CN105759150B - A kind of test system and method for substation secondary device prefabricated cabin - Google Patents

A kind of test system and method for substation secondary device prefabricated cabin Download PDF

Info

Publication number
CN105759150B
CN105759150B CN201610219510.7A CN201610219510A CN105759150B CN 105759150 B CN105759150 B CN 105759150B CN 201610219510 A CN201610219510 A CN 201610219510A CN 105759150 B CN105759150 B CN 105759150B
Authority
CN
China
Prior art keywords
test
secondary device
prefabricated cabin
network
substation secondary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610219510.7A
Other languages
Chinese (zh)
Other versions
CN105759150A (en
Inventor
卜强生
高磊
袁宇波
窦晓波
宋亮亮
宋爽
杨毅
李鹏
黄浩声
嵇建飞
林金娇
弓新月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Southeast University
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Southeast University
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Southeast University, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610219510.7A priority Critical patent/CN105759150B/en
Publication of CN105759150A publication Critical patent/CN105759150A/en
Application granted granted Critical
Publication of CN105759150B publication Critical patent/CN105759150B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0823Errors, e.g. transmission errors
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0823Errors, e.g. transmission errors
    • H04L43/0829Packet loss

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of test system and methods for substation secondary device prefabricated cabin, system includes integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network messages analyzer and tested substation secondary device prefabricated cabin, integrated testing platform is connected by optical fiber interface with tested substation secondary device prefabricated cabin, tested substation secondary device prefabricated cabin is connected by interchanger with IEC61850 network message analyzers, and integrated testing platform is also connected by testing workstation with IEC61850 network message analyzers.The present invention can accurate, reliable, quickly realize the efficient test to substation secondary device prefabricated cabin, it is narrow to solve secondary device prefabricated cabin internal volume, the problem of lacking test method, meet the Large scale construction testing requirement that modularization builds substation, testing efficiency is improved, is had a good application prospect.

