CN107185977B - A kind of more furnaces based on electric signal load in mixture plan coalignment and method - Google Patents
A kind of more furnaces based on electric signal load in mixture plan coalignment and method Download PDFInfo
- Publication number
- CN107185977B CN107185977B CN201710549442.5A CN201710549442A CN107185977B CN 107185977 B CN107185977 B CN 107185977B CN 201710549442 A CN201710549442 A CN 201710549442A CN 107185977 B CN107185977 B CN 107185977B
- Authority
- CN
- China
- Prior art keywords
- heating furnace
- charging roller
- passage
- roller table
- control system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/004—Heating the product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/74—Temperature control, e.g. by cooling or heating the rolls or the product
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Heat Treatment Processes (AREA)
- Tunnel Furnaces (AREA)
Abstract
The present invention relates to a kind of, and more furnaces based on electric signal load in mixture plan coalignment and method, it is characterized by comprising multiple heating furnaces, charging roller table, three-stage control system, second control systems, charging roller table is equipped with before the heating furnace, passage there are two being set between charging roller table and heating furnace, the corresponding charging roller table section of each heating furnace passage, control is operated alone by motor in each charging roller table section, and motor can positive or backwards rotation;Each charging roller table section is furnished with locating and detecting device, is that each entrance track increases by two data blocks in the second control system.The present invention is automatically matched to billet-charging passage in shove charge planning chart according to electric signal, realize that the more furnaces of heating furnace load in mixture the Auto-matching of plan, matching process of the present invention is simply easily realized, it can realize that the more furnaces of heating furnace load in mixture the Auto-matching of plan automatically according only to electric signal, mitigate operator's workload, improves the automatization level of heating furnace planning management.
Description
Technical field
The present invention relates to metallurgical technology fields, and in particular to a kind of more furnaces based on electric signal load in mixture plan coalignment
And method.
Background technique
It, need to be heating steel billet to certain temperature, to reduce material deformation before mill milling in iron and steel enterprise's production
Drag.Enterprise generally configures heating furnace before milling train thus, and configuration mode is largely one or more heating furnaces.
As smelter informationization merges the quickenings of paces with automation, heating furnace shove charge plan is by enterprise's three-level
(MES) it is handed down to heating furnace second control system.But since heating furnace there are more, how billet-charging passage is automatically matched to
It is a problem that more furnaces, which are loaded in mixture, in shove charge planning chart.The currently used practice is manually in three-level (MES) or level two
Middle matching by hand, automatization level is low, large labor intensity, and accuracy is poor.
Summary of the invention
To overcome the deficiency, the purpose of the present invention is to provide a kind of, and more furnaces based on electric signal load in mixture plan matching
Device and method is automatically matched to billet-charging passage in shove charge planning chart according to electric signal, realizes that the more furnaces of heating furnace are mixed
Fill the Auto-matching of plan.
The technical solution adopted by the present invention to solve the technical problems is: a kind of more furnaces based on electric signal load in mixture plan
Coalignment, comprising: multiple heating furnaces, charging roller table, three-stage control system, second control system are equipped with before the heating furnace
Charging roller table is set between charging roller table and heating furnace there are two passage, and each heating furnace passage corresponds to a charging roller table section, often
Control is operated alone by motor in a charging roller table section, and motor can positive and backwards rotation;
Each charging roller table section is furnished with locating and detecting device, and locating and detecting device is connected with second control system, by steel billet
Positioning be sent to second control system, be that each charging roller table section increases by two data blocks, number in the second control system
It is set to data block DB1, data block DB2 according to block, wherein storage of the data block DB1 for the mark of steel billet positioning, works as positioning
After the completion, which is set to 1, and is always maintained at, after the completion of heating furnace second control system matches planning chart shove charge passage,
0 is set to by the reset of heating furnace second control system;
The data block DB2 is used for the storage of heating-furnace front roller-way section forward direction and backwards rotation mark, when rotating forward
Rotation mark is assigned a value of 0, and rotation mark is assigned a value of 1 when backwards rotation, and is always maintained at, and heating furnace second control system is to plan
After the completion of the matching of table shove charge passage, 0 is set to by the reset of heating furnace second control system.
A kind of more furnaces based on electric signal load in mixture plan matching process, and the second control system of heating furnace receives three-level control
The shove charge plan of system (MES) transmission processed simultaneously forms shove charge planning chart, and the corresponding flag bit of passage number is assigned a value of n+ in planning chart
1, wherein n is the passage sum of multiple heating furnaces, and the supplied materials direction of steel billet rotates forward direction for roller-way.
1) when heating-furnace front roller-way section rotates forward: if the i-th witness marker assignment 1 of heating furnace, plans
Planning chart first steel billet passage number is come in table in all steel billets of the steel billet passage number greater than (i-1) and is assigned a value of i.
2) when heating-furnace front roller-way section backwards rotation: if 1 assignment 1 of heating furnace, there is mistake in prompt system;
If the i-th witness marker assignment 1 of heating furnace, in planning chart in all steel billets of the steel billet passage number less than or equal to (i-1)
It comes planning chart first steel billet passage number and is assigned a value of i.
The invention has the following advantages: billet-charging passage is automatically matched to shove charge planning chart according to electric signal
In, realize that the more furnaces of heating furnace load in mixture the Auto-matching of plan, matching process of the present invention is simply easily realized, just according only to electric signal
The Auto-matching that the more furnaces of heating furnace load in mixture plan can be realized automatically, mitigate operator's workload, improve heating furnace plan pipe
The automatization level of reason.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
1 heating furnace in figure, 2 heating furnace passages, 3 data block DB2,4 charging roller tables, 41 charging roller table sections, 5 data block DB1.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.
A kind of more furnaces based on electric signal as shown in Figure 1 load in mixture plan coalignment, including No. 1 heating furnace, No. 2 plus
Three hot stove, No. 3 heating furnaces heating furnaces 1 form, and there are two passages in every heating furnace 1, share 6 passages, from No. 1 heating furnace to
No. 3 heating furnaces are successively set as passage 1, passage 2, passage 3, passage 4, passage 5, passage 6, the passage be in heating furnace roller-way or
The structure of the heating region of heating furnace or other transport steel billets, charging roller table are made of seven sections of charging roller table sections of A1 to A7,
Middle A1 to A6 is corresponded with passage 1 to 6 respectively, and every section of charging roller table section of A1 to A7 is individually controlled by motor, can be positive or inverse
To rotation, a roller-way positive and negative rotation flag bit is arranged in every section of charging roller table section 41 of A1 to A6 in second control system, is followed successively by R1
To R6;Locating and detecting device is provided with to the corresponding charging roller table section 41 of each passage in second control system, steel billet is carried out
Positioning, the flag bit of locating and detecting device are successively set as P1 to P6.
Its matching step is seen below:
(1) heating furnace second control system receives production plan that three-stage control system (MES) issues and forms shove charge
Planning chart, the corresponding flag bit assignment of passage number is set to 7 in planning chart;
(2) when it is 0 that roller-way, which is just reversing flag bit R1 value, charging roller table section A1 is rotated forward, if the positioning mark of heating furnace 1
When will P1 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number greater than 0 is assigned a value of 1;
When it is 0 that roller-way, which is just reversing flag bit R1 value, charging roller table section A2 is rotated forward, if 2 witness marker of heating furnace
When P2 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number greater than 1 is assigned a value of 2;
When it is 0 that roller-way, which is just reversing flag bit R1 value, charging roller table section A3 is rotated forward, if 3 witness marker of heating furnace
When P3 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number greater than 2 is assigned a value of 3;
When it is 0 that roller-way, which is just reversing flag bit R1 value, charging roller table section A4 is rotated forward, if 4 witness marker of heating furnace
When P4 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number greater than 3 is assigned a value of 4;
When it is 0 that roller-way, which is just reversing flag bit R1 value, charging roller table section A5 is rotated forward, if 5 witness marker of heating furnace
When P5 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number greater than 4 is assigned a value of 5;
When it is 0 that roller-way, which is just reversing flag bit R1 value, charging roller table section A6 is rotated forward, if 6 witness marker of heating furnace
When P6 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number greater than 5 is assigned a value of 6.
(3) when it is 1 that roller-way, which is just reversing flag bit R1 value, charging roller table section A1 backwards rotation, then blank exceeds furnace area model
It encloses, prompt system is wrong;
When it is 1 that roller-way, which is just reversing flag bit R2 value, charging roller table section A2 backwards rotation, if 2 witness marker of heating furnace
When P2 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number less than or equal to 1 is assigned a value of
2;
When it is 1 that roller-way, which is just reversing flag bit R3 value, charging roller table section A3 backwards rotation, if 3 witness marker of heating furnace
When P3 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number less than or equal to 2 is assigned a value of
3;
When it is 1 that roller-way, which is just reversing flag bit R4 value, charging roller table section A4 backwards rotation, if 4 witness marker of heating furnace
When P4 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number less than or equal to 3 is assigned a value of
4;
When it is 1 that roller-way, which is just reversing flag bit R5 value, charging roller table section A5 backwards rotation, if 5 witness marker of heating furnace
When P5 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number less than or equal to 4 is assigned a value of
5;
When it is 1 that roller-way, which is just reversing flag bit R6 value, charging roller table section A6 backwards rotation, if 6 witness marker of heating furnace
When P6 value is 1, then the steel billet passage number for being located at planning chart front end in planning chart in steel billet of the passage number less than or equal to 5 is assigned a value of
6。
Specific illustrative embodiment is had been combined above and describes the present invention, but implementation of the invention is without being limited thereto.?
In the spirit and scope of the present invention, various modifications can be carried out and modification by those skilled in the art, these modifications and variations will be fallen
Within the protection scope for entering claim restriction.
The present invention is not limited to the embodiment, anyone should learn that the structure made under the inspiration of the present invention becomes
Change, the technical schemes that are same or similar to the present invention are fallen within the scope of protection of the present invention.
Technology not described in detail in the present invention, shape, construction portion are well-known technique.
Claims (2)
1. a kind of more furnaces based on electric signal load in mixture plan coalignment, it is characterised in that: including multiple heating furnaces, stokehold roller
Road, three-stage control system, second control system, are equipped with charging roller table before the heating furnace, there are two passage in each heating furnace,
Control is operated alone by motor in the corresponding charging roller table section of each heating furnace passage, each charging roller table section, and motor can be just
To and backwards rotation;The second control system of the heating furnace receives the shove charge plan that three-stage control system is sent and forms shove charge
Planning chart;
Each charging roller table section is furnished with locating and detecting device, is that each charging roller table section increases by two in the second control system
Data block, data block is set to data block DB1, data block DB2, the data block DB1 are used for depositing for the mark of steel billet positioning
Storage, after the completion of positioning, which is set to 1, and is always maintained at, and heating furnace second control system is to planning chart shove charge passage
With after the completion, 0 is set to by the reset of heating furnace second control system;The data block DB2 is positive for heating-furnace front roller-way section
With the storage of backwards rotation mark, mark being rotated when rotating forward and is assigned a value of 0, rotation mark is assigned a value of 1, and one when backwards rotation
It is straight to keep, after the completion of heating furnace second control system matches planning chart shove charge passage, resetted by heating furnace second control system
It is set to 0.
2. a kind of more furnaces based on electric signal according to claim 1 load in mixture the matching process of plan coalignment,
Be characterized in that: the corresponding flag bit of the passage number of charging roller table section is assigned a value of n+1 in the planning chart, and wherein n is multiple heating
The passage sum of furnace, the supplied materials direction of steel billet rotate forward direction, matching way for roller-way are as follows:
1) when heating-furnace front roller-way section rotates forward: if the i-th witness marker assignment 1 of heating furnace, in planning chart
Steel billet passage number comes planning chart first steel billet passage number in all steel billets greater than i-1 is assigned a value of i;
2) when heating-furnace front roller-way section backwards rotation: if the 1st witness marker assignment 1 of heating furnace, prompt system
There is mistake;If the i-th witness marker assignment 1 of heating furnace, steel billet passage number is all less than or equal to i-1 in planning chart
Planning chart first steel billet passage number is come in steel billet is assigned a value of i.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710549442.5A CN107185977B (en) | 2017-07-07 | 2017-07-07 | A kind of more furnaces based on electric signal load in mixture plan coalignment and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710549442.5A CN107185977B (en) | 2017-07-07 | 2017-07-07 | A kind of more furnaces based on electric signal load in mixture plan coalignment and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107185977A CN107185977A (en) | 2017-09-22 |
CN107185977B true CN107185977B (en) | 2019-01-29 |
Family
ID=59883412
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710549442.5A Active CN107185977B (en) | 2017-07-07 | 2017-07-07 | A kind of more furnaces based on electric signal load in mixture plan coalignment and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107185977B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109916182A (en) * | 2019-04-09 | 2019-06-21 | 南京钢铁股份有限公司 | A kind of automatic steel loading system of bar plate heating stove and automatic steel loading method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101823079A (en) * | 2010-04-22 | 2010-09-08 | 攀钢集团钢铁钒钛股份有限公司 | Method for charging steel at furnace end of heating furnace |
CN102220476A (en) * | 2011-03-29 | 2011-10-19 | 上海宝钢工业检测公司 | Control method for meeting tapping interval during inserting blank materials in stepping heating furnace |
CN202427938U (en) * | 2011-12-20 | 2012-09-12 | 鞍钢集团自动化公司 | Automatic tracking system for continuous casting slab numbers |
CN103045847A (en) * | 2013-01-15 | 2013-04-17 | 唐山国丰钢铁有限公司 | Monitoring method of heating time and heating temperature of heating furnace |
CN103952528A (en) * | 2014-04-17 | 2014-07-30 | 北京佰能电气技术有限公司 | Automatic steel charging locating system and method for heating furnace |
CN104034172A (en) * | 2014-06-12 | 2014-09-10 | 攀钢集团西昌钢钒有限公司 | Method for automatically and continuously feeding steel to heating furnaces |
CN106868289A (en) * | 2017-03-16 | 2017-06-20 | 北京民静科技有限责任公司 | A kind of heat-treatment furnace steel plate position tracking and controlling method and system |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5474229A (en) * | 1977-11-24 | 1979-06-14 | Kobe Steel Ltd | Descaler for steel material |
KR20020052847A (en) * | 2000-12-26 | 2002-07-04 | 이구택 | Modification method of surface roughness of Austenite stainless steel hot rolling materials |
KR100502294B1 (en) * | 2003-01-29 | 2005-07-20 | 주식회사 포스코건설 | The device measuring the length of a slab for putting into reheating furnace using the infrared laser sensor |
-
2017
- 2017-07-07 CN CN201710549442.5A patent/CN107185977B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101823079A (en) * | 2010-04-22 | 2010-09-08 | 攀钢集团钢铁钒钛股份有限公司 | Method for charging steel at furnace end of heating furnace |
CN102220476A (en) * | 2011-03-29 | 2011-10-19 | 上海宝钢工业检测公司 | Control method for meeting tapping interval during inserting blank materials in stepping heating furnace |
CN202427938U (en) * | 2011-12-20 | 2012-09-12 | 鞍钢集团自动化公司 | Automatic tracking system for continuous casting slab numbers |
CN103045847A (en) * | 2013-01-15 | 2013-04-17 | 唐山国丰钢铁有限公司 | Monitoring method of heating time and heating temperature of heating furnace |
CN103952528A (en) * | 2014-04-17 | 2014-07-30 | 北京佰能电气技术有限公司 | Automatic steel charging locating system and method for heating furnace |
CN104034172A (en) * | 2014-06-12 | 2014-09-10 | 攀钢集团西昌钢钒有限公司 | Method for automatically and continuously feeding steel to heating furnaces |
CN106868289A (en) * | 2017-03-16 | 2017-06-20 | 北京民静科技有限责任公司 | A kind of heat-treatment furnace steel plate position tracking and controlling method and system |
Also Published As
Publication number | Publication date |
---|---|
CN107185977A (en) | 2017-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016110165A1 (en) | Ore dressing multi-production-index optimization decision making system and method based on cloud and mobile terminal | |
CN107185977B (en) | A kind of more furnaces based on electric signal load in mixture plan coalignment and method | |
CN101604145A (en) | Integrative simulation system of production plan of steel making, continuous casting and hot rolling | |
CN107201440A (en) | A kind of furnace temperature of heating furnace system enactment method and system | |
CN108038319B (en) | Method and system for optimizing and modeling energy flow energy consumption of galvanizing unit | |
CN104593569A (en) | Split-type dehydrogenation furnace and conveying device | |
CN104392296B (en) | A kind of information switching method of milling train multiple agent model system | |
CN203804210U (en) | Self-service power heat preservation cover adding and opening device for molten iron bottle haulage motor | |
CN107992705A (en) | A kind of information-based method for expressing of iron steel interface energy simulation model | |
CN113084148A (en) | Method and system for controlling molten iron transportation | |
CN106755711A (en) | One-touch intelligent method for making steel | |
CN101892346B (en) | Layout structure in converter steelmaking bidirectional steel supply system and method for arranging steel ladles and slag ladles | |
CN107502698A (en) | A kind of automatic Steelmaking method suitable for less-slag melting | |
CN111331323A (en) | Welding process for trunnion block of converter backing ring | |
CN207698717U (en) | A kind of vibrating disk automatic charging production line | |
CN206654505U (en) | Double steel automaton | |
CN113814275B (en) | Method for heating area hot feeding and hot charging rate of lifting plate | |
CN205347202U (en) | Suppression stove quick die change system | |
CN105382246B (en) | A kind of high-precision cooling system | |
CN205917170U (en) | Combined type multi -chambered tempering furnace | |
CN103466316B (en) | A kind of air-condition heat exchanger core body production operatorless device and using method | |
CN203486558U (en) | Automatic device for producing air-conditioning heat exchanger cores | |
CN207046283U (en) | Be welded workshop reservoir area induction system | |
CN204021704U (en) | Roller-way is carried and is turned to online platform | |
CN103990972A (en) | Machining center sliding base and manufacturing technology thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 276800 Shandong Province, Rizhao City Arashiyama District Shugang Avenue Applicant after: SHANDONG IRON AND STEEL GROUP RIZHAO CO., LTD. Address before: 276800 Ji'nan Road, Donggang District, Shandong, No. 396, No. Applicant before: SHANDONG IRON AND STEEL GROUP RIZHAO CO., LTD. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |