CN107100593A - Offshore oil drilling platform well head outfit and tubing string docking calculation - Google Patents

Offshore oil drilling platform well head outfit and tubing string docking calculation Download PDF

Info

Publication number
CN107100593A
CN107100593A CN201710302958.XA CN201710302958A CN107100593A CN 107100593 A CN107100593 A CN 107100593A CN 201710302958 A CN201710302958 A CN 201710302958A CN 107100593 A CN107100593 A CN 107100593A
Authority
CN
China
Prior art keywords
tubing string
elevator
iron driller
guide rail
drilling platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710302958.XA
Other languages
Chinese (zh)
Other versions
CN107100593B (en
Inventor
周井玲
吴国庆
徐勋倩
程海正
许波兵
刘苏苏
朱维南
茅靖峰
曹阳
张旭东
顾乐乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong University Technology Transfer Center Co ltd
Original Assignee
Nantong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong University filed Critical Nantong University
Publication of CN107100593A publication Critical patent/CN107100593A/en
Application granted granted Critical
Publication of CN107100593B publication Critical patent/CN107100593B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/0107Connecting of flow lines to offshore structures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/013Connecting a production flow line to an underwater well head

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to petroleum equipment field, specially a kind of offshore oil drilling platform well head outfit and tubing string docking calculation.The offshore oil drilling platform well head outfit includes elevator, slips, iron driller and a pair of vertical rails, and two guide surfaces of the pair of vertical rail are oppositely arranged, and tubing string is located between the guide surface of described two vertical rails;The elevator can be arranged at the top and top of the vertical rail up or down;The slips is placed in the middle part of the vertical rail;The sideshake that the iron driller is connected on a horizontally disposed magnetic levitation system and between two vertical rails is relative with the middle part of the tubing string;The iron driller includes the screw driver for being used for screwing tubing string.The present invention carries out into Analysis of Nested Design to wellhead equipment, and carries out intelligent control, to meet the safety of the oil field energy-saving, cost efficiency of construction and operator, ensures that oil field is more efficient with this, safer, more reasonably develops.

Description

Offshore oil drilling platform well head outfit and tubing string docking calculation
Technical field
The present invention relates to petroleum equipment field, specially a kind of offshore oil drilling platform well head outfit and tubing string pair Connect method.
Background technology
Shaft mouth operation is equipped on offshore oil drilling platform, is mainly used in the exploration and development mistake of offshore oil and natural gas Being lifted of journey petrochina tubing string (drilling rod, drill collar, sleeve pipe, oil pipe) and drilling tool, upper shackle, clamping, are that offshore platform is indispensable Equipment.
Whole operation process is at least by 2 operative employee's cooperations, and operative employee directly manipulates elevator and slips, and is revolved Button;Action, which cannot have, a little slips up.
The technical equipment and operating process of current oil field shaft mouth operation determine the labor intensity of wellhead equipment operator Very big, in the course of work there is larger potential safety hazard in artificial operation, can all occur a fixed number in oil well repairing operation every year Workman's casualty accident of amount.
The content of the invention
Present invention aims at solve the above problems there is provided a kind of offshore oil drilling platform well head outfit and pipe Post docking calculation, is specifically realized by following technical scheme:
A kind of offshore oil drilling platform well head outfit, including elevator 1, slips 3, iron driller 7 and a pair of vertical rails, Two guide surfaces of the pair of vertical rail are oppositely arranged, and tubing string is located between the guide surface of described two vertical rails;Institute The top and top of the vertical rail can be arranged at up or down by stating elevator;The slips is placed in the vertical rail Middle part;The iron driller be connected to sideshake on a horizontally disposed magnetic levitation system and between two vertical rails with The middle part of the tubing string is relative;The iron driller includes the screw driver for being used for screwing tubing string.
Described offshore oil drilling platform well head outfit, it, which is further designed, is, the magnetic levitation system bag Quiet guide rail, dynamic guide rail and linear electric motors are included, the quiet guide rail is fixedly installed, and the dynamic guide rail sleeve is mounted in the periphery of quiet guide rail, directly The mover of line motor is mounted on the center line of dynamic guide rail, and the stator of linear electric motors is arranged on the quiet guide rail with mover corresponding position On, on the inside of the both sides up and down of dynamic guide rail, the carrying electromagnet group being oppositely arranged equipped with above and below, in the right and left of dynamic guide rail Side, equipped with the guiding electromagnet group being oppositely arranged;The iron driller is arranged on the dynamic guide rail.
Described offshore oil drilling platform well head outfit, it, which is further designed, is, the one of the vertical rail Side is provided with screwed state mechanism for monitoring, and the screwed state mechanism for monitoring includes support, hydraulic-driven bar, swing rod, depression bar, rolling Wheel, magnetic patch and magnetic induction unit;The middle part of the swing rod is connected to the support in which can horizontally rotate, the hydraulic-driven bar One end is hinged with a sleeve, and the sleeve is slidably socketed the sidepiece in the swing rod, and the end of the opposite side of the swing rod is fixed Horizontally disposed guide cylinder is provided with, the depression bar sliding plug is provided with bulge loop in the guide cylinder in the middle part of depression bar, institute State and be provided with spring between bulge loop and the guide cylinder;The roller is rotatablely arranged at one end of the depression bar, and rolls The rotating shaft of wheel is vertically arranged, and the other end of the depression bar is provided with the limited block that diameter is more than the guide cylinder internal diameter;The rolling The bottom side of wheel is fixedly installed the mounting post with roller synchronous axial system, and the magnetic patch is fixedly installed on the outside of the mounting post, The detection plate relative with the mounting post is fixedly connected with the downside of the swing rod, the magnetic induction unit is fixedly installed on described In detection plate, the magnetic induction unit includes nonmetallic protective cover, fixed contact and the spring strip contact with ferrous material, described solid Determine contact, spring strip contact to be placed in the nonmetallic protective cover, and the spring strip contact is relative with the fixed contact, institute State spring strip contact be in side of the fixed contact away from the magnetic patch, the fixed contact, spring strip contact be sequentially connected in series in Signal output branch road is connected in electric power loop and by the fixed contact;The signal output branch road is reported by controller and one The control circuit connection of alert device and iron driller.
Described offshore oil drilling platform well head outfit, its further design is that the vertical rail draws It is provided with the middle part of guide face and the projection corresponding with the guiding conduit is provided with the outside of guiding conduit, the elevator.
A kind of offshore oil drilling platform wellhead column docking calculation, adjacent first tubing string is docked with second tubing string, Comprise the following steps:A, slips clamp the second tubing string that is below, and elevator clamps the first tubing string in top, then by the One tubing string is suspended in midair to second tubing string upper end, and the screw socket of first tubing string, second tubing string end is docked;B, iron driller are managed towards first Post rectilinear movement is then by first tubing string clamp column, and the elevator unclamps first tubing string;C, iron driller start to screw operation so that First tubing string is connected through a screw thread integrally with second tubing string;D, elevator clamp first tubing string again, and slips unclamps second tubing string, Then iron driller unclamps first tubing string and makees reverse linear motion and exits and screw station, and elevator is descending, until first tubing string and card It is watt corresponding;E, slips clamp first tubing string, and elevator unclamps first tubing string then up reset, now completes one and include two The butt-joint operation cycle of tubing string;The above-mentioned butt-joint operation cycle is repeated several times, then ultimately forms whole petroleum pipe column.
Described offshore oil drilling platform wellhead column docking calculation, it, which is further designed, is:The step C is also wrapped Tubing string screwed state monitoring resultses are included, now, in outer wall one roller of deduction of the first tubing string, first tubing string is in screw driver Effect is lower to rotate, and roller passively rotates with the rotation of first tubing string, and roller bottom is connected with magnetic patch, and the side of the magnetic patch is set Magnetic induction unit is equipped with, when magnetic patch is relative with the magnetic induction unit, magnetic induction unit output induced signal;It is adjacent to feel twice Time interval between induction signal exports the cycle for induced signal, when fluctuating in the two neighboring induced signal output cycle, The iron driller stops operation, elevator clamping first tubing string, and then iron driller unclamps first tubing string, in first tubing string and the second pipe Step b is again started up after post docking is accurate, and is sequentially completed subsequent step.
The present invention carries out into Analysis of Nested Design to wellhead equipment, and carries out intelligent control, and to meet, oil field construction is energy-saving, drop This synergy and the safety of operator, ensure that oil field is more efficient with this, safer, more reasonably develop;Screwed by setting Status monitoring mechanism, prevents adjacent two sections of tubing strings from causing screw socket to damage due to docking deviation, so as to cause connection between the two Intensity decreases, eliminate safe hidden trouble in time.
Brief description of the drawings
Fig. 1 is the structural representation of the offshore oil drilling platform well head outfit of the present invention.
Fig. 2 is the structural representation of screwed state mechanism for monitoring.
Fig. 3 is the side structure schematic diagram of screwed state mechanism for monitoring.
Fig. 4 is the process flow diagram in a butt-joint operation cycle.
Fig. 5 is the control flow schematic diagram in a butt-joint operation cycle.
Embodiment
The present invention is further described below in conjunction with Figure of description and embodiment:
Present invention aims at solve the above problems there is provided a kind of offshore oil drilling platform well head outfit and tubing string pair Method is connect, is specifically realized by following technical scheme:
As shown in figure 1, the offshore oil drilling platform well head outfit, including elevator 1, slips 2, iron driller 3 and a pair Vertical rail 4, two guide surfaces of the pair of vertical rail are oppositely arranged, and tubing string 5 is located at drawing for described two vertical rails Between guide face;The elevator can be arranged at the top and top of the vertical rail up or down;The slips 2 is placed in institute State the middle part of vertical rail 4;The iron driller is connected on a horizontally disposed magnetic levitation system 6 and vertical led via two Sideshake between rail is relative with the middle part of the tubing string;The iron driller 3 includes the screw driver 31 for being used for screwing tubing string.
The magnetic levitation system 6 includes quiet guide rail 61, dynamic guide rail 62 and linear electric motors(It is not drawn into figure), the quiet guide rail It is fixedly installed, the dynamic guide rail sleeve is mounted in the periphery of quiet guide rail, the mover of linear electric motors is mounted on the center line of dynamic guide rail, straight line The stator of motor be arranged on on the quiet guide rail of mover corresponding position, on the inside of the both sides up and down of dynamic guide rail, equipped with relative up and down The carrying electromagnet group of setting(It is not drawn into figure), on the inside of the right and left of dynamic guide rail, equipped with the guiding electromagnetism being oppositely arranged Iron group;The iron driller is arranged on the dynamic guide rail.In the presence of linear electric motors, iron driller, which enters or exited, screws work The station of industry.Guiding conduit 41 is provided with the middle part of the guide surface of the vertical rail 4, the outside of the elevator 1 is provided with and institute State and be oriented to the corresponding projection 11 of conduit.
As shown in Figure 2 and Figure 3, the side of the vertical rail is provided with screwed state mechanism for monitoring, screwed state monitoring Mechanism includes support 71, hydraulic-driven bar 72, swing rod 73, depression bar 74, roller 75, magnetic patch 76 and magnetic induction unit 77;The pendulum The middle part of bar is connected to the support in which can horizontally rotate, and one end of the hydraulic-driven bar 75 is hinged with a sleeve 78, the set Cylinder is slidably socketed the sidepiece in the swing rod, and the end of the opposite side of the swing rod is fixedly installed horizontally disposed guide cylinder 79, the depression bar sliding plug is provided with bulge loop 741 in the guide cylinder, in the middle part of depression bar, and the bulge loop is oriented to described Spring 742 is provided between cylinder;The roller is rotatablely arranged at one end of the depression bar, and the rotating shaft of roller is vertically set Put, the other end of the depression bar is provided with the limited block 743 that diameter is more than the guide cylinder internal diameter;The bottom side of the roller 75 is consolidated Surely the mounting post 70 with roller synchronous axial system is provided with, the magnetic patch 76 is fixedly installed on the outside of the mounting post, the pendulum The detection plate 701 relative with the mounting post is fixedly connected with the downside of bar, the magnetic induction unit is fixedly installed on the inspection On drafting board, the magnetic induction unit 77 includes nonmetallic protective cover 771, fixed contact 772 and the spring strip contact with ferrous material 773, the fixed contact, spring strip contact are placed in the nonmetallic protective cover, and the spring strip contact and the fixation Contact is relative, and the spring strip contact is in side of the fixed contact away from the magnetic patch, the fixed contact, spring strip contact It is sequentially connected in series in electric power loop and signal output branch road is connected to by the fixed contact;The signal output branch road passes through control Device processed is connected with the control circuit of an alarm and iron driller.
When magnetic patch is relative with the magnetic induction unit, the spring strip contact 773 is by adhesive to fixed contact, so as to believe Number output branch road output induced signal.
Shown in compares figure 4, Fig. 5, the offshore oil drilling platform wellhead column docking calculation, by adjacent first tubing string 51 Dock, comprise the following steps with second tubing string 52:A, slips clamp the second tubing string being below, and elevator is clamped in top First tubing string, then suspends first tubing string to second tubing string upper end in midair, and the screw socket of first tubing string, second tubing string end is docked; B, iron driller move linearly then by first tubing string clamp column towards first tubing string, and the elevator unclamps first tubing string;C, anvil Work starts to screw operation so that first tubing string is connected through a screw thread integrally with second tubing string;D, elevator clamp the first pipe again Post, slips unclamps second tubing string, and then iron driller unclamps first tubing string and makees reverse linear motion and exits and screw station, under elevator OK, until first tubing string is corresponding with slips;E, slips clamp first tubing string, and elevator unclamps first tubing string then up reset, Now complete a butt-joint operation cycle for including two tubing strings;The above-mentioned butt-joint operation cycle is repeated several times, then ultimately forms whole Individual petroleum pipe column.
The step C also includes tubing string screwed state monitoring resultses, now, is rolled in the outer wall deduction one of the first tubing string Wheel, first tubing string is rotated in the presence of screw driver, and roller is passively rotated with the rotation of first tubing string, and roller bottom is connected with Magnetic patch, the side of the magnetic patch is provided with magnetic induction unit, and when magnetic patch is relative with the magnetic induction unit, magnetic induction unit is defeated Go out induced signal;Time interval between adjacent induced signal twice exports the cycle for induced signal, when two neighboring sensing letter When number output cycle is fluctuated, the iron driller stops operation, elevator clamping first tubing string, and then iron driller unclamps first and managed Post, is again started up step b, and be sequentially completed subsequent step after first tubing string is docked accurately with second tubing string.
The present invention carries out into Analysis of Nested Design to wellhead equipment, and carries out intelligent control, and to meet, oil field construction is energy-saving, drop This synergy and the safety of operator, ensure that oil field is more efficient with this, safer, more reasonably develop;Screwed by setting Status monitoring mechanism, prevents adjacent two sections of tubing strings from causing screw socket to damage due to docking deviation, so as to cause connection between the two Intensity decreases, eliminate safe hidden trouble in time.

Claims (6)

1. a kind of offshore oil drilling platform well head outfit, it is characterised in that including elevator 1, slips 3, iron driller 7 and A pair of vertical rails, two guide surfaces of the pair of vertical rail are oppositely arranged, and tubing string is located at described two vertical rails Between guide surface;The elevator can be arranged at the top and top of the vertical rail up or down;The slips is placed in The middle part of the vertical rail;The iron driller is connected on a horizontally disposed magnetic levitation system and vertical led via two Sideshake between rail is relative with the middle part of the tubing string;The iron driller includes the screw driver for being used for screwing tubing string.
2. offshore oil drilling platform well head outfit according to claim 1, it is characterised in that the magnetic suspension dress Put including quiet guide rail, dynamic guide rail and linear electric motors, the quiet guide rail is fixedly installed, and the dynamic guide rail sleeve is mounted in the outer of quiet guide rail Week, the mover of linear electric motors is mounted on the center line of dynamic guide rail, and the stator of linear electric motors is arranged on quiet with mover corresponding position On guide rail, on the inside of the both sides up and down of dynamic guide rail, the carrying electromagnet group being oppositely arranged equipped with above and below, in the left and right two of dynamic guide rail On the inside of side, equipped with the guiding electromagnet group being oppositely arranged;The iron driller is arranged on the dynamic guide rail.
3. offshore oil drilling platform well head outfit according to claim 1, it is characterised in that the vertical rail Side be provided with screwed state mechanism for monitoring, the screwed state mechanism for monitoring include support, hydraulic-driven bar, swing rod, depression bar, Roller, magnetic patch and magnetic induction unit;The middle part of the swing rod is connected to the support, the hydraulic-driven bar in which can horizontally rotate One end be hinged with a sleeve, the sleeve is slidably socketed the sidepiece in the swing rod, and the end of the opposite side of the swing rod is consolidated Surely horizontally disposed guide cylinder is provided with, the depression bar sliding plug is provided with bulge loop in the guide cylinder in the middle part of depression bar, Spring is provided between the bulge loop and the guide cylinder;The roller is rotatablely arranged at one end of the depression bar, and The rotating shaft of roller is vertically arranged, and the other end of the depression bar is provided with the limited block that diameter is more than the guide cylinder internal diameter;It is described The bottom side of roller is fixedly installed the mounting post with roller synchronous axial system, and the magnetic patch is fixedly installed on the outer of the mounting post The detection plate relative with the mounting post is fixedly connected with the downside of side, the swing rod, the magnetic induction unit is fixedly installed on In the detection plate, the magnetic induction unit includes nonmetallic protective cover, fixed contact and the spring strip contact with ferrous material, institute Fixed contact, spring strip contact is stated to be placed in the nonmetallic protective cover, and the spring strip contact and the fixed contact phase Right, the spring strip contact is in side of the fixed contact away from the magnetic patch, and the fixed contact, spring strip contact are gone here and there successively It is connected in electric power loop and signal output branch road is connected to by the fixed contact;The signal output branch road by controller with The control circuit connection of one alarm and iron driller.
4. offshore oil drilling platform well head outfit according to claim 1, it is characterised in that the vertical rail Guide surface in the middle part of be provided with and be provided with the outside of guiding conduit, the elevator and the corresponding projection of the guiding conduit.
5. a kind of offshore oil drilling platform wellhead column docking calculation, adjacent first tubing string is docked with second tubing string, its It is characterised by comprising the following steps:A, slips clamp the second tubing string being below, and elevator clamps the first tubing string in top, Then first tubing string is suspended in midair to second tubing string upper end, the screw socket of first tubing string, second tubing string end is docked;B, iron driller court To first tubing string rectilinear movement then by first tubing string clamp column, the elevator unclamps first tubing string;C, iron driller start to screw Operation so that first tubing string is connected through a screw thread integrally with second tubing string;D, elevator clamp first tubing string again, and slips unclamps Second tubing string, then iron driller unclamp first tubing string and make reverse linear motion and exit and screw station, elevator is descending, until first Tubing string is corresponding with slips;E, slips clamp first tubing string, and elevator unclamps first tubing string then up reset, now completes one Include the butt-joint operation cycle of two tubing strings;The above-mentioned butt-joint operation cycle is repeated several times, then ultimately forms whole petroleum pipe column.
6. offshore oil drilling platform wellhead column docking calculation according to claim 5, it is characterised in that:The step C also includes tubing string screwed state monitoring resultses, now, and in outer wall one roller of deduction of the first tubing string, first tubing string is in rotation Rotated in the presence of the machine of twisting, roller passively rotates with the rotation of first tubing string, and roller bottom is connected with magnetic patch, the magnetic patch Side is provided with magnetic induction unit, when magnetic patch is relative with the magnetic induction unit, magnetic induction unit output induced signal;It is adjacent The time interval between induced signal is that induced signal exports the cycle twice, occurs ripple when the two neighboring induced signal output cycle When dynamic, the iron driller stops operation, elevator clamping first tubing string, and then iron driller unclamps first tubing string, first tubing string with Step b is again started up after second tubing string docking is accurate, and is sequentially completed subsequent step.
CN201710302958.XA 2016-10-14 2017-05-03 Offshore oil drilling platform well head outfit and tubing string interconnection method Active CN107100593B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2016108966809 2016-10-14
CN201610896680 2016-10-14

Publications (2)

Publication Number Publication Date
CN107100593A true CN107100593A (en) 2017-08-29
CN107100593B CN107100593B (en) 2019-04-16

Family

ID=59657404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710302958.XA Active CN107100593B (en) 2016-10-14 2017-05-03 Offshore oil drilling platform well head outfit and tubing string interconnection method

Country Status (1)

Country Link
CN (1) CN107100593B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107630682A (en) * 2017-11-20 2018-01-26 孟凡星 A kind of offshore oil exploiting platform
CN109025855A (en) * 2018-08-03 2018-12-18 四川诺克钻探机械有限公司 A kind of magnetic control drill rod grip device
CN114233200A (en) * 2021-12-21 2022-03-25 刘皓 Drilling device for natural gas geology and drilling method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070068669A1 (en) * 2005-09-23 2007-03-29 Gerald Lesko Pipe gripping ram
CN101343986A (en) * 2008-08-23 2009-01-14 大庆石油学院 Automatized shaft mouth operation clamp for petroleum well workover
CN101429847A (en) * 2008-08-08 2009-05-13 辽河石油勘探局 Oil field well workover operation machine
CN101429856A (en) * 2008-08-08 2009-05-13 辽河石油勘探局 Hydraulic pliers
CN101672168A (en) * 2009-10-23 2010-03-17 大庆石油学院 Workover operation mechanization system replacing well mouth manual operation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070068669A1 (en) * 2005-09-23 2007-03-29 Gerald Lesko Pipe gripping ram
CN101429847A (en) * 2008-08-08 2009-05-13 辽河石油勘探局 Oil field well workover operation machine
CN101429856A (en) * 2008-08-08 2009-05-13 辽河石油勘探局 Hydraulic pliers
CN101343986A (en) * 2008-08-23 2009-01-14 大庆石油学院 Automatized shaft mouth operation clamp for petroleum well workover
CN101672168A (en) * 2009-10-23 2010-03-17 大庆石油学院 Workover operation mechanization system replacing well mouth manual operation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107630682A (en) * 2017-11-20 2018-01-26 孟凡星 A kind of offshore oil exploiting platform
CN109025855A (en) * 2018-08-03 2018-12-18 四川诺克钻探机械有限公司 A kind of magnetic control drill rod grip device
CN109025855B (en) * 2018-08-03 2023-10-10 四川诺克钻探机械有限公司 Magnetic control drill rod clamping device
CN114233200A (en) * 2021-12-21 2022-03-25 刘皓 Drilling device for natural gas geology and drilling method thereof
CN114233200B (en) * 2021-12-21 2022-07-19 刘皓 Drilling device for natural gas geology and drilling method thereof

Also Published As

Publication number Publication date
CN107100593B (en) 2019-04-16

Similar Documents

Publication Publication Date Title
CN107100593A (en) Offshore oil drilling platform well head outfit and tubing string docking calculation
CN104120986A (en) Vehicle-mounted full-automatic hydraulic oil tubing tong device
CN109253844A (en) A kind of online wheel air tightness detection apparatus
CN106698147A (en) Intelligent fall prevention method and device of deep well lifting system
CN103397848A (en) Gear rack coal bed methane drilling rig hoisting system
CN107891285A (en) A kind of steel pipe fixator
CN207129799U (en) A kind of stranded detection means of elevator wire rope
CN202832296U (en) Drill rod lifting device on drilling equipment
CN109545026A (en) A kind of electrical employee training device that safety is good
CN203978335U (en) Vehicular fully automatic hydraulic tubing tongs device
CN206634922U (en) A kind of container spreader
CN206440448U (en) A kind of embedding pipe fittingses drop tester based on technological service
CN104879641B (en) The automatic brush fat device of cable pulley type automobile glass lifter slideway
CN107150220A (en) A kind of constant velocity driving shaft movable joint assembly machine
CN107096957B (en) A kind of steel tube fixing device
CN115059513A (en) Digital signal detection equipment of mine safety detection system
CN206171599U (en) Climb wire rope robot
CN206955525U (en) A kind of system of wire rope rope retention system tension force regulation and control
CN106081940A (en) A kind of weight crane for roof
CN108956603A (en) A kind of semicon industry braid Product Visual detection device
CN209775183U (en) Full-automatic pneumatic water drill
CN112247208A (en) Intelligent punching machine for line passing hole of motor train unit
CN106555553A (en) A kind of oil platform depth drill
CN109909971A (en) Obstacle crossing type water-cooling wall detects robot
CN202810765U (en) Pressure lowering device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230823

Address after: 226000 No. 9 Siyuan Road, Chongchuan District, Nantong City, Jiangsu Province

Patentee after: Nantong University Technology Transfer Center Co.,Ltd.

Address before: School of mechanical engineering, Nantong University, No.9 Xiyuan Road, Nantong City, Jiangsu Province, 226019

Patentee before: NANTONG University

TR01 Transfer of patent right