CN107060336A - Long-span Cantilever Construction of Steel Structure method - Google Patents

Long-span Cantilever Construction of Steel Structure method Download PDF

Info

Publication number
CN107060336A
CN107060336A CN201710234944.9A CN201710234944A CN107060336A CN 107060336 A CN107060336 A CN 107060336A CN 201710234944 A CN201710234944 A CN 201710234944A CN 107060336 A CN107060336 A CN 107060336A
Authority
CN
China
Prior art keywords
support bar
cantilevered structure
construction
buckling support
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710234944.9A
Other languages
Chinese (zh)
Inventor
魏哲刚
严洪丽
刘昌岑
安云
杨继旺
王淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710234944.9A priority Critical patent/CN107060336A/en
Publication of CN107060336A publication Critical patent/CN107060336A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/342Structures covering a large free area, whether open-sided or not, e.g. hangars, halls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of Long-span Cantilever Construction of Steel Structure method, including buckling support bar and cantilevered structure, cantilevered structure is connected with support column by buckling support bar, comprised the following steps:The absolute coordinate virtual network of buckling support bar and cantilevered structure is set up on computers;It is marked in the actual tie point position of cantilevered structure;Determine actual connection point coordinates at the scene using total powerstation, actual connection point coordinates is controlled, cantilevered structure and buckling support bar are synchronously installed, and installation site is controlled using total powerstation.Long-span Cantilever Construction of Steel Structure method of the present invention, buckling support bar is synchronous with cantilevered structure to be installed, without installing the interim fixing devices such as interim setting, all kinds of jack, cantilevered structure need not carry out off-load, reduce working procedure, improve efficiency of construction, reduce construction cost, reduce construction hidden danger, it is ensured that the personal safety of workmen, improve construction quality.

Description

Long-span Cantilever Construction of Steel Structure method
Technical field
It is to be related to a kind of Long-span Cantilever Construction of Steel Structure side specifically the present invention relates to a kind of construction techniques Method.
Background technology
Long-span Cantilever steel construction, needs to carry out uninstall process, such as large stadium cantilevered structure needs profit before complete install Carries out interim fixation with interim settings, all kinds of jack etc., after being segmented after part or general structure installation or whole Off-load is carried out, to reach the resistance to overturning of structure.The requirement of unloading and process are more, to measure project and material, environment bar Required in terms of part higher.It is discharged in Long-span Cantilever steel construction as last process and a most important step, the tradition Discharging method needs to seek Land leveling in construction;Making, the installation of temporary facility, take construction land tenure or influence other specialties Construction, while further relate to delayed engineering quality defects, progress, potential safety hazard, cost increase etc..
The content of the invention
For above-mentioned deficiency of the prior art, the present invention, which provides one kind, reduces working procedure, improves efficiency of construction, Construction cost is reduced, construction hidden danger is reduced, it is ensured that the Long-span Cantilever Construction of Steel Structure of the personal safety of workmen Method.
The technical solution used in the present invention is:
A kind of Long-span Cantilever Construction of Steel Structure method, including buckling support bar and cantilevered structure, cantilevered structure pass through flexing branch Strut is connected with support column, comprises the following steps:
(1)The absolute coordinate virtual network of buckling support bar and cantilevered structure is set up on computers;The coordinate of virtual network is former Point is consistent with the absolute coordinate origin constructed;
(2)Install in place using computer simulation, the absolute coordinate space X/Y/Z of actual tie point is chosen on cantilevered structure;Even Contact coordinate chosen position is installation with regard on the outside of site;
(3)It is marked in the actual tie point position of cantilevered structure;
(4)Determine actual connection point coordinates at the scene using total powerstation, actual connection point coordinates is controlled, it is defeated in instrument The absolute coordinate X/Y/Z for entering tie point is consistent with tie point actual coordinate;
(5)Cantilevered structure and buckling support bar are synchronously installed, and installation site, buckling support bar and knot of encorbelmenting are controlled using total powerstation Structure is connected by flange welding.
The actual tie point quantity is 3-5.
The buckling support bar is connected with cantilevered structure and support column by flange.
The beneficial effect of the present invention compared with the prior art:
Long-span Cantilever Construction of Steel Structure method of the present invention, buckling support bar is synchronous with cantilevered structure to be installed, interim without installing The interim fixing devices such as setting, all kinds of jack, cantilevered structure need not carry out off-load, reduce working procedure, improve Efficiency of construction, reduces construction cost, reduces construction hidden danger, it is ensured that the personal safety of workmen, improves construction matter Amount.
Brief description of the drawings
Fig. 1 is the Long-span Cantilever Construction of Steel Structure plan structure signal of Long-span Cantilever Construction of Steel Structure method of the present invention Figure;
Fig. 2 is that the computer of Long-span Cantilever Construction of Steel Structure method of the present invention sets up simulation absolute coordinate control network;
Fig. 3 is that the structure of the absolute control coordinate points of the selection installation site of Long-span Cantilever Construction of Steel Structure method of the present invention is shown It is intended to;
Fig. 4 is Fig. 3 A-A cross section structure diagrams;
Fig. 5 is that the utilization total powerstation of Long-span Cantilever Construction of Steel Structure method of the present invention controls the structural representation of installation process.
Critical piece symbol description in accompanying drawing:
In figure:
1st, buckling support bar 2, steel-tube construction of encorbelmenting
3rd, the origin of coordinates 4 of virtual network, actual tie point
5th, actual tie point 6, actual tie point
7th, coordinate chosen position 8, support column
9th, total powerstation.
Embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Knowable to accompanying drawing 1-5, a kind of Long-span Cantilever Construction of Steel Structure method, including buckling support bar 1 and cantilevered structure 2, encorbelment Structure 2 is connected by buckling support bar 1 with support column 8, is comprised the following steps:
(1)The absolute coordinate virtual network of buckling support bar and cantilevered structure is set up on computers;The coordinate of virtual network is former Point 3 is consistent with the absolute coordinate origin constructed;
(2)Install in place using computer simulation, actual tie point 4, actual tie point 5, actual connection are chosen on cantilevered structure The absolute coordinate space X/Y/Z of point 6;Point coordinates chosen position 7 is connected to install with regard on the outside of site;
(3)It is marked in the actual tie point position of cantilevered structure;
(4)Determine actual connection point coordinates at the scene using total powerstation 9, actual connection point coordinates is controlled, in instrument The absolute coordinate X/Y/Z of incoming junction is consistent with tie point actual coordinate;
(5)Cantilevered structure 2 and the synchronous installation of buckling support bar 2, installation site, welding and flange connection are controlled using total powerstation, Reach that installation unloading is synchronously completed.
The actual tie point quantity is 3-5.
The buckling support bar is connected with cantilevered structure and support column by flange.
Long-span Cantilever Construction of Steel Structure method of the present invention, buckling support bar is synchronous with cantilevered structure to be installed, without installing The interim fixing devices such as interim setting, all kinds of jack, cantilevered structure need not carry out off-load, reduce working procedure, carry High efficiency of construction, reduces construction cost, reduces construction hidden danger, it is ensured that the personal safety of workmen, improve and apply Working medium amount.
The above described is only a preferred embodiment of the present invention, not making any formal to the structure of the present invention Limitation.Any simple modification, equivalent variations and modification that every technical spirit according to the present invention is made to above example, Belong in the range of technical scheme.

Claims (3)

1. a kind of Long-span Cantilever Construction of Steel Structure method, including buckling support bar and cantilevered structure, cantilevered structure pass through flexing Support bar is connected with support column, it is characterised in that comprise the following steps:
(1)The absolute coordinate virtual network of buckling support bar and cantilevered structure is set up on computers;The coordinate of virtual network is former Point is consistent with the absolute coordinate origin constructed;
(2)Install in place using computer simulation, the absolute coordinate space X/Y/Z of actual tie point is chosen on cantilevered structure;Even Contact coordinate chosen position is installation with regard on the outside of site;
(3)It is marked in the actual tie point position of cantilevered structure;
(4)Determine actual connection point coordinates at the scene using total powerstation, actual connection point coordinates is controlled, it is defeated in instrument The absolute coordinate X/Y/Z for entering tie point is consistent with tie point actual coordinate;
(5)Cantilevered structure and buckling support bar are synchronously installed, and installation site, buckling support bar and knot of encorbelmenting are controlled using total powerstation Structure is connected by flange welding.
2. Long-span Cantilever Construction of Steel Structure method according to claim 1, it is characterised in that:The actual tie point quantity For 3-5.
3. Long-span Cantilever Construction of Steel Structure method according to claim 1, it is characterised in that:The buckling support bar is with hanging Structure is chosen with support column by flange to be connected.
CN201710234944.9A 2017-04-12 2017-04-12 Long-span Cantilever Construction of Steel Structure method Pending CN107060336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710234944.9A CN107060336A (en) 2017-04-12 2017-04-12 Long-span Cantilever Construction of Steel Structure method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710234944.9A CN107060336A (en) 2017-04-12 2017-04-12 Long-span Cantilever Construction of Steel Structure method

Publications (1)

Publication Number Publication Date
CN107060336A true CN107060336A (en) 2017-08-18

Family

ID=59601780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710234944.9A Pending CN107060336A (en) 2017-04-12 2017-04-12 Long-span Cantilever Construction of Steel Structure method

Country Status (1)

Country Link
CN (1) CN107060336A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682417A (en) * 2018-12-26 2019-04-26 中国铁路广州局集团有限公司 High-speed rail station Long-Span Steel Space Structures health monitoring sensor-based system
CN110185185A (en) * 2019-07-08 2019-08-30 同济大学建筑设计研究院(集团)有限公司 A kind of cantilever frame space structure system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019665A (en) * 2015-07-20 2015-11-04 中国二十二冶集团有限公司 Method for mounting long-span structure beam based on total station

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019665A (en) * 2015-07-20 2015-11-04 中国二十二冶集团有限公司 Method for mounting long-span structure beam based on total station

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682417A (en) * 2018-12-26 2019-04-26 中国铁路广州局集团有限公司 High-speed rail station Long-Span Steel Space Structures health monitoring sensor-based system
CN110185185A (en) * 2019-07-08 2019-08-30 同济大学建筑设计研究院(集团)有限公司 A kind of cantilever frame space structure system
CN110185185B (en) * 2019-07-08 2024-03-19 同济大学建筑设计研究院(集团)有限公司 Cantilever truss space structure system

Similar Documents

Publication Publication Date Title
CN107391793B (en) Building structure dismantling method based on 3D scanning technology and MR mixed reality technology
CN104866659B (en) Steel construction integral hoisting method based on BIM
Asyraf et al. Evaluation of Design and Simulation of Creep Test Rig for Full‐Scale Crossarm Structure
CN104748732B (en) Measurement method for segmental precast bridge erection field
CN107060336A (en) Long-span Cantilever Construction of Steel Structure method
CN107421761A (en) The detection method and its device of immersed tube tunnel deformation and temperature in a kind of bilateral fire
Hakim Seismic assessment of RC building using pushover analysis
Ferreira et al. Seismic assessment and retrofitting of peruvian earthen churches by means of numerical modelling
CN107299762A (en) A kind of concrete pouring procedure based on BIM
CN107687254A (en) A kind of concrete disjunctor group storehouse slip form construction device and construction method
CN102425313A (en) Carriage stepped unloading method after expanding large-span truss structure
CN103276909B (en) The assembled moulding bed of rack of arch-shaped space truss assembling method and use thereof
CN104196246A (en) Partial-evacuation in-site lifting construction method for multidirectional stress structure of continuous truss
CN102877412B (en) Method of pre-assembly in integral erecting way of steel tower
CN104060841B (en) Large-span steel girder construction method of installation
CN105387989A (en) Method for providing metal wires on pipeline model to simulate wind-resisting characteristic of suspension cable pipe bridge
CN105970975B (en) A kind of base pit stand construction with basement building
CN205421988U (en) Concrete detached column consolidates with PLC intelligence synchronization of jacking up off -load construction equipment
CN104480976B (en) A kind of visual dead load test on pile foundation remote wireless monitoring system
CN102926547A (en) Installation method of curved-surface net rack of roof
Zhang et al. Construction process simulation and in situ monitoring of dendritic structure on nanjing Niushou mountain
CN102191866A (en) Device and method for removal construction of vertical posts positioned on lower part of large-span net rack
KR20140140838A (en) Structure of power-transmission tower
CN104343382B (en) Pedestrain raise solar steel design and construction method
CN102704494A (en) Sequence excavation top ring beam sharing device of adjacent foundation pits

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818