CN107060307A - Construction simplification triangle operating platform makes and construction method of installation - Google Patents
Construction simplification triangle operating platform makes and construction method of installation Download PDFInfo
- Publication number
- CN107060307A CN107060307A CN201710338087.7A CN201710338087A CN107060307A CN 107060307 A CN107060307 A CN 107060307A CN 201710338087 A CN201710338087 A CN 201710338087A CN 107060307 A CN107060307 A CN 107060307A
- Authority
- CN
- China
- Prior art keywords
- tripod
- muscle
- bolt
- walls
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/20—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/147—Railings specially adapted for mounting prior to the mounting of the platform
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Made the invention discloses a kind of construction simplification triangle operating platform and construction method of installation, include design, the making of tripod, muscle design through walls, making, the design of pulling force pier, making, fence is designed, boat-stretcher design, making, makes safety net, tripod is consolidated, fence is installed, and lays step tread plate, a safety net, tripod is lifted, the step such as tripod dismounting.The present invention during precast beam wallboard or in cast-in-situ concrete beam wall at a certain distance, reserved string muscle mouthful, the vertical facade of the platform support body made using triangular form is effectively connected with wall beam, consolidated using bolt, and pin is hung in progress on string muscle on the inside of wall, constitutes the operating platform of stability;Using triangle stability principle, formed using channel-section steel anchoring, it is few with material, it is easy to operate, it is applied widely.
Description
Technical field
Made the present invention relates to a kind of CONSTRUCTION OPERATIONS platform and construction method of installation.
Background technology
As China's economy faster develops, construction industry human resources imbalance between supply and demand aggravation, batch production building construction progress
Accelerate, the rise of equipment formula building, traditional construction scaffolding construction operation platform can not meet modern architecture construction need
Ask.
The content of the invention
It is an object of the invention to provide a kind of rational in infrastructure, easy construction, the construction simplification of good working effect
Triangle operating platform makes and construction method of installation.
The present invention technical solution be:
A kind of construction simplification triangle operating platform makes and construction method of installation, it is characterized in that:Comprise the following steps:
(1)Design, the making of tripod:Tripod is right angled triangle frame, and each side uses 10# channel-section steels, and horizontal edge length of side 1m is indulged
Side length of side 1.5m, hypotenuse length of side 1.85m;Multiple ф 5mm eyelets are bored on channel-section steel horizontal edge;Three ф 10mm bolts hole are bored in longitudinal edge,
Wherein middle screw keyhole is at longitudinal side length direction side 1/2nd, and remaining two bolt hole is respectively away from longitudinal edge initial and tail sections 10mm
Place;
First longitudinal edge is connected with horizontal edge, hypotenuse is reconnected;Drilling position is determined during connection on channel-section steel, then is drilled, so with solid
Tie bolt;
(2)Muscle design through walls, making:From ф 10mm round steel, length is thickness of wall body+15cm, and in two hank knotting 2cm, outside
With bolt;
(3)The design of pulling force pier, making:Make concrete pulling force pier, length 50cm, height 50cm, width 50cm, wherein being embedded to steel
Wire ring and pulling force rope;
(4)Fence is designed:Fence is connected with vertical rod by cross bar and constituted, and wherein vertical rod is fixedly arranged at the horizontal edge of tripod with hanging bolt
On, cross bar is fixedly arranged in vertical rod with hanging bolt;
(5)Boat-stretcher design, making:Using plank or steel plate, width is 1m, length 2.85m, plank thickness 200mm, and steel plate is thick
Spend 10mm, blending bolt consolidation;
(6)Make safety net;
(7)Tripod is consolidated:The muscle mouthful worn that will be first reserved in wall beam body carries out dredging dynamic, does not stay such as and wears muscle mouthful, then using drill into
Row drilling, formation wears muscle mouthful, muscle through walls is penetrated in wall, consolidated with bolt, and the connection pulling force pier on the muscle through walls of side within the walls;
(8)Fence is installed:After tripod is according to 3m spacing installations, the longitudinal pipe of fence is installed on tripod respectively,
And consolidation is installed using pulling force rib;
After fence vertical pole is installed, cross bar is installed, cross bar hangs foot bolt to use from top to bottom and consolidated;
(9)Lay step tread plate:One piece is often laid to be fixed with hanging foot bolt;
(10)Open safety net:Thrown the net, and fixed with fixture from top to bottom;
(11)Tripod is lifted:First by tripod operating platform personnel, whole Departure operation platforms are removed operating platform and owned
Object, then loosens pulling force pier, turns on bolt on the inside of wall beam, and muscle through walls is released on the outside of wall beam, using suspender, hung by tower crane
Dress is promoted to upper strata wall beam and installed at triangle body panel, by muscle through walls, penetrates side within the walls, then row is anchored with anchoring piece, and
Connect pulling force pier;
(12)Tripod is removed:The personnel on operating platform are made all to withdraw first, while all debris on clear operation platform,
Then pulling force pier is released, bolt on the inside of dismounting wall beam is loosened, muscle through walls is extracted out, then operating platform hung in into ground with tower crane, is entered
Row decomposes dismounting, and component is cleaned into boxing for later use.
