CN104164895A - Basement generating no water buoyant force - Google Patents

Basement generating no water buoyant force Download PDF

Info

Publication number
CN104164895A
CN104164895A CN201310199887.7A CN201310199887A CN104164895A CN 104164895 A CN104164895 A CN 104164895A CN 201310199887 A CN201310199887 A CN 201310199887A CN 104164895 A CN104164895 A CN 104164895A
Authority
CN
China
Prior art keywords
basement
water
bottom board
wall
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310199887.7A
Other languages
Chinese (zh)
Inventor
陈开向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310199887.7A priority Critical patent/CN104164895A/en
Publication of CN104164895A publication Critical patent/CN104164895A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

Provided is a basement generating no water buoyant force. Identical to the prior art, the basement generating no water buoyant force is provided with a bottom board, a wall and a foundation pit supporting system, wherein the bottom board and the wall are made of reinforced concrete. The basement generating no water buoyant force is characterized in that concrete or the reinforced concrete of the bottom board of the basement extends outwards towards the periphery to be in overlapping joint with row piles, secant piles and a waterproof curtain of the supporting system in a seamless mode, the part, between the supporting system and the wall of the basement, of the bottom board is brushed with bituminous flax with the thickness ranging from 1 cm to 10 cm, the position above the bituminous flax is refilled with water-stop agents or soil, and a pumping well deeper than a rubble or broken stone bed course below the bottom board is arranged between the wall of the basement and the waterproof curtain. Compared with the prior art, the basement generating no water buoyant force has the remarkable advantages that the basement is built on a watertight sludge layer or a watertight clay layer, all or most of uplift piles can be omitted, a great number of reinforcing steel bars can be laid on the bottom board of the basement, the process is simple, the construction period is shortened, steel is saved, energy saving and consumption reducing are achieved, and the basement is suitable for city construction of soft soil foundations of places along coasts and rivers of China.