Description

A kind of test system and method for substation secondary device prefabricated cabin
Technical field
The present invention relates to a kind of test system and methods for substation secondary device prefabricated cabin, belong to intelligent substation Modularization construction technique field.
Background technology
Substation's modularization construction is one of the important model that New Generation of Intelligent substation builds, by using prefabricated group Equipment is closed, a whole set of secondary device may be implemented and be integrated in prefabricated cabin by producer, maximizes and realizes batch production processing, in factory It completes work, the secondary device prefabricated cabins such as relevant configuration, wiring, debugging and is integrally distributed to substation field, be arranged in match nearby Near electric installation, field connection is reduced, reduces design, construction workload, effective lifting process quality shortens the construction period, carries High substation's construction efficiency.
Currently, the debugging of secondary device prefabricated cabin is generally divided into the inline reconciliation field adjustable of factory, joint debugging refers to secondary in factory Equipment carries out intelligence before being transported to substation field and being installed, in equipment manufacturer or the third-party authentication mechanism to satisfy the requirements The function and performance verification of secondary device are tested.Joint debugging connects according to the practical networking situation of substation in the factory of usual secondary device Connect, sampled, functions of the equipments verification, interoperability verification etc. various experiments.The main contents of joint debugging include that whole station is matched in factory Set the contents such as inspection, the inspection of SCD file normalization, sampled value inspection, functions of the equipments verification, interoperability verification test.
However, due to the Highgrade integration of secondary device prefabricated cabin, inner space is narrow, and the difficulty tested in cabin is big, with The debud mode of conventional substation, which is compared, has larger difference, does not play the advantage of intelligent station well, therefore, having must The advantage of intelligent substation is played, design meets the debud mode of secondary device prefabricated cabin, improves its debugging efficiency, be current Urgent problem.
Invention content
The invention aims to overcome the Highgrade integration of existing secondary device prefabricated cabin, inner space is narrow, cabin The difficulty of interior experiment is big, has the problem of larger difference compared with the debud mode of conventional substation.The present invention's is used for power transformation The test system and method for secondary device prefabricated cabin of standing accurate, reliable, can be realized quickly pre- to substation secondary device The efficient test in cabin processed solves the problem of the narrow shortage test method of secondary device prefabricated cabin internal volume, meets intelligent change Power station modularization builds the testing requirement of large-scale promotion, improves testing efficiency, has a good application prospect.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of test system for substation secondary device prefabricated cabin, it is characterised in that:Including integrated testing platform, Optical fiber interface, testing workstation, interchanger, IEC61850 network messages analyzer and tested substation secondary device prefabricated cabin,
The tested substation secondary device prefabricated cabin is measurand, and secondary set is received by its internal fine interface cabinet Voltage signal, current signal, primary equipment status signal needed for received shipment row and external control signal;
The integrated testing platform, the control of tested person work station, the electric current of simulated grid operation and are once set voltage Standby status signal gives tested substation secondary device prefabricated cabin to provide simulation running environment, while passing through light by optical fiber interface Fine interface is tested the feedback data of substation secondary device prefabricated cabin;
The optical fiber interface is connected with the optical fiber interface cabinet in tested substation secondary device prefabricated cabin, will be integrated The signal of test platform is input to the secondary device in tested substation secondary device prefabricated cabin;
The testing workstation, for integrated testing platform transmission data emulator command, and to IEC61850 networks Message analysis instrument sends start and stop instruction, and the Test Strategy of configuration testing system receives the test number of integrated testing platform feedback According to according to Test Strategy and feedback data, analysis obtains test result;
The IEC61850 network messages analyzer, the start and stop for receiving testing workstation instruct, and pass through network monitoring Mode records the network message of interchanger, analyzes network message and generates analysis report, and by analysis report data feedback to survey Try work station;
Disparate networks message concentration in tested substation secondary device prefabricated cabin is sent to by the interchanger IEC61850 network message analyzers;
The integrated testing platform is connected by optical fiber interface with tested substation secondary device prefabricated cabin, the quilt It surveys substation secondary device prefabricated cabin by interchanger to be connected with IEC61850 network message analyzers, the integrated testing Platform is also connected by testing workstation with IEC61850 network message analyzers.
