CN107060307A - Construction simplification triangle operating platform makes and construction method of installation - Google Patents

Construction simplification triangle operating platform makes and construction method of installation Download PDF

Info

Publication number
CN107060307A
CN107060307A CN201710338087.7A CN201710338087A CN107060307A CN 107060307 A CN107060307 A CN 107060307A CN 201710338087 A CN201710338087 A CN 201710338087A CN 107060307 A CN107060307 A CN 107060307A
Authority
CN
China
Prior art keywords
tripod
muscle
bolt
walls
operating platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710338087.7A
Other languages
Chinese (zh)
Inventor
葛加君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710338087.7A priority Critical patent/CN107060307A/en
Publication of CN107060307A publication Critical patent/CN107060307A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Made the invention discloses a kind of construction simplification triangle operating platform and construction method of installation, include design, the making of tripod, muscle design through walls, making, the design of pulling force pier, making, fence is designed, boat-stretcher design, making, makes safety net, tripod is consolidated, fence is installed, and lays step tread plate, a safety net, tripod is lifted, the step such as tripod dismounting.The present invention during precast beam wallboard or in cast-in-situ concrete beam wall at a certain distance, reserved string muscle mouthful, the vertical facade of the platform support body made using triangular form is effectively connected with wall beam, consolidated using bolt, and pin is hung in progress on string muscle on the inside of wall, constitutes the operating platform of stability;Using triangle stability principle, formed using channel-section steel anchoring, it is few with material, it is easy to operate, it is applied widely.

Description

Construction simplification triangle operating platform makes and construction method of installation
Technical field
Made the present invention relates to a kind of CONSTRUCTION OPERATIONS platform and construction method of installation.
Background technology
As China's economy faster develops, construction industry human resources imbalance between supply and demand aggravation, batch production building construction progress Accelerate, the rise of equipment formula building, traditional construction scaffolding construction operation platform can not meet modern architecture construction need Ask.
The content of the invention
It is an object of the invention to provide a kind of rational in infrastructure, easy construction, the construction simplification of good working effect Triangle operating platform makes and construction method of installation.
The present invention technical solution be:
A kind of construction simplification triangle operating platform makes and construction method of installation, it is characterized in that:Comprise the following steps:
(1)Design, the making of tripod:Tripod is right angled triangle frame, and each side uses 10# channel-section steels, and horizontal edge length of side 1m is indulged Side length of side 1.5m, hypotenuse length of side 1.85m;Multiple ф 5mm eyelets are bored on channel-section steel horizontal edge;Three ф 10mm bolts hole are bored in longitudinal edge, Wherein middle screw keyhole is at longitudinal side length direction side 1/2nd, and remaining two bolt hole is respectively away from longitudinal edge initial and tail sections 10mm Place;
First longitudinal edge is connected with horizontal edge, hypotenuse is reconnected;Drilling position is determined during connection on channel-section steel, then is drilled, so with solid Tie bolt;
(2)Muscle design through walls, making:From ф 10mm round steel, length is thickness of wall body+15cm, and in two hank knotting 2cm, outside With bolt;
(3)The design of pulling force pier, making:Make concrete pulling force pier, length 50cm, height 50cm, width 50cm, wherein being embedded to steel Wire ring and pulling force rope;
(4)Fence is designed:Fence is connected with vertical rod by cross bar and constituted, and wherein vertical rod is fixedly arranged at the horizontal edge of tripod with hanging bolt On, cross bar is fixedly arranged in vertical rod with hanging bolt;
(5)Boat-stretcher design, making:Using plank or steel plate, width is 1m, length 2.85m, plank thickness 200mm, and steel plate is thick Spend 10mm, blending bolt consolidation;
(6)Make safety net;
(7)Tripod is consolidated:The muscle mouthful worn that will be first reserved in wall beam body carries out dredging dynamic, does not stay such as and wears muscle mouthful, then using drill into Row drilling, formation wears muscle mouthful, muscle through walls is penetrated in wall, consolidated with bolt, and the connection pulling force pier on the muscle through walls of side within the walls;
(8)Fence is installed:After tripod is according to 3m spacing installations, the longitudinal pipe of fence is installed on tripod respectively, And consolidation is installed using pulling force rib;
After fence vertical pole is installed, cross bar is installed, cross bar hangs foot bolt to use from top to bottom and consolidated;
(9)Lay step tread plate:One piece is often laid to be fixed with hanging foot bolt;
(10)Open safety net:Thrown the net, and fixed with fixture from top to bottom;
(11)Tripod is lifted:First by tripod operating platform personnel, whole Departure operation platforms are removed operating platform and owned Object, then loosens pulling force pier, turns on bolt on the inside of wall beam, and muscle through walls is released on the outside of wall beam, using suspender, hung by tower crane Dress is promoted to upper strata wall beam and installed at triangle body panel, by muscle through walls, penetrates side within the walls, then row is anchored with anchoring piece, and Connect pulling force pier;
(12)Tripod is removed:The personnel on operating platform are made all to withdraw first, while all debris on clear operation platform, Then pulling force pier is released, bolt on the inside of dismounting wall beam is loosened, muscle through walls is extracted out, then operating platform hung in into ground with tower crane, is entered Row decomposes dismounting, and component is cleaned into boxing for later use.
Fence cross bar uses 50 × 50mm square tubes, and vertical rod length is 1.5m, and cross bar length can select 3m, 6m or 9m.
The present invention at a certain distance, reserves string muscle mouthful, used during precast beam wallboard or in cast-in-situ concrete beam wall The vertical facade for the platform support body that triangular form makes effectively is connected with wall beam, is consolidated using bolt, and is carried out on the inside of wall on string muscle Pin is hung, the operating platform of stability is constituted, so with stability techniques feature.
Using triangle stability principle, formed using channel-section steel anchoring, it is few with material, it is easy to operate, it is applied widely;Mainly Suitable for industrial civilian prefabricated buildings building engineering construction;Simultaneously suitable for general industrial civilian Existing reinforced concrete bridge architectural engineering Transform decoration construction;It is equally applicable to particularity structures tower, chimney etc..
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is operating platform structural representation of the present invention.
Embodiment
A kind of construction simplification triangle operating platform makes and construction method of installation, comprises the following steps:
(1)Design, the making of tripod 1:Tripod be right angled triangle frame, each side use 10# channel-section steels, horizontal edge length of side 1m, Longitudinal edge length of side 1.5m, hypotenuse length of side 1.85m;Multiple ф 5mm eyelets are bored on channel-section steel horizontal edge;Three ф 10mm bolts are bored in longitudinal edge Hole, wherein middle screw keyhole are at longitudinal side length direction side 1/2nd, and remaining two bolt hole is respectively away from longitudinal edge initial and tail sections At 10mm;
First longitudinal edge is connected with horizontal edge, hypotenuse is reconnected;Drilling position is determined during connection on channel-section steel, then is drilled, so with solid Tie bolt;
(2)Muscle design through walls, making:From ф 10mm round steel, length is thickness of wall body+15cm, and in two hank knotting 2cm, outside With bolt;
(3)Pulling force pier 2 is designed, made:Make concrete pulling force pier, length 50cm, height 50cm, width 50cm, wherein being embedded to Wire loop and pulling force rope;
(4)Fence 3 is designed:Fence is connected with vertical rod by cross bar and constituted, and wherein vertical rod is fixedly arranged at the horizontal stroke of tripod with hanging bolt Bian Shang, cross bar is fixedly arranged in vertical rod with hanging bolt;
(5)Boat-stretcher design, making:Using plank or steel plate, width is 1m, length 2.85m, plank thickness 200mm, and steel plate is thick Spend 10mm, blending bolt consolidation;
(6)Make safety net;
(7)Tripod is consolidated:The muscle mouthful worn that will be first reserved in wall beam body 4 carries out dredging dynamic, does not stay such as and wears muscle mouthful, then using drill into Row drilling, formation wears muscle mouthful, muscle through walls is penetrated in wall, consolidated with bolt, and the connection pulling force pier on the muscle through walls of side within the walls;
(8)Fence is installed:After tripod is according to 3m spacing installations, the longitudinal pipe of fence is installed on tripod respectively, And consolidation is installed using pulling force rib;
After fence vertical pole is installed, cross bar is installed, cross bar hangs foot bolt to use from top to bottom and consolidated;
(9)Lay step tread plate:One piece is often laid to be fixed with hanging foot bolt;
(10)Open safety net:Thrown the net, and fixed with fixture from top to bottom;
(11)Tripod is lifted:First by tripod operating platform personnel, whole Departure operation platforms are removed operating platform and owned Object, then loosens pulling force pier, turns on bolt on the inside of wall beam, and muscle through walls is released on the outside of wall beam, using suspender, hung by tower crane Dress is promoted to upper strata wall beam and installed at triangle body panel, by muscle through walls, penetrates side within the walls, then row is anchored with anchoring piece, and Connect pulling force pier;
(12)Tripod is removed:The personnel on operating platform are made all to withdraw first, while all debris on clear operation platform, Then pulling force pier is released, bolt on the inside of dismounting wall beam is loosened, muscle through walls is extracted out, then operating platform hung in into ground with tower crane, is entered Row decomposes dismounting, and component is cleaned into boxing for later use.
Fence cross bar uses 50 × 50mm square tubes, and vertical rod length is 1.5m, and cross bar length can select 3m, 6m or 9m.

Claims (2)

1. a kind of construction simplification triangle operating platform makes and construction method of installation, it is characterized in that:Including following step Suddenly:
(1)Design, the making of tripod:Tripod is right angled triangle frame, and each side uses 10# channel-section steels, and horizontal edge length of side 1m is indulged Side length of side 1.5m, hypotenuse length of side 1.85m;Multiple ф 5mm eyelets are bored on channel-section steel horizontal edge;Three ф 10mm bolts hole are bored in longitudinal edge, Wherein middle screw keyhole is at longitudinal side length direction side 1/2nd, and remaining two bolt hole is respectively away from longitudinal edge initial and tail sections 10mm Place;
First longitudinal edge is connected with horizontal edge, hypotenuse is reconnected;Drilling position is determined during connection on channel-section steel, then is drilled, so with solid Tie bolt;
(2)Muscle design through walls, making:From ф 10mm round steel, length is thickness of wall body+15cm, and in two hank knotting 2cm, outside With bolt;
(3)The design of pulling force pier, making:Make concrete pulling force pier, length 50cm, height 50cm, width 50cm, wherein being embedded to steel Wire ring and pulling force rope;
(4)Fence is designed:Fence is connected with vertical rod by cross bar and constituted, and wherein vertical rod is fixedly arranged at the horizontal edge of tripod with hanging bolt On, cross bar is fixedly arranged in vertical rod with hanging bolt;
(5)Boat-stretcher design, making:Using plank or steel plate, width is 1m, length 2.85m, plank thickness 200mm, and steel plate is thick Spend 10mm, blending bolt consolidation;
(6)Make safety net;
(7)Tripod is consolidated:The muscle mouthful worn that will be first reserved in wall beam body carries out dredging dynamic, does not stay such as and wears muscle mouthful, then using drill into Row drilling, formation wears muscle mouthful, muscle through walls is penetrated in wall, consolidated with bolt, and the connection pulling force pier on the muscle through walls of side within the walls;
(8)Fence is installed:After tripod is according to 3m spacing installations, the longitudinal pipe of fence is installed on tripod respectively, And consolidation is installed using pulling force rib;
After fence vertical pole is installed, cross bar is installed, cross bar hangs foot bolt to use from top to bottom and consolidated;
(9)Lay step tread plate:One piece is often laid to be fixed with hanging foot bolt;
(10)Open safety net:Thrown the net, and fixed with fixture from top to bottom;
(11)Tripod is lifted:First by tripod operating platform personnel, whole Departure operation platforms are removed operating platform and owned Object, then loosens pulling force pier, turns on bolt on the inside of wall beam, and muscle through walls is released on the outside of wall beam, using suspender, hung by tower crane Dress is promoted to upper strata wall beam and installed at triangle body panel, by muscle through walls, penetrates side within the walls, then row is anchored with anchoring piece, and Connect pulling force pier;
(12)Tripod is removed:The personnel on operating platform are made all to withdraw first, while all debris on clear operation platform, Then pulling force pier is released, bolt on the inside of dismounting wall beam is loosened, muscle through walls is extracted out, then operating platform hung in into ground with tower crane, is entered Row decomposes dismounting, and component is cleaned into boxing for later use.
2. construction simplification triangle operating platform according to claim 1 makes and construction method of installation, it is special Levying is:Fence cross bar uses 50 × 50mm square tubes, and vertical rod length is 1.5m, and cross bar length can select 3m, 6m or 9m.
CN201710338087.7A 2017-05-15 2017-05-15 Construction simplification triangle operating platform makes and construction method of installation Pending CN107060307A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710338087.7A CN107060307A (en) 2017-05-15 2017-05-15 Construction simplification triangle operating platform makes and construction method of installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710338087.7A CN107060307A (en) 2017-05-15 2017-05-15 Construction simplification triangle operating platform makes and construction method of installation

Publications (1)

Publication Number Publication Date
CN107060307A true CN107060307A (en) 2017-08-18

Family

ID=59596731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710338087.7A Pending CN107060307A (en) 2017-05-15 2017-05-15 Construction simplification triangle operating platform makes and construction method of installation

Country Status (1)

Country Link
CN (1) CN107060307A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031309U (en) * 2011-04-21 2011-11-09 中国水利水电第五工程局有限公司 Suspending operation platform for structural concrete constructions
CN203977833U (en) * 2014-06-19 2014-12-03 中兴建设有限公司 A kind of wall-attached builder's jack
CN204299145U (en) * 2014-11-14 2015-04-29 中国建筑第八工程局有限公司 For the operating platform that external climbing tower crane support frame is installed
JP2015094100A (en) * 2013-11-11 2015-05-18 株式会社保全テクノワーク Sleeve beam for guard rail end part buffering
CN204435816U (en) * 2014-12-10 2015-07-01 中国建筑第八工程局有限公司 Telescopic steel post operation platform
CN106193566A (en) * 2016-09-26 2016-12-07 安徽三建工程有限公司 A kind of adjustable pylon of assembled integral shear wall structure
CN106400847A (en) * 2016-10-14 2017-02-15 中交天津港湾工程研究院有限公司 Construction device used for ocean steel pipe pile cladding anti-corrosion system and mounting method of construction device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031309U (en) * 2011-04-21 2011-11-09 中国水利水电第五工程局有限公司 Suspending operation platform for structural concrete constructions
JP2015094100A (en) * 2013-11-11 2015-05-18 株式会社保全テクノワーク Sleeve beam for guard rail end part buffering
CN203977833U (en) * 2014-06-19 2014-12-03 中兴建设有限公司 A kind of wall-attached builder's jack
CN204299145U (en) * 2014-11-14 2015-04-29 中国建筑第八工程局有限公司 For the operating platform that external climbing tower crane support frame is installed
CN204435816U (en) * 2014-12-10 2015-07-01 中国建筑第八工程局有限公司 Telescopic steel post operation platform
CN106193566A (en) * 2016-09-26 2016-12-07 安徽三建工程有限公司 A kind of adjustable pylon of assembled integral shear wall structure
CN106400847A (en) * 2016-10-14 2017-02-15 中交天津港湾工程研究院有限公司 Construction device used for ocean steel pipe pile cladding anti-corrosion system and mounting method of construction device

Similar Documents

Publication Publication Date Title
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN106013517A (en) Fabricated reinforced concrete shear wall and manufacturing method thereof
CN104153587B (en) A kind of built with ribbed bricks body of wall assembly construction method
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN214220561U (en) Building slope facade diversion rail formula hanging flower basket construction platform
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN102733608B (en) Construction method for spray head layer of granulation tower
CN206352388U (en) A kind of special scaffold of dual operation platform elevator
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN102444271A (en) Suspended scaffolding with cast-in-place concrete structure
CN107575032A (en) A kind of bolt-ball net frame roofing installation method
CN102561689B (en) Construction method for cantilever lifting scaffold
CN204728554U (en) Integral structure of ceiling keel and double-layer construction platform
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN206917244U (en) Integral lifting type construction operation platform for elevator shaft
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN107060307A (en) Construction simplification triangle operating platform makes and construction method of installation
CN107288640A (en) A kind of steady rope self-supporting modularization vertical shaft driving and masonry construction device of nothing
CN212405472U (en) Cross node connection structure of assembled frame structure
CN205591926U (en) Do not have self -supporting modularization shaft of surely restricting and dig step construction equipment
CN204715720U (en) The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls
CN107327307A (en) A kind of internal model steel pipe support integral slipping method and structure
CN211647234U (en) Overhanging type scaffold
CN202788017U (en) Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818