Fence cross bar uses 50 × 50mm square tubes, and vertical rod length is 1.5m, and cross bar length can select 3m, 6m or 9m.
The present invention at a certain distance, reserves string muscle mouthful, used during precast beam wallboard or in cast-in-situ concrete beam wall
The vertical facade for the platform support body that triangular form makes effectively is connected with wall beam, is consolidated using bolt, and is carried out on the inside of wall on string muscle
Pin is hung, the operating platform of stability is constituted, so with stability techniques feature.
Using triangle stability principle, formed using channel-section steel anchoring, it is few with material, it is easy to operate, it is applied widely;Mainly
Suitable for industrial civilian prefabricated buildings building engineering construction;Simultaneously suitable for general industrial civilian Existing reinforced concrete bridge architectural engineering
Transform decoration construction;It is equally applicable to particularity structures tower, chimney etc..
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is operating platform structural representation of the present invention.
Embodiment
A kind of construction simplification triangle operating platform makes and construction method of installation, comprises the following steps:
(1)Design, the making of tripod 1:Tripod be right angled triangle frame, each side use 10# channel-section steels, horizontal edge length of side 1m,
Longitudinal edge length of side 1.5m, hypotenuse length of side 1.85m;Multiple ф 5mm eyelets are bored on channel-section steel horizontal edge;Three ф 10mm bolts are bored in longitudinal edge
Hole, wherein middle screw keyhole are at longitudinal side length direction side 1/2nd, and remaining two bolt hole is respectively away from longitudinal edge initial and tail sections
At 10mm;
First longitudinal edge is connected with horizontal edge, hypotenuse is reconnected;Drilling position is determined during connection on channel-section steel, then is drilled, so with solid
Tie bolt;
(2)Muscle design through walls, making:From ф 10mm round steel, length is thickness of wall body+15cm, and in two hank knotting 2cm, outside
With bolt;
(3)Pulling force pier 2 is designed, made:Make concrete pulling force pier, length 50cm, height 50cm, width 50cm, wherein being embedded to
Wire loop and pulling force rope;
(4)Fence 3 is designed:Fence is connected with vertical rod by cross bar and constituted, and wherein vertical rod is fixedly arranged at the horizontal stroke of tripod with hanging bolt
Bian Shang, cross bar is fixedly arranged in vertical rod with hanging bolt;
(5)Boat-stretcher design, making:Using plank or steel plate, width is 1m, length 2.85m, plank thickness 200mm, and steel plate is thick
Spend 10mm, blending bolt consolidation;
(6)Make safety net;
(7)Tripod is consolidated:The muscle mouthful worn that will be first reserved in wall beam body 4 carries out dredging dynamic, does not stay such as and wears muscle mouthful, then using drill into
Row drilling, formation wears muscle mouthful, muscle through walls is penetrated in wall, consolidated with bolt, and the connection pulling force pier on the muscle through walls of side within the walls;
(8)Fence is installed:After tripod is according to 3m spacing installations, the longitudinal pipe of fence is installed on tripod respectively,
And consolidation is installed using pulling force rib;
After fence vertical pole is installed, cross bar is installed, cross bar hangs foot bolt to use from top to bottom and consolidated;
(9)Lay step tread plate:One piece is often laid to be fixed with hanging foot bolt;
(10)Open safety net:Thrown the net, and fixed with fixture from top to bottom;
(11)Tripod is lifted:First by tripod operating platform personnel, whole Departure operation platforms are removed operating platform and owned
Object, then loosens pulling force pier, turns on bolt on the inside of wall beam, and muscle through walls is released on the outside of wall beam, using suspender, hung by tower crane
Dress is promoted to upper strata wall beam and installed at triangle body panel, by muscle through walls, penetrates side within the walls, then row is anchored with anchoring piece, and
Connect pulling force pier;
(12)Tripod is removed:The personnel on operating platform are made all to withdraw first, while all debris on clear operation platform,
Then pulling force pier is released, bolt on the inside of dismounting wall beam is loosened, muscle through walls is extracted out, then operating platform hung in into ground with tower crane, is entered
Row decomposes dismounting, and component is cleaned into boxing for later use.
Fence cross bar uses 50 × 50mm square tubes, and vertical rod length is 1.5m, and cross bar length can select 3m, 6m or 9m.
Claims (2)
1. a kind of construction simplification triangle operating platform makes and construction method of installation, it is characterized in that:Including following step
Suddenly:
(1)Design, the making of tripod:Tripod is right angled triangle frame, and each side uses 10# channel-section steels, and horizontal edge length of side 1m is indulged
Side length of side 1.5m, hypotenuse length of side 1.85m;Multiple ф 5mm eyelets are bored on channel-section steel horizontal edge;Three ф 10mm bolts hole are bored in longitudinal edge,
Wherein middle screw keyhole is at longitudinal side length direction side 1/2nd, and remaining two bolt hole is respectively away from longitudinal edge initial and tail sections 10mm
Place;
First longitudinal edge is connected with horizontal edge, hypotenuse is reconnected;Drilling position is determined during connection on channel-section steel, then is drilled, so with solid
Tie bolt;
(2)Muscle design through walls, making:From ф 10mm round steel, length is thickness of wall body+15cm, and in two hank knotting 2cm, outside
With bolt;
(3)The design of pulling force pier, making:Make concrete pulling force pier, length 50cm, height 50cm, width 50cm, wherein being embedded to steel
Wire ring and pulling force rope;
(4)Fence is designed:Fence is connected with vertical rod by cross bar and constituted, and wherein vertical rod is fixedly arranged at the horizontal edge of tripod with hanging bolt
On, cross bar is fixedly arranged in vertical rod with hanging bolt;
(5)Boat-stretcher design, making:Using plank or steel plate, width is 1m, length 2.85m, plank thickness 200mm, and steel plate is thick
Spend 10mm, blending bolt consolidation;
(6)Make safety net;
(7)Tripod is consolidated:The muscle mouthful worn that will be first reserved in wall beam body carries out dredging dynamic, does not stay such as and wears muscle mouthful, then using drill into
Row drilling, formation wears muscle mouthful, muscle through walls is penetrated in wall, consolidated with bolt, and the connection pulling force pier on the muscle through walls of side within the walls;
(8)Fence is installed:After tripod is according to 3m spacing installations, the longitudinal pipe of fence is installed on tripod respectively,
And consolidation is installed using pulling force rib;
After fence vertical pole is installed, cross bar is installed, cross bar hangs foot bolt to use from top to bottom and consolidated;
(9)Lay step tread plate:One piece is often laid to be fixed with hanging foot bolt;
(10)Open safety net:Thrown the net, and fixed with fixture from top to bottom;
(11)Tripod is lifted:First by tripod operating platform personnel, whole Departure operation platforms are removed operating platform and owned
Object, then loosens pulling force pier, turns on bolt on the inside of wall beam, and muscle through walls is released on the outside of wall beam, using suspender, hung by tower crane
Dress is promoted to upper strata wall beam and installed at triangle body panel, by muscle through walls, penetrates side within the walls, then row is anchored with anchoring piece, and
Connect pulling force pier;
(12)Tripod is removed:The personnel on operating platform are made all to withdraw first, while all debris on clear operation platform,
Then pulling force pier is released, bolt on the inside of dismounting wall beam is loosened, muscle through walls is extracted out, then operating platform hung in into ground with tower crane, is entered
Row decomposes dismounting, and component is cleaned into boxing for later use.
2. construction simplification triangle operating platform according to claim 1 makes and construction method of installation, it is special
Levying is:Fence cross bar uses 50 × 50mm square tubes, and vertical rod length is 1.5m, and cross bar length can select 3m, 6m or 9m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710338087.7A CN107060307A (en) | 2017-05-15 | 2017-05-15 | Construction simplification triangle operating platform makes and construction method of installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710338087.7A CN107060307A (en) | 2017-05-15 | 2017-05-15 | Construction simplification triangle operating platform makes and construction method of installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107060307A true CN107060307A (en) | 2017-08-18 |
Family
ID=59596731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710338087.7A Pending CN107060307A (en) | 2017-05-15 | 2017-05-15 | Construction simplification triangle operating platform makes and construction method of installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107060307A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202031309U (en) * | 2011-04-21 | 2011-11-09 | 中国水利水电第五工程局有限公司 | Suspending operation platform for structural concrete constructions |
CN203977833U (en) * | 2014-06-19 | 2014-12-03 | 中兴建设有限公司 | A kind of wall-attached builder's jack |
CN204299145U (en) * | 2014-11-14 | 2015-04-29 | 中国建筑第八工程局有限公司 | For the operating platform that external climbing tower crane support frame is installed |
JP2015094100A (en) * | 2013-11-11 | 2015-05-18 | 株式会社保全テクノワーク | Sleeve beam for guard rail end part buffering |
CN204435816U (en) * | 2014-12-10 | 2015-07-01 | 中国建筑第八工程局有限公司 | Telescopic steel post operation platform |
CN106193566A (en) * | 2016-09-26 | 2016-12-07 | 安徽三建工程有限公司 | A kind of adjustable pylon of assembled integral shear wall structure |
CN106400847A (en) * | 2016-10-14 | 2017-02-15 | 中交天津港湾工程研究院有限公司 | Construction device used for ocean steel pipe pile cladding anti-corrosion system and mounting method of construction device |
-
2017
- 2017-05-15 CN CN201710338087.7A patent/CN107060307A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202031309U (en) * | 2011-04-21 | 2011-11-09 | 中国水利水电第五工程局有限公司 | Suspending operation platform for structural concrete constructions |
JP2015094100A (en) * | 2013-11-11 | 2015-05-18 | 株式会社保全テクノワーク | Sleeve beam for guard rail end part buffering |
CN203977833U (en) * | 2014-06-19 | 2014-12-03 | 中兴建设有限公司 | A kind of wall-attached builder's jack |
CN204299145U (en) * | 2014-11-14 | 2015-04-29 | 中国建筑第八工程局有限公司 | For the operating platform that external climbing tower crane support frame is installed |
CN204435816U (en) * | 2014-12-10 | 2015-07-01 | 中国建筑第八工程局有限公司 | Telescopic steel post operation platform |
CN106193566A (en) * | 2016-09-26 | 2016-12-07 | 安徽三建工程有限公司 | A kind of adjustable pylon of assembled integral shear wall structure |
CN106400847A (en) * | 2016-10-14 | 2017-02-15 | 中交天津港湾工程研究院有限公司 | Construction device used for ocean steel pipe pile cladding anti-corrosion system and mounting method of construction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108643544B (en) | High-altitude overhanging construction platform support system and construction method | |
CN106013517A (en) | Fabricated reinforced concrete shear wall and manufacturing method thereof | |
CN104153587B (en) | A kind of built with ribbed bricks body of wall assembly construction method | |
CN205025086U (en) | Strength nature skeleton concrete beam construction suspend template in midair | |
CN214220561U (en) | Building slope facade diversion rail formula hanging flower basket construction platform | |
CN206467667U (en) | Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh | |
CN106400691A (en) | Integrated construction process for anti-collision wall formwork | |
CN102733608B (en) | Construction method for spray head layer of granulation tower | |
CN206352388U (en) | A kind of special scaffold of dual operation platform elevator | |
CN105347142B (en) | A kind of building hoist is mounted on the threading installation method on basement roof | |
CN102444271A (en) | Suspended scaffolding with cast-in-place concrete structure | |
CN107575032A (en) | A kind of bolt-ball net frame roofing installation method | |
CN102561689B (en) | Construction method for cantilever lifting scaffold | |
CN204728554U (en) | Integral structure of ceiling keel and double-layer construction platform | |
CN206769199U (en) | After wear formula post stretching vertical prestressing cast-in-place concrete rod structure | |
CN206917244U (en) | Integral lifting type construction operation platform for elevator shaft | |
CN111622347A (en) | Cross-shaped node connecting structure of assembled frame structure and construction method thereof | |
CN107060307A (en) | Construction simplification triangle operating platform makes and construction method of installation | |
CN107288640A (en) | A kind of steady rope self-supporting modularization vertical shaft driving and masonry construction device of nothing | |
CN212405472U (en) | Cross node connection structure of assembled frame structure | |
CN205591926U (en) | Do not have self -supporting modularization shaft of surely restricting and dig step construction equipment | |
CN204715720U (en) | The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls | |
CN107327307A (en) | A kind of internal model steel pipe support integral slipping method and structure | |
CN211647234U (en) | Overhanging type scaffold | |
CN202788017U (en) | Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170818 |