CN107227715A - A kind of side slope protection construction method on reservoir gentle slope - Google Patents

A kind of side slope protection construction method on reservoir gentle slope Download PDF

Info

Publication number
CN107227715A
CN107227715A CN201710509327.5A CN201710509327A CN107227715A CN 107227715 A CN107227715 A CN 107227715A CN 201710509327 A CN201710509327 A CN 201710509327A CN 107227715 A CN107227715 A CN 107227715A
Authority
CN
China
Prior art keywords
parts
side slope
construction method
grid
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710509327.5A
Other languages
Chinese (zh)
Inventor
苏冠东
币丽红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mayor Of Fangchenggang Branch Of Water Conservancy Management
Original Assignee
Mayor Of Fangchenggang Branch Of Water Conservancy Management
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mayor Of Fangchenggang Branch Of Water Conservancy Management filed Critical Mayor Of Fangchenggang Branch Of Water Conservancy Management
Priority to CN201710509327.5A priority Critical patent/CN107227715A/en
Publication of CN107227715A publication Critical patent/CN107227715A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • CCHEMISTRY; METALLURGY
    • C05FERTILISERS; MANUFACTURE THEREOF
    • C05BPHOSPHATIC FERTILISERS
    • C05B17/00Other phosphatic fertilisers, e.g. soft rock phosphates, bone meal
    • CCHEMISTRY; METALLURGY
    • C05FERTILISERS; MANUFACTURE THEREOF
    • C05GMIXTURES OF FERTILISERS COVERED INDIVIDUALLY BY DIFFERENT SUBCLASSES OF CLASS C05; MIXTURES OF ONE OR MORE FERTILISERS WITH MATERIALS NOT HAVING A SPECIFIC FERTILISING ACTIVITY, e.g. PESTICIDES, SOIL-CONDITIONERS, WETTING AGENTS; FERTILISERS CHARACTERISED BY THEIR FORM
    • C05G3/00Mixtures of one or more fertilisers with additives not having a specially fertilising activity

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Pest Control & Pesticides (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of side slope protection construction method on reservoir gentle slope, comprise the following steps:(1) side slope shaping, digs a plurality of cross one another groove on side slope vertical and horizontal, forms grid;(2) reinforcing bar is laid in groove, then casting concrete, conserved 10 15 days, form concrete grid;(3) sow, the Modified soil for being mixed with grass-seed is injected in the grid of side slope, the Modified soil for being mixed with grass seeds is compressed, smooth, then lay non-woven fabrics, complete construction and sow;Wherein, Modified soil in the step (3), counts, is mainly made up of following raw material by weight:9 13 parts of 9 13 parts of bentonite, 5 12 parts of kaolin, 27 parts of cornstarch, 13 parts of mesh polypropylene-fibre, 39 parts of flyash, 15 parts of fertilizer, 7 15 parts of clay and fine silica powder.The side slope protection construction method on reservoir gentle slope of the present invention, adds Modified soil in construction, can improve topsoil stability, and soil losses are less.Good ecological protection effect can be obtained.

