CN107190769A - Stop well construction between a kind of underground deep space of soft soil foundation - Google Patents

Stop well construction between a kind of underground deep space of soft soil foundation Download PDF

Info

Publication number
CN107190769A
CN107190769A CN201611216033.5A CN201611216033A CN107190769A CN 107190769 A CN107190769 A CN 107190769A CN 201611216033 A CN201611216033 A CN 201611216033A CN 107190769 A CN107190769 A CN 107190769A
Authority
CN
China
Prior art keywords
stake
pile
soft soil
soil foundation
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611216033.5A
Other languages
Chinese (zh)
Inventor
杨小方
金胜华
张�杰
沈亦豪
周林光
严敬忠
江海波
许明星
陈希
金仲远
林彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou City Resources Development Engineering Co Ltd
Original Assignee
Wenzhou City Resources Development Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou City Resources Development Engineering Co Ltd filed Critical Wenzhou City Resources Development Engineering Co Ltd
Priority to CN201611216033.5A priority Critical patent/CN107190769A/en
Publication of CN107190769A publication Critical patent/CN107190769A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Stop well construction between a kind of underground deep space of soft soil foundation, it is characterized in that, the structure is included by the 1.2m of stake footpath 0.5, the long single shaft or multiaxis cement mixing pile for exceeding parking well depth 1 10m of stake or the stake of SMW engineering methods enclose curtain as peripheral sealing, by the 1.5m of stake footpath 0.7, the long cast-in-situ bored pile or interlocking pile for exceeding parking well depth 8 30m of stake is used as exterior wall, segmentation formwork pours into a mould thick 0.3 0.8m armored concrete interior wall from the top down or from below to up, shaft bottom is reinforced concrete floor and plain concrete back cover layer, plane is square or rectangle well type structured, underlie the waterstop that is made up of 5 10m solid cements mixing piles or high-pressure rotary jet grouting pile in back cover layer.Compared with prior art, can be used in the city business district of China coast soft soil foundation, with shaft bottom soil layer not on gush, required construction site is small, and construction equipment is simple, and speed of application is fast, low engineering cost, the advantages of water-tight.

Description

Stop well construction between a kind of underground deep space of soft soil foundation
Technical field
The present invention relates to the well construction that stopped between building field, more particularly to a kind of underground deep space of soft soil foundation.
Background technology
It is well known that city parking difficulty is a bottleneck of current city development, it is also an important project supported by commen people, especially It is Deposits in Eastern Coastal China soft soil foundation city parking difficulty it is even more serious, its reason be reform and opening-up in one's early years build cell by In not planning long-range parking, basement or only one layer basement parking are not provided with substantially, nowadays, even if night roadside is all fully parked with Private car, can not still meet growing private car parking and require.
The content of the invention
Stop well construction between a kind of underground deep space of soft soil foundation of present invention offer, can be in China coast soft soil foundation City business district is used, small with required construction site, shaft bottom soil layer not on gush, construction equipment is simple, and speed of application is fast, engineering Cost is low, the advantages of water-tight.
Stop well construction between a kind of underground deep space of soft soil foundation of the present invention, it is characterised in that the structure include by Stake footpath 0.5-1.2m, the long single shaft or multiaxis cement mixing pile for exceeding parking well depth 1-10m of stake or the stake of SMW engineering methods are as periphery Sealing encloses curtain, by stake footpath 0.7-1.5m, the long cast-in-situ bored pile or interlocking pile for exceeding parking well depth 8-30m of stake as exterior wall, Segmentation formwork pours into a mould thickness 0.3-0.8m armored concrete interior wall from the top down or from below to up, and shaft bottom is reinforced concrete floor And plain concrete back cover layer, plane be it is square or rectangle well type structured, back cover layer underlie have 5-10m solid cements mixing pile or The waterstop of high-pressure rotary jet grouting pile composition.
The present invention compared with prior art, can be used in the city business district of China coast soft soil foundation, with shaft bottom soil Layer not on gush, required construction site is small, and construction equipment is simple, and speed of application is fast, low engineering cost, the advantages of water-tight.
Brief description of the drawings
Fig. 1 is diagrammatic cross-section of the embodiment of the present invention.
Drawing explanation:1 miscellaneous fill, 2 soil cement water-stop curtains, the borehole wall in 3,4 wellholes, the outer borehole wall of 5 cast-in-situ bored piles, 6 become silted up Mud layer, 7 argillic horizons, 8 gravel layers, 9 soil cement waterstops, 10 concrete sealing bottoms layer, 11 reinforced concrete floors.
Embodiment
According to Fig. 1, the embodiment construction procedure for the well construction that stopped between a kind of underground deep space of soft soil foundation is as follows:
1. at the construction field (site), cast-in-situ bored pile (5) of the construction diameter 1m length from ground to gravel layer (8).
2. in wellhole (4) bottom argillic horizon (7), with the thick soil cement waterstops (9) of churning ram machine construction 8m, filled in drilling Note on the outside of stake (5), with the native water-stop curtain (2) of mixing pile machine construction 1.2m solid cements.
3. water filling digs a well the interior soil body to shaft bottom absolute altitude, then tremie concrete back cover layer (10).
4. after concrete sealing bottom layer (10) intensity reaches, drawn water in pit shaft (4), making reinforcing bar by existing construction technology mixes Solidifying soil bottom plate (11).
5. it is segmented formwork from bottom to top by current art and pours 0.6m thickness armored concrete Inner walls (3), that is, completes a kind of soft The construction of parking well construction between the underground deep space of soil base.

Claims (1)

1. stop well construction between a kind of underground deep space of soft soil foundation, it is characterised in that the structure is included by stake footpath 0.5- 1.2m, the long single shaft or multiaxis cement mixing pile for exceeding parking well depth 1-10m of stake or the stake of SMW engineering methods are enclosed as peripheral sealing Curtain, by stake footpath 0.7-1.5m, the long cast-in-situ bored pile or interlocking pile for exceeding parking well depth 8-30m of stake as exterior wall, on to Lower or segmentation formwork cast thickness 0.3-0.8m from below to up armored concrete interior wall, shaft bottom is that reinforced concrete floor and element are mixed Solidifying grave bottom, plane is square or rectangle well type structured, and underliing in back cover layer has 5-10m solid cements mixing pile or high pressure rotation Spray the waterstop of stake composition.
CN201611216033.5A 2016-12-08 2016-12-08 Stop well construction between a kind of underground deep space of soft soil foundation Pending CN107190769A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611216033.5A CN107190769A (en) 2016-12-08 2016-12-08 Stop well construction between a kind of underground deep space of soft soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611216033.5A CN107190769A (en) 2016-12-08 2016-12-08 Stop well construction between a kind of underground deep space of soft soil foundation

Publications (1)

Publication Number Publication Date
CN107190769A true CN107190769A (en) 2017-09-22

Family

ID=59870867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611216033.5A Pending CN107190769A (en) 2016-12-08 2016-12-08 Stop well construction between a kind of underground deep space of soft soil foundation

Country Status (1)

Country Link
CN (1) CN107190769A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138006A (en) * 2018-09-07 2019-01-04 温州市城市资源开发工程有限公司 A kind of underground parking well construction with vibrating string type sensor and unidirectional RF chip
CN109191792A (en) * 2018-08-15 2019-01-11 温州市城市资源开发工程有限公司 Stop well construction between a kind of underground deep space of long-range wired control construction
CN111827321A (en) * 2019-08-29 2020-10-27 中国铁建港航局集团有限公司 Composite cofferdam construction method
CN114033388A (en) * 2021-12-13 2022-02-11 中铁七局集团有限公司 Vertical shaft construction method for underground tunnel top pipe of water-rich silt layer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101139839A (en) * 2007-10-15 2008-03-12 上海市隧道工程轨道交通设计研究院 Setting arrangement for high artesian area ultra-deep foundation pit
JP2010222913A (en) * 2009-03-25 2010-10-07 Jfe Engineering Corp Underground structure using rotary rectangular-steel-tube pile, and method for constructing the same
CN104775440A (en) * 2015-04-21 2015-07-15 五洋建设集团股份有限公司 Mineshaft-type underground garage deep foundation pit supporting structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101139839A (en) * 2007-10-15 2008-03-12 上海市隧道工程轨道交通设计研究院 Setting arrangement for high artesian area ultra-deep foundation pit
JP2010222913A (en) * 2009-03-25 2010-10-07 Jfe Engineering Corp Underground structure using rotary rectangular-steel-tube pile, and method for constructing the same
CN104775440A (en) * 2015-04-21 2015-07-15 五洋建设集团股份有限公司 Mineshaft-type underground garage deep foundation pit supporting structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109191792A (en) * 2018-08-15 2019-01-11 温州市城市资源开发工程有限公司 Stop well construction between a kind of underground deep space of long-range wired control construction
CN109138006A (en) * 2018-09-07 2019-01-04 温州市城市资源开发工程有限公司 A kind of underground parking well construction with vibrating string type sensor and unidirectional RF chip
CN111827321A (en) * 2019-08-29 2020-10-27 中国铁建港航局集团有限公司 Composite cofferdam construction method
CN114033388A (en) * 2021-12-13 2022-02-11 中铁七局集团有限公司 Vertical shaft construction method for underground tunnel top pipe of water-rich silt layer
CN114033388B (en) * 2021-12-13 2023-10-27 中铁七局集团有限公司 Shaft construction method for water-rich silty sand layer underground tunnel roof pipe

Similar Documents

Publication Publication Date Title
CN104612143B (en) Composite pile constructed in drilled hole structure under a kind of solution cavity/soil cave geological conditions
CN105464134B (en) Multi-layer underground space is along inverse combining construction method and supporting construction under existing facility
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN107190769A (en) Stop well construction between a kind of underground deep space of soft soil foundation
CN104314042B (en) Adopt the levee construction method of pile formula case barrel structure
CN203729324U (en) Anchor rod lattice type retaining wall structure
CN106049196B (en) Flexible pile combines ballastless track roadbed construction method with stake raft with section
CN104099943A (en) Underground diaphragm wall and deserted underground civil air defense engineering intersection processing method
CN100532733C (en) Diving casting cast-in-place pile construction method for constructing in scree layer and sand layer
CN103696416B (en) A kind of method for processing foundation
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN103114609A (en) Connection device of new and old underground diaphragm walls and construction method
CN104652444A (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN107829441A (en) It is a kind of do not influence surrounding enviroment draw hole caisson structure and its construction method
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN101603311B (en) Jet grouting pile construction method adopting heavy hammer-tamping compaction soil preformed hole
CN104164895A (en) Basement generating no water buoyant force
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN107700521A (en) One kind is built(Structure)Build thing foundation stabilization and underpin pier and its construction method
CN103966996A (en) Gravel pile and manufacturing method thereof
CN204282295U (en) Pile formula case cylinder breakwater structure
CN104005416A (en) Method for processing major-diameter hole pile collapsed holes under high and steep slope plain fill back-pressing condition
CN203891012U (en) Novel filling pile with prearranged clay pile
CN106245641A (en) PHC pile tube post grouting construction technique and PHC pile tube composite pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170922