performance test, including GOOSE message applied in network performance test are surveyed under given network load flow
Tripping, the correctness closed a floodgate and response time between examination protection measuring and controlling equipment and intelligent terminal, and a certain two in analog network
Secondary device goes wrong, in the case of mistake sends GOOSE message, the response condition and property of other secondary devices in test network
Energy;
Sampled value applied in network performance test, under different background flow, whether test SV packet samplings value has packet loss or mistake
Sequence, Telemetry, function of measuring sampling precision;
Station level applied in network performance test, under heterogeneous networks flow, between test protection measuring and controlling equipment and monitoring backstage
Communication performance, including the delay of MMS messages, the packet loss of protection or remote signalling event MMS, monitoring backstage transmitting order to lower levels are protected
Protect correctness and response time of the measure and control device to command response.
The basic principles and main features and advantage of the present invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe the originals of the present invention
Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements
It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle
It is fixed.
Claims (9)
1. a kind of test system for substation secondary device prefabricated cabin, it is characterised in that:Including integrated testing platform, light
Fine interface, testing workstation, interchanger, IEC61850 network messages analyzer and tested substation secondary device prefabricated cabin,
The tested substation secondary device prefabricated cabin is measurand, and secondary device is received by its internal optical fiber interface cabinet
Voltage signal, current signal, primary equipment status signal and external control signal needed for operation;
The integrated testing platform, the control of tested person work station, electric current, voltage and the primary equipment shape of simulated grid operation
State signal is given tested substation secondary device prefabricated cabin to provide simulation running environment, while being connect by optical fiber by optical fiber interface
Mouth receives the feedback data for being tested substation secondary device prefabricated cabin;
The optical fiber interface is connected with the optical fiber interface cabinet in tested substation secondary device prefabricated cabin, by integrated testing
The signal of platform is input to the secondary device in tested substation secondary device prefabricated cabin;
The testing workstation, for integrated testing platform transmission data emulator command, and to IEC61850 network messages
Analyzer sends start and stop instruction, and the Test Strategy of configuration testing system receives the test data of integrated testing platform feedback, root
According to Test Strategy and feedback data, analysis obtains test result;
The IEC61850 network messages analyzer, the start and stop for receiving testing workstation instruct, and pass through network monitoring mode
The network message of interchanger is recorded, network message is analyzed and generates analysis report, and gives analysis report data feedback to test work
It stands;
Disparate networks message concentration in tested substation secondary device prefabricated cabin is sent to IEC61850 nets by the interchanger
Network message analysis instrument;
The integrated testing platform is connected by optical fiber interface with tested substation secondary device prefabricated cabin, the tested change
Power station secondary device prefabricated cabin is connected by interchanger with IEC61850 network message analyzers, the integrated testing platform
Also it is connected with IEC61850 network message analyzers by testing workstation.
2. the test system according to claim 1 for substation secondary device prefabricated cabin, it is characterised in that:Described point
Analysis is reported as XML file.
3. the test system according to claim 1 for substation secondary device prefabricated cabin, it is characterised in that:Described one
Body test platform, the control of tested person work station, electric current, voltage and the primary equipment status signal of simulated grid operation,
Signal simulation scale can according to actual conditions extend or reduce.
4. the test method of the test system according to claim 1 for substation secondary device prefabricated cabin, feature
It is:Include the following steps,
Step(1), integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network messages are analyzed
Instrument and tested substation secondary device prefabricated cabin are attached, and testing workstation executes its test content;
Step(2)If the test content of testing workstation can not be completed, according to the analysis of IEC61850 network message analyzers
Report, testing workstation, which obtains, is tested the prefabricated interior problem equipment of substation secondary device, and carries out single device to problem device
It examines, process problem equipment, the performance test prepared again;
Step(3), after the test content for completing testing workstation, the performance that testing workstation executes entire test system is surveyed
Examination, IEC61850 network message analyzers generate analysis report, and are sent to testing workstation, and testing workstation carries out analysis report
Announcement processing, outputs test result, and completes test.
5. the test method of the test system according to claim 4 for substation secondary device prefabricated cabin, feature
It is:Step(1), the test content that testing workstation executes, including the test of GOOSE message normalization, the survey of SV message specifications
It tries, output and input virtual terminator verification and relay protection function test.
6. the test method of the test system according to claim 5 for substation secondary device prefabricated cabin, feature
It is:The GOOSE message normalization test has the tested secondary of GOOSE transmitting capacities using message analysis software test
Integrality, correctness, the normalization for the GOOSE messages that equipment generates;
The SV message specifications test, testing workstation pass through its internal benchmark combining unit or combining unit emulator
The SV reports for meeting DL/T860 standards are sent to protection equipment, measurement and control unit and other secondary devices for receiving ability with SV
Text examines the SV of equipment under test to receive ability, and carries out sampled value accuracy test;
It is described to output and input virtual terminator verification, including verification device configuration file and version;Data model;Equipment under test is sent out
Send and receive the correctness of GOOSE displacements;Equipment under test receives the correctness of SV samplings;The above verification have one it is unqualified, then
It is unqualified that this, which outputs and inputs virtual terminator validation test,;
The relay protection function test includes functional verification and the every fixed value checking protected of protective relaying device.
7. the test method of the test system according to claim 5 for substation secondary device prefabricated cabin, feature
It is:Step(2), single device inspection is carried out to problem device, including single device uniformity test and communication function are examined,
The single device uniformity test, including device configuration file and version it is whether effective;Whether data model is correct;Model
It is whether normal with mapping mode;
The communication function is examined, including normally whether device receive and send messages;Data transmission correctness;Communication function normally with
It is no;Whether communication process has disruption.
8. the test method of the test system according to claim 5 for substation secondary device prefabricated cabin, feature
It is:Step(3), testing workstation executes the performance test of entire test system, including equipment information interaction is tested, relay
Protect whole group behavior and time test, automated system performance test, snowslide inspection and applied in network performance test.
9. the test method of the test system according to claim 8 for substation secondary device prefabricated cabin, feature
It is:The equipment information interaction test, including the start failure protection between verification protective relaying device, lock-reclosing lock, shunt tripping
The correctness of information exchange response;Verify the correctness of five anti-block signal interactions of monitoring system;
During the relay protection whole group behavior and time test, including the system failure, function is matched between verification protection equipment
The correctness of conjunction and the correctness of sequence of movement;Test sends out whole process since failure to relay protection trip signal
Time, as relay protection whole group actuation time;
The automated system performance test, including telemetering, remote signalling, distant control function verification of correctness, telemetering accuracy test, remote signalling
SOE time tests;System response time:Telemetering changes the time for being transferred to station level, and quantity of state variation is transferred to station level
Time, remote control execute the time;System loading rate index test:CPU normal duty rates, cpu load rate under accident, network are normally born
Lotus rate, accident lower network rate of load condensate;
The snowslide is examined, and in the case where setting fault mode, is carried out snowslide inspection, is obtained network load rate, cpu load rate, event
Journal situation, telemetering, remote signalling, remote regulating, remote control executive condition;
The applied in network performance test, including GOOSE message applied in network performance test, under given network load flow, test is protected
It protects tripping between measuring and controlling equipment and intelligent terminal, the correctness closed a floodgate and response time, and a certain in analog network secondary sets
It is standby to go wrong, in the case of mistake sends GOOSE message, the response condition and performance of other secondary devices in test network;
Sampled value applied in network performance test, under different background flow, whether test SV packet samplings value has packet loss or incorrect order, surveys
Try observing and controlling, function of measuring sampling precision;
Station level applied in network performance test, under heterogeneous networks flow, the communication between test protection measuring and controlling equipment and monitoring backstage
Performance, including the delay of MMS messages, the packet loss of protection or remote signalling event MMS, monitoring backstage transmitting order to lower levels, protection are surveyed
Control correctness and response time of the device to command response.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610219510.7A CN105759150B (en) | 2016-04-11 | 2016-04-11 | A kind of test system and method for substation secondary device prefabricated cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610219510.7A CN105759150B (en) | 2016-04-11 | 2016-04-11 | A kind of test system and method for substation secondary device prefabricated cabin |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105759150A CN105759150A (en) | 2016-07-13 |
CN105759150B true CN105759150B (en) | 2018-07-17 |
Family
ID=56333686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610219510.7A Active CN105759150B (en) | 2016-04-11 | 2016-04-11 | A kind of test system and method for substation secondary device prefabricated cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105759150B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106019039B (en) * | 2016-08-11 | 2019-01-25 | 国网江苏省电力公司电力科学研究院 | Standardize protective relaying device assembly line automatic checkout system and method |
CN106774237A (en) * | 2016-11-18 | 2017-05-31 | 中国电力科学研究院 | A kind of observing and controlling remote control sluggish detection method and its system |
CN107171830A (en) * | 2017-04-25 | 2017-09-15 | 上海科梁信息工程股份有限公司 | Power information physical hardware is in ring security simulation test platform |
CN107478922A (en) * | 2017-06-29 | 2017-12-15 | 国网上海市电力公司 | Intelligent substation closed loop test method based on GOOSE network |
CN108848008B (en) * | 2018-08-30 | 2021-11-09 | 国网福建省电力有限公司 | Online fault diagnosis method for telecontrol device of transformer substation |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101854078A (en) * | 2009-03-31 | 2010-10-06 | 华东电力试验研究院有限公司 | Monitoring system and method of operation condition of digitalized substation secondary device |
CN102055544A (en) * | 2010-12-09 | 2011-05-11 | 成都引众数字设备有限公司 | System and method for synchronously monitoring secondary equipment time of power supply system |
CN202076849U (en) * | 2011-06-03 | 2011-12-14 | 云南电网公司普洱供电局 | Centralized protection, measurement and control device for transformer station |
CN103887882A (en) * | 2014-03-31 | 2014-06-25 | 国网上海市电力公司 | Prefabricated modular secondary equipment system for substation |
-
2016
- 2016-04-11 CN CN201610219510.7A patent/CN105759150B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101854078A (en) * | 2009-03-31 | 2010-10-06 | 华东电力试验研究院有限公司 | Monitoring system and method of operation condition of digitalized substation secondary device |
CN102055544A (en) * | 2010-12-09 | 2011-05-11 | 成都引众数字设备有限公司 | System and method for synchronously monitoring secondary equipment time of power supply system |
CN202076849U (en) * | 2011-06-03 | 2011-12-14 | 云南电网公司普洱供电局 | Centralized protection, measurement and control device for transformer station |
CN103887882A (en) * | 2014-03-31 | 2014-06-25 | 国网上海市电力公司 | Prefabricated modular secondary equipment system for substation |
Non-Patent Citations (1)
Title |
---|
智能变电站预制舱式二次组合设备方案探析;戴建清等;《机电信息》;20151231(第36期);第72-73页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105759150A (en) | 2016-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105759150B (en) | A kind of test system and method for substation secondary device prefabricated cabin | |
CN104820635B (en) | A kind of self-closing ring gauge about robustness testing method based on the semantic parsing of dynamic script | |
CN102937685B (en) | The integrated testing platform of a kind of transformer station based on Real-time Simulation Technology | |
CN103076520A (en) | Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation | |
CN102005736B (en) | On-line monitoring method of state of relay protection equipment | |
CN104868599B (en) | A kind of intelligent substation message emulating test and correlation analysis system and emulation mode | |
CN105242164A (en) | Automatic detection system and method of secondary virtual loop of intelligent transformer station | |
CN114640173A (en) | Early warning model of transformer and generator based on many characteristic quantities | |
CN103176084A (en) | Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system | |
CN207020264U (en) | Suitable for the detecting system of protective relaying device | |
CN108512730B (en) | Intelligent substation telecontrol system equipment testing method, device and system | |
CN104750911B (en) | A kind of emulation modelling method of transformer station's prudential sub-station | |
CN203117313U (en) | Dynamic simulation and emulation detecting platform for intelligent substation secondary system | |
CN108268023B (en) | Remote fault diagnosis method and system for rail transit platform door | |
CN103926917A (en) | Intelligent transformer substation master control device testing system and method | |
CN106774237A (en) | A kind of observing and controlling remote control sluggish detection method and its system | |
CN106921522A (en) | Intelligent substation network message record analysis device networked information model inspection device | |
CN110376468A (en) | The live check method of virtual terminator is set in assembly under a kind of intelligent substation protection equipment | |
CN109768625A (en) | A kind of electric system overhaul management terminal and method | |
CN104076807A (en) | Method of debugging automation system of intelligent substation | |
CN110763937A (en) | Intelligent substation test platform and method based on electromagnetic transient real-time simulation | |
CN107766649A (en) | A kind of system protection real-time closed-loop emulation test system and its operation method | |
CN111030301B (en) | Method for checking correlation of scheduling automation information points | |
CN204706958U (en) | A kind of intelligent substation message emulating test and correlation analysis system | |
CN103997126A (en) | Fault diagnosis grading method and system based on on-off state |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||