CN109226259A - A method of improving hot rolling pipeline steel oxidation iron sheet integrality - Google Patents

A method of improving hot rolling pipeline steel oxidation iron sheet integrality Download PDF

Info

Publication number
CN109226259A
CN109226259A CN201811065608.7A CN201811065608A CN109226259A CN 109226259 A CN109226259 A CN 109226259A CN 201811065608 A CN201811065608 A CN 201811065608A CN 109226259 A CN109226259 A CN 109226259A
Authority
CN
China
Prior art keywords
scaling
finishing
iron sheet
cooling
hot rolling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811065608.7A
Other languages
Chinese (zh)
Inventor
范益
赵柏杰
陈林恒
吴俊平
姜金星
李睿鑫
王光磊
蔡佳兴
代芹芹
杨文秀
郦锁云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Iron and Steel Co Ltd
Original Assignee
Nanjing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Iron and Steel Co Ltd filed Critical Nanjing Iron and Steel Co Ltd
Priority to CN201811065608.7A priority Critical patent/CN109226259A/en
Publication of CN109226259A publication Critical patent/CN109226259A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/04Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for de-scaling, e.g. by brushing
    • B21B45/08Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for de-scaling, e.g. by brushing hydraulically
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/02Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of sheets

Abstract

The invention discloses a kind of methods for improving hot rolling pipeline steel oxidation iron sheet integrality, and this method comprises the following steps: (1) heating;(2) just de-scaling;(3) single chassis rolls, and operation roll of mill uses high ferrochrome roll;(4) roughing, the 1st and the 2nd uses the water de-scaling of milling train fuselage, pressure >=22Mpa of de-scaling water when roughing;(5) finish rolling, intermediate base carry out finish rolling after temperature, and start rolling temperature control is at 980 ± 10 DEG C, and finishing temperature control is at 820 ± 10 DEG C, finish rolling extreme trace reduction in pass≤15%;(6) flying shear;(7) cooling, it is cooling using layer flow mode;(8) aligning, finishing;(9) it examines, storage.Steel oxidation iron sheet integrality made from this method is good, corrosion-resistant strong.

