CN107090779A - A kind of mobile formwork front leg strut running gear - Google Patents
A kind of mobile formwork front leg strut running gear Download PDFInfo
- Publication number
- CN107090779A CN107090779A CN201710445412.XA CN201710445412A CN107090779A CN 107090779 A CN107090779 A CN 107090779A CN 201710445412 A CN201710445412 A CN 201710445412A CN 107090779 A CN107090779 A CN 107090779A
- Authority
- CN
- China
- Prior art keywords
- front leg
- wheel
- leg strut
- hanger
- drive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 210000001364 upper extremity Anatomy 0.000 title claims abstract description 30
- 238000009415 formwork Methods 0.000 title claims abstract description 16
- 230000008878 coupling Effects 0.000 claims description 4
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 239000000969 carrier Substances 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims 1
- 238000006073 displacement reaction Methods 0.000 abstract description 3
- 230000001360 synchronised effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003638 chemical reducing agent Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
A kind of mobile formwork front leg strut running gear, including:Two hangers, drive shaft, drive shaft drive mechanism and two guide rails.When mobile formwork front leg strut needs vertical shift, drive shaft drive mechanism drives two drive shafts on a hanger synchronously to rotate in same direction, so as to drive change gear to rotate, because bridge of the nose both sides are respectively provided with hanger, therefore two hangers are rotated by respective two change gears and walked along the guide rail on the bridge of the nose, realize hanger front leg strut is hung by bearing pin and realize vertical shift, it is ensured that mean allocation front leg strut is conducted oneself with dignity, and prevents unbalance loading during front leg strut vertical shift.By four change gears and guide rail contact, contact area is increased, and then increases frictional force, prevents from skidding, it is ensured that the synchronism of both sides displacement.
Description
Technical field
The present invention relates to bridge machine field, and in particular to a kind of mobile formwork front leg strut running gear.
Background technology
Traditional mobile formwork front leg strut running gear, upper end is by the electric block of fixed installation along vertical shift track travel
To realize vertical shift process, but when electric block is during vertical shift, the limiting and fixing device of front leg strut and girder need to be removed,
And the situation and wheel slip phenomenon of stress unbalance loading occur during vertical shift, need manually to re-registrate installation in place afterwards, grasp
Make complicated, inefficiency.The vertical shift orbit strength and rigidity of electric block must be controlled strictly simultaneously, need to expend lot of materials,
Increase overall structure weight.
The content of the invention
The present invention in order to overcome the shortcomings of above technology there is provided it is a kind of it is easy to operate, prevent from producing during front leg strut vertical shift
The mobile formwork front leg strut running gear of unbalance loading.
The technical scheme that the present invention overcomes its technical problem to be used is:
A kind of mobile formwork front leg strut running gear, including:
Two hangers, respectively positioned at bridge of the nose left and right ends, the hanger lower end is installed on the top of front leg strut by hinge,
Each hanger upper end is provided with two wheel carriers I;
Drive shaft, is horizontally rotated by bearing and is installed in wheel carrier I, and the drive shaft front end is provided with change gear;
Drive shaft drive mechanism, is installed on hanger, and two drive shafts of driving synchronously rotate in same direction;And
Two guide rails, it is horizontally placed on the bridge of the nose left and right sides along bridge of the nose length direction respectively, and two change gears of homonymy roll peace
Loaded on guide rail.
Sprocket wheel that above-mentioned drive shaft drive mechanism includes being installed in drive shaft, the reductor that is installed on hanger and with
The motor of speed reducer drive connection, the output shaft of the reductor is connected by shaft coupling and a drive shaft, two chains
Wheel is connected by chain drive.
For tension chain, in addition to the wheel carrier II being installed on hanger, the upper end of wheel carrier II is rotatablely equipped with tensioning
Wheel, the tensioning wheel is by chain tension.
In order to improve guidance quality, in addition to the wheel shaft of hanger front and rear sides is vertically arranged to respectively and is rotatablely installed in wheel
Directive wheel on axle, the directive wheel is in contact with the outward flange of the bridge of the nose.
The beneficial effects of the invention are as follows:When mobile formwork front leg strut needs vertical shift, drive shaft drive mechanism drives one
Two drive shafts on hanger synchronously rotate in same direction, so as to drive change gear to rotate, because bridge of the nose both sides are respectively provided with hanger, therefore two
Individual hanger is rotated by respective two change gears and walked along the guide rail on the bridge of the nose, is realized hanger and is hung front leg strut by bearing pin
Realize vertical shift, it is ensured that mean allocation front leg strut is conducted oneself with dignity, and prevents unbalance loading during front leg strut vertical shift.Connect by four change gears with guide rail
Touch, increase contact area, and then increase frictional force, prevent from skidding, it is ensured that the synchronism of both sides displacement.
Brief description of the drawings
Fig. 1 is main structure diagram of the invention;
Fig. 2 is side structure schematic view of the invention;
In figure, the sprocket wheel of 1. bridge of the nose, 2. hanger, 3. bearing pin, 4. front leg strut, 5. guide rail, 6. wheel carrier, I 7. drive shaft, 8. change gear 9.
10. the tensioning wheel of 16. wheel carrier of reductor 11. motor, 12. shaft coupling, 13. chain, 14. wheel shaft, 15. directive wheel II 17..
Embodiment
Below in conjunction with the accompanying drawings 1, the present invention will be further described for accompanying drawing 2.
A kind of mobile formwork front leg strut running gear, including:Two hangers 2, respectively positioned at the left and right ends of the bridge of the nose 1, hanger 2
Lower end is hinged the top for being installed on front leg strut 4 by bearing pin 3, and each upper end of hanger 2 is provided with two wheel carriers I 6;Drive shaft 7,
Horizontally rotated by bearing and be installed in wheel carrier I 6, the front end of drive shaft 7 is provided with change gear 8;Drive shaft drive mechanism, is installed on
On hanger 2, two drive shafts of driving 7 are synchronous to be rotate in same direction;And two guide rails 5, it sets along the length direction level of the bridge of the nose 1 respectively
The left and right sides of the bridge of the nose 1 is placed in, two change gears 8 of homonymy, which are rolled, to be installed on guide rail 5.When mobile formwork front leg strut 4 needs vertical shift
When, drive shaft drive mechanism drives two drive shafts 7 on a hanger 2 are synchronous to rotate in same direction, so that drive change gear 8 to rotate,
Because the both sides of the bridge of the nose 1 are respectively provided with hanger 2, therefore two hangers 2 are rotated along the guide rail 5 on the bridge of the nose 1 by respective two change gears 8
Walking, realizes hanger 2 and hangs front leg strut 4 by bearing pin 3 and realize vertical shift, it is ensured that mean allocation front leg strut 4 is conducted oneself with dignity, before preventing
Occurs unbalance loading during 4 vertical shift of supporting leg.Contacted by four change gears 8 with guide rail 5, increase contact area, and then increase frictional force,
Prevent from skidding, it is ensured that the synchronism of both sides displacement.
It is preferred that, drive shaft drive mechanism is following structure, its sprocket wheel 9 for including being installed in drive shaft 7, is installed on extension
Reductor 10 on frame 2 and the motor 11 being connected with reductor 10, the output shaft of reductor 10 by shaft coupling 12 with
One drive shaft 7 is connected, and two sprocket wheels 9 are connected by chain 13.Motor 11 is rotated to slow down by reductor 10 and put
A drive shaft 7 is driven to rotate after high pulling torque, the drive shaft 7 drives sprocket wheel 9 thereon to rotate, so as to be driven separately by chain 13
One drive shaft 7 is rotated, and the synchronous same-speed for realizing two change gears 8 is rotated.
Further, in addition to the wheel carrier II 16 that is installed on hanger 2, the upper end of wheel carrier II 16 is rotatablely equipped with tensioning wheel
17, chain 13 is tensioned by tensioning wheel 17.Chain 13 is tensioned by tensioning wheel 17, can effectively be prevented in the accessary sprocket wheel 9 of chain 13
Come off, further increase the reliability used.
It can also include being vertically arranged to the wheel shaft 14 of the front and rear sides of hanger 2 respectively and be rotatablely installed on wheel shaft 14
Directive wheel 15, directive wheel 15 is in contact with the outward flange of the bridge of the nose 1.The side edge contact of two directive wheels 15 and the bridge of the nose 1, so that
Effectively prevent the edge of itself and the bridge of the nose 1 from occurring rigid collision during whole mobile formwork front leg strut running gear vertical shift, further carry
Stability during high vertical shift.
Claims (4)
1. a kind of mobile formwork front leg strut running gear, it is characterised in that including:
Two hangers(2), respectively positioned at the bridge of the nose(1)Left and right ends, the hanger(2)Lower end passes through bearing pin(3)It is hinged and is installed on
Front leg strut(4)Top, each hanger(2)Upper end is provided with two wheel carriers I(6);
Drive shaft(7), horizontally rotated by bearing and be installed on wheel carrier I(6)In, the drive shaft(7)Front end is provided with change gear
(8);
Drive shaft drive mechanism, is installed on hanger(2)On, drive two drive shafts(7)Synchronously rotate in same direction;And
Two guide rails(5), it is respectively along the bridge of the nose(1)Length direction is horizontally placed on the bridge of the nose(1)The left and right sides, two extensions of homonymy
Wheel(8)Rolling is installed on guide rail(5)On.
2. mobile formwork front leg strut running gear according to claim 1, it is characterised in that:The drive shaft drive mechanism
Including being installed on drive shaft(7)On sprocket wheel(9), be installed on hanger(2)On reductor(10)And and reductor(10)Pass
The motor of dynamic connection(11), the reductor(10)Output shaft pass through shaft coupling(12)With a drive shaft(7)Drive connection,
Two sprocket wheels(9)Pass through chain(13)Drive connection.
3. mobile formwork front leg strut running gear according to claim 1, it is characterised in that:Also include being installed on hanger
(2)On wheel carrier II(16), the wheel carrier II(16)Upper end is rotatablely equipped with tensioning wheel(17), the tensioning wheel(17)By chain
(13)Tensioning.
4. the mobile formwork front leg strut running gear according to claim 1 or 2 or 3, it is characterised in that:Also include erecting respectively
Directly it is installed on hanger(2)The wheel shaft of front and rear sides(14)And be rotatablely installed in wheel shaft(14)On directive wheel(15), it is described to lead
To wheel(15)With the bridge of the nose(1)Outward flange be in contact.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710445412.XA CN107090779A (en) | 2017-06-14 | 2017-06-14 | A kind of mobile formwork front leg strut running gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710445412.XA CN107090779A (en) | 2017-06-14 | 2017-06-14 | A kind of mobile formwork front leg strut running gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107090779A true CN107090779A (en) | 2017-08-25 |
Family
ID=59640031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710445412.XA Pending CN107090779A (en) | 2017-06-14 | 2017-06-14 | A kind of mobile formwork front leg strut running gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107090779A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107881925A (en) * | 2017-12-20 | 2018-04-06 | 长沙理工大学 | Gantry crane system matched with movable formwork and construction method thereof |
WO2020143210A1 (en) * | 2019-01-09 | 2020-07-16 | 山东恒堃机械有限公司 | Front leg of movable formwork |
WO2020143211A1 (en) * | 2019-01-09 | 2020-07-16 | 山东恒堃机械有限公司 | Novel supporting leg in mobile scaffold |
WO2021022611A1 (en) * | 2019-08-06 | 2021-02-11 | 山东恒堃机械有限公司 | Broken shaft protection device for front supporting leg of upstroke movable formwork |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090043932A (en) * | 2007-10-30 | 2009-05-07 | 허용호 | Self-launching movable scafolding system |
CN201261866Y (en) * | 2008-07-11 | 2009-06-24 | 中铁大桥局股份有限公司 | Down moving type movable mould frame |
CN201873946U (en) * | 2010-07-22 | 2011-06-22 | 中交第二航务工程局有限公司 | Supporting and moving trolley for self-propelled type moving die frame of small radius |
CN201891077U (en) * | 2010-09-15 | 2011-07-06 | 中建二局土木工程有限公司 | Front and back supporting legs suspension system of upward movable mould base bridging machine |
CN202323733U (en) * | 2011-11-24 | 2012-07-11 | 武桥重工集团股份有限公司 | Bridge girder erection machine rear supporting leg capable of walking independently |
CN102797479A (en) * | 2011-05-23 | 2012-11-28 | 中交隧道工程局有限公司 | Inverted-arch moving die carrier with crossing running gears |
CN202658527U (en) * | 2012-06-27 | 2013-01-09 | 中铁四局集团机电设备安装有限公司 | Full-hydraulic linkage hole passing device for form traveler |
CN105350986A (en) * | 2015-11-15 | 2016-02-24 | 贵阳鼎辉科技有限公司 | Double-wheel driven assembly mechanism for tunnel lining trolley |
CN207597262U (en) * | 2017-06-14 | 2018-07-10 | 山东恒堃机械有限公司 | A kind of mobile formwork front leg strut running gear |
-
2017
- 2017-06-14 CN CN201710445412.XA patent/CN107090779A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090043932A (en) * | 2007-10-30 | 2009-05-07 | 허용호 | Self-launching movable scafolding system |
CN201261866Y (en) * | 2008-07-11 | 2009-06-24 | 中铁大桥局股份有限公司 | Down moving type movable mould frame |
CN201873946U (en) * | 2010-07-22 | 2011-06-22 | 中交第二航务工程局有限公司 | Supporting and moving trolley for self-propelled type moving die frame of small radius |
CN201891077U (en) * | 2010-09-15 | 2011-07-06 | 中建二局土木工程有限公司 | Front and back supporting legs suspension system of upward movable mould base bridging machine |
CN102797479A (en) * | 2011-05-23 | 2012-11-28 | 中交隧道工程局有限公司 | Inverted-arch moving die carrier with crossing running gears |
CN202323733U (en) * | 2011-11-24 | 2012-07-11 | 武桥重工集团股份有限公司 | Bridge girder erection machine rear supporting leg capable of walking independently |
CN202658527U (en) * | 2012-06-27 | 2013-01-09 | 中铁四局集团机电设备安装有限公司 | Full-hydraulic linkage hole passing device for form traveler |
CN105350986A (en) * | 2015-11-15 | 2016-02-24 | 贵阳鼎辉科技有限公司 | Double-wheel driven assembly mechanism for tunnel lining trolley |
CN207597262U (en) * | 2017-06-14 | 2018-07-10 | 山东恒堃机械有限公司 | A kind of mobile formwork front leg strut running gear |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107881925A (en) * | 2017-12-20 | 2018-04-06 | 长沙理工大学 | Gantry crane system matched with movable formwork and construction method thereof |
WO2020143210A1 (en) * | 2019-01-09 | 2020-07-16 | 山东恒堃机械有限公司 | Front leg of movable formwork |
WO2020143211A1 (en) * | 2019-01-09 | 2020-07-16 | 山东恒堃机械有限公司 | Novel supporting leg in mobile scaffold |
WO2021022611A1 (en) * | 2019-08-06 | 2021-02-11 | 山东恒堃机械有限公司 | Broken shaft protection device for front supporting leg of upstroke movable formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090779A (en) | A kind of mobile formwork front leg strut running gear | |
CN205294608U (en) | Plug borer hoist | |
CN102556891B (en) | Slide lifter | |
CN203461405U (en) | Casting conveying track | |
CN107299598A (en) | A kind of mobile device for being used for bridge machinery and reinforcing | |
CN104828100B (en) | A kind of rail mounted flat bed transport vehicle for track construction | |
CN207597262U (en) | A kind of mobile formwork front leg strut running gear | |
CN105383501B (en) | A kind of cycle traction single track multiplies people's train | |
CN103754651B (en) | A kind of device protection backing plate moved to from neonychium sheetpile buttress on manufacturing line | |
CN104563561A (en) | Avoiding-free parking equipment | |
CN218493613U (en) | Tunnel waterproof board paving and hanging trolley | |
CN205739500U (en) | The heap de-stacking device of conveying sledge | |
CN204728770U (en) | Go in ring bracing wire reciprocating rotary ascending/decending without dodging garage | |
CN201395483Y (en) | Electric chain hoist with small hook span | |
CN203877519U (en) | Device for lifting protective backing plates | |
CN205875843U (en) | Pick up car vertical lift class stereo garage of ware of adoption | |
CN107139422A (en) | Plastic tube caterpillar tractor | |
CN210214669U (en) | Cloth belt type gantry crane | |
CN108118926A (en) | Lifting-oscillating overstory parking platform device and the Transport Vehicle method using the device | |
CN107401304A (en) | A kind of double-deck stereo lugs | |
CN205709344U (en) | A kind of novel high speed elevator | |
CN208762890U (en) | Bridge construction anti-drop device | |
CN202465179U (en) | Slide lifter | |
CN206360719U (en) | Material feeding navigation tractor | |
CN207513262U (en) | A kind of double-deck stereo parking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170825 |