It is previously described for the test system of substation secondary device prefabricated cabin, it is characterised in that:The analysis report is XML File.
It is previously described for the test system of substation secondary device prefabricated cabin, it is characterised in that:The integrated testing is flat Platform, the control of tested person work station, simulated grid operation electric current, voltage and primary equipment status signal, signal simulation Scale can be extended or be reduced according to actual conditions.
Test method based on the above-mentioned test system for substation secondary device prefabricated cabin, it is characterised in that:Packet Include following steps,
Step(1), by integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network messages Analyzer and tested substation secondary device prefabricated cabin are attached, and testing workstation executes its test content;
Step(2)If the test content of testing workstation can not be completed, according to IEC61850 network message analyzers Analysis report, testing workstation, which obtains, is tested the prefabricated interior problem equipment of substation secondary device, and is carried out to problem device single Unit check, process problem equipment prepare its performance test again;
Step(3), after the test content for completing testing workstation, testing workstation executes the performance of entire test system Test, IEC61850 network message analyzers generate analysis report, and are sent to testing workstation, and testing workstation is analyzed Report is handled, and is outputed test result, and test is completed.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:Step (1), testing workstation executes its test content, including the test of GOOSE message normalization, SV message specifications are tested, input With the verification of output virtual terminator and relay protection function test.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:It is described GOOSE message normalization is tested, and using message analysis software test there is the tested secondary device of GOOSE transmitting capacities to generate GOOSE messages integrality, correctness, normalization;
The SV message specifications test, testing workstation are imitative by its internal benchmark combining unit or combining unit True device meets DL/T860 standards to protection equipment, measurement and control unit and the transmission of other secondary devices with SV ability to accepts SV messages examine the SV of equipment under test to receive ability, and carry out sampled value accuracy test;
It is described to output and input virtual terminator verification, including verification device configuration file and version;Data model;It is tested to set The standby correctness for sending and receiving GOOSE displacements;Equipment under test receives the correctness of SV samplings;The above verification has one not conform to Lattice, then it is unqualified that this, which outputs and inputs virtual terminator validation test,;
The relay protection function test includes functional verification and the every definite value school protected of protective relaying device It tests.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:Step (2), single device inspection is carried out to problem device, including single device uniformity test and communication function are examined,
The single device uniformity test, including device configuration file and version it is whether effective;Whether data model is correct; Whether model is normal with mapping mode;
The communication function is examined, including normally whether device receive and send messages;Data transmission correctness;Communication function is normal Whether;Whether communication process has disruption.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:Step (3), testing workstation executes the performance test of entire test system, including equipment information interaction is tested, relay protection whole group Behavior and time test, automated system performance test, snowslide inspection and applied in network performance test.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:It is described to set Standby information interaction is tested, including the start failure protection between verification protective relaying device, lock-reclosing lock, the response of shunt tripping information exchange Correctness;Verify the correctness of five anti-block signal interactions of monitoring system;
During the relay protection whole group behavior and time test, including the system failure, work(between verification protection equipment It can the correctness of cooperation and the correctness of sequence of movement;Test sends out entirely mistake since failure to relay protection trip signal The time of journey, as relay protection whole group actuation time;
The automated system performance test, including telemetering, remote signalling, distant control function verification of correctness, telemetering accuracy test, Remote signalling SOE time tests;System response time:Telemetering changes the time for being transferred to station level, and control of arriving at a station is transmitted in quantity of state variation The time of layer, remote control execute the time;System loading rate index test:CPU normal duty rates, cpu load rate under accident, network is just Normal rate of load condensate, accident lower network rate of load condensate;
The snowslide is examined, in the case where setting fault mode, progress snowslide inspection, and acquisition network load rate, cpu load rate, Sequence of events recording situation, telemetering, remote signalling, remote regulating, remote control executive condition;
The applied in network performance test, including GOOSE message applied in network performance test are surveyed under given network load flow Tripping, the correctness closed a floodgate and response time between examination protection measuring and controlling equipment and intelligent terminal, and a certain two in analog network Secondary device goes wrong, in the case of mistake sends GOOSE message, the response condition and property of other secondary devices in test network Energy;
Sampled value applied in network performance test, under different background flow, whether test SV packet samplings value has packet loss or mistake Sequence, Telemetry, function of measuring sampling precision;
Station level applied in network performance test, under heterogeneous networks flow, between test protection measuring and controlling equipment and monitoring backstage Communication performance, including the delay of MMS messages, the packet loss of protection or remote signalling event MMS, monitoring backstage transmitting order to lower levels are protected Protect correctness and response time of the measure and control device to command response.
The beneficial effects of the invention are as follows:The test system and method for substation secondary device prefabricated cabin of the present invention, The efficient test to substation secondary device prefabricated cabin can accurate, reliable, be quickly realized, secondary device prefabricated cabin is solved The problem of internal volume is narrow, shortage test method meets the Large scale construction testing requirement that modularization builds substation, carries High testing efficiency, has a good application prospect.
Description of the drawings
Fig. 1 is the system block diagram of the test system for substation secondary device prefabricated cabin of the present invention.
Fig. 2 is the flow chart of the test method for substation secondary device prefabricated cabin of the present invention.
Specific implementation mode
Below in conjunction with Figure of description, the present invention will be further described.Following embodiment is only used for clearly Illustrate technical scheme of the present invention, and not intended to limit the protection scope of the present invention.
The test system and method for substation secondary device prefabricated cabin of the present invention, can be accurate, reliable, quick The efficient test to substation secondary device prefabricated cabin is realized, solution secondary device prefabricated cabin internal volume is narrow, lacks and surveys The problem of method for testing, meets the testing requirement that intelligent substation modularization builds large-scale promotion, improves testing efficiency, such as Shown in Fig. 1, including
Including integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network message analyzers With tested substation secondary device prefabricated cabin,
The tested substation secondary device prefabricated cabin is measurand, and secondary set is received by its internal fine interface cabinet Voltage signal, current signal, primary equipment status signal needed for received shipment row and external control signal;
The integrated testing platform, the control of tested person work station, the electric current of simulated grid operation and are once set voltage Standby status signal gives tested substation secondary device prefabricated cabin to provide simulation running environment, while passing through light by optical fiber interface Fine interface is tested the feedback data of substation secondary device prefabricated cabin;
The optical fiber interface is connected with the optical fiber interface cabinet in tested substation secondary device prefabricated cabin, will be integrated The signal of test platform is input to the secondary device in tested substation secondary device prefabricated cabin;
The testing workstation, for integrated testing platform transmission data emulator command, and to IEC61850 networks Message analysis instrument sends start and stop instruction, and the Test Strategy of configuration testing system receives the test number of integrated testing platform feedback According to according to Test Strategy and feedback data, analysis obtains test result;
The IEC61850 network messages analyzer, the start and stop for receiving testing workstation instruct, and pass through network monitoring Mode records the network message of interchanger, analyzes network message and generates analysis report, and by analysis report data feedback to survey Try work station;
Disparate networks message concentration in tested substation secondary device prefabricated cabin is sent to by the interchanger IEC61850 network message analyzers;
The integrated testing platform is connected by optical fiber interface with tested substation secondary device prefabricated cabin, the quilt It surveys substation secondary device prefabricated cabin by interchanger to be connected with IEC61850 network message analyzers, the integrated testing Platform is also connected by testing workstation with IEC61850 network message analyzers.
The analysis report is XML file.
The integrated testing platform, the control of tested person work station, the electric current of simulated grid operation and are once set voltage Standby status signal, signal simulation scale can extend or reduce according to actual conditions.
As shown in Fig. 2, the test method based on the above-mentioned test system for substation secondary device prefabricated cabin, including Following steps,
Step(1), by integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network messages Analyzer and tested substation secondary device prefabricated cabin are attached(Optical fiber, cable or conducting wire etc. may be selected to be attached), survey Examination work station executes its test content, wherein testing workstation executes its test content, including GOOSE message normalization Test, outputs and inputs virtual terminator verification and relay protection function test at the test of SV message specifications.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:It is described GOOSE message normalization is tested, and using message analysis software test there is the tested secondary device of GOOSE transmitting capacities to generate GOOSE messages integrality, correctness, normalization;
The SV message specifications test, testing workstation are imitative by its internal benchmark combining unit or combining unit True device meets DL/T860 standards to protection equipment, measurement and control unit and the transmission of other secondary devices with SV ability to accepts SV messages examine the SV of equipment under test to receive ability, and carry out sampled value accuracy test;
It is described to output and input virtual terminator verification, including verification device configuration file and version;Data model;It is tested to set The standby correctness for sending and receiving GOOSE displacements;Equipment under test receives the correctness of SV samplings;The above verification has one not conform to Lattice, then it is unqualified that this, which outputs and inputs virtual terminator validation test,;
The relay protection function test includes functional verification and the every definite value school protected of protective relaying device It tests;
Step(2)If the test content of testing workstation can not be completed, according to IEC61850 network message analyzers Analysis report, testing workstation, which obtains, is tested the prefabricated interior problem equipment of substation secondary device, and is carried out to problem device single Unit check, process problem equipment prepare its performance test again, wherein single device inspection is carried out to problem device, including Single device uniformity test and communication function are examined,
The single device uniformity test, including device configuration file and version it is whether effective;Whether data model is correct; Whether model is normal with mapping mode;
The communication function is examined, including normally whether device receive and send messages;Data transmission correctness;Communication function is normal Whether;Whether communication process has disruption;
Step(3), after the test content for completing testing workstation, testing workstation executes the performance of entire test system Test, IEC61850 network message analyzers generate analysis report, and are sent to testing workstation, and testing workstation is analyzed Report is handled, and is outputed test result, and test is completed, and wherein testing workstation executes the performance test of entire test system, including The test of equipment information interaction, the behavior of relay protection whole group and time test, automated system performance test, snowslide inspection and net Network performance test.
It is previously described for the test method of the test system of substation secondary device prefabricated cabin, it is characterised in that:It is described to set Standby information interaction is tested, including the start failure protection between verification protective relaying device, lock-reclosing lock, the response of shunt tripping information exchange Correctness;Verify the correctness of five anti-block signal interactions of monitoring system;
During the relay protection whole group behavior and time test, including the system failure, work(between verification protection equipment It can the correctness of training and the correctness of sequence of movement;Test sends out entirely mistake since failure to relay protection trip signal The time of journey, as relay protection whole group actuation time;
The automated system performance test, including telemetering, remote signalling, distant control function verification of correctness, telemetering accuracy test, Remote signalling SOE time tests;System response time:Telemetering changes the time for being transferred to station level, and control of arriving at a station is transmitted in quantity of state variation The time of layer, remote control execute the time;System loading rate index test:CPU normal duty rates, cpu load rate under accident, network is just Normal rate of load condensate, accident lower network rate of load condensate;
The snowslide is examined, in the case where setting fault mode, progress snowslide inspection, and acquisition network load rate, cpu load rate, Sequence of events recording situation, telemetering, remote signalling, remote regulating, remote control executive condition;
The applied in network performance test, including GOOSE message applied in network performance test are surveyed under given network load flow Tripping, the correctness closed a floodgate and response time between examination protection measuring and controlling equipment and intelligent terminal, and a certain two in analog network Secondary device goes wrong, in the case of mistake sends GOOSE message, the response condition and property of other secondary devices in test network Energy;
Sampled value applied in network performance test, under different background flow, whether test SV packet samplings value has packet loss or mistake Sequence, Telemetry, function of measuring sampling precision;
Station level applied in network performance test, under heterogeneous networks flow, between test protection measuring and controlling equipment and monitoring backstage Communication performance, including the delay of MMS messages, the packet loss of protection or remote signalling event MMS, monitoring backstage transmitting order to lower levels are protected Protect correctness and response time of the measure and control device to command response.
The basic principles and main features and advantage of the present invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe the originals of the present invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (9)

