CN107165158A - The method that the mud produced using basement subsidence process makes wall - Google Patents

The method that the mud produced using basement subsidence process makes wall Download PDF

Info

Publication number
CN107165158A
CN107165158A CN201710395299.9A CN201710395299A CN107165158A CN 107165158 A CN107165158 A CN 107165158A CN 201710395299 A CN201710395299 A CN 201710395299A CN 107165158 A CN107165158 A CN 107165158A
Authority
CN
China
Prior art keywords
mud
basement
produced
wall
subsidence process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710395299.9A
Other languages
Chinese (zh)
Inventor
林威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wing Aircraft Technology (tianjin) Co Ltd
Original Assignee
Wing Aircraft Technology (tianjin) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wing Aircraft Technology (tianjin) Co Ltd filed Critical Wing Aircraft Technology (tianjin) Co Ltd
Priority to CN201710395299.9A priority Critical patent/CN107165158A/en
Publication of CN107165158A publication Critical patent/CN107165158A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/182Bulkheads or similar walls made solely of concrete in situ using formworks to separate sections
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to the method that the mud of technical field of buildings, more particularly to a kind of generation of utilization basement subsidence process makes wall, comprise the following steps:Step 1: making wall frame, the position support shuttering of making wall first is being needed, template surrounds rectangle, upper opening;Step 2: the mud that basement is produced is poured into mould with the mixture after cement, flyash are sufficiently stirred for, jolt ramming;Step 4: after solidification, form removal.This method can avoid mud outward transport problem in work progress, and live construction material most absolutely is solved the problems, such as again, and this brick is big due to density, and its heat insulation effect is far superior to present foamed bricks, energy-conserving and environment-protective.

Description

The method that the mud produced using basement subsidence process makes wall
Technical field
Wall is made the present invention relates to technical field of buildings, more particularly to the mud that a kind of utilization basement subsidence process is produced The method of body.
Background technology
At present, in basement subsidence process, it is generally adopted by the working procedure of earth excavation after first driving piles.Technique mistake Cheng Zhonghui produces many mud, and either in-situ processing or outward transport are all pretty troublesome things to these mud, how to handle these mud Slurry is those skilled in the art's urgent problem to be solved.
The content of the invention
It is an object of the invention to overcome the shortcomings of above-mentioned technology, and provide what a kind of utilization basement subsidence process was produced The method that mud makes wall.
The present invention to achieve the above object, using following technical scheme:
The method that the mud that a kind of utilization basement subsidence process is produced makes wall, it is characterised in that:Including following step Suddenly:
Step 1: making wall frame, the position support shuttering of making wall first is being needed, template surrounds rectangle, on Portion's opening;
Step 2: the mud that basement is produced is poured into mould with the mixture after cement, flyash are sufficiently stirred for, Jolt ramming;
Step 4: after solidification, form removal.
The beneficial effects of the invention are as follows:Relative to prior art, this method can be avoided outside mud in work progress Fortune problem, solves the problems, such as live construction material most absolutely again, and this brick is big due to density, and its heat insulation effect is far superior to Present foamed bricks, energy-conserving and environment-protective.
Embodiment
Describe the embodiment of the present invention in detail with reference to preferred embodiment.
The method that the mud that a kind of utilization basement subsidence process is produced makes wall, comprises the following steps:
Step 1: making wall frame, the position support shuttering of making wall first is being needed, template surrounds rectangle, on Portion's opening;
Step 2: the mud that basement is produced is poured into mould with the mixture after cement, flyash are sufficiently stirred for, Jolt ramming;The mud that this method is directly produced using basement;
Step 4: after solidification, form removal.General hardening time is 2-3 days, and taking this brick after mould apart just can scene Using or transport and used as other buildings.
This method can avoid mud outward transport problem in work progress, and live Building wood most absolutely is solved again Material problem, this brick is big due to density, and its heat insulation effect is far superior to present foamed bricks, energy-conserving and environment-protective.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (1)

1. the method that the mud that a kind of utilization basement subsidence process is produced makes wall, it is characterised in that:Comprise the following steps:
Step 1: making wall frame, the position support shuttering of making wall first is being needed, template surrounds rectangle, and top is opened Mouthful;
Step 2: the mud that basement is produced is poured into mould with the mixture after cement, flyash are sufficiently stirred for, shake It is real;
Step 4: after solidification, form removal.
CN201710395299.9A 2017-05-26 2017-05-26 The method that the mud produced using basement subsidence process makes wall Pending CN107165158A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710395299.9A CN107165158A (en) 2017-05-26 2017-05-26 The method that the mud produced using basement subsidence process makes wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710395299.9A CN107165158A (en) 2017-05-26 2017-05-26 The method that the mud produced using basement subsidence process makes wall

Publications (1)

Publication Number Publication Date
CN107165158A true CN107165158A (en) 2017-09-15

Family

ID=59822027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710395299.9A Pending CN107165158A (en) 2017-05-26 2017-05-26 The method that the mud produced using basement subsidence process makes wall

Country Status (1)

Country Link
CN (1) CN107165158A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102161581A (en) * 2010-09-13 2011-08-24 李子现 Light wall material produced on site
CN202299401U (en) * 2011-08-18 2012-07-04 雷灿波 Assembling structure of building wall surface template
CN203394019U (en) * 2013-08-12 2014-01-15 张润成 Frame type template structure for placing of concrete
KR101646527B1 (en) * 2016-03-14 2016-08-08 에스와이시 주식회사 The construction and civil engineering and construction methods that integrally formed stone

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102161581A (en) * 2010-09-13 2011-08-24 李子现 Light wall material produced on site
CN202299401U (en) * 2011-08-18 2012-07-04 雷灿波 Assembling structure of building wall surface template
CN203394019U (en) * 2013-08-12 2014-01-15 张润成 Frame type template structure for placing of concrete
KR101646527B1 (en) * 2016-03-14 2016-08-08 에스와이시 주식회사 The construction and civil engineering and construction methods that integrally formed stone

Similar Documents

Publication Publication Date Title
CN105064579B (en) A kind of construction method ensureing toilet water stopping thresholds platform pouring molding
CN205975626U (en) Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch
CN100467814C (en) Anti-leakage construction process for inclined roof
CN104790436B (en) Basement in high rise building top board pouring after settlement advance water stop construction method
CN103556819B (en) A kind of construction method of reserved constructional column hole on beam slab
CN108035354A (en) A kind of construction method of GRC cement plates brick mold
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
CN106812219A (en) Filling wall top stuff up a crack construction method
CN104358275B (en) Darker elevator shaft or collecting well construction method
CN103276916A (en) Constructing method and infill board for solidly sealed lightweight concrete board wall hole
CN103242009B (en) A kind of abutment infiltration material non-fine concrete block and manufacture craft thereof
CN104790565A (en) Cast-in-site ardealite load bearing wall composite structure main building construction method
CN107165158A (en) The method that the mud produced using basement subsidence process makes wall
CN108547450A (en) A kind of self-insulating brick wall construction method for exempting from formwork
CN203320578U (en) Waterproof treatment structure of reinforced concrete cast-in-place pile head
CN106545008A (en) A kind of cast-in-situ bored pile pile making method
CN206706748U (en) Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation
CN106013094A (en) Method suitable for pouring concrete on pile body of manual hole digging pile
CN203514332U (en) Casing for blocking dewatering tube well of post-cast strip
CN205188933U (en) Utilize composite foundation of precipitation well formation
CN205329714U (en) Compound retaining wall structure of highway precast concrete piece
CN107176805A (en) The method for handling the mud that basement subsidence process is produced
CN107299649A (en) A kind of post-cast strip advance water stop construction method for plentiful level of ground water
CN105804123B (en) Waterproof construction construction method
CN207419806U (en) A kind of girt strip lacing wire for built-in square plaster mould box cast-in-place concrete hollow floor slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915

RJ01 Rejection of invention patent application after publication