CN107060152A - Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor - Google Patents
Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor Download PDFInfo
- Publication number
- CN107060152A CN107060152A CN201710256423.3A CN201710256423A CN107060152A CN 107060152 A CN107060152 A CN 107060152A CN 201710256423 A CN201710256423 A CN 201710256423A CN 107060152 A CN107060152 A CN 107060152A
- Authority
- CN
- China
- Prior art keywords
- floor
- internal partition
- partition wall
- tank
- connecting component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005192 partition Methods 0.000 title claims abstract description 66
- 238000000034 method Methods 0.000 title claims description 10
- 239000004570 mortar (masonry) Substances 0.000 claims description 9
- 238000009408 flooring Methods 0.000 abstract description 2
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 7
- 239000004567 concrete Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
- E04B2/821—Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Building Environments (AREA)
Abstract
The present invention relates to the attachment means between a kind of prefabricated internal partition wall of transformer station and floor, connection for internal partition wall (1) and upper strata floor (9) and lower floor's floor (3), device includes tank-type connecting component (4), wall screw (5) and floor crab-bolt (6), tank-type connecting component (4) is across internal partition wall (1) both sides, wall screw (5) is horizontal through tank-type connecting component (4) two-arm and internal partition wall (1) wall, tank-type connecting component (4) two-arm is fixedly connected with internal partition wall (1), floor crab-bolt (6) passes vertically through tank-type connecting component (4) bottom or top and stretches into floor, tank-type connecting component (4) bottom or top are fixedly connected with floor.Compared with prior art, the present invention by wall screw, tank-type connecting component, floor crab-bolt formation connected mode, by the load of the horizontal direction suffered by internal partition wall pass to above and below flooring, it is ensured that stability of the wall under horizontal loads.
Description
Technical field
The present invention relates to a kind of assembled steel reinforced concrete inner wall connector, more particularly, to a kind of transformer station it is prefabricated in every
Attachment means and method between wall and floor.
Background technology
Prefabricated assembled concrete structure is prefabricated in the factory using component, and the mode of on-site consolidation is constructed.With tradition
Cast-in-place concrete structure, which is compared, has the characteristics of component quality is good, efficiency of construction is high, cost controllability is good, environmental pollution is small, is
Building industry realizes the advanced method of construction of modernization upgrading.
In prefabricated assembled concrete frame construction system, wallboard and load of floor are undertaken by frame structure, and are passed to
Basis and ground.Wall in frame structure belongs to non-bearing wall body, general to use masonry or light material wall, in main body
Constructed after the completion of structure.The shortcoming of both walls is:
1) masonry wall needs manually to be built by laying bricks or stones, constructs relatively complicated, and with the increase of human cost, cost can be entered
The increase of one step;
2) makings material sound insulation of wall effect is poor, and can not bear the load of horizontal direction, it is impossible to according to requirements
The facilities such as equipment box are installed, especially for 110kV assembleds transformer station, it is necessary to arrange a number of hook on interior wall.
Therefore, in order to make indoor partition that there is certain bearing capacity while the high efficiency of assembled construction is ensured,
Partition wall preferably uses mechanical property and sound insulation property all relatively good armored concrete concrete panels.
Reinforced concrete wall panel is produced by prefabricated mode, for ensure its connection security and construction it is easy
Property, it is desirable to provide a kind of existing sufficient intensity, facilitate the connected mode of installing/dismounting again, to be matched in this novel wall.
The content of the invention
Installed it is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind is safe efficient
The prefabricated internal partition wall of transformer station and floor between attachment means and method.
The purpose of the present invention can be achieved through the following technical solutions:
Attachment means between a kind of prefabricated internal partition wall of transformer station and floor, for internal partition wall and upper strata floor and lower floor
The connection of plate, described device includes tank-type connecting component, wall screw and floor crab-bolt, and described tank-type connecting component is across internal partition wall
Both sides, described wall screw is horizontal through tank-type connecting component two-arm and internal partition wall wall, by tank-type connecting component two-arm and internal partition wall
It is fixedly connected, described floor crab-bolt passes vertically through tank-type connecting component bottom or top and stretches into floor, by tank-type connecting component bottom
Portion or top are fixedly connected with floor.Internal partition wall wallboard top surface is slotted with bottom surface, so that the floor crab-bolt end protruded from floor
Portion can enter.
Described wall screw is embedded in internal partition wall, and described tank-type connecting component two-arm, which is provided with, to be used to install wall screw
Strip gab.
Described strip gab is vertical direction.
Described strip gab bottom is the arc matched with wall screw.
Edge angle at the top of described strip gab is fillet.
Described wall screw two ends are connected with tank-type connecting component two-arm by nut and pad.
A kind of method that attachment means using between the described prefabricated internal partition wall of transformer station and floor are attached, including
Following steps:
Pre-buried floor crab-bolt in S1, lower floor's floor, described floor crab-bolt is vertical with lower floor floor;
S2, pours lower floor's floor;
S3, by tank-type connecting component and floor anchor bolts;
S4, mortar bed, covering tank-type connecting component bottom are laid in the upper surface of lower floor's floor;
S5, lifts internal partition wall wallboard, the wall screw of internal partition wall bottom is aligned with the tank-type connecting component in lower floor floor, institute
The wall screw stated is embedded in internal partition wall wallboard in advance;
S6, the wall screw of internal partition wall bottom is fixedly connected with the tank-type connecting component in lower floor floor;
S7, upper strata floor slab bottoms install tank-type connecting component;
S8, internal partition wall panel tops laying mortar bed;
S9, lifts upper strata floor, the wall screw at the top of internal partition wall is aligned with the tank-type connecting component in the floor of upper strata;
S10, the wall screw at the top of internal partition wall is fixedly connected with the tank-type connecting component in the floor of upper strata.
Compared with prior art, the present invention has advantages below:
(1) connected mode formed by wall screw, tank-type connecting component, floor crab-bolt, by the level suffered by internal partition wall
The load in direction pass to above and below flooring, it is ensured that stability of the wall under horizontal loads.
(2) wall screw is embedded in internal partition wall, and tank-type connecting component two-arm is provided with the strip gab for being used for installing wall screw,
It is easy to the in-site installation of tank-type connecting component.
(3) strip gab is vertical direction, it is ensured that wallboard is fixed in the horizontal direction, and in the vertical direction can be with
It is a certain degree of to slide, meet the not heavy mechanical characteristic of internal partition wall.
(4) strip gab bottom is the arc matched with wall screw, it is ensured that wall screw
(5) edge angle at the top of strip gab is fillet, is easy to wallboard to install pre-buried crab-bolt when lifting and positions.
(6) crab-bolt nut is divided into backing plate and is connected with tank-type connecting component within the walls, it is ensured that the power of crab-bolt is evenly distributed on groove profile company
On fitting.
(7) cast-in fixing bolt when floor slab construction and wallboard are produced, to scene after tank-type connecting component is installed, both ensure that construction
Conveniency, avoid the connector of evagination to be damaged in transport, hoisting process again.
(8) mortar bed is laid in the upper surface of lower floor's floor, covering tank-type connecting component bottom can with mortar bed joint filling
Ensure smooth and metope the perpendicularity in bottom surface, and the deadweight of internal partition wall wall is delivered to downstairs by way of bottom surface is shelved
Plate, rather than tank-type connecting component is transmitted to by the shearing resistance effect of crab-bolt is transmitted to lower floor again, further increase the steady of internal partition wall
It is qualitative.
Brief description of the drawings
Fig. 1 is the decomposition texture schematic diagram of the present embodiment attachment means;
Fig. 2 is the present embodiment attachment means in the schematic view of the mounting position of internal partition wall and lower floor's floor;
Fig. 3 is the present embodiment attachment means in the schematic view of the mounting position of upper strata floor and lower floor's floor;
Reference:
1 is internal partition wall;2 be mortar bed;3 be lower floor's floor;4 be tank-type connecting component;5 be wall screw;6 be building
Plate crab-bolt;7 be nut;8 be pad;9 be upper strata floor.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention
Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to
Following embodiments.
Embodiment
As shown in Figures 1 to 3, the attachment means between a kind of prefabricated internal partition wall of transformer station and floor, for internal partition wall 1 with
The connection of floor plate 9 and lower floor's floor 3, device include tank-type connecting component 4, wall screw 5 and floor crab-bolt 6, tank-type connecting component 4 across
In the both sides of internal partition wall 1, wall screw 5 connects horizontal through the two-arm of tank-type connecting component 4 and the wall of internal partition wall 1, the two ends of wall screw 5 with groove profile
The two-arm of tank-type connecting component 4 is fixedly connected, wall screw 5 by the two-arm of fitting 4 by nut 7 and the firm connection of pad 8 with internal partition wall 1
It is embedded in internal partition wall 1, the two-arm of tank-type connecting component 4 is provided with the strip gab for being used for installing wall screw 5, and strip gab is vertical
Direction, strip gab bottom is that the edge angle at the top of the arc matched with wall screw 5, strip gab is fillet, during installation, wallboard
It is directly placed into opening, after degree of gravity vertical forwall surface adjustment is finished, backing plate 8 and nut 7 is installed in order;Floor crab-bolt 6 is worn vertically
Cross the bottom of tank-type connecting component 4 or top and stretch into floor, the bottom of tank-type connecting component 4 or top are fixedly connected with floor.
The floor of prefabricated assembled concrete structure can be using the folded of complete fabricated floor or assembled integral
Close floor.Monolithic wallboard is attached by the attachment means positioned at corner with upper and lower floor plate or beam.Attachment means are all logical
Cross bolt to be attached so that site operation is safe efficient.
The method that attachment means between a kind of prefabricated internal partition wall of use transformer station and floor are attached, including following step
Suddenly:
Pre-buried floor crab-bolt 6 in S1, lower floor's floor 3, floor crab-bolt 6 is vertical with lower floor floor 3;
S2, pours lower floor's floor 3;
S3, tank-type connecting component 4 is connected with floor crab-bolt 6;
S4, mortar bed 2, covering tank-type connecting component 4 bottom are laid in the upper surface of lower floor's floor 3;
S5, lifts the wallboard of internal partition wall 1, makes the wall screw 5 and 4 pairs of tank-type connecting component in lower floor's floor 3 of the bottom of internal partition wall 1
Standard, wall screw 5 is embedded in the wallboard of internal partition wall 1 in advance;
S6, the wall screw 5 of the bottom of internal partition wall 1 is fixedly connected with the tank-type connecting component 4 in lower floor floor 3;
S7, the bottom of upper strata floor 9 is installed by tank-type connecting component 4;
S8, the panel tops of internal partition wall 1 laying mortar bed 2;
S9, lifts upper strata floor 9, makes the wall screw 5 and 4 pairs of tank-type connecting component in upper strata floor 9 at the top of internal partition wall 1
It is accurate;
S10, the wall screw 5 at the top of internal partition wall 1 is fixedly connected with the tank-type connecting component 4 in upper strata floor 9.
Claims (7)
1. the attachment means between a kind of prefabricated internal partition wall of transformer station and floor, for internal partition wall (1) and upper strata floor (9) and under
The connection of floor plate (3), it is characterised in that described device includes tank-type connecting component (4), wall screw (5) and floor crab-bolt
(6), described tank-type connecting component (4) is across internal partition wall (1) both sides, and described wall screw (5) is horizontal through tank-type connecting component (4)
Two-arm and internal partition wall (1) wall, tank-type connecting component (4) two-arm is fixedly connected with internal partition wall (1), described floor crab-bolt (6)
Pass vertically through tank-type connecting component (4) bottom or top and stretch into floor, tank-type connecting component (4) bottom or top are fixed with floor
Connection.
2. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 1 and floor, it is characterised in that
Described wall screw (5) is embedded in internal partition wall (1), and described tank-type connecting component (4) two-arm, which is provided with, to be used to install wall screw
(5) strip gab.
3. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 2 and floor, it is characterised in that
Described strip gab is vertical direction.
4. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 3 and floor, it is characterised in that
Described strip gab bottom is the arc matched with wall screw (5).
5. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 3 and floor, it is characterised in that
Edge angle at the top of described strip gab is fillet.
6. the attachment means between the prefabricated internal partition wall of a kind of transformer station according to claim 1 and floor, it is characterised in that
Described wall screw (5) two ends are connected with tank-type connecting component (4) two-arm by nut (7) and pad (8).
7. the attachment means between a kind of prefabricated internal partition wall of transformer station and floor using as described in claim 2~6 is any are entered
The method of row connection, it is characterised in that comprise the following steps:
Pre-buried floor crab-bolt (6) in S1, lower floor's floor (3), described floor crab-bolt (6) is vertical with lower floor's floor (3);
S2, pours lower floor's floor (3);
S3, tank-type connecting component (4) is connected with floor crab-bolt (6);
S4, in the upper surface laying mortar bed (2) of lower floor's floor (3), covers tank-type connecting component (4) bottom;
S5, lifts internal partition wall (1) wallboard, the wall screw (5) of internal partition wall (1) bottom is connected with the groove profile in lower floor's floor (3)
Part (4) is aligned, and described wall screw (5) is embedded in internal partition wall (1) wallboard in advance;
S6, the wall screw (5) of internal partition wall (1) bottom is fixedly connected with the tank-type connecting component (4) in lower floor's floor (3);
S7, upper strata floor (9) bottom is installed by tank-type connecting component (4);
S8, internal partition wall (1) panel tops laying mortar bed (2);
S9, lifting upper strata floor (9) makes the wall screw (5) at the top of internal partition wall (1) and the tank-type connecting component in upper strata floor (9)
(4) it is aligned;
S10, the wall screw (5) at the top of internal partition wall (1) is fixedly connected with the tank-type connecting component (4) in upper strata floor (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710256423.3A CN107060152B (en) | 2017-04-19 | 2017-04-19 | Attachment device and method between a kind of prefabricated internal partition wall of substation and floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710256423.3A CN107060152B (en) | 2017-04-19 | 2017-04-19 | Attachment device and method between a kind of prefabricated internal partition wall of substation and floor |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107060152A true CN107060152A (en) | 2017-08-18 |
CN107060152B CN107060152B (en) | 2019-07-12 |
Family
ID=59599953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710256423.3A Active CN107060152B (en) | 2017-04-19 | 2017-04-19 | Attachment device and method between a kind of prefabricated internal partition wall of substation and floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107060152B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107642184A (en) * | 2017-08-30 | 2018-01-30 | 河北建筑工程学院 | A kind of prefabricated partition wall connecting structure and its construction method |
CN111608291A (en) * | 2020-05-22 | 2020-09-01 | 雷香梅 | Energy-conserving building cavity wall body is stabilized to modularization and location structure thereof |
CN111827478A (en) * | 2020-07-24 | 2020-10-27 | 中建科工集团有限公司 | Steel structure and mounting method thereof |
CN111980217A (en) * | 2020-08-04 | 2020-11-24 | 萧云建设股份有限公司 | Laminated concrete member and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3305983A (en) * | 1962-06-16 | 1967-02-28 | Holzaepfel Kg Moebel Christian | Room divider |
DE19705539A1 (en) * | 1997-02-14 | 1998-08-20 | Kakuk Stefan | Installation- and holder profile for walls |
DE20006011U1 (en) * | 2000-03-31 | 2000-06-29 | Lechner Helmut | Device for attaching U-profiles to ceiling or wall of a room |