1. a kind of test system for substation secondary device prefabricated cabin, it is characterised in that:Including integrated testing platform, light Fine interface, testing workstation, interchanger, IEC61850 network messages analyzer and tested substation secondary device prefabricated cabin,
The tested substation secondary device prefabricated cabin is measurand, and secondary device is received by its internal optical fiber interface cabinet Voltage signal, current signal, primary equipment status signal and external control signal needed for operation;
The integrated testing platform, the control of tested person work station, electric current, voltage and the primary equipment shape of simulated grid operation State signal is given tested substation secondary device prefabricated cabin to provide simulation running environment, while being connect by optical fiber by optical fiber interface Mouth receives the feedback data for being tested substation secondary device prefabricated cabin;
The optical fiber interface is connected with the optical fiber interface cabinet in tested substation secondary device prefabricated cabin, by integrated testing The signal of platform is input to the secondary device in tested substation secondary device prefabricated cabin;
The testing workstation, for integrated testing platform transmission data emulator command, and to IEC61850 network messages Analyzer sends start and stop instruction, and the Test Strategy of configuration testing system receives the test data of integrated testing platform feedback, root According to Test Strategy and feedback data, analysis obtains test result;
The IEC61850 network messages analyzer, the start and stop for receiving testing workstation instruct, and pass through network monitoring mode The network message of interchanger is recorded, network message is analyzed and generates analysis report, and gives analysis report data feedback to test work It stands;
Disparate networks message concentration in tested substation secondary device prefabricated cabin is sent to IEC61850 nets by the interchanger Network message analysis instrument;
The integrated testing platform is connected by optical fiber interface with tested substation secondary device prefabricated cabin, the tested change Power station secondary device prefabricated cabin is connected by interchanger with IEC61850 network message analyzers, the integrated testing platform Also it is connected with IEC61850 network message analyzers by testing workstation.
2. the test system according to claim 1 for substation secondary device prefabricated cabin, it is characterised in that:Described point Analysis is reported as XML file.
3. the test system according to claim 1 for substation secondary device prefabricated cabin, it is characterised in that:Described one Body test platform, the control of tested person work station, electric current, voltage and the primary equipment status signal of simulated grid operation, Signal simulation scale can according to actual conditions extend or reduce.
4. the test method of the test system according to claim 1 for substation secondary device prefabricated cabin, feature It is:Include the following steps,
Step(1), integrated testing platform, optical fiber interface, testing workstation, interchanger, IEC61850 network messages are analyzed Instrument and tested substation secondary device prefabricated cabin are attached, and testing workstation executes its test content;
Step(2)If the test content of testing workstation can not be completed, according to the analysis of IEC61850 network message analyzers Report, testing workstation, which obtains, is tested the prefabricated interior problem equipment of substation secondary device, and carries out single device to problem device It examines, process problem equipment, the performance test prepared again;
Step(3), after the test content for completing testing workstation, the performance that testing workstation executes entire test system is surveyed Examination, IEC61850 network message analyzers generate analysis report, and are sent to testing workstation, and testing workstation carries out analysis report Announcement processing, outputs test result, and completes test.
5. the test method of the test system according to claim 4 for substation secondary device prefabricated cabin, feature It is:Step(1), the test content that testing workstation executes, including the test of GOOSE message normalization, the survey of SV message specifications It tries, output and input virtual terminator verification and relay protection function test.
6. the test method of the test system according to claim 5 for substation secondary device prefabricated cabin, feature It is:The GOOSE message normalization test has the tested secondary of GOOSE transmitting capacities using message analysis software test Integrality, correctness, the normalization for the GOOSE messages that equipment generates;
The SV message specifications test, testing workstation pass through its internal benchmark combining unit or combining unit emulator The SV reports for meeting DL/T860 standards are sent to protection equipment, measurement and control unit and other secondary devices for receiving ability with SV Text examines the SV of equipment under test to receive ability, and carries out sampled value accuracy test;
It is described to output and input virtual terminator verification, including verification device configuration file and version;Data model;Equipment under test is sent out Send and receive the correctness of GOOSE displacements;Equipment under test receives the correctness of SV samplings;The above verification have one it is unqualified, then It is unqualified that this, which outputs and inputs virtual terminator validation test,;
The relay protection function test includes functional verification and the every fixed value checking protected of protective relaying device.
7. the test method of the test system according to claim 5 for substation secondary device prefabricated cabin, feature It is:Step(2), single device inspection is carried out to problem device, including single device uniformity test and communication function are examined,
The single device uniformity test, including device configuration file and version it is whether effective;Whether data model is correct;Model It is whether normal with mapping mode;
The communication function is examined, including normally whether device receive and send messages;Data transmission correctness;Communication function normally with It is no;Whether communication process has disruption.
8. the test method of the test system according to claim 5 for substation secondary device prefabricated cabin, feature It is:Step(3), testing workstation executes the performance test of entire test system, including equipment information interaction is tested, relay Protect whole group behavior and time test, automated system performance test, snowslide inspection and applied in network performance test.
9. the test method of the test system according to claim 8 for substation secondary device prefabricated cabin, feature It is:The equipment information interaction test, including the start failure protection between verification protective relaying device, lock-reclosing lock, shunt tripping The correctness of information exchange response;Verify the correctness of five anti-block signal interactions of monitoring system;
During the relay protection whole group behavior and time test, including the system failure, function is matched between verification protection equipment The correctness of conjunction and the correctness of sequence of movement;Test sends out whole process since failure to relay protection trip signal Time, as relay protection whole group actuation time;
The automated system performance test, including telemetering, remote signalling, distant control function verification of correctness, telemetering accuracy test, remote signalling SOE time tests;System response time:Telemetering changes the time for being transferred to station level, and quantity of state variation is transferred to station level Time, remote control execute the time;System loading rate index test:CPU normal duty rates, cpu load rate under accident, network are normally born Lotus rate, accident lower network rate of load condensate;
The snowslide is examined, and in the case where setting fault mode, is carried out snowslide inspection, is obtained network load rate, cpu load rate, event Journal situation, telemetering, remote signalling, remote regulating, remote control executive condition;
The applied in network performance test, including GOOSE message applied in network performance test, under given network load flow, test is protected It protects tripping between measuring and controlling equipment and intelligent terminal, the correctness closed a floodgate and response time, and a certain in analog network secondary sets It is standby to go wrong, in the case of mistake sends GOOSE message, the response condition and performance of other secondary devices in test network;
Sampled value applied in network performance test, under different background flow, whether test SV packet samplings value has packet loss or incorrect order, surveys Try observing and controlling, function of measuring sampling precision;
Station level applied in network performance test, under heterogeneous networks flow, the communication between test protection measuring and controlling equipment and monitoring backstage Performance, including the delay of MMS messages, the packet loss of protection or remote signalling event MMS, monitoring backstage transmitting order to lower levels, protection are surveyed Control correctness and response time of the device to command response.
CN201610219510.7A 2016-04-11 2016-04-11 A kind of test system and method for substation secondary device prefabricated cabin Active CN105759150B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610219510.7A CN105759150B (en) 2016-04-11 2016-04-11 A kind of test system and method for substation secondary device prefabricated cabin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610219510.7A CN105759150B (en) 2016-04-11 2016-04-11 A kind of test system and method for substation secondary device prefabricated cabin

Publications (2)

Publication Number Publication Date
CN105759150A CN105759150A (en) 2016-07-13
CN105759150B true CN105759150B (en) 2018-07-17

Family

ID=56333686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610219510.7A Active CN105759150B (en) 2016-04-11 2016-04-11 A kind of test system and method for substation secondary device prefabricated cabin

Country Status (1)

Country Link
CN (1) CN105759150B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106019039B (en) * 2016-08-11 2019-01-25 国网江苏省电力公司电力科学研究院 Standardize protective relaying device assembly line automatic checkout system and method
CN106774237A (en) * 2016-11-18 2017-05-31 中国电力科学研究院 A kind of observing and controlling remote control sluggish detection method and its system
CN107171830A (en) * 2017-04-25 2017-09-15 上海科梁信息工程股份有限公司 Power information physical hardware is in ring security simulation test platform
CN107478922A (en) * 2017-06-29 2017-12-15 国网上海市电力公司 Intelligent substation closed loop test method based on GOOSE network
CN108848008B (en) * 2018-08-30 2021-11-09 国网福建省电力有限公司 Online fault diagnosis method for telecontrol device of transformer substation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101854078A (en) * 2009-03-31 2010-10-06 华东电力试验研究院有限公司 Monitoring system and method of operation condition of digitalized substation secondary device
CN102055544A (en) * 2010-12-09 2011-05-11 成都引众数字设备有限公司 System and method for synchronously monitoring secondary equipment time of power supply system
CN202076849U (en) * 2011-06-03 2011-12-14 云南电网公司普洱供电局 Centralized protection, measurement and control device for transformer station
CN103887882A (en) * 2014-03-31 2014-06-25 国网上海市电力公司 Prefabricated modular secondary equipment system for substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101854078A (en) * 2009-03-31 2010-10-06 华东电力试验研究院有限公司 Monitoring system and method of operation condition of digitalized substation secondary device
CN102055544A (en) * 2010-12-09 2011-05-11 成都引众数字设备有限公司 System and method for synchronously monitoring secondary equipment time of power supply system
CN202076849U (en) * 2011-06-03 2011-12-14 云南电网公司普洱供电局 Centralized protection, measurement and control device for transformer station
CN103887882A (en) * 2014-03-31 2014-06-25 国网上海市电力公司 Prefabricated modular secondary equipment system for substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
智能变电站预制舱式二次组合设备方案探析;戴建清等;《机电信息》;20151231(第36期);第72-73页 *

Also Published As

Publication number Publication date
CN105759150A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN105759150B (en) A kind of test system and method for substation secondary device prefabricated cabin
CN104820635B (en) A kind of self-closing ring gauge about robustness testing method based on the semantic parsing of dynamic script
CN102937685B (en) The integrated testing platform of a kind of transformer station based on Real-time Simulation Technology
CN103076520A (en) Dynamic analogue simulation detection platform and analogue simulation method for secondary system of intelligent substation
CN102005736B (en) On-line monitoring method of state of relay protection equipment
CN104868599B (en) A kind of intelligent substation message emulating test and correlation analysis system and emulation mode
CN105242164A (en) Automatic detection system and method of secondary virtual loop of intelligent transformer station
CN114640173A (en) Early warning model of transformer and generator based on many characteristic quantities
CN103176084A (en) Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN207020264U (en) Suitable for the detecting system of protective relaying device
CN108512730B (en) Intelligent substation telecontrol system equipment testing method, device and system
CN104750911B (en) A kind of emulation modelling method of transformer station's prudential sub-station
CN203117313U (en) Dynamic simulation and emulation detecting platform for intelligent substation secondary system
CN108268023B (en) Remote fault diagnosis method and system for rail transit platform door
CN103926917A (en) Intelligent transformer substation master control device testing system and method
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN106921522A (en) Intelligent substation network message record analysis device networked information model inspection device
CN110376468A (en) The live check method of virtual terminator is set in assembly under a kind of intelligent substation protection equipment
CN109768625A (en) A kind of electric system overhaul management terminal and method
CN104076807A (en) Method of debugging automation system of intelligent substation
CN110763937A (en) Intelligent substation test platform and method based on electromagnetic transient real-time simulation
CN107766649A (en) A kind of system protection real-time closed-loop emulation test system and its operation method
CN111030301B (en) Method for checking correlation of scheduling automation information points
CN204706958U (en) A kind of intelligent substation message emulating test and correlation analysis system
CN103997126A (en) Fault diagnosis grading method and system based on on-off state

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant