CN107083846A - A kind of shockproof reinforcement means of log cabin - Google Patents

A kind of shockproof reinforcement means of log cabin Download PDF

Info

Publication number
CN107083846A
CN107083846A CN201710219224.5A CN201710219224A CN107083846A CN 107083846 A CN107083846 A CN 107083846A CN 201710219224 A CN201710219224 A CN 201710219224A CN 107083846 A CN107083846 A CN 107083846A
Authority
CN
China
Prior art keywords
rotten
pin
collar tie
reinforcement
tie beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710219224.5A
Other languages
Chinese (zh)
Inventor
许强
马浩鑫
季笑庆
孙盛毅
张婷婷
田书然
邹积志
吕克超
王丽萍
麻常存
尹华山
孙鸥
迟荣民
吴庭吉
李耀甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201710219224.5A priority Critical patent/CN107083846A/en
Publication of CN107083846A publication Critical patent/CN107083846A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G2023/0248Increasing or restoring the load-bearing capacity of building construction elements of elements made of wood

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A kind of shockproof reinforcement means of log cabin, it is characterised in that comprise the following steps:To Wood member carry out component damage by worms, rotten consolidation process;It will partially or fully remove weak soil, change with dirt.It is appropriate in terms of stress to widen intensification, dig to old soil layer, and in step-like.Used around pin based on base block and armored concrete, after fixed house pin, dirt is filled out in layering rammer;The former floated coat of cleaning, descum, and moistening metope of sprinkling water;Arrange that plank angle mount on pin and crossbeam, is installed using joinery and its construction along former hard gable wall both sides;Set up along house arrangement of reinforcement brick collar tie beam surrounding and socket reinforcing bar and be connected pin with arrangement of reinforcement brick collar tie beam;Set up vertical support column separately along two extensions worn in ladder, the support column top is hung with two and fixed using bolt, and lower anchor is in combination collar tie beam;Divide all over cement sand bed is smeared, light is received on surface.Construction infection of the present invention is small, expense is low, and reinforcement effect and effect are notable.

Description

A kind of shockproof reinforcement means of log cabin
Technical field
The invention belongs to the method in wooden dilapidated buildings renovation field, more particularly to a kind of shockproof reinforcing of log cabin.
Background technology
China is located between the most active two violent earthquakes band in the whole world, and circum-Pacific seismic belt is on the point of in east, and western and southwest is happiness The refined Mediterranean earthquake zone of horse traction, seismic profile scope is wide, and 6 ~ 9 degree of earthquake territories of China mainland account for the 80% of area, hair shake Frequency is high.The rural area and rural area of China are then earthquake districts occurred frequently.From live seimic disaster census, strong by equal earthquake Spend under failure condition, the collapse degree of population injures and deaths, building in the unit administrative division of rural area is far above city, poorer Poor area, it is disaster-stricken more serious.Its main cause is backward in economy, and a large amount of houses owed by a citizen are in mostly wooden tile-roofed house, and house is old to be lacked Caused by weary earthquake resistant construction, shock resistance difference.Existing common wooden frame structure has following several types:
(1) pin wooden frame (flat roof type).General to make the weak post of brutal or crossbeam buttress shaft, beam-to-column joint is simple, lumber quality compared with Difference, roof is typically made with mud or lime Jiao's quarrel thick 10 ~ 30cm, therefore roofing weight is larger;House is short and small, roof pitch It is smaller, it is to avoid tall and big and unstable pediment.
(2) pin wooden frame (slope top formula).This type house, which is divided into, has corridor tall building and without two kinds of corridor tall building, there is the house in corridor tall building General to have 3 ~ 4 pillars, the house without corridor tall building only has front and rear two pillars, and using various more than the roofing in two kinds of houses Tile roofing, weight is than larger.
(3) pin wood roof truss.House is taller and bigger, spaciousness, roof truss and pin with wearing feather joint, some node plus dog or Iron nail is combined.
(4) bucket gallows timber is worn.Vertically and horizontally wooden frame and pin coak combine to form space frame, and crossbeam end is used Dowel typically has 3 ~ 5 posts through can prevent out of joint per Pin roof trusses, therefore, wear bucket timber framed house connecting structure and Globality is all stronger, and lateral stability is also preferable, and framework is seen in longitudinally connected good being formed.Mostly one, two-layer structure, Three layers can also be accomplished.The common premises such as private residence, teaching and office have use.In shape, it is divided to a Po Shui, two Po Shui and four Slope water form, conventional is two slope boiled water room rooms of the landing of three posts or the landing of five posts.
In the last few years rural area using log cabin all the more common for wearing bucket timber-frame structure because wearing bucket gallows timber bearing system Separated with building enclosure.Similar modern frame structure, load-bearing is mainly undertaken by wooden frame, and wall is used as building enclosure.Planar cloth Office is versatile and flexible, can meet different use requirements.There is preferable anti-seismic performance.The node joggle of bucket timber structure is worn, is such as detained Tenon, double dovetail key, joggle can be with the globalities of enhancing structure, to reduce earthquake;The energy that bean column node absorbs is more;Structure is light, ground Shake load small;Elasticity is good, and restoring force is big after deformation;Cycle is long, it is not easy to and solid soil resonates.There is wall frame The feature do not collapsed.Gather materials on the spot and well adapt to various regions weather conditions.Load-bearing structure timber, building enclosure loam wall, soil Base wall, pebble wall, wood siding wall, bamboo sheathing wall etc., these construction materials are all easier to take in locality.Construction technology letter It is single.
Although wearing bucket timber structure has preferable anti-seismic performance, in ago earthquake centre, some weaknesses of bucket timber structure are worn Link still is revealed out.Wear bucket timber structure and destruction occur in ago earthquake centre, these destructions
Mainly there is the following aspects:
(1) pin fractures.The wooden component of bucket is worn in manufacturing process, larger to the section weakening ratio of pillar, tenon mouthful compares comparatively dense. Wooden frame deformation ratio is larger in earthquake, pin is fractureed at the weakening of section.Such destruction is mainly manifested in floor layer absolute altitude and indulged At laterally.In addition with because joggle at pin spreading is insecure and fractures.The selection of indivedual pins is improper, is there is larger carrying On the section of power, exostosis is occurred in that, weak part is formed, pin also easily fractures here in earthquake.
(2) wooden frame destruction caused by the connection of the component such as beam, post, purlin is insecure.Always vertically and horizontally wooden frame and pin connection are used Be tenon (be generally dovetail).Because the hardness of timber is little, tenon node can loosen after wood shrinkage, if vibrations are compared in earthquake Greatly, then can occur phenomenon out of joint.Floor layer joist and the dovetail of crossbeam junction are too short, and tenon mouthful is pulled during earthquake, so as to lead Cause superstructure slump.
(3) roof truss is tilted or collapsed.The reason for roof truss is destroyed is relatively more, wherein most importantly wearing bucket timber framed house Lateral rigidity is smaller, and particularly longitudinal rigidity is smaller, is swung in earthquake, inclined building after earthquake.Horizontal whole Pin Gallows timber is not worn a tree, used in making timber for boats and run through, and makes each post and crosshead displacement excessive, causes inclined building or collapses.
(4) suspension column is moved with base for post.When pillar is not connected with base for post (base block) with tenon, pin is directly put On base for post (base block), occurs the translation changing of the relative positions because horizontal jitter causes between post and base for post during earthquake.Appearance post also Root is tilted, and pillar hangs empty or fallen.
(5) house height, the slope of roof are more heavier than larger, roof weight, and top heavy causes the destruction in house;Wooden structure Part is rotten, and some houses are long neglected and in disrepair, and wooden component is rotten to be degraded, and section weakens, and is destroyed first during earthquake and then causes other structures The destruction of part.
The content of the invention
In order to solve the above problems, the present invention proposes a kind of shockproof reinforcement means of log cabin, and specific operating method includes Following steps:
A kind of shockproof reinforcement means of log cabin, it is characterised in that comprise the following steps:
Step 1, to Wood member carry out component damage by worms, rotten consolidation process;
Step 2, will partially or fully weak soil remove, change with dirt.It is appropriate in terms of stress to widen intensification, dig to old soil layer, And in step-like.Use based on base block and armored concrete, after fixed house pin, filled out in layering rammer around pin Dirt;
Step 3, the former floated coat of cleaning, descum, and moistening metope of sprinkling water;
Step 4, along former hard gable wall both sides arrange that plank angle mount on pin and crossbeam, is installed using joinery and its construction;
Step 5, set up along house arrangement of reinforcement brick collar tie beam surrounding and to socket reinforcing bar and be connected pin with arrangement of reinforcement brick collar tie beam;
Two extensions that step 6, edge are worn in ladder set up vertical support column separately, and the support column top is hung with two and fixed using bolt, bottom It is anchored in combination collar tie beam;
Step 7, point all over cement sand bed is smeared, light is received on surface.
Further, the step 1 to Wood member the damage by worms specific method of rotten consolidation process is:
Center is intact, only the component such as the rotten beam in top layer, post, and rotten part is rejected into clean, drying is used after preservative treatment Timber is according to former state and the neat bonding of size repairing;
Wooden component inside because damage by worms or rotten formation in space-time, be irrigated using unsatured epoxy resin slurries.Before perfusion Rotten rotten wooden unit, chip are removed totally, and the small position perforate of stress in post.
Further, support column upper end is no less than 12mm with two extension connecting bolt diameters in the step 6.
The present invention effectively increases the anti-side rigidity of wooden frame structure for the measure of the shockproof use wallboard skew nailing of log cabin, Using having good damping, vibration isolating effect based on base block and armored concrete around pin, to ensure wooden component on ground The good anti-seismic performance in earthquake centre, is wearing installation scissors-type support frame on ladder, ladder resistance to overturning is worn in reinforcement;In pin and Increase sockets reinforcing bar between arrangement of reinforcement brick collar tie beam, can be effectively increased the connection of log cabin lid and wall, give full play to the space support of roof system Effect, and construction infection is small, expense is low, reinforcement effect and effect are notable.
Brief description of the drawings
The ground end structure chart on Fig. 1 pin bases of the present invention;
Fig. 2 is plank angle mount front view of the present invention;
Fig. 3 is plank angle mount mounting structure figure of the present invention;
Fig. 4 is collar tie beam of the present invention and pin attachment structure;
Fig. 5 is that support column of the present invention installs front view;
Fig. 6 is earthquake post bottom and capital displacement comparison figure before log cabin is reinforced;
Fig. 7 is earthquake post bottom and capital displacement comparison figure after log cabin is reinforced.
In figure:1st, collar tie beam;2nd, reinforcing bar is socketed;3rd, pin;4th, bolster;5th, U-shaped ironware;6th, mitered plank;7th, bolt;8th, prop up Dagger.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that specific embodiment described herein is not used to limit only to explain the present invention The fixed present invention.
Below in conjunction with the accompanying drawings and specific embodiment to the present invention application principle be further described.
A kind of shockproof reinforcement means of log cabin, it is characterised in that comprise the following steps:
Step 1, to Wood member carry out component damage by worms, rotten consolidation process;
Step 2, will partially or fully weak soil remove, change with dirt.It is appropriate in terms of stress to widen intensification, dig to old soil layer, And in step-like.Use based on base block and armored concrete, after fixed house pin, filled out in layering rammer around pin Dirt;
Step 3, the former floated coat of cleaning, descum, and moistening metope of sprinkling water;
Step 4, along former hard gable wall both sides arrange that plank angle mount on pin and crossbeam, is installed using joinery and its construction;
Step 5, set up along house arrangement of reinforcement brick collar tie beam surrounding and to socket reinforcing bar and be connected pin with arrangement of reinforcement brick collar tie beam;
Two extensions that step 6, edge are worn in ladder set up vertical support column separately, and the support column top is hung with two and fixed using bolt, bottom It is anchored in combination collar tie beam;
Step 7, point all over cement sand bed is smeared, light is received on surface.
The step 1 to Wood member the damage by worms specific method of rotten consolidation process is:
Center is intact, only the component such as the rotten beam in top layer, post, and rotten part is rejected into clean, drying is used after preservative treatment Timber is according to former state and the neat bonding of size repairing;
Wooden component inside because damage by worms or rotten formation in space-time, be irrigated using unsatured epoxy resin slurries.Before perfusion Rotten rotten wooden unit, chip are removed totally, and the small position perforate of stress in post.
Support column upper end is no less than 12mm with two extension connecting bolt diameters in the step 6.
Embodiment 1
It can be obtained by Fig. 6-7, the rigidity of wooden frame structure is added a lot, capital displacement and suspension column displacement do not occur many delayed Reaction, peak value is substantially produced in the identical time, the increase step by step of seismic acceleration peak value, and the swing of capital also gradually adds Greatly, displacement difference becomes big between suspension column and capital, but the difference of its displacement peak value is well controlled, it is to avoid may be due to post The house collapse for pushing up the relatively excessive displacement difference with post bottom and producing.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (3)

1. a kind of shockproof reinforcement means of log cabin, it is characterised in that comprise the following steps:
Step 1, to Wood member carry out component damage by worms, rotten consolidation process;
Step 2, will partially or fully weak soil remove, change with dirt;
It is appropriate in terms of stress to widen intensification, dig to old soil layer, and in step-like;
Used around pin based on base block and armored concrete, after fixed house pin, dirt is filled out in layering rammer;
Step 3, the former floated coat of cleaning, descum, and moistening metope of sprinkling water;
Step 4, along former hard gable wall both sides arrange that plank angle mount on pin and crossbeam, is installed using joinery and its construction;
Step 5, set up along house arrangement of reinforcement brick collar tie beam surrounding and to socket reinforcing bar and be connected pin with arrangement of reinforcement brick collar tie beam;
Two extensions that step 6, edge are worn in ladder set up vertical support column separately, and the support column top is hung with two and fixed using bolt, bottom It is anchored in combination collar tie beam;
Step 7, point all over cement sand bed is smeared, light is received on surface.
2. the shockproof reinforcement means of log cabin as claimed in claim 1, it is characterised in that the step 1 is damaged by worms to Wood member The specific method of rotten consolidation process is:
Center is intact, only the component such as the rotten beam in top layer, post, and rotten part is rejected into clean, drying is used after preservative treatment Timber is according to former state and the neat bonding of size repairing;
Wooden component inside because damage by worms or rotten formation in space-time, be irrigated using unsatured epoxy resin slurries, before perfusion Rotten rotten wooden unit, chip are removed totally, and the small position perforate of stress in post.
3. the shockproof reinforcement means of log cabin as claimed in claim 1, it is characterised in that support column upper end is hung with two in the step 6 Connecting bolt diameter is no less than 12mm.
CN201710219224.5A 2017-04-06 2017-04-06 A kind of shockproof reinforcement means of log cabin Pending CN107083846A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710219224.5A CN107083846A (en) 2017-04-06 2017-04-06 A kind of shockproof reinforcement means of log cabin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710219224.5A CN107083846A (en) 2017-04-06 2017-04-06 A kind of shockproof reinforcement means of log cabin

Publications (1)

Publication Number Publication Date
CN107083846A true CN107083846A (en) 2017-08-22

Family

ID=59614275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710219224.5A Pending CN107083846A (en) 2017-04-06 2017-04-06 A kind of shockproof reinforcement means of log cabin

Country Status (1)

Country Link
CN (1) CN107083846A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441606A (en) * 2020-04-30 2020-07-24 山西四建集团有限公司 Traditional building repairing method
CN114563276A (en) * 2022-02-28 2022-05-31 北京工业大学 Traditional residential wooden framework masonry enclosure wall surface external loading device and testing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638944A (en) * 2009-07-28 2010-02-03 佛山市工程承包总公司 In situ repairing method for historic building structure
CN201460250U (en) * 2009-05-26 2010-05-12 故宫博物院 Reinforcing device used for historic building timber structure side span mortise and tenon joint
CN101922241A (en) * 2010-08-13 2010-12-22 成都建筑工程集团总公司 Method for repairing wood beam column of old building by embedded rib reinforcement
CN106351460A (en) * 2016-08-26 2017-01-25 四川省建筑科学研究院 Method for maintenance and reinforcement of rural dangerous building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201460250U (en) * 2009-05-26 2010-05-12 故宫博物院 Reinforcing device used for historic building timber structure side span mortise and tenon joint
CN101638944A (en) * 2009-07-28 2010-02-03 佛山市工程承包总公司 In situ repairing method for historic building structure
CN101922241A (en) * 2010-08-13 2010-12-22 成都建筑工程集团总公司 Method for repairing wood beam column of old building by embedded rib reinforcement
CN106351460A (en) * 2016-08-26 2017-01-25 四川省建筑科学研究院 Method for maintenance and reinforcement of rural dangerous building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄曙: "农村典型木结构房屋的抗震性能及加固措施研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441606A (en) * 2020-04-30 2020-07-24 山西四建集团有限公司 Traditional building repairing method
CN114563276A (en) * 2022-02-28 2022-05-31 北京工业大学 Traditional residential wooden framework masonry enclosure wall surface external loading device and testing method
CN114563276B (en) * 2022-02-28 2024-02-06 北京工业大学 External loading device for enclosure wall surface of traditional civil wood framework masonry and testing method

Similar Documents

Publication Publication Date Title
CN105735524B (en) A kind of ancient building wooden frame power consumption wall
CN104674997B (en) A kind of supporting construction and its construction method on timber buildings roof modelled after an antique
US3354590A (en) Building frame structure
CN107083846A (en) A kind of shockproof reinforcement means of log cabin
CN112282097B (en) Assembled building anti-seismic structure with good stability
CN200975025Y (en) Wood joist house structural
CN205637233U (en) Ancient building wooden frame wall body that consumes energy
CN105386532B (en) A kind of archaized building structure antidetonation system
CN107447865A (en) One species Wood construction frame structure and preparation method thereof
CN218540754U (en) Steel column base node for connecting bamboo-wood column and concrete foundation
CN109281390B (en) Assembled concrete truss shear wall building structure
KR100681317B1 (en) Wood-carving structure for construction and the erection method using that
US20150240472A1 (en) Cantilevered structure
CN207277607U (en) A kind of assembled steel support frame Strengthened Masonry Walls load bearing wall
CN206245831U (en) A kind of superelevation steel megastructure vibration damping integrated system
CN106013421B (en) A kind of method of construction of the compound assembled fiber concrete building of steel wood
JP6767552B1 (en) Wood fence straight pin construction method
CN109281478B (en) Assembly method of shear wall-concrete truss cantilever type building
CN106760839A (en) A kind of superelevation steel megastructure vibration damping integrated system
CN204491955U (en) A kind of braced structures of Archaizing wood structural construction roof
CN219794240U (en) Steel construction column base just connects node structure
RU2265705C1 (en) Method for building reconstruction and raising
CN109372266B (en) Assembling method of interlayer overhanging concrete truss type building
CN216616962U (en) Reinforced structure of dislocation post because of construction error produces
CN109372100B (en) Assembly method of assembly type concrete truss shear wall building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170822