CN103015572A (en) * | 2013-01-06 | 2013-04-03 | 河南天丰节能板材科技股份有限公司 | Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house |
CN204850526U (en) * | 2015-07-24 | 2015-12-09 | 安徽富煌钢构股份有限公司 | Existing floor adds connection structure of layer with various steel composite sheet of polystyrene |
-
2017
- 2017-04-19 CN CN201710256423.3A patent/CN107060152B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3305983A (en) * | 1962-06-16 | 1967-02-28 | Holzaepfel Kg Moebel Christian | Room divider |
DE19705539A1 (en) * | 1997-02-14 | 1998-08-20 | Kakuk Stefan | Installation- and holder profile for walls |
DE20006011U1 (en) * | 2000-03-31 | 2000-06-29 | Lechner Helmut | Device for attaching U-profiles to ceiling or wall of a room |
CN103015572A (en) * | 2013-01-06 | 2013-04-03 | 河南天丰节能板材科技股份有限公司 | Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house |
CN204850526U (en) * | 2015-07-24 | 2015-12-09 | 安徽富煌钢构股份有限公司 | Existing floor adds connection structure of layer with various steel composite sheet of polystyrene |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107642184A (en) * | 2017-08-30 | 2018-01-30 | 河北建筑工程学院 | A kind of prefabricated partition wall connecting structure and its construction method |
CN107642184B (en) * | 2017-08-30 | 2023-09-26 | 河北建筑工程学院 | Prefabricated partition wall connection structure and construction method thereof |
CN111608291A (en) * | 2020-05-22 | 2020-09-01 | 雷香梅 | Energy-conserving building cavity wall body is stabilized to modularization and location structure thereof |
CN111827478A (en) * | 2020-07-24 | 2020-10-27 | 中建科工集团有限公司 | Steel structure and mounting method thereof |
CN111980217A (en) * | 2020-08-04 | 2020-11-24 | 萧云建设股份有限公司 | Laminated concrete member and construction method thereof |
CN111980217B (en) * | 2020-08-04 | 2021-11-05 | 萧云建设股份有限公司 | Laminated concrete member and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN107060152B (en) | 2019-07-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103374986B (en) | A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof | |
CN107060152B (en) | Attachment device and method between a kind of prefabricated internal partition wall of substation and floor | |
WO2017031627A1 (en) | Assembled building structure, wallboard installation hanger, and assembled building construction method | |
CN105178433A (en) | Precast concrete shear wall structure and construction method thereof | |
CN103821229A (en) | Rapid assembly type integrated house and installation method | |
CN106869368A (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN112196159B (en) | Glass curtain wall construction structure and construction method thereof | |
JP4847153B2 (en) | Roof repair structure and construction method of flat roof building | |
CN104261232A (en) | Lifting device attaching to special-shaped section and mounting method of lifting device | |
CN203769069U (en) | Rapidly-assembled integrated house | |
WO2018174825A1 (en) | Pre-fabricated pre-finished volumetric construction of a building | |
CN210562276U (en) | Integrated foundation structure of assembled transformer substation | |
CN108894509B (en) | Steel structure assembly type house prefabricated sandwich heat-insulation external wall panel construction method without external frame | |
CN104499625A (en) | Profiled steel sheet and composite floor | |
CN208803681U (en) | Piping shaft and building structure | |
CN106436746A (en) | Prefabricated box-type substation cement foundation | |
CN110761416B (en) | Connecting structure of prefabricated caisson | |
CN204753895U (en) | Combination wall body of single prefabricated wall section | |
CN114439242A (en) | Construction method for optimizing and hoisting and reinforcing assembled overhanging complex component | |
CN203546945U (en) | Wallboard and shear wall with post-cast strip at floor position composed of wallboard | |
CN112761245A (en) | Assembled reinforced concrete building main body structure and installation construction method thereof | |
KR20210068283A (en) | Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing | |
CN206360430U (en) | A kind of low-loss and energy-saving is without mechanically operated parking building | |
CN204728764U (en) | A kind of container-type plant maintenance structure | |
CN221073338U (en) | Prefabricated concrete flue structure capable of effectively dispersing load for high-rise building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |