CN107185961A - A kind of preparation method of big specification, thin cladding nickel-base alloy/pipeline steel composite board - Google Patents

A kind of preparation method of big specification, thin cladding nickel-base alloy/pipeline steel composite board Download PDF

Info

Publication number
CN107185961A
CN107185961A CN201710453074.4A CN201710453074A CN107185961A CN 107185961 A CN107185961 A CN 107185961A CN 201710453074 A CN201710453074 A CN 201710453074A CN 107185961 A CN107185961 A CN 107185961A
Authority
CN
China
Prior art keywords
nickel
base alloy
pipeline steel
composite
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710453074.4A
Other languages
Chinese (zh)
Other versions
CN107185961B (en
Inventor
沈春豫
赵惠
郝红卫
赵峰
冯海龙
刘燕平
朱磊
李莹
王俊
布伟刚
马东康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Tianli metal composite Co.,Ltd.
Original Assignee
Xi An Tianli Metal Complex Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi An Tianli Metal Complex Material Co Ltd filed Critical Xi An Tianli Metal Complex Material Co Ltd
Priority to CN201710453074.4A priority Critical patent/CN107185961B/en
Publication of CN107185961A publication Critical patent/CN107185961A/en
Application granted granted Critical
Publication of CN107185961B publication Critical patent/CN107185961B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/38Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling sheets of limited length, e.g. folded sheets, superimposed sheets, pack rolling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/58Roll-force control; Roll-gap control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • B21B45/0215Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
    • B21B45/0218Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for strips, sheets, or plates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B47/00Auxiliary arrangements, devices or methods in connection with rolling of multi-layer sheets of metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/38Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling sheets of limited length, e.g. folded sheets, superimposed sheets, pack rolling
    • B21B2001/386Plates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2261/00Product parameters
    • B21B2261/02Transverse dimensions
    • B21B2261/04Thickness, gauge
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2261/00Product parameters
    • B21B2261/02Transverse dimensions
    • B21B2261/06Width
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2261/00Product parameters
    • B21B2261/12Length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2261/00Product parameters
    • B21B2261/20Temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B2265/00Forming parameters
    • B21B2265/12Rolling load or rolling pressure; roll force

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Heat Treatment Of Steel (AREA)
  • Metal Rolling (AREA)

Abstract

The invention discloses a kind of big specification, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, this method is:First, composite plate blank is made by the way that weldering of exploding is compound in the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit;2nd, composite plate blank is subjected to smoothing process, then heated;3rd, cooling treatment is carried out to the composite plate blank after heating;4th, the composite plate blank after cooling treatment is sent into asynchronous rolling machine and carries out asymmetrical rolling, obtain nickel-base alloy/pipeline steel composite board;The shear strength of the nickel-base alloy/pipeline steel composite board is not less than 210MPa;The total reduction of the asymmetrical rolling is 50%~90%, and the friction speed ratio of every time asynchronous rolling machine is 1.05~1.30.The method of present invention preparation composite plate both ensure that the corrosion resistance of cladding nickel-base alloy, ensure the tensile property and impact flexibility of base pipeline steel again, and the performance requirement such as the bond strength of composite plate meets the requirement of NB/T47002.2 standards, or even reduce the requirement to mill rolling force.

Description

A kind of preparation method of big specification, thin cladding nickel-base alloy/pipeline steel composite board
Technical field
The invention belongs to composite plate manufacturing technology field, and in particular to a kind of big specification, thin cladding nickel-base alloy/pipe line steel The preparation method of composite plate.
Background technology
Nickel-base alloy/pipeline steel composite board the corrosion resisting property good because possessing, particularly resistance to CO2And H2S corrosive natures and pipe The high impact flexibility of line steel, therefore it is widely used in the industries such as petroleum pipeline, chemical industry, ocean engineering.
On the premise of performance is met, nickel-base alloy/pipeline steel composite board of thin cladding can further reduce manufacture Cost.As China's economy constantly advances, the development trend for equipping maximization is more and more obvious, the Ni-based conjunction of thin cladding The demand of gold/pipeline steel composite board is also increasingly urgent
Big specification, thin cladding nickel-base alloy/pipeline steel composite board are both needed using specific processing method so that it reaches The requirement of required size, at the same be also required to ensure in process and meanwhile be also required to ensure in process nickel-base alloy and The tissue and performance of pipe line steel all meet respective requirement.But, these current conventional production methods are producing big specification, Bao Fu The problem of existing various in terms of layer nickel-base alloy/pipeline steel composite board.Such as produced using the method for centrifugal casting+rolling Big specification, thin cladding nickel-base alloy/pipeline steel composite board complex process, while easily occur that inner surface quality is poor, hole size not Accurately, the low problem of recovery rate of iron.Big specification, thin cladding nickel-base alloy/pipeline steel composite board are produced using explosive welding process The problems such as easily there is edge unstability, regional area fusing and poor bond quality, particularly nickel-base alloy/pipeline of petroleum pipeline Steel composite board, generally length >=10000mm, width≤2000mm composite plates, the simple explosive welding of composite plate of such specification Difficulty is very big.Big specification, thin cladding nickel-base alloy/pipeline steel composite board complex operation are produced using Direct Rolling method, due to needing Vacuum assembly is wanted, the production method is also high to equipment requirement.The method of explosive welding+rolling can play explosive welding and rolling The advantage of two methods, but conventional rolling mill practice is difficult to produce the Ni-based conjunction of the big specification for meeting requirements, thin cladding Gold/pipeline steel composite board, as the warpage issues of the deformation institute output by nickel-base alloy and pipe line steel not only make rolling Process is difficult to be smoothed out, and template is difficult to ensure that, while composite plate head occurs excessively without nickel-base alloy covered section, causes multiple Plywood yield rate is low.Also, generally nickel-base alloy is identical with pipe line steel rolling temperature in traditional operation of rolling, due to Each optimal rolling temperature is interval different for two kinds of metals, thus traditional rolling mill practice be also difficult to make after rolling nickel-base alloy with The structure property of pipe line steel can meet requirement.
The content of the invention
The technical problems to be solved by the invention be for above-mentioned the deficiencies in the prior art there is provided a kind of big specification, The preparation method of thin cladding nickel-base alloy/pipeline steel composite board.The preparation method use explosive welding base, asymmetrical rolling it Between the Pipeline Steel Plate of composite plate blank and nickel-base alloy plate are down to different temperature, meet its each the need for split rolling method, And the two sides of composite plate blank are inwardly formed thermograde, the skill that thermograde and asymmetrical rolling assemblage zone come has been given full play to The advantage of art, has coordinated the deformation that nickel-base alloy and pipe line steel occur in the operation of rolling uneven, it is ensured that after asymmetrical rolling The nickel-base alloy arrived/pipeline steel composite board it is straight, and rolling nickel-base alloy/pipeline steel composite board operation of rolling is smoothly entered OK, finally prepd big specification, thin cladding nickel-base alloy/pipeline steel composite board both ensure that the corrosion resistance of cladding nickel-base alloy, Ensure that the tensile property and impact flexibility of base pipeline steel, and the performance requirement such as bond strength of composite plate meet NB/ again The requirement of T47002.2 standards, or even reduce the requirement to mill rolling force.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of big specification, thin cladding nickel-base alloy/ The preparation method of pipeline steel composite board, it is characterised in that this method comprises the following steps:
Step 1: the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit are made again by the way that weldering of exploding is compound Plywood blank;The length of the nickel-base alloy plate be 1050mm~6100mm, width be 550mm~2100mm, thickness be 2mm~ 12mm, the length of the Pipeline Steel Plate is 1000mm~6000mm, and width is 500mm~2000mm, thickness be 16mm~ 200mm;
Step 2: the composite plate blank obtained in step one is carried out into smoothing process, it is subsequently placed in heating furnace and is heated to 1050 DEG C~1300 DEG C, and be incubated after 2h~6.5h and come out of the stove;
Step 3: the composite plate blank after being come out of the stove in step 2 carries out cooling treatment so that the pipeline of composite plate blank The temperature of surface of steel plate is down to 850 DEG C~1150 DEG C, the temperature of the nickel-base alloy plate side surface of composite plate blank is down to 1000 DEG C~1250 DEG C, then composite plate blank be inwardly formed thermograde by two sides;The Pipeline Steel Plate surface of the composite plate blank Temperature be less than the composite plate blank nickel-base alloy plate side surface temperature;
Step 4: the composite plate blank for forming thermograde in step 3 after cooling treatment is sent into asynchronous rolling machine Length is obtained after the asymmetrical rolling of row multi-pass, cooling not less than 10000mm, width is 500mm~2000mm, and thickness is 9mm The thickness of nickel-base alloy plate is in~44mm nickel-base alloy/pipeline steel composite board, wherein nickel-base alloy/pipeline steel composite board 1mm~4mm;The shear strength of the nickel-base alloy/pipeline steel composite board is not less than 210MPa;Under the stagnation pressure of the asymmetrical rolling Rate is 50%~90%, and the friction speed ratio of every time asynchronous rolling machine is 1.05~1.30.
A kind of above-mentioned big specification, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, it is characterised in that step The trade mark of nickel-base alloy described in rapid one is UNSN06625, UNSN08825, UNSN06600 or UNSN10276.
A kind of above-mentioned big specification, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, it is characterised in that step The trade mark of pipe line steel described in rapid one is X56, X60, X65 or X70.
A kind of above-mentioned big specification, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, it is characterised in that step The reduction ratio of every time in rapid three is 10%~30%.
A kind of above-mentioned big specification, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, it is characterised in that step The Pipeline Steel Plate side of composite plate blank described in rapid three carries out spraying cooling, the Ni-based conjunction of the composite plate blank by cooling water Golden plate side using natural cooling or carries out spraying cooling by cooling water.
A kind of above-mentioned big specification, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, it is characterised in that step The temperature on the Pipeline Steel Plate surface of the composite plate blank is 800 DEG C~1100 DEG C during asymmetrical rolling open rolling in rapid four, asynchronous to roll The temperature of the nickel-base alloy plate surface of the composite plate blank is 960 DEG C~1200 DEG C during open rolling processed;Asymmetrical rolling finish to gauge when institute The temperature for stating the Pipeline Steel Plate side surface of composite plate blank is 750 DEG C~950 DEG C, composite plate blank during asymmetrical rolling finish to gauge Nickel-base alloy plate side surface temperature be 900 DEG C~1100 DEG C.
The present invention has advantages below compared with prior art:
1st, at home under the conditions of existing equipment and raw material supply, the present invention uses explosive welding legal system composite plate blanks material, Then Pipeline Steel Plate side and nickel-base alloy plate side respectively to composite plate blank cools, because Pipeline Steel Plate is sideways and Ni-based Alloy sheets side is directly contacted with cooling source, and surface cooling is very fast, hence in so that the two sides of composite plate blank are inwardly formed one Fixed thermograde, and the Pipeline Steel Plate and nickel-base alloy plate surface of composite plate blank are down to different temperatures, and this is according to pipe What the effect of line steel plate and nickel-base alloy plate played in composite plate was determined, and thermograde can make cladding nickel after asymmetrical rolling Based alloy and base pipeline steel disclosure satisfy that the requirement of respective structure property simultaneously;While the Pipeline Steel Plate surface of composite plate blank Temperature be less than the temperature of nickel-base alloy plate side surface, this causes when subsequently carrying out asymmetrical rolling, meet rolling to substrate and The requirement of the split rolling method of compound plate, both ensure that the corrosion resistance of cladding nickel-base alloy, again ensure base pipeline steel tensile property, Grain size and impact flexibility, and composite plate the performance requirement such as bond strength, reduce the requirement to milling train.
2nd, the Pipeline Steel Plate of composite plate blank and nickel-base alloy plate are down to different temperature by the present invention between asymmetrical rolling Degree, meets its each the need for split rolling method, and the two sides of composite plate blank are inwardly formed thermograde, have given full play to temperature The advantage for the technology that gradient and asymmetrical rolling assemblage zone come is spent, overcomes asymmetrical rolling to have the shortcomings that deformation penetrating power is limited, Wherein can to coordinate the deformation that nickel-base alloy and pipe line steel occur in the operation of rolling uneven for asymmetrical rolling, it is ensured that asymmetrical rolling The nickel-base alloy obtained afterwards/pipeline steel composite board it is straight, and make rolling nickel-base alloy/pipeline steel composite board operation of rolling smooth Carry out.
3rd, the present invention prepares composite plate blank using explosive welding, and composite plate blank cladding prepared by explosive welding is Ni-based to close Gold is high with the bond strength of base pipeline steel, composite plate blank asymmetrical rolling process below may caused by Interface Cracking, It is improved the intensity of nickel-base alloy after rolling/pipeline steel composite board simultaneously, by ultrasonic examination and shear strength test: The Percentage bound 100% of nickel-base alloy/pipeline steel composite board, shear strength is far longer than specified in NB/T47002.2 standards 210MPa requirement.
Technical scheme is described in further detail below by embodiment.
Embodiment
Embodiment 1
The method that the present embodiment prepares nickel-base alloy/pipeline steel composite board comprises the following steps:
Step 1: the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit are made again by the way that weldering of exploding is compound Plywood blank;The length of the nickel-base alloy plate is 2690mm, and width is 2060mm, and thickness is 10mm, the Pipeline Steel Plate Length is 2590mm, and width is 1960mm, and thickness is 200mm;The trade mark of the nickel-base alloy is UNSN10276;The pipeline The trade mark of steel is X70;
Step 2: the composite plate blank obtained in step one is carried out into smoothing process, it is subsequently placed in heating furnace and is heated to 1300 DEG C, and be incubated after 6.5h and come out of the stove;
Step 3: the composite plate blank after being come out of the stove in step 2 carries out cooling treatment, the process of the cooling treatment is: The Pipeline Steel Plate side of the composite plate blank carries out spraying cooling by cooling water so that the Pipeline Steel Plate surface of composite plate blank Temperature be down to 1150 DEG C, the temperature of the nickel-base alloy plate side surface of the composite plate blank naturally cools to 1250 DEG C, then multiple Plywood blank is inwardly formed the increased thermograde of temperature by two sides, and this is easy to next step to carry out nickel-base alloy during asymmetrical rolling Plate, Pipeline Steel Plate meets the requirement of respective structure property, and the Pipeline Steel Plate side and nickel-base alloy plate side of composite plate blank Thermograde is inwardly formed, open rolling requirement when meeting open rolling in step 4 to Pipeline Steel Plate and nickel-base alloy plate;
The different of multi-pass is carried out in asynchronous rolling machine Step 4: the composite plate blank in step 3 after cooling treatment is sent into Step rolling, obtains length for 17200mm, and width is 1960mm, and thickness is 31.5mm nickel-base alloys/pipeline steel composite board, wherein The thickness of nickel-base alloy plate is 1.5mm in nickel-base alloy/pipeline steel composite board;The total reduction of the asymmetrical rolling is 85%, The friction speed ratio of every time asynchronous rolling machine is 1.05.
The road number of times of asymmetrical rolling described in step 4 is followed successively by 10%, 11.1% for the reduction ratio of 11,11 passages, 13.8%, 21%, 19.3%, 20.5%, 17.1%, 17.2%, 16.7%, 12.6%, 14.2%;
The temperature on the Pipeline Steel Plate surface of the composite plate blank is 1100 DEG C during asymmetrical rolling open rolling in step 4, asynchronous The temperature of the nickel-base alloy plate surface of the composite plate blank is 1200 DEG C when rolling open rolling;It is described compound during asymmetrical rolling finish to gauge The temperature of the Pipeline Steel Plate side surface of plate blank material is 950 DEG C, the nickel-base alloy plate of composite plate blank during asymmetrical rolling finish to gauge The temperature of side surface is 1100 DEG C, is rolled nickel-base alloy/pipeline steel composite board water cooling to 400 DEG C of air coolings after terminating.
Nickel-base alloy manufactured in the present embodiment/pipeline steel composite board passes through ultrasonic examination and shear strength test:It is Ni-based The Percentage bound 100% of alloy/pipeline steel composite board, shear strength reaches 405MPa, more than specified in NB/T47002.2 standards 210MPa requirement.
Embodiment 2
The method that the present embodiment prepares nickel-base alloy/pipeline steel composite board comprises the following steps:
Step 1: the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit are made again by the way that weldering of exploding is compound Plywood blank;The length of the nickel-base alloy plate is 6100mm, and width is 2100mm, and thickness is 2mm, the length of the Pipeline Steel Plate Spend for 6000mm, width is 2000mm, and thickness is 16mm;The trade mark of the nickel-base alloy is UNSN06625;The pipe line steel The trade mark is X56;
Step 2: the composite plate blank obtained in step one is carried out into smoothing process, it is subsequently placed in heating furnace and is heated to 1100 DEG C, and be incubated after 2h and come out of the stove;
Step 3: the composite plate blank after being come out of the stove in step 2 carries out cooling treatment, the process of the cooling treatment is: The Pipeline Steel Plate side of the composite plate blank carries out spraying cooling by cooling water so that the Pipeline Steel Plate surface of composite plate blank Temperature be down to 850 DEG C, the temperature of the nickel-base alloy plate side surface of the composite plate blank naturally cools to 1050 DEG C, then is combined Plate blank material is inwardly formed the increased thermograde of temperature by two sides, and this is easy to next step to carry out nickel-base alloy during asymmetrical rolling Plate, Pipeline Steel Plate meets the requirement of respective structure property, and the Pipeline Steel Plate side and nickel-base alloy plate side of composite plate blank Thermograde is inwardly formed, open rolling requirement when meeting open rolling in step 4 to Pipeline Steel Plate and nickel-base alloy plate;
The different of multi-pass is carried out in asynchronous rolling machine Step 4: the composite plate blank in step 3 after cooling treatment is sent into Step rolling, obtains length for 12000mm, and width is 1990mm, and thickness is 9mm nickel-base alloys/pipeline steel composite board, wherein Ni-based The thickness of nickel-base alloy plate is 1mm in alloy/pipeline steel composite board;The total reduction of the asymmetrical rolling is 50%, every time Asynchronous rolling machine friction speed ratio be 1.3.
The road number of times of asymmetrical rolling described in step 4 is followed successively by 12.5%, 14.3% for the reduction ratio of 5,5 passages, 16.7%, 11%, 10.1%;
The temperature on the Pipeline Steel Plate surface of the composite plate blank is 800 DEG C during asymmetrical rolling open rolling described in step 4, The temperature of the nickel-base alloy plate surface of the composite plate blank is 1000 DEG C during asymmetrical rolling open rolling;Described in during asymmetrical rolling finish to gauge The temperature of the Pipeline Steel Plate side surface of composite plate blank is 750 DEG C, the Ni-based conjunction of composite plate blank during asymmetrical rolling finish to gauge The temperature of golden plate side surface is 900 DEG C, is rolled nickel-base alloy/pipeline steel composite board water cooling to 600 DEG C of air coolings after terminating.
Nickel-base alloy manufactured in the present embodiment/pipeline steel composite board passes through ultrasonic examination and shear strength test:It is Ni-based Alloy/pipeline steel composite board Percentage bound 100%, shear strength reaches 380MPa, more than specified in NB/T47002.2 standards 210MPa requirement.
Embodiment 3
The method that the present embodiment prepares nickel-base alloy/pipeline steel composite board comprises the following steps:
Step 1: the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit are made again by the way that weldering of exploding is compound Plywood blank;The length of the nickel-base alloy plate is 3790mm, and width is 1900mm, and thickness is 12mm, the Pipeline Steel Plate Length is 3690mm, and width is 1800mm, and thickness is 18mm;The trade mark of the nickel-base alloy is UNSN08825;The pipe line steel The trade mark be X65;
Step 2: the composite plate blank obtained in step one is carried out into smoothing process, it is subsequently placed in heating furnace and is heated to 1200 DEG C, and be incubated after 2.5h and come out of the stove;
Step 3: the composite plate blank after being come out of the stove in step 2 carries out cooling treatment, the process of the cooling treatment is: The Pipeline Steel Plate side of the composite plate blank carries out spraying cooling by cooling water so that the Pipeline Steel Plate surface of composite plate blank Temperature be down to 900 DEG C, the temperature of the nickel-base alloy plate side surface of the composite plate blank naturally cools to 1150 DEG C, then is combined Plate blank material is inwardly formed the increased thermograde of temperature by two sides, and this is easy to next step to carry out nickel-base alloy during asymmetrical rolling Plate, Pipeline Steel Plate meets the requirement of respective structure property, and the Pipeline Steel Plate side and nickel-base alloy plate side of composite plate blank Thermograde is inwardly formed, open rolling requirement when meeting open rolling in step 4 to Pipeline Steel Plate and nickel-base alloy plate;
The different of multi-pass is carried out in asynchronous rolling machine Step 4: the composite plate blank in step 3 after cooling treatment is sent into Step rolling, obtains length for 11000mm, and width is 1800mm, and thickness is 10mm nickel-base alloys/pipeline steel composite board, wherein nickel The thickness of nickel-base alloy plate is 4mm in based alloy/pipeline steel composite board;The total reduction of the asymmetrical rolling is 66.7%, often The friction speed ratio of the asynchronous rolling machine of passage is 1.2.
The road number of times of the asymmetrical rolling is 7 times, and the reduction ratio of 7 passages is followed successively by 11.1%, 10%, 10.4%, 11.6%, 30%, 13.5%, 13%;
The temperature on the Pipeline Steel Plate surface of the composite plate blank is 900 DEG C, asymmetrical rolling during the asymmetrical rolling open rolling The temperature of the nickel-base alloy plate surface of the composite plate blank is 1100 DEG C during open rolling;Composite plate blanks during asymmetrical rolling finish to gauge The temperature of the Pipeline Steel Plate side surface of material is 880 DEG C, the nickel-base alloy plate side table of composite plate blank during asymmetrical rolling finish to gauge The temperature in face is 1000 DEG C, is rolled nickel-base alloy/pipeline steel composite board water cooling to 560 DEG C of air coolings after terminating.
Nickel-base alloy manufactured in the present embodiment/pipeline steel composite board passes through ultrasonic examination and shear strength test:It is Ni-based Alloy/pipeline steel composite board Percentage bound 100%, shear strength reaches 329MPa, more than specified in NB/T47002.2 standards 210MPa requirement.
Embodiment 4
The method that the present embodiment prepares nickel-base alloy/pipeline steel composite board comprises the following steps:
Step 1: the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit are made again by the way that weldering of exploding is compound Plywood blank;The length of the nickel-base alloy plate is 3710mm, and width is 2080mm, and thickness is 6mm, the length of the Pipeline Steel Plate Spend for 3610mm, width is 2000mm, and thickness is 126mm;The trade mark of the nickel-base alloy is UNSN06600;The pipe line steel The trade mark be X60;
Step 2: the composite plate blank obtained in step one is carried out into smoothing process, it is subsequently placed in heating furnace and is heated to 1150 DEG C, and be incubated after 4h and come out of the stove;
Step 3: the composite plate blank after being come out of the stove in step 2 carries out cooling treatment, the process of the cooling treatment is: The Pipeline Steel Plate side of the composite plate blank carries out spraying cooling by cooling water so that the Pipeline Steel Plate surface of composite plate blank Temperature be down to 900 DEG C, the temperature of the nickel-base alloy plate side surface of the composite plate blank naturally cools to 1050 DEG C, then is combined Plate blank material is inwardly formed the increased thermograde of temperature by two sides, and this is easy to next step to carry out nickel-base alloy during asymmetrical rolling Plate, Pipeline Steel Plate meets the requirement of respective structure property, and the Pipeline Steel Plate side and nickel-base alloy plate side of composite plate blank Thermograde is inwardly formed, open rolling requirement when meeting open rolling in step 4 to Pipeline Steel Plate and nickel-base alloy plate;
The different of multi-pass is carried out in asynchronous rolling machine Step 4: the composite plate blank in step 3 after cooling treatment is sent into Step rolling, obtains length for 10800mm, and width is 2000mm, and thickness is 44mm nickel-base alloys/pipeline steel composite board, wherein nickel The thickness of nickel-base alloy plate is 2mm in based alloy/pipeline steel composite board;The total reduction of the asymmetrical rolling is 66.7%, often The friction speed ratio of the asynchronous rolling machine of passage is 1.1.
The road number of times of the asymmetrical rolling is 9 times, and the reduction ratio of 9 passages is followed successively by 10.3%, 10.6%, 10.9%, 10%, 12.3%, 14.1%, 13.1%, 11.5%, 10.4%;
The temperature on the Pipeline Steel Plate surface of the composite plate blank is 890 DEG C, asymmetrical rolling during the asymmetrical rolling open rolling The temperature of the nickel-base alloy plate surface of the composite plate blank is 1000 DEG C during open rolling;Composite plate blanks during asymmetrical rolling finish to gauge The temperature of the Pipeline Steel Plate side surface of material is 850 DEG C, the nickel-base alloy plate side table of composite plate blank during asymmetrical rolling finish to gauge The temperature in face is 1000 DEG C, is rolled nickel-base alloy/pipeline steel composite board water cooling to 600 DEG C of air coolings after terminating.
Nickel-base alloy manufactured in the present embodiment/pipeline steel composite board passes through ultrasonic examination and shear strength test:It is Ni-based Alloy/pipeline steel composite board Percentage bound 100%, shear strength reaches 360MPa, more than specified in NB/T47002.2 standards 210MPa requirement.
Embodiment 5
The method that the present embodiment prepares nickel-base alloy/pipeline steel composite board comprises the following steps:
Step 1: the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit are made again by the way that weldering of exploding is compound Plywood blank;The length of the nickel-base alloy plate is 2100mm, and width is 550mm, and thickness is 6mm, the length of the Pipeline Steel Plate Spend for 2000mm, width is 500mm, and thickness is 44mm;The trade mark of the nickel-base alloy is UNSN06600;The pipe line steel The trade mark is X60;
Step 2: the composite plate blank obtained in step one is carried out into smoothing process, it is subsequently placed in heating furnace and is heated to 1150 DEG C, and be incubated after 2h and come out of the stove;
Step 3: the composite plate blank after being come out of the stove in step 2 carries out cooling treatment, the process of the cooling treatment is: The Pipeline Steel Plate side of the composite plate blank carries out spraying cooling by cooling water so that the Pipeline Steel Plate surface of composite plate blank Temperature be down to 900 DEG C, the temperature water-spraying control of the nickel-base alloy plate side surface of the composite plate blank is then combined to 1050 DEG C Plate blank material is inwardly formed the increased thermograde of temperature by two sides, and this is easy to next step to carry out nickel-base alloy during asymmetrical rolling Plate, Pipeline Steel Plate meets the requirement of respective structure property, and the Pipeline Steel Plate side and nickel-base alloy plate side of composite plate blank Thermograde is inwardly formed, open rolling requirement when meeting open rolling in step 4 to Pipeline Steel Plate and nickel-base alloy plate;
The different of multi-pass is carried out in asynchronous rolling machine Step 4: the composite plate blank in step 3 after cooling treatment is sent into Step rolling, obtains length for 10000mm, and width is 500mm, and thickness is 10mm nickel-base alloys/pipeline steel composite board, wherein Ni-based The thickness of nickel-base alloy plate is 1.2mm in alloy/pipeline steel composite board;The total reduction of the asymmetrical rolling is 80%, per pass The friction speed ratio of secondary asynchronous rolling machine is 1.16.
The road number of times of the asymmetrical rolling is 9 times, and the reduction ratio of 9 passages is followed successively by 10%, 11.1%, 10.4%, 11.6%, 15.8%, 25%, 20.8%, 26.3%, 14.3%;
The temperature on the Pipeline Steel Plate surface of the composite plate blank is 890 DEG C, asymmetrical rolling during the asymmetrical rolling open rolling The temperature of the nickel-base alloy plate surface of the composite plate blank is 1000 DEG C during open rolling;Composite plate blanks during asymmetrical rolling finish to gauge The temperature of the Pipeline Steel Plate side surface of material is 850 DEG C, the nickel-base alloy plate side table of composite plate blank during asymmetrical rolling finish to gauge The temperature in face is 1000 DEG C, is rolled nickel-base alloy/pipeline steel composite board water cooling to 600 DEG C of air coolings after terminating.
Nickel-base alloy manufactured in the present embodiment/pipeline steel composite board passes through ultrasonic examination and shear strength test:It is Ni-based Alloy/pipeline steel composite board Percentage bound 100%, shear strength reaches 339MPa, more than specified in NB/T47002.2 standards 210MPa requirement.
Embodiment 6
The method that the present embodiment prepares nickel-base alloy/pipeline steel composite board comprises the following steps:
Step 1: the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit are made again by the way that weldering of exploding is compound Plywood blank;The length of the nickel-base alloy plate is 1050mm, and width is 900mm, and thickness is 11mm, the length of the Pipeline Steel Plate Spend for 1000mm, width is 800mm, and thickness is 100mm;The trade mark of the nickel-base alloy is UNSN08825;The pipe line steel The trade mark is X56;
Step 2: the composite plate blank obtained in step one is carried out into smoothing process, it is subsequently placed in heating furnace and is heated to 1050 DEG C, and be incubated after 3.6h and come out of the stove;
Step 3: the composite plate blank after being come out of the stove in step 2 carries out cooling treatment, the process of the cooling treatment is: The Pipeline Steel Plate side of the composite plate blank carries out spraying cooling by cooling water so that the Pipeline Steel Plate surface of composite plate blank Temperature be down to 900 DEG C, the temperature of the nickel-base alloy plate side surface of the composite plate blank naturally cools to 1000 DEG C, then is combined Plate blank material is inwardly formed the increased thermograde of temperature by two sides, and this is easy to next step to carry out nickel-base alloy during asymmetrical rolling Plate, Pipeline Steel Plate meets the requirement of respective structure property, and the Pipeline Steel Plate side and nickel-base alloy plate side of composite plate blank Thermograde is inwardly formed, open rolling requirement when meeting open rolling in step 4 to Pipeline Steel Plate and nickel-base alloy plate;
The different of multi-pass is carried out in asynchronous rolling machine Step 4: the composite plate blank in step 3 after cooling treatment is sent into Step rolling, obtains length for 10000mm, and width is 800mm, and thickness is 11.1mm nickel-base alloys/pipeline steel composite board, wherein nickel The thickness of nickel-base alloy plate is 1.1mm in based alloy/pipeline steel composite board;The total reduction of the asymmetrical rolling is 90%, often The friction speed ratio of the asynchronous rolling machine of passage is 1.13.
The road number of times of asymmetrical rolling described in step 4 is 9 times, and the reduction ratio of 9 passages is followed successively by 10.9%, 21.4%, 28%, 28%, 29%, 23.1%, 26.6%, 20%, 14.1%;
The temperature on the Pipeline Steel Plate surface of the composite plate blank is 850 DEG C during asymmetrical rolling open rolling in step 4, asynchronous 960 DEG C of the temperature of the nickel-base alloy plate surface of composite plate blank when rolling open rolling;Composite plate during asymmetrical rolling finish to gauge The temperature of the Pipeline Steel Plate side surface of blank is 760 DEG C, the nickel-base alloy plate side of composite plate blank during asymmetrical rolling finish to gauge The temperature on surface is 900 DEG C, is rolled nickel-base alloy/pipeline steel composite board water cooling to 600 DEG C of air coolings after terminating.
Nickel-base alloy manufactured in the present embodiment/pipeline steel composite board passes through ultrasonic examination and shear strength test:It is Ni-based Alloy/pipeline steel composite board Percentage bound 100%, shear strength reaches 404MPa, specified in NB/T47002.2 standards 210MPa requirement.
It is described above, only it is presently preferred embodiments of the present invention, not the present invention is imposed any restrictions.It is every according to invention skill Any simple modification, change and equivalence change that art is substantially made to above example, still fall within technical solution of the present invention Protection domain in.

Claims (6)

1. the preparation method of a kind of big specification, thin cladding nickel-base alloy/pipeline steel composite board, it is characterised in that this method includes Following steps:
Step 1: the nickel-base alloy plate as cladding and the Pipeline Steel Plate as basic unit are welded into composite plate blanks by blast Material;The length of the nickel-base alloy plate is 1050mm~6100mm, and width is 550mm~2100mm, and thickness is 2mm~12mm, The length of the Pipeline Steel Plate is 1000mm~6000mm, and width is 500mm~2000mm, and thickness is 16mm~200mm;
Step 2: the composite plate blank obtained in step one is carried out into smoothing process, it is subsequently placed in heating furnace and is heated to 1050 DEG C~1300 DEG C, and be incubated after 2h~6.5h and come out of the stove;
Step 3: the composite plate blank after being come out of the stove in step 2 carries out cooling treatment so that the Pipeline Steel Plate of composite plate blank The temperature on surface is down to 850 DEG C~1150 DEG C, make the nickel-base alloy plate side surface of composite plate blank temperature be down to 1000 DEG C~ 1250 DEG C, then composite plate blank be inwardly formed thermograde by two sides;The temperature on the Pipeline Steel Plate surface of the composite plate blank Temperature of the degree less than the nickel-base alloy plate side surface of the composite plate blank;
Step 4: it is more that the composite plate blank for forming thermograde in step 3 after cooling treatment is sent into progress in asynchronous rolling machine Length is obtained after the asymmetrical rolling of passage, cooling not less than 10000mm, width is 500mm~2000mm, thickness be 9mm~ The thickness of nickel-base alloy plate is 1mm in 44mm nickel-base alloy/pipeline steel composite board, wherein nickel-base alloy/pipeline steel composite board ~4mm;The shear strength of the nickel-base alloy/pipeline steel composite board is not less than 210MPa;The total reduction of the asymmetrical rolling For 50%~90%, the friction speed ratio of every time asynchronous rolling machine is 1.05~1.30.
2. a kind of big specification according to claim 1, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, its Be characterised by, the trade mark of nickel-base alloy described in step one for UNSN06625, UNSN08825, UNSN06600 or UNSN10276。
3. a kind of big specification according to claim 1, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, its It is characterised by, the trade mark of pipe line steel described in step one is X56, X60, X65 or X70.
4. a kind of big specification according to claim 1, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, its It is characterised by, the reduction ratio of every time in step 3 is 10%~30%.
5. a kind of big specification according to claim 1, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, its It is characterised by, the Pipeline Steel Plate side of composite plate blank described in step 3 carries out spraying cooling, the composite plate by cooling water The nickel-base alloy plate side of blank using natural cooling or carries out spraying cooling by cooling water.
6. a kind of big specification according to claim 1, the preparation method of thin cladding nickel-base alloy/pipeline steel composite board, its Be characterised by, in step 4 during asymmetrical rolling open rolling the Pipeline Steel Plate surface of the composite plate blank temperature for 800 DEG C~ 1100 DEG C, the temperature of the nickel-base alloy plate surface of the composite plate blank is 960 DEG C~1200 DEG C during asymmetrical rolling open rolling;It is asynchronous The temperature of the Pipeline Steel Plate side surface of the composite plate blank is 750 DEG C~950 DEG C, asymmetrical rolling finish to gauge when institute when rolling finish to gauge The temperature for stating the nickel-base alloy plate side surface of composite plate blank is 900 DEG C~1100 DEG C.
CN201710453074.4A 2017-06-15 2017-06-15 A kind of big specification, thin cladding nickel-base alloy/pipeline steel composite board preparation method Active CN107185961B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710453074.4A CN107185961B (en) 2017-06-15 2017-06-15 A kind of big specification, thin cladding nickel-base alloy/pipeline steel composite board preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710453074.4A CN107185961B (en) 2017-06-15 2017-06-15 A kind of big specification, thin cladding nickel-base alloy/pipeline steel composite board preparation method

Publications (2)

Publication Number Publication Date
CN107185961A true CN107185961A (en) 2017-09-22
CN107185961B CN107185961B (en) 2019-08-06

Family

ID=59879704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710453074.4A Active CN107185961B (en) 2017-06-15 2017-06-15 A kind of big specification, thin cladding nickel-base alloy/pipeline steel composite board preparation method

Country Status (1)

Country Link
CN (1) CN107185961B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107931327A (en) * 2017-10-12 2018-04-20 武汉钢铁有限公司 A kind of manufacture method of pipe line steel and stainless steel hot-rolling composite plate and application
CN109693072A (en) * 2017-10-20 2019-04-30 鞍钢股份有限公司 A kind of 825/X70/825 double-sided composite plate and its production method
CN109694989A (en) * 2017-10-20 2019-04-30 鞍钢股份有限公司 A kind of 825/X70 nickel-base alloy composite plate and its production method
CN112222187A (en) * 2020-09-22 2021-01-15 武汉科技大学 Preparation method of high-impact-toughness nickel-based alloy composite material
CN112742869A (en) * 2021-01-04 2021-05-04 南京钢铁股份有限公司 Production process of wide N06625 nickel-based alloy steel plate
CN114193855A (en) * 2021-07-20 2022-03-18 吕林 Nickel-based alloy composite plate produced based on transition intermediate blank and preparation method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06234083A (en) * 1993-02-09 1994-08-23 Yamaki Kogyo Kk Titanium clad stainless steel plate and its production
MXPA03009729A (en) * 2001-04-24 2004-01-29 Pechiney Rhenalu Metal blocks suitable for machining applications.
CN103878536A (en) * 2012-12-20 2014-06-25 北京有色金属研究总院 Production method for layered wearproof lightweight steel-aluminum composite boards
CN104308463A (en) * 2014-08-26 2015-01-28 西安天力金属复合材料有限公司 Preparation method of super-long titanium/pipeline steel composite plate for oil-gas pipeline
CN104308462A (en) * 2014-08-26 2015-01-28 西安天力金属复合材料有限公司 Preparation method of stainless steel/pipeline steel composite plate for oil-gas transport pipeline
CN105149354A (en) * 2014-10-10 2015-12-16 卢森锴 Asynchronous hot rolling technology for large-size stainless steel-copper alloy composite boards
CN105195512A (en) * 2015-09-14 2015-12-30 山东钢铁股份有限公司 Equipment for preparing metal composite plate and preparation method for metal composite plate
CN105598166A (en) * 2016-01-04 2016-05-25 燕山大学 Different-temperature rolling method for preparing stainless steel and carbon steel composite board

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06234083A (en) * 1993-02-09 1994-08-23 Yamaki Kogyo Kk Titanium clad stainless steel plate and its production
MXPA03009729A (en) * 2001-04-24 2004-01-29 Pechiney Rhenalu Metal blocks suitable for machining applications.
CN103878536A (en) * 2012-12-20 2014-06-25 北京有色金属研究总院 Production method for layered wearproof lightweight steel-aluminum composite boards
CN104308463A (en) * 2014-08-26 2015-01-28 西安天力金属复合材料有限公司 Preparation method of super-long titanium/pipeline steel composite plate for oil-gas pipeline
CN104308462A (en) * 2014-08-26 2015-01-28 西安天力金属复合材料有限公司 Preparation method of stainless steel/pipeline steel composite plate for oil-gas transport pipeline
CN105149354A (en) * 2014-10-10 2015-12-16 卢森锴 Asynchronous hot rolling technology for large-size stainless steel-copper alloy composite boards
CN105195512A (en) * 2015-09-14 2015-12-30 山东钢铁股份有限公司 Equipment for preparing metal composite plate and preparation method for metal composite plate
CN105598166A (en) * 2016-01-04 2016-05-25 燕山大学 Different-temperature rolling method for preparing stainless steel and carbon steel composite board

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107931327A (en) * 2017-10-12 2018-04-20 武汉钢铁有限公司 A kind of manufacture method of pipe line steel and stainless steel hot-rolling composite plate and application
CN109693072A (en) * 2017-10-20 2019-04-30 鞍钢股份有限公司 A kind of 825/X70/825 double-sided composite plate and its production method
CN109694989A (en) * 2017-10-20 2019-04-30 鞍钢股份有限公司 A kind of 825/X70 nickel-base alloy composite plate and its production method
CN112222187A (en) * 2020-09-22 2021-01-15 武汉科技大学 Preparation method of high-impact-toughness nickel-based alloy composite material
CN112222187B (en) * 2020-09-22 2022-06-03 武汉科技大学 Preparation method of high-impact-toughness nickel-based alloy composite material
CN112742869A (en) * 2021-01-04 2021-05-04 南京钢铁股份有限公司 Production process of wide N06625 nickel-based alloy steel plate
CN114193855A (en) * 2021-07-20 2022-03-18 吕林 Nickel-based alloy composite plate produced based on transition intermediate blank and preparation method thereof

Also Published As

Publication number Publication date
CN107185961B (en) 2019-08-06

Similar Documents

Publication Publication Date Title
CN107185961B (en) A kind of big specification, thin cladding nickel-base alloy/pipeline steel composite board preparation method
WO2018036382A1 (en) Method for preparing stainless steel composite plate for tmcp bridge
CN103465027B (en) The thin brilliant dish base manufacture method of a kind of GH4169 alloy
CN104357754B (en) A kind of corrosionproof steel against sulfuric acid at dew point plate and manufacture method thereof
CN109252108B (en) A kind of 150mm thickness low compression ratio Z-direction performance steel plate and its production method
CN108754321B (en) Super-thick normalized high-strength pressure vessel steel plate and production method thereof
CN107661900B (en) A kind of hot tandem produces the manufacturing method of two-sided stainless steel clad plate
CN108467973A (en) 700 DEG C of ultra-supercritical boilers nickel chromium triangle tungsten system's high-temperature alloy seamless pipe and manufacturing method
CN109693072B (en) 825/X70/825 double-sided composite board and production method thereof
CN109226259A (en) A method of improving hot rolling pipeline steel oxidation iron sheet integrality
CN102965575A (en) Ultra-fast cooling preparation method of 355MPa ship plate steel
CN104018071B (en) The production method of low-carbon-equivalent high tenacity Q420E steel plate
CN108705197B (en) Chromium ferrite stainless steel welding and post-welding annealing process in cold continuous rolling production line
CN103147022B (en) A kind of TMCP type E47 steel plate and manufacture method thereof with good low-temperature toughness
CN102649123B (en) Method for producing extra thick composite board through dissymmetrical composite rolling
CN105925889A (en) Ultrathick specification 1.2311 mold steel plate and preparation method thereof
CN110004359B (en) High-uniformity longitudinal and transverse toughness wide steel plate and TMCP (thermal mechanical control processing) process production method thereof
CN113522972A (en) Production process of stainless steel composite board with corrosion-resistant surface
CN105525228B (en) Nuclear safety grade 316L stainless steel gauge pipe
CN113523241A (en) Efficient forming method of stainless steel/carbon steel composite material
CN110539065B (en) Vacuum electron beam assembly welding process for high-carbon equivalent extra-thick composite blank
CN108555202A (en) A kind of manufacturing method of the embedded pin flat bar of diameter forging machine production core grade driving mechanism
CN106216947A (en) A kind of production method of big thickness flaw detection steel plate
CN103302097A (en) Method for rolling carbon steel and low alloy steel large-piece-weight extra thick composite blank
CN106345809B (en) A kind of assembly method using vacuum complex technique production super-thick steel plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 710201 Shaanxi city of Xi'an Province Economic and Technological Development Zone Jingwei Industrial Park Road

Patentee after: Xi'an Tianli metal composite Co.,Ltd.

Address before: 710201 Shaanxi city of Xi'an province Xi'an economic and Technological Development Zone Jingwei Industrial Park Road No. 19

Patentee before: XI'AN TIANLI CLAD METAL MATERIALS Co.,Ltd.

CP03 Change of name, title or address