Description

A kind of basement that does not produce water buoyancy
Technical field
The present invention relates to building foundation engineering field, relate in particular to a kind of basement that does not produce water buoyancy.
Background technology
As everyone knows, in the urban construction of China coast soft foundation, thousands of from the area of common single building high-rise building, the small underground chamber of square meters up to ten thousand, to manufacturing products for both peacetime and wartime us, ground is road, the underground store in square or greenery patches, subterranean commercial area, area several ten thousand is to the design of the big basement (being also the underground space) of hundreds of thousands square meter, all stereotyped under base plate, design quite a lot for overcoming the uplift pile of water uplift pressure, no matter be to be built in fluid-tight mud or argillic horizon from it, still build permeable layer of sand in, on sandy soil layer or gravel layer.
In soil mechanics textbook,, there is not free Free water in the elasticoplastic body that known mud and clay are made up of by different proportion soil particle, air, water three-phase.When water buoyancy only occurs in and has free Free water under basement bottom board, as the hole diving of earth's surface miscellaneous fill penetrates under base plate in rubble hardcore bed, or be layer of sand, sandy soil layer or the gravel layer containing free water under base plate, just produce the uplift pressure of water to basement bottom board.
Therefore, at the little basement in mud, argillic horizon Shang Jiandanzhuan building, or the large basement of the underground space, as produce the uplift pressure of water, be because the rubble hardcore bed that after basement wall, under backfill and base plate, 200mm is thick is used to lead to, become the path of surface water, in rainwater season, when surface water flows into bed course by loop, also just produce the buoyancy of water to basement bottom board.
Summary of the invention
The object of the present invention is to provide a kind of basement that does not produce water buoyancy, can make to be built in all types of basements on mud and argillic horizon, enter the passage of the rubble hardcore bed of basement bottom board below because having blocked surface water backfill seepage flow after miscellaneous fill layer and basement wall, the uplift pressure of the water under base plate has not been existed, also just needn't under base plate, design a large amount of uplift piles, base plate also needn't heavy reinforcement, thereby reduces foundation cost, save energy and reduce the cost, economize on resources.
The object of the invention is to be achieved through the following technical solutions: a kind of basement that does not produce water buoyancy, like the prior art, all there is base plate and the body of wall of steel concrete, and the required support system of excavation basement foundation ditch, as campshed, interlocking pile, cement-soil water-stop curtain, the stake of SMW engineering method, jet-grouted anchor pile, anchor pole, it is characterized in that, the concrete of basement bottom board or steel concrete are to campshed and the seamless overlap joint of water-stop curtain of surrounding extension and support system, the Concrete Thick 50-1000mm of extension, on the base plate between support system and basement wall, fill out the thick bitumen-dipped hemp of brush 1-10cm, backfill water-stop or backfill again on bitumen-dipped hemp, between basement wall and water-stop curtain, be provided with the degree of depth and exceed the underlie pumped well of rubble hardcore bed of base plate.Water-stop described herein is impermeablely to mould shape mud, or is mixed with mud or the mud of cement, or weak concrete.
The present invention compared with prior art, there is following remarkable advantage: on fluid-tight mud, argillic horizon, build all kinds of basements, can be by anti-group whole or large portion cancellation, basement bottom board can spread a large amount of because establishing the required agent on crack resistance of concrete shearing of uplift pile reinforcing bar less, technique of the present invention is simple, reduction of erection time, saving steel, energy-saving and cost-reducing, is suitable for the urban construction of China coast, riverine soft foundation.
Brief description of the drawings
Fig. 1 is basement one side generalized section of the present invention.
In figure: 1. miscellaneous fill, 2. mud, 3. ground level, 4. sprayed mortar 5. cement-soil water-stop curtains, 6. Guan Liang, 7. retaining piles, 8. pumped well, 9. sealing mud, 10. basement wall reinforcing bar, 11. basement walls, 12. basement bottom board absolute altitudes, 13. basement bottom boards, 14. basement bottom board reinforcing bars, 15.C10 plain concrete layer, 16. rubbles or hardcore bed, 17. engineering piles, 18. cement mixing piles of being reinforced by the district of breaking ground, 19. base plate extension concrete, 20. bitumen-dipped hemps.
Detailed description of the invention
An exemplary embodiments of the present invention, as Fig. 1:
1. in basement construction place, by drawing setting-out, the engineering pile (17) of first constructing under basement bottom board;
2. the cement mixing pile (18) of being reinforced by the district of being broken ground in construction cement mixing pile water stopping curtain (5) and hole in the miscellaneous fill floor (1) outside basement and mud (2);
3. at water-stop curtain (5) inner side construction supporting campshed (7), campshed (7) upper steel concrete Guan Liang (6);
4. in the time that 2 meters of soil excavations are dark, excavation slope paving reinforced mesh sprayed mortar (4);
5. when soil excavation is to design elevation, outer fix at basement wall (11) is uprightly buried 20-30cm diameter underground, the permeable gauze of its outer wrapping, and the plastic pipe that is drilled with permeable hole makes pumped well (8), filling pebble stone drainage outside pumped well (8) bottom and gauze;
6. in the mud at the bottom of foundation ditch (2), clean out engineering pile (17), at engineering pile (17) periphery and the full hall paving thick rubble hardcore bed of 200mm in the end, hole (16), on it, repave the thick C10 plain concrete of 100mm layer (15);
7. at C10 plain concrete layer (15) upper berth baseplate reinforcing bar (14), and continuous pouring concrete floor (13);
8. colligation basement wall reinforcing bar (10) and filling concrete wall (11), after body of wall (11) form removal, on the base plate between support system and basement wall (11), fill out the brush thick bitumen-dipped hemp of 8cm (20), body of wall (11) outer wall is also brushed bitumen-dipped hemp (20);
9. between body of wall (11) and campshed (7), backfill, containing the sealing mud (9) of 5% cement, completes the present invention's construction.

Claims (2)

1. one kind does not produce the basement of water buoyancy, like the prior art, all there is base plate and the body of wall of steel concrete, and the required support system of excavation basement foundation ditch, as campshed, interlocking pile, cement-soil water-stop curtain, the stake of SMW engineering method, jet-grouted anchor pile, anchor pole, it is characterized in that, the concrete of basement bottom board or steel concrete are to campshed and the seamless overlap joint of water-stop curtain of surrounding extension and support system, the Concrete Thick 50-1000mm of extension, on the base plate between support system and basement wall, fill out the thick bitumen-dipped hemp of brush 1-10cm, backfill water-stop or backfill again on bitumen-dipped hemp, between basement wall and water-stop curtain, be provided with the degree of depth and exceed the underlie pumped well of rubble hardcore bed of base plate.
2. according to claim 1, water-stop described herein is characterized in that, water-stop is impermeablely to mould shape mud, or is mixed with mud or the mud of cement, or weak concrete.
CN201310199887.7A 2013-05-15 2013-05-15 Basement generating no water buoyant force Pending CN104164895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310199887.7A CN104164895A (en) 2013-05-15 2013-05-15 Basement generating no water buoyant force

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310199887.7A CN104164895A (en) 2013-05-15 2013-05-15 Basement generating no water buoyant force

Publications (1)

Publication Number Publication Date
CN104164895A true CN104164895A (en) 2014-11-26

Family

ID=51908868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310199887.7A Pending CN104164895A (en) 2013-05-15 2013-05-15 Basement generating no water buoyant force

Country Status (1)

Country Link
CN (1) CN104164895A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239578A (en) * 2015-08-28 2016-01-13 中交第二航务工程局有限公司 Water-rich sand layer deep foundation pit underwater construction method
CN105569095A (en) * 2016-02-29 2016-05-11 华南理工大学 Interception and drainage pressure-reduction anti-floating system
CN111705826A (en) * 2020-07-01 2020-09-25 吉林建筑科技学院 Civil engineering foundation water stopping method
CN112049116A (en) * 2020-08-20 2020-12-08 韶关市新城兴建筑工程有限公司 Soft soil layer deep foundation pit excavation construction method
CN112982427A (en) * 2021-03-22 2021-06-18 云南建投第一勘察设计有限公司 Reinforcement construction method for foundation pit dangerous case in soft soil area

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239578A (en) * 2015-08-28 2016-01-13 中交第二航务工程局有限公司 Water-rich sand layer deep foundation pit underwater construction method
CN105239578B (en) * 2015-08-28 2017-05-17 中交第二航务工程局有限公司 Water-rich sand layer deep foundation pit underwater construction method
CN105569095A (en) * 2016-02-29 2016-05-11 华南理工大学 Interception and drainage pressure-reduction anti-floating system
CN105569095B (en) * 2016-02-29 2017-08-25 华南理工大学 One kind cuts row's decompression anti-floating system
CN111705826A (en) * 2020-07-01 2020-09-25 吉林建筑科技学院 Civil engineering foundation water stopping method
CN112049116A (en) * 2020-08-20 2020-12-08 韶关市新城兴建筑工程有限公司 Soft soil layer deep foundation pit excavation construction method
CN112982427A (en) * 2021-03-22 2021-06-18 云南建投第一勘察设计有限公司 Reinforcement construction method for foundation pit dangerous case in soft soil area

Similar Documents

Publication Publication Date Title
CN103741714A (en) Construction method for full cover-excavation reverse method of underground engineering
CN104452829B (en) A kind of pile-raft foundation float Structure and construction method
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN104110038A (en) Construction method for large-area pit support structure in deep-sludge type soft soil area
CN109914472B (en) Soft soil area assembled comprehensive pipe gallery and construction method thereof
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN104164895A (en) Basement generating no water buoyant force
CN109208545B (en) Construction method of artificial landscape overflow dam with energy dissipation effect
CN106592756A (en) Karst region step-type basement water drainage structure and construction method thereof
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN203475486U (en) Basement producing no water buoyancy
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN101319501B (en) Construction method of deep foundation ditch
CN202108045U (en) Sleeve pipe with anchor rod penetrating through underground continuous wall
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN102220764A (en) Deep foundation pit bracing system and construction method thereof
CN107700521A (en) One kind is built(Structure)Build thing foundation stabilization and underpin pier and its construction method
CN204326119U (en) A kind of pile-raft foundation float Structure
CN101597903B (en) Construction method of cylindrical slurry core pile for retaining and protecting foundation pit
CN103015430A (en) Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN111519647A (en) Novel foundation suitable for marine soft foundation treatment and reinforcement and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141126