CN107023114B - A kind of combination beam of the connector and its composition of steel and concrete combined structure - Google Patents

A kind of combination beam of the connector and its composition of steel and concrete combined structure Download PDF

Info

Publication number
CN107023114B
CN107023114B CN201710465444.6A CN201710465444A CN107023114B CN 107023114 B CN107023114 B CN 107023114B CN 201710465444 A CN201710465444 A CN 201710465444A CN 107023114 B CN107023114 B CN 107023114B
Authority
CN
China
Prior art keywords
steel
reinforcing bar
connector
bottom plate
bar rest
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710465444.6A
Other languages
Chinese (zh)
Other versions
CN107023114A (en
Inventor
王清远
薛辉
王志宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN201710465444.6A priority Critical patent/CN107023114B/en
Publication of CN107023114A publication Critical patent/CN107023114A/en
Application granted granted Critical
Publication of CN107023114B publication Critical patent/CN107023114B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses the connectors of a kind of steel and concrete combined structure, including bottom plate and steel bar positioning mechanism, the steel bar positioning mechanism includes web, flange plate and reinforcing bar rest pad, the floor level setting, the web is vertically arranged and bottom plate upper surface is fixed in its lower end, the flange plate side of being set on the bottom plate and parallel with bottom plate;Described flange plate one end is fixedly connected in webbed side wall, the bottom of flange plate, which is constituted, locating notch, in the reinforcing bar rest pad insertion locating notch and one end is fixedly connected with flange plate, and reinforcing bar insertion mouth is formed between the reinforcing bar rest pad other end and the side wall of locating notch;Region between the reinforcing bar rest pad and bottom plate is the first reinforcing bar rest region, and the locating notch inner region above reinforcing bar rest pad is the second reinforcing bar rest region.The invention also discloses the combination beams that above-mentioned connector is constituted.It, can lifting construction efficiency convenient for overlap joint reinforcing bar when the present invention applies.

Description

A kind of combination beam of the connector and its composition of steel and concrete combined structure
Technical field
The present invention relates to steel-concrete combined structure field, the connector of specifically a kind of steel and concrete combined structure And its combination beam constituted.
Background technique
Steel and concrete combined structure are a kind of knots of performance optimization to be grown up based on steel construction and concrete structure Configuration formula, by reasonably designing, this structure type can give full play to the material property of steel tension and concrete anti-compression, To obtain significant economic benefit, therefore increasingly extensive application is obtained in engineering.
It is the key that guarantee that the two can cooperate together that connector is arranged between steel and concrete component, Neng Gouyou Effect prevents Relative sliding and separation between girder steel and concrete slab.All the time, researcher be find one kind make steel and The cooperative reliable fashion of concrete has carried out a large amount of test and research to various connectors, connects including curved muscle Part, structural steel connecting member, Welded-Stud Conectors etc..Due to Welded-Stud Conectors in setting without the concern for Impact direction, add it Job specfication and high reliablity have become connector form more common in domestic and international steel and concrete combined structure at present. Open pore steel plate connector relies primarily on concrete tenon in hole and reinforcing bar is vertical to resist as the connector developed after a kind of To shear flow, for peg, have many advantages, such as that bearing capacity is high, rigidity is big, anti-fatigue performance is good and easy for construction, thus by by Gradually it is applied in the larger and antifatigue demanding composite structure of load.
Existing open pore steel plate connector is generally similar to 101736691 A invention disclosed of China Patent Publication No. CN Structure described in entitled " shape plate-concrete combined bridge deck is rolled in FRP ribbing " is created, by being drilled with circle on floor Stiffener is simultaneously run through to obtain higher load-carrying properties in hole.However, the aperture of existing open pore steel plate connector be it is closed, It often will increase the difficulty and workload of construction when arrangement is through reinforcing bar, construction efficiency is low.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide the connections of a kind of steel and concrete combined structure Part can lifting construction efficiency convenient for overlap joint reinforcing bar when applying.The invention also discloses above-mentioned steel and concrete combined structures The combination beam that connector is constituted.
The purpose of the present invention is achieved through the following technical solutions: a kind of connector of steel and concrete combined structure, Including bottom plate and steel bar positioning mechanism, the steel bar positioning mechanism includes web, flange plate and reinforcing bar rest pad, the Floor water Flat setting, the web is vertically arranged and bottom plate upper surface is fixed in its lower end, the flange plate side of being set on the bottom plate and with bottom Plate is parallel;Described flange plate one end is fixedly connected in webbed side wall, and the bottom of flange plate, which is constituted, locating notch, the reinforcing bar In rest pad insertion locating notch and one end is fixedly connected with flange plate, the side wall of the reinforcing bar rest pad other end and locating notch Between be formed with reinforcing bar insertion mouth;Region between the reinforcing bar rest pad and bottom plate is the first reinforcing bar rest region, reinforcement bar support Locating notch inner region above supporting block is the second reinforcing bar rest region.Connector of the invention is in application, by upper layer transverse direction steel Muscle passes sequentially through region between flange plate and bottom plate, places after region and reinforcing bar insertion mouth between reinforcing bar rest pad and bottom plate On reinforcing bar rest pad, lower layer's transverse steel is passed through between flange plate and bottom plate behind region, reinforcing bar rest pad and bottom are placed on Between plate on the bottom plate in region, to realize the laying of upper and lower level transverse steel.
Further, the quantity of the steel bar positioning mechanism is multiple, and multiple steel bar positioning mechanisms are horizontally sequentially arranged Cloth.In this way, connector of the invention can support more upper layer transverse steels of positioning and Duo Gen lower layer transverse steel when applying, in group It is more convenient when the construction of beam to close.
Further, the steel bar positioning mechanism includes two blocks of flange plates and two pieces of reinforcing bar rest pads, two blocks of flange plates point It is not connected to the two sides of web, every block of flange plate is correspondingly connected with one piece of reinforcing bar rest pad.
In order to promote the structural strength of connector of the present invention, further, the bottom plate, web, flange plate and reinforcement bar support Supporting block becomes one.
Further, the locating notch is rectangular notch, and locating notch Liang Ge corner constitutes circular arc chamfering;It is described Turning between bottom plate and web is circular arc chamfering.The present invention can further promote this by forming circular arc chamfering in corner The structural strength of invention.
The present invention is based on the groups for the first embodiment that the connector of a kind of above-mentioned steel and concrete combined structure is constituted Beam is closed, further includes steel I-beam, upper layer transverse steel, lower layer's transverse steel and concrete slab, the connector is fixed on I-shaped On the top flange plate of girder steel, the upper layer transverse steel passes through the second reinforcing bar rest region of connector and is propped up by reinforcing bar rest pad It holds, lower layer's transverse steel passes through the first reinforcing bar rest region of connector and by bearing plate;The concrete slab package Connector, upper layer transverse steel and lower layer's transverse steel.
Further, the quantity of the steel I-beam is two or more, is fixed on the top flange plate of each steel I-beam Two or more connector arranged side by side, the upper layer transverse steel pass through the second reinforcing bar rest region of all connectors, institute State the first reinforcing bar rest region that lower layer's transverse steel passes through all connectors.
Second of the embodiment constituted the present invention is based on the connector of a kind of above-mentioned steel and concrete combined structure Combination beam, further includes T steel beam, upper layer transverse steel, lower layer's transverse steel and concrete slab, and the connector is fixed on T word On the T steel web of girder steel, the upper layer transverse steel passes through the second reinforcing bar rest region of connector and by reinforcing bar rest pad Bearing, lower layer's transverse steel pass through the first reinforcing bar rest region of connector and by bearing plates;The concrete slab packet Wrap up in connector, upper layer transverse steel and lower layer's transverse steel.Using second of embodiment combination beam when, due to eliminating work Connector is cut directly into type on the T steel web of girder steel, can reduce the use of steel by the top flange plate of shaped sections girder steel Amount, to reduce project cost.
Further, the quantity of the T steel beam is two or more, is respectively and fixedly provided on the T steel web of each T steel beam Connector, the upper layer transverse steel pass through the second reinforcing bar rest region of all connectors, and lower layer's transverse steel passes through First reinforcing bar rest region of all connectors.
In conclusion the invention has the following advantages: (1) present invention is in application, steel bar stress in concrete slab It can directly be held on the bottom and reinforcing bar rest pad of connector, avoid the cloth in traditional open pore steel plate connector closing cavity When setting reinforcing bar, excessive resource is expended, to reach reduction difficulty of construction, the operating time is saved, improves construction efficiency.
(2) connector of the invention shearing resistance with higher, anti-pulling capacity and anti-fatigue performance, apply it to combination Liang Zhong can guarantee effective connection of concrete slab and girder steel.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of a specific embodiment of connector of the present invention;
Fig. 2 is that connector is fixed on the structural schematic diagram on steel I-beam in Fig. 1;
Fig. 3 is that connector is fixed on the structural schematic diagram on T steel beam in Fig. 1;
Fig. 4 is the structural schematic diagram that structure described in Fig. 2 places upper and lower layer transverse steel;
Fig. 5 is the structural schematic diagram that structure described in Fig. 3 places upper and lower layer transverse steel;
Fig. 6 is the structural schematic diagram of one specific embodiment of combination beam of the present invention.
Label and corresponding parts title in attached drawing: 1, connector, 101, bottom plate, 102, web, 103, flange plate, 104, reinforcing bar rest pad, 2, upper layer transverse steel, 3, lower layer's transverse steel, 4, concrete slab, 5, steel I-beam, 6, T steel beam.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment 1:
As shown in Figure 1, the connector of a kind of steel and concrete combined structure, including bottom plate 101 and steel bar positioning mechanism, In, steel bar positioning mechanism includes web 102, flange plate 103 and reinforcing bar rest pad 104, and 101 level of bottom plate of the present embodiment is set Set, web 102 is vertically arranged and 101 upper surface of bottom plate is fixed in its lower end, flange plate 103 be set to 101 top of bottom plate and with bottom Plate 101 is parallel.103 one end of flange plate of the present embodiment is fixedly connected on 102 side wall of web, and the bottom of flange plate 103 is constituted There is locating notch, reinforcing bar rest pad 104 is embedded in locating notch and one end is fixedly connected with flange plate 103, reinforcing bar rest pad Reinforcing bar insertion mouth is formed between 104 other ends and the side wall of locating notch.The reinforcing bar rest pad 104 and bottom plate of the present embodiment Region between 101 is the first reinforcing bar rest region, and the locating notch inner region of 104 top of reinforcing bar rest pad is that the second reinforcing bar is put Set region.The present embodiment in specific setting, the quantity of steel bar positioning mechanism be it is multiple, multiple steel bar positioning mechanisms are horizontally Sequentially arrange.Steel bar positioning mechanism includes two blocks of flange plates 103 and two pieces of reinforcing bar rest pads 104, two pieces of edges of a wing in the present embodiment Plate 103 is connected to the two sides of web 102, and every block of flange plate 103 is correspondingly connected with one piece of reinforcing bar rest pad 104.
In order to promote the structural strength of the present embodiment, the bottom plate 101, web 102, flange plate 103 and reinforcing bar of the present embodiment Rest pad 104 4 becomes one.The locating notch of the present embodiment is rectangular notch, and locating notch Liang Ge corner is constituted Circular arc chamfering;Turning between the bottom plate 101 and web 102 of the present embodiment is circular arc chamfering.The present embodiment connects in specific manufacture When fitting 1, profiled section processing and fabricating is rejected using one piece of rectangular steel plates and is formed.
The more common Welded-Stud Conectors of the connector 1 of the present embodiment have bigger shear stiffness, can provide higher anti- Bearing capacity and more excellent anti-fatigue performance are cut, combination can be improved while guaranteeing that concrete slab and girder steel effectively connect The endurance quality of structure;Since its construction is convenient, man power and material can be largely saved, reduces cost, is had good Social benefit.The present embodiment can to avoid in the closed hole for the traditional open pore steel plate being arranged side by side intert reinforcing bar, and Be directly by reinforcing bar be placed on the bottom plate of connector and reinforcing bar rest pad 104 on, it is ensured that the consistency with design drawing, The reinforcement location changing of the relative positions is reduced, construction efficiency is improved.
The combination beam that connector based on a kind of above-mentioned steel and concrete combined structure is constituted, further include steel I-beam 5, on Layer transverse steel 2, lower layer's transverse steel 3 and concrete slab 4, wherein connector 1 is fixed on the top flange plate of steel I-beam 5, Upper layer transverse steel 2 passes through the second reinforcing bar rest region of connector 1 and is supported by reinforcing bar rest pad 104, lower layer's transverse steel 3 Across connector 1 the first reinforcing bar rest region and supported by bottom plate 101.Concrete slab 4 wraps up connector 1, upper layer transverse direction steel Muscle 2 and lower layer's transverse steel 3, wherein normal concrete or high performance concrete can be used in concrete slab 4.The present embodiment combination The steel I-beam 5 of beam is I-shaped cross-section, and connector 1 is directly welded in along longitudinal direction on the top flange plate of steel I-beam 5.
The present embodiment sets the diameter with upper layer transverse steel 2 for the length of reinforcing bar rest pad 104 in specific setting Equal, upper layer transverse steel 2 can avoid misplacing by the support of 103 inner wall of flange plate, to guarantee reinforcement location and design The consistency of drawing, while it is alternatively arranged as the reference of 3 position of lower layer's transverse steel.
For the present embodiment in specific setting, the quantity of steel I-beam 5 is two or more, the top flange of each steel I-beam 5 Fixed more than two connectors 1 arranged side by side, the second reinforcing bar that upper layer transverse steel 2 passes through all connectors 1 are put on plate Region is set, lower layer's transverse steel 3 passes through the first reinforcing bar rest region of all connectors 1.Concrete slab 4 in the present embodiment Transverse steel 2 and lower layer's transverse steel 3 laterally aligned arrangement in the vertical direction in principle at the middle and upper levels, the horizontal position of transverse steel Set by the spacing control of 102 width of web and adjacent connections unit of connector 1, can equidistant or unequal spacing arrangement, The spacing of upper and lower layer transverse steel is determined by the height of flange plate.The protection thickness of concrete slab 4 in the combination beam of the present embodiment Degree is controlled by the height of bottom plate 101, and 101 height of bottom plate is identical as the protective layer thickness of concrete slab 4, can be in assembling reinforcement Concrete protective layer pad is saved, the construction time can be shortened, and the uniformity of thickness of concrete cover is effectively ensured.
The connector 1 of the present embodiment is applied to combination beam, and construction procedure is as follows:
Step 1: the spacing of adjacent connections is determined according to the horizontal space of transverse steel in concrete slab 4;According to it is upper, The vertical interval of lower layer's transverse steel determines the height of flange plate 103;Reinforcing bar is determined according to the maximum gauge of upper layer transverse steel The length of rest pad 104, in principle the two numerically equal;And bottom plate is determined according to concrete cover to reinforcement thickness 101 height.
Step 2: preparing several strip rectangular steel plates in processing factory, and every block of steel plate is carried out according to 1 geometric profile of connector Cutting removes profiled section, obtains required connector 1, be finally welded on the top flange plate of steel I-beam 5;Connection The quantity of part 1 is determined by the shearing size between steel I-beam 5 and concrete slab 4.
Step 3: after girder steel is transported to construction site, first lower layer's transverse steel 3 is arranged under reinforcing bar rest pad 104 Side, is aligned in the vertical direction with reinforcing bar rest pad 104, binds lower layer's longitudinal reinforcement, then places on reinforcing bar rest pad 104 Upper layer transverse steel binds upper layer longitudinal reinforcement, ultimately forms upper layer and lower layer steel mesh.
Step 4: reinforcement location check it is errorless after, can casting concrete plate 4, formed after concrete reaches age mixed Effective connection between concrete board and girder steel.
Embodiment 2:
The present embodiment is the difference from embodiment 1 is that present embodiments provide another combination beam, the combination of the present embodiment The structure of beam is as follows: the present embodiment further includes T steel beam 6, upper layer transverse steel 2, lower layer's transverse steel 3 and concrete slab 4, In, connector 1 is fixed on the T steel web of T steel beam 6, and the second reinforcing bar that upper layer transverse steel 2 passes through connector 1 is shelved It region and is supported by reinforcing bar rest pad 104, lower layer's transverse steel 3 passes through the first reinforcing bar rest region of connector 1 and by bottom plate 101 bearings;Concrete slab 4 wraps up connector 1, upper layer transverse steel 2 and lower layer's transverse steel 3.The present embodiment is specifically being arranged When, the quantity of T steel beam 6 is two or more, and connector 1 is respectively and fixedly provided on the T steel web of each T steel beam 6, and upper layer is lateral Reinforcing bar 2 passes through the second reinforcing bar rest region of all connectors 1, and lower layer's transverse steel 3 passes through the first reinforcing bar of all connectors 1 Rest region.The T steel beam 6 of the present embodiment combination beam is T-shaped section, and the steel I-beam 5 compared with documents 1 eliminates upper limb Listrium, in processing factory directly by 1 excision forming of connector in edge on the web of T steel beam 6, this girder steel can reduce the use of steel Amount, reduces cost.
The present embodiment can directly cut on T steel web and obtain in specifically manufacture connector 1;The group of the present embodiment The protective layer thickness for closing concrete slab 4 in beam is controlled by the life requirement of design side's calculated result and composite structure.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (9)

1. the connector of a kind of steel and concrete combined structure, including bottom plate (101), it is characterised in that: further include reinforcing bar positioning Mechanism;The bottom plate (101) is the steel plate of steel bar positioning mechanism lower horizontal setting;The steel bar positioning mechanism includes web (102), flange plate (103) and reinforcing bar rest pad (104), the web (102) is vertically arranged and bottom plate is fixed in its lower end (101) upper surface, the flange plate (103) are set to above bottom plate (101) and parallel with bottom plate (101);The flange plate (103) One end is fixedly connected on web (102) side wall, and the bottom of flange plate (103), which is constituted, locating notch, the reinforcing bar rest pad (104) insertion locating notch is interior and one end is fixedly connected with flange plate (103), reinforcing bar rest pad (104) other end and positioning Reinforcing bar insertion mouth is formed between the side wall of notch;Region between the reinforcing bar rest pad (104) and bottom plate (101) is first Reinforcing bar rest region, the locating notch inner region above reinforcing bar rest pad (104) are the second reinforcing bar rest region.
2. the connector of a kind of steel and concrete combined structure according to claim 1, which is characterized in that the reinforcing bar is fixed Position mechanism quantity be it is multiple, multiple steel bar positioning mechanisms are horizontally sequentially arranged.
3. the connector of a kind of steel and concrete combined structure according to claim 1, which is characterized in that the reinforcing bar is fixed Position mechanism includes two pieces of flange plates (103) and two pieces of reinforcing bar rest pads (104), and two pieces of flange plates (103) are connected to web (102) two sides, every piece of flange plate (103) are correspondingly connected with one piece of reinforcing bar rest pad (104).
4. the connector of a kind of steel and concrete combined structure according to any one of claims 1 to 3, feature exist In the bottom plate (101), web (102), flange plate (103) and reinforcing bar rest pad (104) four become one.
5. the connector of a kind of steel and concrete combined structure according to claim 4, which is characterized in that the positioning lacks Mouth is rectangular notch, and locating notch Liang Ge corner constitutes circular arc chamfering;Between the bottom plate (101) and web (102) Turning is circular arc chamfering.
6. the group constituted based on the connector of a kind of steel and concrete combined structure described in any one of Claims 1 to 5 Close beam, which is characterized in that further include steel I-beam (5), upper layer transverse steel (2), lower layer's transverse steel (3) and concrete slab (4), the connector (1) is fixed on the top flange plate of steel I-beam (5), and the upper layer transverse steel (2) passes through connector (1) it the second reinforcing bar rest region and is supported by reinforcing bar rest pad (104), lower layer's transverse steel (3) passes through connector (1) The first reinforcing bar rest region and by bottom plate (101) support;The bottom plate (101) is fixed on the top flange plate of steel I-beam (5) On;Concrete slab (4) package connector (1), upper layer transverse steel (2) and lower layer's transverse steel (3).
7. combination beam according to claim 6, which is characterized in that the quantity of the steel I-beam (5) is two or more, often Fixed more than two connectors (1) arranged side by side, the upper layer transverse steel on the top flange plate of a steel I-beam (5) (2) the second reinforcing bar rest region of all connectors (1) is passed through, lower layer's transverse steel (3) passes through all connectors (1) First reinforcing bar rest region.
8. the group constituted based on the connector of a kind of steel and concrete combined structure described in any one of Claims 1 to 5 Close beam, which is characterized in that further include T steel beam (6), upper layer transverse steel (2), lower layer's transverse steel (3) and concrete slab (4), the connector (1) is cut directly into type in edge on the web of T steel beam (6), and the upper layer transverse steel (2), which passes through, to be connected Second reinforcing bar rest region of fitting (1) and by reinforcing bar rest pad (104) support, lower layer's transverse steel (3) pass through connection First reinforcing bar rest region of part (1) and by bottom plate (101) support;The bottom plate (101) is the one of the web of T steel beam (6) Part;Concrete slab (4) package connector (1), upper layer transverse steel (2) and lower layer's transverse steel (3).
9. combination beam according to claim 8, which is characterized in that the quantity of the T steel beam (6) is two or more, often There is connector (1) equal excision forming on the T steel web of a T steel beam (6), the upper layer transverse steel (2) passes through all companies Second reinforcing bar rest region of fitting (1), the first reinforcing bar that lower layer's transverse steel (3) passes through all connectors (1) are shelved Region.
CN201710465444.6A 2017-06-19 2017-06-19 A kind of combination beam of the connector and its composition of steel and concrete combined structure Expired - Fee Related CN107023114B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710465444.6A CN107023114B (en) 2017-06-19 2017-06-19 A kind of combination beam of the connector and its composition of steel and concrete combined structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710465444.6A CN107023114B (en) 2017-06-19 2017-06-19 A kind of combination beam of the connector and its composition of steel and concrete combined structure

Publications (2)

Publication Number Publication Date
CN107023114A CN107023114A (en) 2017-08-08
CN107023114B true CN107023114B (en) 2019-03-26

Family

ID=59531388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710465444.6A Expired - Fee Related CN107023114B (en) 2017-06-19 2017-06-19 A kind of combination beam of the connector and its composition of steel and concrete combined structure

Country Status (1)

Country Link
CN (1) CN107023114B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021146758A1 (en) * 2020-01-16 2021-07-22 Novel Structures, LLC Serrated beam
RU216853U1 (en) * 2022-06-02 2023-03-03 Федеральное государственное бюджетное образовательное учреждение высшего образования "Тихоокеанский государственный университет" Connecting element for combining a reinforced concrete slab and a steel beam of a steel-reinforced concrete superstructure

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058543A (en) * 2020-01-03 2020-04-24 广州大学 Connecting structure and mounting method of concrete slab and steel beam
US11725386B2 (en) 2020-01-16 2023-08-15 Simpson Strong-Tie Company Inc. Serrated beam
US11028573B1 (en) 2020-01-16 2021-06-08 Novel Structures, LLC Serrated beam
CN111877134A (en) * 2020-06-19 2020-11-03 东南大学 Perforated plate shear connector
CN112195778B (en) * 2020-09-22 2022-07-05 浙江大学 Toughness combination bridge deck plate composed of T-shaped steel
CN113463495A (en) * 2021-07-21 2021-10-01 台州市交通勘察设计院有限公司 Construction method of cast-in-situ steel-concrete composite beam with double main beam longitudinal one-way plates

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008011176A1 (en) * 2008-02-26 2009-09-03 Ssf-Ingenieure Gmbh Steel-concrete composite beam and process for its production
CN104100037B (en) * 2014-06-26 2017-01-18 同济大学 Combined flat beam
CN204509976U (en) * 2014-11-23 2015-07-29 郑州大学 A kind of shear connector of steel-concrete combination beam
DE102015118241A1 (en) * 2015-10-26 2017-04-27 Ssf Ingenieure Ag Reinforced concrete composite beam and method for its production
CN106638961A (en) * 2017-01-10 2017-05-10 北京交通大学 Assembly type steel frame connection node with post-seismic recoverable function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021146758A1 (en) * 2020-01-16 2021-07-22 Novel Structures, LLC Serrated beam
RU216853U1 (en) * 2022-06-02 2023-03-03 Федеральное государственное бюджетное образовательное учреждение высшего образования "Тихоокеанский государственный университет" Connecting element for combining a reinforced concrete slab and a steel beam of a steel-reinforced concrete superstructure

Also Published As

Publication number Publication date
CN107023114A (en) 2017-08-08

Similar Documents

Publication Publication Date Title
CN107023114B (en) A kind of combination beam of the connector and its composition of steel and concrete combined structure
CN105040878A (en) Overlapped floor
CN110067185A (en) A kind of steel pipe-steel plate combination web steel reinforced concrete combined box beam
CN102995755B (en) RCS (reinforced concrete structure) combined node with continuous webs and partially-cut flanges
CN103953147A (en) Two-way sandwich panel for split mounting type reinforcing bar girder
CN110055893A (en) A kind of corrugated steel-rubber concrete combined bridge deck
CN103643625B (en) A kind of steel truss-concrete slab composite beam based on shear connections structure
CN104674647A (en) Steel-concrete combination structure for hybrid girder bridge
CN105887660A (en) Perforated plate connecting piece with boot-shaped slots, steel beam and methods
CN202913337U (en) Prestress combination box girder composed of concrete frange plates and corrugated steel webs
CN108316164A (en) It is a kind of to reinforce old assembled Hollow Slab Beam Bridge construction and construction method using new beam
CN210458913U (en) Combination beam with shear partition connecting piece in channel steel flange
CN111794423A (en) Steel-concrete combined beam structure, building and construction method
CN207419848U (en) A kind of corrugated sheet steel-concrete combined box beam
CN111021616A (en) Full-embedded steel beam composite floor and construction method thereof
CN210151553U (en) Open-hole shear key structure for steel web lining concrete
CN107542212A (en) A kind of Prefabricated porous plate being connected and attaching method thereof
CN203613652U (en) Side plate strengthening honeycomb type H-shaped steel beam frame joint component
CN204590411U (en) A kind of Novel box shaped steel bone concrete composite beam
CN207793839U (en) A kind of butterfly shape steel web steel reinforced concrete combination main beam structure
CN207776235U (en) A kind of Prefabricated porous plate being connected
CN203639805U (en) Steel truss-concrete slab composite beam based on shear-resistant connecting structure
CN205907851U (en) Embedded perfobond strip concrete compound shear wall
CN109853807A (en) Overlap concrete bidirectional stress heat insulation house surface Alveolus type prefabricated board
CN103388364A (en) Connection structure for two steel tube shear walls on building plane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190326

Termination date: 20210619