Description

A method of improving hot rolling pipeline steel oxidation iron sheet integrality
Technical field
The present invention relates to the production method of hot rolling pipeline steel oxidation iron sheet, in particular to a kind of raising hot rolling pipeline steel oxidation The method of iron sheet integrality.
Background technique
Currently, the means of transportation of steel mill's pipe line steel outlet is mainly transported by sea, generally require 1-2 months, and reaches system It also needs to store after pipe factory several months, in the meantime, steel plate, which gets rusty easily, causes mark to fall off, and some even will appear Local corrosion causes steel plate thickness to cause to scrap beyond the margin of tolerance.The steel in storage and transportational process is improved in the prior art There are mainly two types of methods for the corrosion resistance of plate: one is brush corrosion-inhibiting coatings, since clear stipulaties do not allow brush applied coating in API standard, Along with manufacturing cost is increased, so seldom application;Second method is to improve the quality of hot rolling iron scale, by hindering oxygen The method of contact with iron matrix improves corrosion resistance.This method is due to road work after hardly increasing manufacturing cost and not influencing Sequence is favored by more and more steel mills, but due to generally requiring to control cold strong aligning by force in pipeline steel making processes, thus to It is difficult that control obtains complete iron scale.
It is entitled " a kind of corrosion proof using iron scale raising hot rolled steel plate application No. is CN201210461252.5 Method ", the finishing temperature of involved steel grade and final cooling temperature are higher in this method, differ too with existing pipe line steel production technology Greatly, it is not easy to realize.Application No. is CN103962386A, a kind of entitled " the corrosion proof iron scale of raising hot rolled steel plate Control method ", this method propose that controlling the cooling speed of upper cold bed reaches iron oxide leather block by controlling the eutectoid reaction degree of FeO The reasonable control of structure, but the integrality of final iron scale is undesirable.
Summary of the invention
Goal of the invention: it is an object of the present invention to provide a kind of method for improving hot rolling pipeline steel oxidation iron sheet integrality, the party Method can be improved hot rolling pipeline steel oxidation iron sheet and keep preferable integrality in strong cold and straightening process, improve subsequent storage and object The corrosion resistance on stream process light plate surface.
Technical solution: the present invention provides a kind of method for improving hot rolling pipeline steel oxidation iron sheet integrality, including walks as follows It is rapid:
(1) it heats, slab heating temperature≤1170 DEG C, heating time 250-320min;
(2) just de-scaling, pressure >=22Mpa of first de-scaling high pressure water;
(3) single chassis rolls, and operation roll of mill uses high ferrochrome roll, and the weight of chromium degree of high ferrochrome is 15%-20%, roll surface hardness >=75HSD, axially and radially working lining difference of hardness≤1.5HSD;
(4) roughing, the 1st and the 2nd uses the water de-scaling of milling train fuselage, pressure >=22Mpa of de-scaling water when roughing;
(5) finish rolling, intermediate base carry out finish rolling after temperature, and start rolling temperature is controlled at 980 ± 10 DEG C, to guarantee final iron oxide Skin thickness is 12-15 microns, and in order to make finished product plate have good low temperature block hammer performance, finishing temperature control is 820 ± 10 DEG C, wherein finish rolling extreme trace reduction in pass≤15%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, whole cold red temperature≤500 DEG C cooling using layer flow mode;
(8) aligning, finishing;
(9) it examines, storage.
Further, the weight percent content of Ni is 0.2%≤Ni≤0.5% in step (1) slab.
Further, in step (5) in finishing stands on the basis of the 1st and 2 dephosphorization, increase by 2nd entrance reciprocal De-scaling.
Further, step (7) the section cooling nozzle is U-typed collector, nozzle exit pressure 0.2Mpa.
Further, finishing includes scale trimming in the step (8), and surface defect checks reconditioning and sampling, further includes The step of other inspections need.The aligning steel plate bad to template after cooling is aligned in the step (8).
The present invention be arranged above-mentioned steps and parameter main foundation and reason is that
(1) why the present invention limits the additive amount of Ni, mainly in view of Ni is to later period scale structure With the influence of adhesive force.Ni is a kind of more dysoxidizable element in steel, and in high-temperature heating, Fe is preferentially reacted with O, and Ni can Enrichment forms metal twine in iron scale, the plasticity and toughness of iron scale is improved, so even if in section cooling mistake It is not easily broken in journey and also and falls off in straightening process.The content of Ni is in just when the enrichment of the Ni in iron scale and the smelting of matrix It is found than, the present invention by system test, when the weight percent content of Ni >=0.2%, does not influence finish rolling scale removal effect, But in cooling and straightening process iron scale adhesive force be improved significantly, as Ni > 0.5%, iron scale is in essence The defects of removal difficulty for rolling process can obviously increase, and will cause iron scale indentation.Therefore, the present invention in Ni weight percent It controls than content in 0.2%≤Ni≤0.5%.
(2) institute of the present invention controls slab heating temperature at 1170 DEG C hereinafter, mainly considering heating temperature to matrix With the influence at iron scale interface.When 1170 DEG C of heating temperature >, the internal oxidition of matrix side is obviously reinforced near interface, The especially oxidation of crystal boundary, these internal oxiditions stretch to the feeler of matrix like iron scale, greatly strengthen iron scale Adhesive force be easy to cause de-scaling not to the utmost.Moreover, subsequent increased 2nd de-scaling temperature reciprocal is relatively low (840 DEG C of general <), The removal difficulty of iron scale increases, given once oxidation iron sheet forms internal oxidition pinning, three be subsequently formed in heating process Secondary iron scale is difficult to remove increasing de-scaling passage, also will form de-scaling band.So heating and temperature control is existed 1170 DEG C or less.
(3) operation roll of mill of the present invention uses high ferrochrome roll, mainly for increasing the thickness uniformity of iron scale.It is high Ferrochrome surface forms M7C3 carbide, and this Carbide Phases are more coarse than traditional MC carbide, and roll can be guaranteed in heat Good surface roughness is kept during rolling, reduces the inhomogeneous deformation defect of iron scale;
(4) finish rolling extreme trace reduction in pass is reduced, template on the one hand can be improved, reduces subsequent aligning to iron scale Destruction;On the other hand, with the reduction of extreme trace time rolling temperature, plasticity and the toughness decline of iron scale, big deformation Amount be easy to cause iron scale locally broken, forms red scale or iron scale falls off.It is demonstrated experimentally that when finish rolling end Road reduction in pass≤15%, finished product plate template and iron scale are preferable.
(5) de-scaling of finishing pass 1 and 2 mainly completely removes intermediate base and waits for temperature iron scale generated, and increase is fallen Number the 2nd is the thickness in order to control iron scale.It is demonstrated experimentally that template can be seriously affected by increasing inverse the 1st, and can shadow Finishing temperature is rung, causes performance unstable;Increase inverse the 3rd or other passages, iron scale thickness is blocked up will cause after It cracks and falls off in continuous cooling and straightening process;And increase the 2nd de-scaling reciprocal, not only smaller to the influence of finishing temperature, mechanics Performance is stablized, and final iron scale thickness can control at 12-15 microns, and iron scale has good plasticity, toughness And corrosion resistance.
(6) cooling by the way of section cooling after rolling mainly to consider the nozzle with pressure (>=1Mpa) to iron scale With destruction, and laminar flow, mainly by the gravity of water itself, the influence to iron scale is smaller.
The utility model has the advantages that the present invention can have good by the thickness control of finished product plate iron scale in 12-15 microns Plasticity, toughness, can guarantee not fracture and flake off in cooling and straightening process, make iron scale in subsequent handling It is not destroyed, ensure that the corrosion resistance in later period, be conducive to improve product quality in kind, remarkable in economical benefits;Furthermore, it is not necessary that volume Outer increase equipment carries out scrap build, easy to implement.
Detailed description of the invention
Fig. 1 be iron scale fall off region percentages calculate intercept method schematic diagram.
Specific embodiment
Embodiment 1
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1170 DEG C of slab heating temperature, heating time 320min, the weight percent content of Ni in slab It is 0.5%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 15% of high ferrochrome, Roll surface hardness 75HSD, axially and radially working lining difference of hardness 1.4HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is the 1st, 2,4, and intermediate base carries out finish rolling, open rolling temperature after temperature Degree control is at 990 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 830 DEG C, wherein finish rolling extreme trace reduction in pass 13.4%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 500 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Embodiment 2
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1150 DEG C of slab heating temperature, heating time 250min, the weight percent content of Ni in slab It is 0.5%;
(2) just de-scaling, the pressure 23Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 16% of high ferrochrome, Roll surface hardness 77HSD, axially and radially working lining difference of hardness 14HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 23Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is the 1st, 2,4, and intermediate base carries out finish rolling, open rolling temperature after temperature Degree control is at 980 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 820 DEG C, wherein finish rolling extreme trace reduction in pass 13.6%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 490 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Embodiment 3
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1163 DEG C of slab heating temperature, heating time 280min, the weight percent content of Ni in slab It is 0.43%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 20% of high ferrochrome, Roll surface hardness 75HSD, axially and radially working lining difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is the 1st, 2,4, and intermediate base carries out finish rolling, open rolling temperature after temperature Degree control is at 970 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 810 DEG C, wherein finish rolling extreme trace reduction in pass 15%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold red temperature≤500 DEG C, section cooling nozzle are U-typed collector eventually, Nozzle exit pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Embodiment 4
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1143 DEG C of slab heating temperature, heating time 320min, the weight percent content of Ni in slab It is 0.43%;
(2) just de-scaling, the pressure 24Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 16% of high ferrochrome, Roll surface hardness 76HSD, axially and radially working lining difference of hardness 1.2HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is the 1st, 2,4, and intermediate base carries out finish rolling, open rolling temperature after temperature Degree control is at 990 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 820 DEG C, wherein finish rolling extreme trace reduction in pass 14.4%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 485 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Embodiment 5
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1147 DEG C of slab heating temperature, heating time 250min, the weight percent content of Ni in slab It is 0.2%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 15% of high ferrochrome, Roll surface hardness 77HSD, axially and radially working lining difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is the 1st, 2,4, and intermediate base carries out finish rolling, open rolling temperature after temperature Degree control is at 985 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 825 DEG C, wherein finish rolling extreme trace reduction in pass 14.1%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 468 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Embodiment 6
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1154 DEG C of slab heating temperature, heating time 260min, the weight percent content of Ni in slab It is 0.2%;
(2) just de-scaling, the pressure 23Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 16% of high ferrochrome, Roll surface hardness 76HSD, axially and radially working lining difference of hardness 1.4HSD;
(4) roughing, roughing passage are 7, and dephosphorization passage is the 1st, 2,4, and the 1st and the 2nd uses milling train when roughing Fuselage water de-scaling, the pressure 22Mpa of de-scaling water;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is that base carries out finish rolling, open rolling temperature after temperature among the 1st, 2,4 Degree control is at 980 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 820 DEG C, wherein finish rolling extreme trace reduction in pass 12.5%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 500 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Comparative example 1
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1163 DEG C of slab heating temperature, heating time 250min, the weight percent content of Ni in slab It is 0.01%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 15% of high ferrochrome, Roll surface hardness 75HSD, axially and radially working lining difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is that base carries out finish rolling, open rolling temperature after temperature among the 1st, 2,4 Degree control is at 990 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 830 DEG C, wherein finish rolling extreme trace reduction in pass 13.5%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 500 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Comparative example 2
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1157 DEG C of slab heating temperature, heating time 320min, the weight percent content of Ni in slab It is 0.89%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 15% of high ferrochrome, Roll surface hardness 75HSD, axially and radially working lining difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is that base carries out finish rolling, open rolling temperature after temperature among the 1st, 2,4 Degree control is at 970 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 810 DEG C, wherein finish rolling extreme trace reduction in pass 13.5%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 500 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Comparative example 3
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1189 DEG C of slab heating temperature, heating time 250-320min, the weight percent of Ni in slab Content is 0.5%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 15% of high ferrochrome, Roll surface hardness 75HSD, axially and radially working lining difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is that base carries out finish rolling, open rolling temperature after temperature among the 1st, 2,4 Degree control is at 990 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 810 DEG C, wherein finish rolling extreme trace reduction in pass 14.6%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 500 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Comparative example 4
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1165 DEG C of slab heating temperature, heating time 320min, the weight percent content of Ni in slab It is 0.5%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis rolls, and operation roll of mill uses chromium nickel roll, and roll surface hardness 75HSD axially and radially works Layer difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is that base carries out finish rolling, open rolling temperature after temperature among the 1st, 2,4 Degree control is at 980 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 820 DEG C, wherein finish rolling extreme trace reduction in pass 14.7%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 500 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Comparative example 5
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1167 DEG C of slab heating temperature, heating time 250min, the weight percent content of Ni in slab It is 0.43%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 15% of high ferrochrome, Roll surface hardness 75HSD, axially and radially working lining difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is that base carries out finish rolling, open rolling temperature after temperature among the 1st, 2,4 Degree control is at 970 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 810 DEG C, wherein finish rolling extreme trace reduction in pass 18.7%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold red temperature≤500 DEG C, section cooling nozzle are U-typed collector eventually, Nozzle exit pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Comparative example 6
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1165 DEG C of slab heating temperature, heating time 250min, the weight percent content of Ni in slab It is 0.43%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 15% of high ferrochrome, Roll surface hardness 75HSD, axially and radially working lining difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is the 1st, 2, and intermediate base carries out finish rolling, start rolling temperature control after temperature System is at 970 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate that there is good low temperature to drop hammer Performance, finishing temperature control is at 810 DEG C, wherein finish rolling extreme trace reduction in pass 14.8%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using layer flow mode, cold 500 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, spray Mouth pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Comparative example 7
The method of the raising hot rolling pipeline steel oxidation iron sheet integrality of the present embodiment, includes the following steps:
(1) it heats, 1160 DEG C of slab heating temperature, heating time 320min, the weight percent content of Ni in slab It is 0.2%;
(2) just de-scaling, the pressure 22Mpa of first de-scaling high pressure water;
(3) single chassis roll, operation roll of mill use high ferrochrome roll, the weight of chromium degree 15% of high ferrochrome, Roll surface hardness 75HSD, axially and radially working lining difference of hardness 1.5HSD;
(4) roughing, roughing passage are 7, and the 1st and the 2nd uses the water de-scaling of milling train fuselage, the pressure of de-scaling water when roughing Power 22Mpa;
(5) finish rolling, finishing pass are 5, and dephosphorization passage is that base carries out finish rolling, open rolling temperature after temperature among the 1st, 2,4 Degree control is at 985 DEG C, to guarantee final iron scale with a thickness of 12-15 microns, in order to make finished product plate have good low temperature Block hammer performance, finishing temperature control is at 825 DEG C, wherein finish rolling extreme trace reduction in pass 14.4%;
(6) flying shear, the long rolled piece after refining require sub-cut at section according to size;
(7) cooling, cooling using ultrafast cold mode, cold 500 DEG C of red temperature eventually, section cooling nozzle is U-typed collector, Nozzle exit pressure is 0.2Mpa;
(8) aligning, finishing are aligned the steel plate bad to template after cooling and are aligned.Finishing includes scale trimming, surface Defect inspection reconditioning and sampling further include the steps that other inspections need;
(9) it examines, storage.
Performance test:
The integrality of iron scale is first clapped whole plate with high definition camera by the region percentages calculation that falls off of iron scale According to then being fallen off area percentage on photo using intercept method calculating, transversal position calculates at plate factory 1/4,1/2 and 3/4 Formula is (a+b+c)/3w, as shown in Figure 1, wherein wherein L1, L2 and L3 are transversal, and s1, s2 and s3 are iron scale obscission zone Domain, a, b and c are respectively the zone length that falls off that L1, L2 and L3 are intercepted, and w is the wide length of plate.As the area percentage < 5% that falls off When, iron scale integrality is judged as preferably, when >=5%, iron scale integrality be then it is poor, test result is shown in Table 1:
1 the performance test results of table
Number Iron scale integrality
Embodiment 1 Preferably
Embodiment 2 Preferably
Embodiment 3 Preferably
Embodiment 4 Preferably
Embodiment 5 Preferably
Embodiment 6 Preferably
Comparative example 1 It is poor
Comparative example 2 It is poor
Comparative example 3 It is poor
Comparative example 4 It is poor
Comparative example 5 It is poor
Comparative example 6 It is poor
Comparative example 7 It is poor
As it can be seen from table 1 embodiment 1-6 technique and step meet technical solution of the present invention, surface of steel plate iron oxide Leatherware has a preferable integrality, and comparative example 1-7 is respectively to Ni content, heating temperature, roll material, finish rolling extreme trace drafts, Finish rolling de-scaling passage, the type of cooling are limited to the complete of the external Study on Steel plate surface iron scale of technical solution of the present invention Property, steel surface iron oxide scale falls off seriously as the result is shown, has poor integrality, illustrates that technical solution of the present invention has More prominent effect.

Claims (8)

1. a kind of method for improving hot rolling pipeline steel oxidation iron sheet integrality, characterized by the following steps:
(1) it heats, slab heating temperature≤1170 DEG C, heating time 250-320min;
(2) just de-scaling, pressure >=22Mpa of first de-scaling high pressure water;
(3) single chassis rolls, and operation roll of mill uses high ferrochrome roll, and the weight of chromium degree of high ferrochrome is 15%- 20%, roll surface hardness >=75HSD, axially and radially working lining difference of hardness≤1.5HSD;
(4) roughing, the 1st and the 2nd uses the water de-scaling of milling train fuselage, pressure >=22Mpa of de-scaling water when roughing;
(5) finish rolling, intermediate base carry out finish rolling after temperature, start rolling temperature control at 980 ± 10 DEG C, finishing temperature control 820 ± 10 DEG C, finish rolling extreme trace reduction in pass≤15%;
(6) long rolled piece after refining is required sub-cut at section by flying shear according to size;
(7) cooling, whole cold red temperature≤500 DEG C cooling using layer flow mode;
(8) aligning, finishing;
(9) it examines, storage.
2. the method according to claim 1 for improving hot rolling pipeline steel oxidation iron sheet integrality, it is characterised in that: the step Suddenly the weight percent content of Ni is 0.2%≤Ni≤0.5% in (1) slab.
3. the method according to claim 1 for improving hot rolling pipeline steel oxidation iron sheet integrality, it is characterised in that: the step Suddenly roughing passage is 7 in (4).
4. the method according to claim 1 for improving hot rolling pipeline steel oxidation iron sheet integrality, it is characterised in that: the step Suddenly finishing pass is 5 in (5).
5. the method according to claim 1 for improving hot rolling pipeline steel oxidation iron sheet integrality, it is characterised in that: the step Suddenly in (5) in finishing stands on the basis of the 1st and 2 dephosphorization, increase by 2nd entrance de-scaling reciprocal.
6. the method according to claim 1 for improving hot rolling pipeline steel oxidation iron sheet integrality, it is characterised in that: the step Suddenly section cooling with nozzle is U-typed collector, nozzle exit pressure 0.2Mpa in (7).
7. the method according to claim 1 for improving hot rolling pipeline steel oxidation iron sheet integrality, it is characterised in that: the step Suddenly finishing includes scale trimming in (8), and surface defect checks reconditioning and sampling.
8. the method according to claim 1 for improving hot rolling pipeline steel oxidation iron sheet integrality, it is characterised in that: the step Suddenly the aligning steel plate bad to template after cooling is aligned in (8).
CN201811065608.7A 2018-09-12 2018-09-12 A method of improving hot rolling pipeline steel oxidation iron sheet integrality Pending CN109226259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811065608.7A CN109226259A (en) 2018-09-12 2018-09-12 A method of improving hot rolling pipeline steel oxidation iron sheet integrality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811065608.7A CN109226259A (en) 2018-09-12 2018-09-12 A method of improving hot rolling pipeline steel oxidation iron sheet integrality

Publications (1)

Publication Number Publication Date
CN109226259A true CN109226259A (en) 2019-01-18

Family

ID=65057855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811065608.7A Pending CN109226259A (en) 2018-09-12 2018-09-12 A method of improving hot rolling pipeline steel oxidation iron sheet integrality

Country Status (1)

Country Link
CN (1) CN109226259A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110560495A (en) * 2019-09-17 2019-12-13 安徽工业大学 Laboratory scale removal experiment platform and experiment method thereof
CN111593182A (en) * 2019-11-26 2020-08-28 北京特冶工贸有限责任公司 Production method of corrosion-resistant Baima complex phase structure steel rail
CN112474838A (en) * 2020-11-09 2021-03-12 江苏省沙钢钢铁研究院有限公司 Wide and thick plate full-flow descaling device, descaling method and wide and thick plate
CN112903680A (en) * 2021-01-26 2021-06-04 广西柳钢华创科技研发有限公司 Method for quantitatively evaluating integrity of iron scale on surface of steel bar
CN114433641A (en) * 2022-01-18 2022-05-06 安阳钢铁股份有限公司 Method for improving black ash on surface of hot continuous rolling thick-specification steel for automobile engineering

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513370A (en) * 2011-12-16 2012-06-27 南京钢铁股份有限公司 Control process for single-stand Steckel mill to produce special-purpose pipeline steel
CN103276314A (en) * 2013-05-17 2013-09-04 武汉钢铁(集团)公司 X80 pipeline steel plate with low yield ratio and high toughness and manufacturing method thereof
CN103341498A (en) * 2013-06-05 2013-10-09 武汉钢铁(集团)公司 Method for reducing thickness of oxide scale on surface of hot-rolled steel sheet
CN103769424A (en) * 2014-01-08 2014-05-07 南京钢铁股份有限公司 Method for controlling red oxide scale on surface of steckel mill steel plate
CN104550234A (en) * 2014-12-26 2015-04-29 南阳汉冶特钢有限公司 Rolling method of pipeline steel and stainless steel composite plate
CN105039870A (en) * 2015-08-31 2015-11-11 山东钢铁股份有限公司 X80M pipeline steel resistant to low temperature and large in strain and manufacturing method and application of X80M pipeline steel
CN108018482A (en) * 2017-12-19 2018-05-11 中钢集团邢台机械轧辊有限公司 A kind of high ferrochrome roll

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513370A (en) * 2011-12-16 2012-06-27 南京钢铁股份有限公司 Control process for single-stand Steckel mill to produce special-purpose pipeline steel
CN103276314A (en) * 2013-05-17 2013-09-04 武汉钢铁(集团)公司 X80 pipeline steel plate with low yield ratio and high toughness and manufacturing method thereof
CN103341498A (en) * 2013-06-05 2013-10-09 武汉钢铁(集团)公司 Method for reducing thickness of oxide scale on surface of hot-rolled steel sheet
CN103769424A (en) * 2014-01-08 2014-05-07 南京钢铁股份有限公司 Method for controlling red oxide scale on surface of steckel mill steel plate
CN104550234A (en) * 2014-12-26 2015-04-29 南阳汉冶特钢有限公司 Rolling method of pipeline steel and stainless steel composite plate
CN105039870A (en) * 2015-08-31 2015-11-11 山东钢铁股份有限公司 X80M pipeline steel resistant to low temperature and large in strain and manufacturing method and application of X80M pipeline steel
CN108018482A (en) * 2017-12-19 2018-05-11 中钢集团邢台机械轧辊有限公司 A kind of high ferrochrome roll

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110560495A (en) * 2019-09-17 2019-12-13 安徽工业大学 Laboratory scale removal experiment platform and experiment method thereof
CN111593182A (en) * 2019-11-26 2020-08-28 北京特冶工贸有限责任公司 Production method of corrosion-resistant Baima complex phase structure steel rail
CN112474838A (en) * 2020-11-09 2021-03-12 江苏省沙钢钢铁研究院有限公司 Wide and thick plate full-flow descaling device, descaling method and wide and thick plate
CN112903680A (en) * 2021-01-26 2021-06-04 广西柳钢华创科技研发有限公司 Method for quantitatively evaluating integrity of iron scale on surface of steel bar
CN112903680B (en) * 2021-01-26 2023-10-03 广西柳钢华创科技研发有限公司 Method for quantitatively evaluating integrity of iron scale on surface of steel bar
CN114433641A (en) * 2022-01-18 2022-05-06 安阳钢铁股份有限公司 Method for improving black ash on surface of hot continuous rolling thick-specification steel for automobile engineering
CN114433641B (en) * 2022-01-18 2024-03-26 安阳钢铁股份有限公司 Method for improving black ash on surface of hot continuous rolling thick steel for automobile engineering

Similar Documents

Publication Publication Date Title
CN109226259A (en) A method of improving hot rolling pipeline steel oxidation iron sheet integrality
CN103212571B (en) Method for producing oxide scale capable of preventing steel plate surface from getting rusty
CN109465295B (en) Method for preventing edge cracking and strip breakage of hot continuous rolled steel plate in cold rolling
CN101704026B (en) Method for controlling pitting on surface of medium steel plate
CN110438416A (en) A method of eliminating ultra-wide high-nitrogen austenitic stainless steel surface crack of plate
CN109500130B (en) Manufacturing method of seamless steel tube with diameter of 920mm for long-tube trailer gas cylinder
CN1995431A (en) Method for medium sized or thin plate blank continuous casting and continuous rolling for producing superfine crystal grain steel plate and the steel plate
CN105689408A (en) Hot rolling control method for scale on edges of low-carbon aluminum killed steel
CN104451386B (en) A kind of low yield strength ratio oil reserve is 610Mpa high-strength steel sheet and manufacture method thereof for tank body
CN102658294A (en) Low-carbon cold-rolled precision ultrathin steel strip for toy industry, and process method and application thereof
CN104862583A (en) Pickle sheet for 400MPa-level automobile structure and production method of pickle sheet
CN105624382A (en) Hot-rolling method for V-Ti microalloyed steel
CN110394363B (en) Production method for rolling high-quality carbon structural steel with thickness of more than or equal to 60mm by utilizing wide and thick plate finishing mill at differential temperature
CN110747323A (en) Acid-washing cold-formed steel and manufacturing method thereof
CN110394364A (en) A kind of production method of thin gauge technical pure titanium plate
CN103341498A (en) Method for reducing thickness of oxide scale on surface of hot-rolled steel sheet
CN106282801A (en) A kind of hot rolling large roughness surface weathering steel and manufacture method thereof
CN107649522A (en) Surface quality of hot rolled steel coils control method
CN109365529A (en) A kind of production method of austenitic stainless steel cut deal
WO2018199062A1 (en) Hot-rolled and annealed ferritic stainless steel sheet, and method for manufacturing same
CN110453148A (en) A kind of ultra-wide economizing type two phase stainless steel cut deal and its manufacturing method
CN105032974B (en) The production method of zirconium and zircaloy band volume
CN107012371A (en) A kind of preparation method of architectural decoration aluminium strip
CN112126855A (en) Production method of cold-rolled weather-resistant steel with yield strength of more than 310MPa
CN110004359B (en) High-uniformity longitudinal and transverse toughness wide steel plate and TMCP (thermal mechanical control processing) process production method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190118

RJ01 Rejection of invention patent application after publication