CN107165188A - A kind of adjustable main transformer basis of gauge, method and transformer station - Google Patents

A kind of adjustable main transformer basis of gauge, method and transformer station Download PDF

Info

Publication number
CN107165188A
CN107165188A CN201710569541.XA CN201710569541A CN107165188A CN 107165188 A CN107165188 A CN 107165188A CN 201710569541 A CN201710569541 A CN 201710569541A CN 107165188 A CN107165188 A CN 107165188A
Authority
CN
China
Prior art keywords
support beam
base
transformer
gauge
main transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710569541.XA
Other languages
Chinese (zh)
Inventor
冯涛池
王博
张猛
丁学真
褚学斌
彭建国
刘思斌
韩雯
杜鹃
朱峰
商希彤
李冰
张干珍
许丙秀
韩志宏
孙彩岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ji'nan Luyuan Electric Power Design Consulting Co Ltd
Original Assignee
Ji'nan Luyuan Electric Power Design Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ji'nan Luyuan Electric Power Design Consulting Co Ltd filed Critical Ji'nan Luyuan Electric Power Design Consulting Co Ltd
Priority to CN201710569541.XA priority Critical patent/CN107165188A/en
Publication of CN107165188A publication Critical patent/CN107165188A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/04Transformer houses; Substations or switchgear houses

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Power Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

The invention discloses a kind of adjustable main transformer basis of gauge, method and transformer station, belong to power engineering correlation technique.Foundation mainly includes:Base (10) and support beam (30);There is lug boss (12), support beam (30) is provided with the concave part (32) corresponding with the lug boss (12) on the base (10);Support beam (30) is fastened on base (10);The base (10) is detachably connected by steel member (20) with support beam (30);Adjacent support beam (30) is detachably connected also by steel member (20);Wherein, the support beam (30) at least two.The transformer foundation of the present invention, can carry out being adjusted support beam gauge, in order to carry the main transformer of different structure.

Description

A kind of adjustable main transformer basis of gauge, method and transformer station
Technical field
The present invention relates to electric power project engineering, more particularly to a kind of adjustable main transformer basis of gauge, method and power transformation Stand.
Background technology
Main transformer foundation conventional traditional method in the country's is to use cast-in-situ steel reinforced concrete beam type raft foundation and portion at present Steel splitting architecture basics.
But this design is constrained to the uncertain and time-bounded of main transformer equipment data, and then serious shadow first Building, technique, the normal duration of structural working drawing are rung, is restricted obvious by device parameter.
Next to that the duration such as cast-in-site, maintenance is longer during construction, it is individual critical for the whole construction period Work, the length of its duration directly influences larger to total lever factor.
In addition, outdoor main transformer electrical equipment due to be it is exposed outside, whole basis it is organoleptic by construction equipment, weather conditions, The factors such as workman's attainment substantially, the component outward appearance after shaping is very different, for whole engineering, sensorial effects be influence compared with For obvious key factor.
Before this, although there is other forms assembled main transformer foundation, it is also considered that the form of module batch production processing, But it does not complete complete meaning modularization, equipment determination after still need to part wet trade, second pouring or pass through increase Regulating block could realize final functional effect to adjust after main transformer foundation gauge, this pattern is more due to component, and regulation is complicated, One of modularization standardization it can not produce completely, therefore be still the major reason of restriction duration.The major defect of traditional method is Main transformer must call for bid and could design and construct after determination, once and equipment changing, existing basis will be unable to use, it is necessary to tear open Except reconstruction.
In summary, the duration is longer, can not change, cost is higher and main transformer low-frequency vibration is its master to surrounding enviroment pollution The shortcoming to be existed.
The content of the invention
In view of this, the present invention provides a kind of gauge adjustable main transformer basis, and by designing, brand-new structure, makes it Can carry out being adjusted support beam gauge, in order to carry the main transformer of different structure, and can standardized production, enter And greatly shorten the transformer substation construction cycle.
Originally above-mentioned purpose is reached, the technical proposal of the invention is realized in this way:
A kind of adjustable main transformer basis of gauge, including:
Base 10 and support beam 30;
There is lug boss 12, support beam 30 is provided with the concave part corresponding with the lug boss 12 on the base 10 32;
Support beam 30 is fastened on base 10;
The base 10 is detachably connected by steel member 20 with support beam 30;
Adjacent support beam 30 is detachably connected also by steel member 20;
Wherein, the support beam 30 at least two.
The lug boss 12 is trapezoidal.The lug boss 12 is provided with line with rubber layer 11.
Further, there is the first built-in fitting 13, the first built-in fitting 13 is connected by bolt with steel member 20 in the base 10 Connect.
There is the second built-in fitting 31, the second built-in fitting 31 is connected by bolt with steel member 20 in the support beam 30.
Further optimally, while above-mentioned infrastructure arrangement is provided, present invention also offers above-mentioned basic peace Dress method, mainly comprises the following steps:
A, base 10 is lifted on to emergency oil pond bottom, and base 10 is fixedly connected with emergency oil pond;
B, support beam 30 lifted and be fastened on base 10;
C, adjacent support beam 30 connected;
D, support beam 30 is connected with base 10 completed.
As another situation, present invention also offers a kind of transformer station, the transformer station has emergency oil pond, emergency oil pond It is interior have transformer foundation, and transformer foundation on be fixedly connected with transformer;
Wherein, the transformer foundation is the above-mentioned adjustable main transformer basis of gauge.
The present invention has the advantages that:
Support beam lifting is fastened on base, and unconventional integral structure, then the distance between support beam just can be with Adjustment, it is adaptable to the transformer assembling of different model.
Brief description of the drawings
Fig. 1 is the structural representation on the adjustable main transformer basis of gauge of the present invention;
Fig. 2 is the top view of base in the adjustable main transformer basis of gauge of the present invention;
Fig. 3 is the sectional view of base in the adjustable main transformer basis of gauge of the present invention;
Fig. 4 is the structural representation of support beam in the adjustable main transformer basis of gauge of the present invention;
In figure:
Base 10, line with rubber layer 11, lug boss 12, the first built-in fitting 13;
Steel member 20;
Support beam 30, the second built-in fitting 31, concave part 32.
Embodiment
For the technical characterstic for illustrating this programme can be understood, below by embodiment, and its accompanying drawing is combined, to this hair It is bright to be described in detail.
As Figure 1-Figure 4, the adjustable main transformer basis of the gauge, its structure mainly includes:
Base 10 and support beam 30;
There is lug boss 12, support beam 30 is provided with the concave part corresponding with the lug boss 12 on the base 10 32;
Support beam 30 is fastened on base 10;
The base 10 is detachably connected by steel member 20 with support beam 30;
Adjacent support beam 30 is detachably connected also by steel member 20.
Wherein, the support beam 30 at least two.
The lug boss 12 is trapezoidal, can so cause support beam 30 when being lifted, and be open relatively large ground Side is adapted with lug boss 12 so that the larger place of the upper shed of base 10 can be also adapted to the lug boss in support beam 30, The effect of automatic alignment is played, installation time can greatly be shortened.
Specifically, there is the first built-in fitting 13, the first built-in fitting 13 passes through bolt and steel member 20 in the base 10 Connection;And there is the second built-in fitting 31 in support beam 30, the second built-in fitting 31 is connected by bolt with steel member 20.
In the upper top of lug boss 12, provided with line with rubber layer 11.Line with rubber layer 11 is that high-damping is modified vibration-proof rubber, makes main transformer And affiliated facility vibration damping is set up defences, sound insulation and noise reduction effect is obvious.
The assemble method of the above-mentioned foundation structure of the present invention is as follows:
A, base 10 is lifted on to emergency oil pond bottom, and base 10 is fixedly connected with emergency oil pond;
B, first support beam 30 lifted and be fastened on base 10;
C, second support beam 30 lifted and be fastened on base 10;
D, adjacent support beam 30 connected;
E, support beam 30 is connected with base 10.
Employ after said structure, the present invention also has following advantage concurrently:
1) do not limited by device parameter, shorten and design the figure duration.
2) it is not affected by the weather, component standardized production in the factory, the site installation test time is extremely short, shortens Total completion time of project;For reconstruction and extension project, it is only necessary to trickle adjustment bearing case bay, shortening of this field for the duration.
3) finished product metaplasia is produced, it is to avoid field worker, the deficiency of technical equipment condition and the various flaws produced, for sense The lifting for the property seen.
4) duration of each link is shortened, element factory standard production reduces the expense in life cycle management indirectly Cost.
5) for transformation, extension project, without being remake after abolishing, it is only necessary to which appropriate regulation can be continuing with, energy-saving ring Protect, reuse, realize target of sustainable development.
7) new basic unit's installation and debugging step is simple, and without complicated technology, whole peaces can be completed by being not required to professional Debugging routine is filled, technology application is utilized.
Meanwhile, present invention also offers a kind of transformer station, the transformer station, which has, has transformation in emergency oil pond, emergency oil pond Device basis, and transformer is fixedly connected with transformer foundation.
Wherein, the transformer foundation is the above-mentioned adjustable main transformer basis of gauge.
Part is not described in detail by the present invention, is the known technology of those skilled in the art of the present technique.Finally illustrate, the above is real Example is applied to be merely illustrative of the technical solution of the present invention and unrestricted, although having been carried out specifically to the present invention with reference to preferred embodiment It is bright, it will be understood by those within the art that, technical scheme can be modified or equivalent substitution, and The objective and scope of technical solution of the present invention are not departed from, it all should cover among scope of the presently claimed invention.

Claims (7)

1. a kind of adjustable main transformer basis of gauge, it is characterised in that including:
Base (10) and support beam (30);
There is lug boss (12), support beam (30) is provided with the groove corresponding with the lug boss (12) on the base (10) Portion (32);
Support beam (30) is fastened on base (10);
The base (10) is detachably connected by steel member (20) with support beam (30);
Adjacent support beam (30) is detachably connected also by steel member (20);
Wherein, the support beam (30) at least two.
2. the adjustable main transformer basis of gauge according to claim 1, it is characterised in that the lug boss (12) is ladder Shape.
3. the adjustable main transformer basis of gauge according to claim 1, it is characterised in that set on the lug boss (12) There is line with rubber layer (11).
4. the adjustable main transformer basis of gauge according to claim 1, it is characterised in that have in the base (10) First built-in fitting (13), the first built-in fitting (13) is connected by bolt with steel member (20).
5. the adjustable main transformer basis of gauge according to claim 4, it is characterised in that have in the support beam (30) There is the second built-in fitting (31), the second built-in fitting (31) is connected by bolt with steel member (20).
6. a kind of installation method on the adjustable main transformer basis of gauge described in any one of claim 1-5, it is characterised in that Step is as follows:
A, base (10) is lifted on to emergency oil pond bottom, and base (10) is fixedly connected with emergency oil pond;
B, by support beam (30) lift and be fastened on base (10);
C, adjacent support beam (30) connected;
D, by support beam (30) be connected with base (10) i.e. complete.
7. a kind of transformer station, the transformer station has in emergency oil pond, emergency oil pond and had on transformer foundation, and transformer foundation It is fixedly connected with transformer;
Characterized in that, the transformer foundation is the adjustable main transformer basis of gauge described in claim any one of 1-5.
CN201710569541.XA 2017-07-13 2017-07-13 A kind of adjustable main transformer basis of gauge, method and transformer station Pending CN107165188A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710569541.XA CN107165188A (en) 2017-07-13 2017-07-13 A kind of adjustable main transformer basis of gauge, method and transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710569541.XA CN107165188A (en) 2017-07-13 2017-07-13 A kind of adjustable main transformer basis of gauge, method and transformer station

Publications (1)

Publication Number Publication Date
CN107165188A true CN107165188A (en) 2017-09-15

Family

ID=59818408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710569541.XA Pending CN107165188A (en) 2017-07-13 2017-07-13 A kind of adjustable main transformer basis of gauge, method and transformer station

Country Status (1)

Country Link
CN (1) CN107165188A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431079A (en) * 2021-07-05 2021-09-24 温州电力设计有限公司 Main transformer foundation with adjustable gauge and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3153763U (en) * 2009-07-07 2009-09-17 株式会社竹原電設 Foundation stand for water storage tank unit
CN203147186U (en) * 2013-03-15 2013-08-21 金川集团股份有限公司 Adjustable supporting device for horizontal tank
CN103590419A (en) * 2013-11-25 2014-02-19 山东电力工程咨询院有限公司 Assembled type adjustable high-voltage reactor foundation
CN204597305U (en) * 2015-05-18 2015-08-26 国家电网公司 Transformer displacement auxiliary device
CN104894925A (en) * 2015-04-10 2015-09-09 同济大学 Modularized steel structure track bed with adjustable gauge
CN205248809U (en) * 2015-11-18 2016-05-18 哈尔滨九洲电气技术有限责任公司 Big bear building -up constructs with adjustable
CN206070559U (en) * 2016-10-11 2017-04-05 国网青海省电力公司 A kind of main transformer general basic
CN207003466U (en) * 2017-07-13 2018-02-13 济南鲁源电力设计咨询院有限公司 A kind of adjustable main transformer basis of gauge and transformer station

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3153763U (en) * 2009-07-07 2009-09-17 株式会社竹原電設 Foundation stand for water storage tank unit
CN203147186U (en) * 2013-03-15 2013-08-21 金川集团股份有限公司 Adjustable supporting device for horizontal tank
CN103590419A (en) * 2013-11-25 2014-02-19 山东电力工程咨询院有限公司 Assembled type adjustable high-voltage reactor foundation
CN104894925A (en) * 2015-04-10 2015-09-09 同济大学 Modularized steel structure track bed with adjustable gauge
CN204597305U (en) * 2015-05-18 2015-08-26 国家电网公司 Transformer displacement auxiliary device
CN205248809U (en) * 2015-11-18 2016-05-18 哈尔滨九洲电气技术有限责任公司 Big bear building -up constructs with adjustable
CN206070559U (en) * 2016-10-11 2017-04-05 国网青海省电力公司 A kind of main transformer general basic
CN207003466U (en) * 2017-07-13 2018-02-13 济南鲁源电力设计咨询院有限公司 A kind of adjustable main transformer basis of gauge and transformer station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113431079A (en) * 2021-07-05 2021-09-24 温州电力设计有限公司 Main transformer foundation with adjustable gauge and construction method thereof

Similar Documents

Publication Publication Date Title
CN207003466U (en) A kind of adjustable main transformer basis of gauge and transformer station
CN107217815B (en) Resistance to compression, safe type assembled steel construction elevartor shaft
CN104695715A (en) Construction method of beam string structure of roof
CN106760197A (en) A kind of method that allowable error is installed in steel column structure and its control
CN111395532B (en) Installation and construction method for large-span half-opening elliptical spherical reticulated shell
CN101538936A (en) Hydraulic slip-and-lift construction method for water tower, hydraulic slip-form device, lifting device and hanger rod connecting piece thereof
CN103912006A (en) Assembled multi-pile foundation structure and construction method thereof
CN107657138A (en) Application of the Virtual Construction equipment and technology based on BIM in steel crossover engineering
CN107165188A (en) A kind of adjustable main transformer basis of gauge, method and transformer station
US10738499B2 (en) Concrete towers manufacturing method for wind turbines and concrete tower for wind turbine
CN102493671A (en) Additional concrete protection structure for ancient dwelling and construction method thereof
CN104032966A (en) Partitioning, hoisting, overhead closing and mounting method for arc-shaped double-layer net racks
CN111535446B (en) Construction method of large-span stadium
CN110512581B (en) Construction method of offshore wind power jacket
CN205841102U (en) Steel reinforced concrete combination type tower
CN105501391B (en) A kind of all-direction propeller is installed to the installation method of bottom of ship from building berth
CN104278779A (en) Network cable for large decorative curtain wall and stretching formation method during mounting of network cable
CN107795185A (en) Chimney reinforces pylon high-altitude installation node security construction method
CN109281408B (en) Comprehensive pipe gallery embedded part and fixing method thereof
CN104863259B (en) Upside-down construction method for large-span ultra-high signal-layer cylindrical architectural steel structure
JP2014080824A (en) Method for constructing foundation structure by utilizing skeleton of existing structure, and foundation structure
CN207175138U (en) Outdoor installation elevator
CN102425115A (en) Control method for actively overcoming dead weight and line shape of vice cable saddle buttress concrete
CN105678001B (en) Construction method for truss concrete injection
CN202672176U (en) Electric transmission line angle steel tower single column high platform bearing type base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915

RJ01 Rejection of invention patent application after publication