Description

A kind of side slope protection construction method on reservoir gentle slope
Technical field
The present invention relates to side slope protection field, more particularly to a kind of side slope protection construction method on reservoir gentle slope.
Background technology
In the work progress of the infrastructure such as highway, railway, water conservancy, mine, the destruction of original place looks vegetation is inevitable, Spoir, abandon stone, excavation etc. and can leave substantial amounts of bare side sloping to harmonious natural environment, protecting slope ecology can conserve water Source, reduction soil erosion, can also effectively purify air, protecting ecology, beautify the environment, with good ecological benefits.
Side slope protection technology mainly includes plant protection and engineering protection two ways.Plant protection is typically using artificial paving The form such as careless, kind grass and plantation shrub (trees), is used for the soil-slope that slope Gao Bugao, the gradient are relatively delayed, suitable for plant grows, But plant protection also easily causes the harm such as ground coombe, table soil loss, once there are these harm, generally require to implement to repair Engineering, and recovery project needs the human and material resources of input, workload all very big.
The information for being disclosed in the background section is merely intended to understanding of the increase to the general background of the present invention, without answering When the prior art for being considered as recognizing or implying the information structure in any form well known to persons skilled in the art.
The content of the invention
It is an object of the invention to provide a kind of side slope protection construction method on reservoir gentle slope, so as to overcome side slope protection to imitate It is really bad, easily occur the shortcoming of coombe.
To achieve the above object, the invention provides a kind of side slope protection construction method on reservoir gentle slope, including following step Suddenly:
(1) side slope shaping, rejects the ratchel of the loose rubble of side slope and particle diameter in more than 10cm, in side slope vertical and horizontal It is upper to dig a plurality of cross one another groove, form grid;
(2) reinforcing bar is laid in groove, then casting concrete, conserved 10-15 days, form concrete grid, concrete Grid is higher by domatic 10-15cm;
(3) sow, the Modified soil for being mixed with grass-seed is injected in the grid of side slope, the Modified soil for being mixed with grass seeds is compressed, It is smooth, non-woven fabrics is then laid, construction is completed and sows;
Wherein, Modified soil in the step (3), counts, is mainly made up of following raw material by weight:Bentonite 9-13 Part, 5-12 parts of kaolin, 2-7 parts of cornstarch, 1-3 parts of mesh polypropylene-fibre, 3-9 parts of flyash, 1-5 parts of fertilizer, clay 7-15 parts and 9-13 parts of fine silica powder.
Preferably, in above-mentioned technical proposal, the depth that groove is excavated in the step (1) is 10-25cm, and width is 5- 10cm。
Preferably, in above-mentioned technical proposal, the 50-100cm that grid single lattice area is in the step (1)2
Preferably, in above-mentioned technical proposal, the grass seeds mixed in the step (3) in Modified soil, it is per square mud that it, which is matched, Grass-seed 10-12kg is added in soil, and is mixed with water, humidity is 40-50%.
Preferably, in above-mentioned technical proposal, the thickness of injection Modified soil is 5-10cm in the step (3).
Preferably, in above-mentioned technical proposal, the fertilizer in the step (3) is counted, mainly by following raw material by weight It is made:5-10 parts of phosphorus pentoxide, 12-22 parts of urea, 1-5 parts of potassium oxide, 1-3 parts of humic acid, 0.5-2 parts of potassium fulvate and poly- 0.5-2 parts of acrylamide.
Compared with prior art, the present invention has the advantages that:
(1) the side slope protection construction method on reservoir gentle slope of the present invention, the construction method is mainly used in carrying out the side slope of reservoir Protection, after, forms the grid entirety being connected with each other, improves overall barrier propterty.Modified soil is added in construction, can be carried High topsoil stability, soil losses are less.Good ecological protection effect can be obtained.
(2) in work progress using Modified soil carry out grass seeds sowing, can vegetation fast-growth go, and growth vegetation It is difficult to be washed away by water, makes side slope formation slot.Non-woven fabrics is laid during being conserved, can prevent vegetable layer from being rushed by rainwater Brush.
Embodiment
With reference to specific embodiment, the embodiment to the present invention is described in detail, it is to be understood that this hair Bright protection domain is not limited by embodiment.
Embodiment 1
A kind of side slope protection construction method on reservoir gentle slope, comprises the following steps:
(1) side slope shaping, rejects the ratchel of the loose rubble of side slope and particle diameter in more than 10cm, in side slope vertical and horizontal Upper to dig a plurality of cross one another groove, the depth for excavating groove is 10-25cm, and width is 5-10cm, forms grid;Grid single lattice face The 50-100cm that product is2
(2) reinforcing bar is laid in groove, then casting concrete, conserved 13 days, form concrete grid, concrete grid It is higher by domatic 10-15cm;Concrete is mainly made up of following raw material:Common sulpho-aluminous cement, fine aggregate, calcium hydroxide, kaolin And calcium lignosulfonate.The mass ratio of mixing is 70:20:15:10:3.
(3) sow, the Modified soil for being mixed with grass-seed is injected in the grid of side slope, the thickness of injection Modified soil is 5- 10cm.The grass seeds mixed in Modified soil, it is to add grass-seed 11kg per in square soil that it, which is matched, and is mixed with water, and humidity is 40-50%.The Modified soil for being mixed with grass seeds is compressed, it is smooth, then lay non-woven fabrics, complete construction and sow;
Wherein, Modified soil in the step (3), counts, is mainly made up of following raw material by weight:11 parts of bentonite, 7 parts of kaolin, 4 parts of cornstarch, 2 parts of mesh polypropylene-fibre, 5 parts of flyash, 3 parts of fertilizer, 11 parts of clay and silica 11 parts of micro mist.
Fertilizer in the step (3), counts, is mainly made up of following raw material by weight:7 parts of phosphorus pentoxide, urine 1.5 parts of 16 parts of element, 3 parts of potassium oxide, 2 parts of humic acid, 1 part of potassium fulvate and polyacrylamide.
Embodiment 2
A kind of side slope protection construction method on reservoir gentle slope, comprises the following steps:
(1) side slope shaping, rejects the ratchel of the loose rubble of side slope and particle diameter in more than 10cm, in side slope vertical and horizontal Upper to dig a plurality of cross one another groove, the depth for excavating groove is 10-25cm, and width is 5-10cm, forms grid;Grid single lattice face The 50-100cm that product is2
(2) reinforcing bar is laid in groove, then casting concrete, conserved 10 days, form concrete grid, concrete grid It is higher by domatic 10-15cm;Concrete is mainly made up of following raw material:Common sulpho-aluminous cement, fine aggregate, calcium hydroxide, kaolin And calcium lignosulfonate.The mass ratio of mixing is 70:20:15:10:3.
(3) sow, the Modified soil for being mixed with grass-seed is injected in the grid of side slope, the thickness of injection Modified soil is 5- 10cm.The grass seeds mixed in Modified soil, it is to add grass-seed 10kg per in square soil that it, which is matched, and is mixed with water, and humidity is 40-50%.The Modified soil for being mixed with grass seeds is compressed, it is smooth, then lay non-woven fabrics, complete construction and sow;
Wherein, Modified soil in the step (3), counts, is mainly made up of following raw material by weight:9 parts of bentonite, height 12 parts of ridge soil, 2 parts of cornstarch, 3 parts of mesh polypropylene-fibre, 3 parts of flyash, 1 part of fertilizer, 7 parts of clay and silica are micro- 13 parts of powder.
Fertilizer in the step (3), counts, is mainly made up of following raw material by weight:5 parts of phosphorus pentoxide, urine 0.5 part of 22 parts of element, 1 part of potassium oxide, 3 parts of humic acid, 0.5 part of potassium fulvate and polyacrylamide.
Embodiment 3
A kind of side slope protection construction method on reservoir gentle slope, comprises the following steps:
(1) side slope shaping, rejects the ratchel of the loose rubble of side slope and particle diameter in more than 10cm, in side slope vertical and horizontal Upper to dig a plurality of cross one another groove, the depth for excavating groove is 10-25cm, and width is 5-10cm, forms grid;Grid single lattice face The 50-100cm that product is2
(2) reinforcing bar is laid in groove, then casting concrete, conserved 15 days, form concrete grid, concrete grid It is higher by domatic 10-15cm;Concrete is mainly made up of following raw material:Common sulpho-aluminous cement, fine aggregate, calcium hydroxide, kaolin And calcium lignosulfonate.The mass ratio of mixing is 70:20:15:10:3.
(3) sow, the Modified soil for being mixed with grass-seed is injected in the grid of side slope, the thickness of injection Modified soil is 5- 10cm.The grass seeds mixed in Modified soil, it is to add grass-seed 12kg per in square soil that it, which is matched, and is mixed with water, and humidity is 40-50%.The Modified soil for being mixed with grass seeds is compressed, it is smooth, then lay non-woven fabrics, complete construction and sow;
Wherein, Modified soil in the step (3), counts, is mainly made up of following raw material by weight:13 parts of bentonite, 5 parts of kaolin, 7 parts of cornstarch, 1 part of mesh polypropylene-fibre, 9 parts of flyash, 5 parts of fertilizer, 15 parts of clay and silica 9 parts of micro mist.
Fertilizer in the step (3), counts, is mainly made up of following raw material by weight:10 parts of phosphorus pentoxide, urine 2 parts of 12 parts of element, 5 parts of potassium oxide, 1 part of humic acid, 2 parts of potassium fulvate and polyacrylamide.
Embodiment 4
A kind of side slope protection construction method on reservoir gentle slope, comprises the following steps:
(1) side slope shaping, rejects the ratchel of the loose rubble of side slope and particle diameter in more than 10cm, in side slope vertical and horizontal Upper to dig a plurality of cross one another groove, the depth for excavating groove is 10-25cm, and width is 5-10cm, forms grid;Grid single lattice face The 50-100cm that product is2
(2) reinforcing bar is laid in groove, then casting concrete, conserved 13 days, form concrete grid, concrete grid It is higher by domatic 10-15cm;Concrete is mainly made up of following raw material:Common sulpho-aluminous cement, fine aggregate, calcium hydroxide, kaolin And calcium lignosulfonate.The mass ratio of mixing is 70:20:15:10:3.
(3) sow, will be mixed with the common soil and fertilizer of grass-seed, the mass ratio of fertilizer and common soil is 3:51;Spray Penetrate in the grid of side slope, the thickness of injection Modified soil is 5-10cm.The grass seeds mixed in Modified soil, it is per square soil that it, which is matched, Middle addition grass-seed 11kg, and be mixed with water, humidity is 40-50%.By be mixed with grass seeds Modified soil compress, it is smooth, then Non-woven fabrics is laid, construction is completed and sows.
Fertilizer in the step (3), counts, is mainly made up of following raw material by weight:7 parts of phosphorus pentoxide, urine 1.5 parts of 16 parts of element, 3 parts of potassium oxide, 2 parts of humic acid, 1 part of potassium fulvate and polyacrylamide.
The use of the side slope protection construction method on reservoir gentle slope of the present invention is 1 to the gradient:2.2 side slope is applied using gunite Work, sprayed construction after 6 months implementation result it is as shown in table 1.
The contrast that the construction method side slope of the different side slope protections of table 1 is protected
As shown in table 1, the side slope protection construction method on reservoir gentle slope, adds Modified soil in construction, can improve topsoil Earth stability, soil losses are less.Good ecological protection effect can be obtained.
It is foregoing to the present invention specific illustrative embodiment description be in order to illustrate and illustration purpose.These descriptions It is not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to above-mentioned teaching, can be much changed And change.The purpose of selecting and describing the exemplary embodiment is that explaining that the certain principles and its reality of the present invention should With so that those skilled in the art can realize and using the present invention a variety of exemplaries and A variety of selections and change.The scope of the present invention is intended to be limited by claims and its equivalents.

Claims (6)

1. a kind of side slope protection construction method on reservoir gentle slope, it is characterised in that comprise the following steps:
(1) side slope shaping, rejects the ratchel of the loose rubble of side slope and particle diameter in more than 10cm, is dug on side slope vertical and horizontal A plurality of cross one another groove, forms grid;
(2) reinforcing bar is laid in groove, then casting concrete, conserved 10-15 days, form concrete grid, concrete grid It is higher by domatic 10-15cm;
(3) sow, the Modified soil for being mixed with grass-seed is injected in the grid of side slope, by be mixed with grass seeds Modified soil compress, it is smooth, Then non-woven fabrics is laid, construction is completed and sows;
Wherein, Modified soil in the step (3), counts, is mainly made up of following raw material by weight:9-13 parts of bentonite, height 5-12 parts of ridge soil, 2-7 parts of cornstarch, 1-3 parts of mesh polypropylene-fibre, 3-9 parts of flyash, 1-5 parts of fertilizer, 7-15 parts of clay With 9-13 parts of fine silica powder.
2. the side slope protection construction method on reservoir gentle slope according to claim 1, it is characterised in that in the step (1) The depth for excavating groove is 10-25cm, and width is 5-10cm.
3. the side slope protection construction method on reservoir gentle slope according to claim 1, it is characterised in that in the step (1) The 50-100cm that grid single lattice area is2
4. the side slope protection construction method on reservoir gentle slope according to claim 1, it is characterised in that in the step (3) The grass seeds mixed in Modified soil, it is to add grass-seed 10-12kg per in square soil that it, which is matched, and is mixed with water, and humidity is 40- 50%.
5. the side slope protection construction method on reservoir gentle slope according to claim 1, it is characterised in that in the step (3) The thickness for spraying Modified soil is 5-10cm.
6. the side slope protection construction method on reservoir gentle slope according to claim 1, it is characterised in that in the step (3) Fertilizer, count, be mainly made up of following raw material by weight:5-10 parts of phosphorus pentoxide, 12-22 parts of urea, potassium oxide 1-5 Part, 1-3 parts of humic acid, 0.5-2 parts of potassium fulvate and 0.5-2 parts of polyacrylamide.
CN201710509327.5A 2017-06-28 2017-06-28 A kind of side slope protection construction method on reservoir gentle slope Pending CN107227715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710509327.5A CN107227715A (en) 2017-06-28 2017-06-28 A kind of side slope protection construction method on reservoir gentle slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710509327.5A CN107227715A (en) 2017-06-28 2017-06-28 A kind of side slope protection construction method on reservoir gentle slope

Publications (1)

Publication Number Publication Date
CN107227715A true CN107227715A (en) 2017-10-03

Family

ID=59936513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710509327.5A Pending CN107227715A (en) 2017-06-28 2017-06-28 A kind of side slope protection construction method on reservoir gentle slope

Country Status (1)

Country Link
CN (1) CN107227715A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108513874A (en) * 2018-04-27 2018-09-11 山西智德安全技术股份有限公司 A kind of hillock side slope anti-erosion method for recovering vegetation
CN110304971A (en) * 2019-06-21 2019-10-08 西安颐普生态科技股份有限公司 A kind of glycosyl slow-release fertilizer for hillside fields
CN114540040A (en) * 2020-11-18 2022-05-27 蓝星(北京)化工机械有限公司 Soil matrix modifier for rapid restoration and desertification of plateau environment vegetation

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804095A (en) * 2016-03-15 2016-07-27 云南建工集团有限公司 Prefabricated grid beam used for supporting side slopes and supporting method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804095A (en) * 2016-03-15 2016-07-27 云南建工集团有限公司 Prefabricated grid beam used for supporting side slopes and supporting method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孟兆祯等: "《风景园林工程》", 31 March 2012, 中国林业出版社教材出版中心 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108513874A (en) * 2018-04-27 2018-09-11 山西智德安全技术股份有限公司 A kind of hillock side slope anti-erosion method for recovering vegetation
CN108513874B (en) * 2018-04-27 2020-08-07 山西智德安全技术股份有限公司 Erosion-resistant vegetation recovery method for hillock side slope
CN110304971A (en) * 2019-06-21 2019-10-08 西安颐普生态科技股份有限公司 A kind of glycosyl slow-release fertilizer for hillside fields
CN114540040A (en) * 2020-11-18 2022-05-27 蓝星(北京)化工机械有限公司 Soil matrix modifier for rapid restoration and desertification of plateau environment vegetation

Similar Documents

Publication Publication Date Title
CN108124632B (en) greening method suitable for high and steep shale slope
CN106638634A (en) Road rock slope vine ecological protection structure and construction method
CN101761086B (en) Three-dimensional net greening technique for roadbed side slope
CN108589743B (en) Ecological geogrid for slope protection
CN102409637B (en) Ecological restoration method of hydro-fluctuation belt
CN107653893A (en) A kind of grass fills the surface of a wound ecological restoring method combined
CN105165325B (en) A kind of cohesive soil with low liquid protecting slope ecology method
CN108093729A (en) Side-slope greening and protection method
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN104196038A (en) High and steep rock side slope active protection method and facility
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN105178340A (en) Anti-scouring structure used for ecological regreening of rock slope and concrete material used for anti-scouring structure
CN206736931U (en) Highway Lithological Slope liana ecological safeguard structure
CN107237334B (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN108547307A (en) Protecting slope ecology method based on artificial loam
CN107227715A (en) A kind of side slope protection construction method on reservoir gentle slope
CN107100176A (en) A kind of expressway slope greening system
CN102523970A (en) Quick ecological rehabilitation method for steep rock slope
CN113235623A (en) Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof
CN207619967U (en) Restoration of the ecosystem side slope surface construction on a kind of mine
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN1714616A (en) Recovering technology for VRT base plate reparing and plastisizing vegitation
CN205035814U (en) A scour prevention structure that is used for rock matter side slope ecological compound green
CN107285713A (en) Side slope protection concrete and side slope protection construction method
CN204676571U (en) A kind of flexible protective slope structure of feldspathic sandstone natural slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171003