CN106994577A - A kind of mould 3D built-up welding intelligent robots - Google Patents
A kind of mould 3D built-up welding intelligent robots Download PDFInfo
- Publication number
- CN106994577A CN106994577A CN201710259085.9A CN201710259085A CN106994577A CN 106994577 A CN106994577 A CN 106994577A CN 201710259085 A CN201710259085 A CN 201710259085A CN 106994577 A CN106994577 A CN 106994577A
- Authority
- CN
- China
- Prior art keywords
- axis
- welding
- vertical guide
- mould
- crossbeams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/02—Carriages for supporting the welding or cutting element
- B23K37/0252—Steering means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/02—Carriages for supporting the welding or cutting element
- B23K37/0247—Driving means
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Heat Treatment Of Articles (AREA)
- Laser Beam Processing (AREA)
Abstract
The invention discloses a kind of mould 3D built-up welding intelligent robots, including two X-axis crossbeams, two Y-axis crossbeams are installed between two X-axis crossbeam top surfaces, two Y-axis crossbeams are by each independent actuator drives along X-axis cross beam movement, Z axis vertical guide is respectively mounted on two Y-axis crossbeams, Z axis vertical guide is driven along Y-axis cross beam movement by Z-axis transmission device, be slidably installed plumb joint in the Z axis vertical guide on a Y-axis crossbeam wherein, erecting and welding destressing device in Z axis vertical guide on another Y-axis crossbeam, welding destressing device includes high frequency hammering device and dust exhaust apparatus, lower section between two X-axis crossbeams is provided with mould constant temperature heating device.Ensure the temperature in welding process, improve welding quality.Reduce due to the too high influence brought to welding precision of temperature.Using welding destressing device, remove welding slag, it is ensured that the flatness after welding, can be used for reparation and the new mould of printing of mould.
Description
Technical field
The present invention relates to a kind of robot architecture, more particularly to a kind of mould 3D built-up welding intelligent robots.
Background technology
The billions of members of swage die market scale greatly national at present, medium and small swage die exceeds 100 billion (10 tons of module weight <'s
For medium and small swage die, 10 tons~50 tons are big swage die, are super large swage die more than 50 tons).With national ship, big aircraft system
Make the demands such as industry to be lifted rapidly, maximum ultra-large type stamp forging hydraulic press (80,000 tons) is in Chinese second heavy-duty machinery collection in the world
Company of group puts into operation, and its super large swage die used often covers weight more than 100 tons, using traditional forging die manufacture method, module
Forge difficulty big, forging permeability is poor, and heat treatment after forging hardness is low, about HRC35~38, it is difficult to reach that forging die uses hardness requirement
(HRC42~48), manufacturing cost is high, and the manufacturing cycle is up to 5~6 months, has had a strong impact on effectively using for the large scale equipment.
Both at home and abroad to the research tendency of big swage die:On the one hand, by continuing to optimize alloying component, the life-span of big swage die
Improved;On the other hand, in forging die surface addition element alloying, surface property and forging die are also improved to a certain extent
Life-span.But for (super) big swage die, optimized alloy composition is very not clear to the surface layer abrasion-proof and life-span of raising forging die
It is aobvious;On forging die surface using factures such as alloyings, process route is complicated, and cost is high, and strengthening layer thickness is low, in HTHP bar
Part lower substrate top layer is yielding, and requirement of (super) the big swage die to low cost and high life can not be met at all.
It is one for this it is proposed that a kind of prepare (super) big swage die method using in cast steel substrate upper epidermis gradient built-up welding
It is individual first to make cast steel substrate, then according to the work characteristics of forging die, complete the bead-welding technology of transition zone and working lining.Current built-up welding
It is to use first to heat matrix, then takes out, the mode of human weld, inefficiency, and stable welding material can not be ensured
Expect performance, it is impossible to ensure the stability of technique in welding.
The content of the invention
In order to solve the above-mentioned technical problem, a kind of mould 3D built-up welding intelligent robots of present invention offer, welding procedure stabilization,
Welding quality is high.
To achieve these goals, technical scheme is as follows:A kind of mould 3D built-up welding intelligent robots, including two
The parallel X-axis crossbeam of bar, two X-axis crossbeams are installed by column, and two are installed between two X-axis crossbeam top surfaces
Y-axis crossbeam, two Y-axis crossbeams are by each independent actuator drives along X-axis cross beam movement, two Y-axis
Z axis vertical guide is respectively mounted on crossbeam, the Z axis vertical guide is driven along Y-axis cross beam movement by Z-axis transmission device,
It is characterized in that:Be slidably installed plumb joint in the Z axis vertical guide on a Y-axis crossbeam wherein, on another Y-axis crossbeam
Erecting and welding destressing device in Z axis vertical guide, the welding destressing device includes high frequency hammering device and dust exhaust apparatus,
The high frequency hammering device is slidably mounted in Z axis vertical guide by hammering device mounting seat, the hammering device mounting seat
Driven and moved up and down along Z axis vertical guide by the hammering drive cylinder installed in Z axis vertical guide upper end;The dust suction dress
Put including dust absorption nozzle, dust absorption nozzle bearing, hose and dust absorption nozzle drive cylinder, upper end and the hose phase of the dust absorption nozzle
Even, the dust absorption nozzle is arranged in the Z axis vertical guide by dust absorption nozzle bearing sliding, the dust absorption nozzle drive cylinder driving
Dust absorption nozzle bearing is slided up and down along Z axis vertical guide;
Lower section between two X-axis crossbeams is provided with mould constant temperature heating device.
Using such scheme, die matrix is placed on mould constant temperature heating device, it is ensured that temperature during welding, to provide
Stable welding material performance, it is ensured that the stability of welding procedure, improves welding quality.Two Y-axis crossbeam alternately enters to mould
Row processing, specifically, being first moved through plumb joint to carry out built-up welding to mould, then plumb joint is exited, and welds destressing device
Come over, complete stress elimination after welding, high frequency hammering is carried out to face of weld, high frequency hammering can play control shape, the purpose of control property,
Ensure the flatness and interior tissue uniformity after welding.Dust exhaust apparatus siphons away the welding slag of face of weld.Plumb joint and welding are gone
Power apparatus alternation is answered, so, plumb joint worked after a period of time, exits and is cooled.Weld destressing device then work
Make, after the completion of welding destressing device work, cooling is exited again, plumb joint works on, and so on, reduce heater pair
The influence of plumb joint and welding destressing device drive disk assembly and control element, it is ensured that robot is produced steadily in the long term, improves machine
Device people's service life.
In such scheme:Lower section between two X-axis crossbeams is provided with flatcar guide rail, and electric flat carriage is arranged on flatcar
On guide rail, the mould constant temperature heating device is arranged on electric flat carriage.Electric flat carriage completes the carrying of mould, is easy to mould to enter
Go out 3D built-up welding region.
In such scheme:The plumb joint includes welding gun, welding head bracket, holder for welding gun, welding gun slewing equipment and sent
Silk machine, the plumb joint bracket slide is connected in the Z axis vertical guide, and Z by welding head driving apparatus drives edge
Axle vertical guide is moved up and down, and the welding gun slewing equipment is arranged on the lower end of welding head bracket, and the holder for welding gun is installed
Below welding head bracket, the upper end of the welding gun is connected through holder for welding gun with welding gun slewing equipment, the welding gun upper end
It is connected with wire-feed motor, the wire-feed motor is arranged on Z axis vertical guide upper end.The steering that welding gun slewing equipment can complete welding gun is moved
Make.
In such scheme:Additional body is additionally provided with the welding head bracket.Spatial digitizer is installed in additional body
With welding tracking device, spatial digitizer can complete the reconstruct of mould.Welding tracking device tracks welding quality, checks whether there is gas
Bubble and welding slag, further improve welding quality.
It is preferred that:The welding head driving apparatus is servomotor, rack pinion system.
Beneficial effect:The mould 3D Intelligent weldings robot that the present invention is designed is protected by setting mould constant temperature heating device
Demonstrate,prove the temperature in welding process, it is ensured that the technology stability in welding, improve welding quality.By dividing on two Y-axis crossbeams
Other erecting and welding head and welding destressing device, alternation, are reduced because temperature is too high to drive disk assembly and control element band
The influence come, increases the service life.Using welding destressing device, on the one hand remove welding slag, complete stress elimination after welding, separately
On the one hand the flatness after welding, control face of weld shape and material structure performance are ensured, the present invention can be used for mould
Repair and the new mould of 3D printing.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 is the structural representation of plumb joint.
Fig. 3 is the structural representation of welding destressing device.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples:
Embodiment 1, as Figure 1-3:The mould 3D built-up welding intelligent robot of the present invention is by X-axis crossbeam 1, Y-axis crossbeam 2, Z
Axle vertical guide 3, plumb joint 4, flatcar guide rail 5, welding destressing device 6, electric flat carriage 7, mould constant temperature heating device composition.
X-axis crossbeam 1 be two, two X-axis crossbeams 1 be arranged in parallel, two X-axis crossbeams 1 by column be arranged on ground or
On base, two Y-axis crossbeams 2 are installed between two top surfaces of X-axis crossbeam 1, two Y-axis crossbeams 2 pass through each independent transmission
Device driving is moved along X-axis crossbeam 1, and gear, tooth are installed on rack, Y-axis crossbeam 2 specifically, being laid in the top surface of X-axis crossbeam 1
Wheel and rack is engaged, and Y-axis crossbeam 2 is moved by servomotor, the control of rack pinion system on X-axis crossbeam 1, realizes X
To precise motion.Servomotor, rack pinion system are prior art, be will not be described here.
Z axis vertical guide 3 is respectively mounted on two Y-axis crossbeams 2, Z axis vertical guide 3 passes through Z-axis transmission device drives edge
Y-axis crossbeam 2 to slide, Z-axis transmission device is servomotor screw rod transmission system, this system is also prior art, is not done herein
Repeat.
Be slidably installed plumb joint 4 in the Z axis vertical guide 3 on a Y-axis crossbeam 2 wherein.Specifically:Plumb joint 4 is wrapped
Include welding gun 4-1, welding head bracket 4-2, holder for welding gun 4-3, welding gun slewing equipment 4-4 and wire-feed motor 4-5, welding head bracket 4-
2 are slidably connected in Z axis vertical guide 3, and Z axis vertical guide 3 by welding head driving apparatus drives edge and move up and down, and weld
Joint drive device is also to install vertical rack, plumb joint branch in servomotor, rack pinion system, Z axis vertical guide 3
Gear is installed, servomotor band moving gear is moved on rack on frame 4-2.Welding gun slewing equipment 4-4 is arranged on welding head bracket
4-2 lower end, welding gun slewing equipment 4-4 is to include rotary disk, and rotary disk is driven by servomotor to be rotated, holder for welding gun 4-
3 are arranged on below welding head bracket 4-2, and welding gun 4-1 upper end is connected through holder for welding gun 4-3 with welding gun slewing equipment 4-4,
Welding gun 4-1 upper ends are connected through rotary disk with wire-feed motor 4-5, and wire-feed motor 4-5 is arranged on the upper end of Z axis vertical guide 3.Plumb joint branch
Additional body 4-6 is additionally provided with frame 4-2.Install and be not drawn into spatial digitizer and welding tracking device, figure on additional body 4-6
Spatial digitizer and welding tracking device.
Erecting and welding destressing device 6 in Z axis vertical guide 3 on another Y-axis crossbeam 2, specifically:Weld destressing
Device includes high frequency hammering device 6-1 and dust exhaust apparatus, and high frequency hammering device 6-1 structure is prior art, is not done herein superfluous
State.High frequency hammering device 6-1 is led by the hammering device mounting seat 6-3 auxiliary being slidably mounted on the slide carriage of Z axis vertical guide 3
On rail, slide carriage is slidably connected in Z axis vertical guide, and hammering device mounting seat 6-3 passes through installed in the upper end of Z axis vertical guide 3
Hammering drive cylinder 6-4 drive moved up and down along Z axis vertical guide 3;The piston rod and hammering for hammering drive cylinder 6-4 are filled
Mounting seat 6-3 is put to be connected.Dust exhaust apparatus includes dust absorption nozzle 6-2, dust absorption nozzle bearing 6-5, hose 6-6 and dust absorption nozzle driving gas
Cylinder 6-7, dust absorption nozzle 6-2 upper end are connected with hose 6-6, and hose 6-6 is connected with vacuum cleaner, and dust absorption nozzle passes through dust suction
Mouth bearing 6-5 is slidably mounted in the auxiliary guide rail of another slide carriage in Z axis vertical guide 3, another slide carriage also company of slip
It is connected in Z axis vertical guide, dust absorption nozzle drive cylinder 6-7 drivings dust absorption nozzle bearing 6-5 is slided up and down along Z axis vertical guide 3,
Dust absorption nozzle drive cylinder 6-7 piston rod is connected with dust absorption nozzle bearing 6-5.Dust absorption nozzle drive cylinder 6-7 is vertically led installed in Z axis
The upper end of rail.
Lower section between two X-axis crossbeams 1 is provided with two flatcar guide rails 5, and flatcar guide rail 5 is mounted on ground or base,
Electric flat carriage 7 is arranged on flatcar guide rail 5, and mould constant temperature heating device is arranged on electric flat carriage 7.
In use, die matrix is placed on mould constant temperature heating device, it is ensured that temperature during welding, to provide stabilization
Welding material performance, it is ensured that the stability of welding procedure, improves welding quality.Two Y-axis crossbeam 2 is alternately added to mould
Work, specifically, being first moved through plumb joint 4 to carry out built-up welding to mould, then plumb joint is exited, the mistake of welding destressing device 6
Come, complete stress elimination after welding, high frequency hammering is carried out to face of weld, high frequency hammering can play control shape, the purpose of control property, protect
Flatness and interior tissue uniformity after card welding.Dust exhaust apparatus siphons away the welding slag of face of weld.Plumb joint and welding are gone should
Power apparatus alternation, so, plumb joint worked after a period of time, exits and is cooled.Welding destressing device proceeds with one's work,
Weld after the completion of the work of destressing device, cooling is exited again, plumb joint works on, and so on, reduce heater butt welding
Joint and welding destressing device are driven the influence of control element, it is ensured that robot is produced steadily in the long term, improve robot and use
Life-span.
The present invention is not limited to above-mentioned specific embodiment, it will be appreciated that one of ordinary skill in the art is without creative
Work just can make many modifications and variations according to the design of the present invention.In a word, all technical staff in the art are according to this
The design of invention passes through the available technical side of logical analysis, reasoning, or a limited experiment on the basis of existing technology
Case, all should be in the protection domain being defined in the patent claims.
Claims (5)
1. a kind of mould 3D built-up welding intelligent robots, including two parallel X-axis crossbeams (1), two X-axis crossbeams (1) are led to
Column installation is crossed, two Y-axis crossbeams (2), two Y-axis crossbeams (2) are installed between two X-axis crossbeam (1) top surfaces
It is mobile along X-axis crossbeam (1) by each independent actuator drives, it is respectively mounted Z axis on two Y-axis crossbeams (2)
Vertical guide (3), the Z axis vertical guide (3) is driven along Y-axis crossbeam (2) movement by Z-axis transmission device, and its feature exists
In:Be slidably installed plumb joint (4), another Y-axis crossbeam (2) in the Z axis vertical guide (3) on a Y-axis crossbeam (2) wherein
On Z axis vertical guide (3) on erecting and welding destressing device (6), the welding destressing device includes high frequency hammering device
(6-1) and dust exhaust apparatus, it is vertical that the high frequency hammering device (6-1) is slidably mounted on Z axis by hammering device mounting seat (6-3)
On guide rail (3), the hammering device mounting seat (6-3) passes through the hammering drive cylinder installed in Z axis vertical guide (3) upper end
(6-4) drives and moved up and down along Z axis vertical guide (3);The dust exhaust apparatus includes dust absorption nozzle (6-2), dust absorption nozzle bearing (6-
5), hose (6-6) and dust absorption nozzle drive cylinder (6-7), upper end and hose (6-6) phase of the dust absorption nozzle (6-2)
Even, the dust absorption nozzle is slidably mounted on the Z axis vertical guide (3) by dust absorption nozzle bearing (6-5), the dust absorption nozzle driving
Cylinder (6-7) driving dust absorption nozzle bearing (6-5) is slided up and down along Z axis vertical guide (3);
Lower section between two X-axis crossbeams (1) is provided with mould constant temperature heating device.
2. a kind of mould 3D built-up welding intelligent robots according to claim 1, it is characterised in that:Two X-axis crossbeams (1)
Between lower section be provided with flatcar guide rail (5), electric flat carriage (7) is arranged on flatcar guide rail (5), the mould heated at constant temperature dress
Put on electric flat carriage (7).
3. a kind of mould 3D built-up welding intelligent robots according to claim 1 or claim 2, it is characterised in that:Plumb joint (4) bag
Include welding gun (4-1), welding head bracket (4-2), holder for welding gun (4-3), welding gun slewing equipment (4-4) and wire-feed motor (4-5), institute
State welding head bracket (4-2) to be slidably connected on the Z axis vertical guide (3), and Z by welding head driving apparatus drives edge
Axle vertical guide (3) is moved up and down, and the welding gun slewing equipment (4-4) is arranged on the lower end of welding head bracket (4-2), the weldering
Rifle clamper (4-3) is arranged on below welding head bracket (4-2), and the upper end of the welding gun (4-1) passes through holder for welding gun (4-3)
It is connected with welding gun slewing equipment (4-4), welding gun (4-1) upper end is connected with wire-feed motor (4-5), wire-feed motor (4-5) peace
Mounted in Z axis vertical guide (3) upper end.
4. a kind of mould 3D built-up welding intelligent robots according to claim 3, it is characterised in that:Welding head bracket (the 4-
2) additional body (4-6) is additionally provided with.
5. a kind of mould 3D built-up welding intelligent robots according to claim 3, it is characterised in that:The welding head driving apparatus
For servomotor, rack pinion system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710259085.9A CN106994577B (en) | 2017-04-19 | 2017-04-19 | A kind of mold 3D built-up welding intelligent robots |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710259085.9A CN106994577B (en) | 2017-04-19 | 2017-04-19 | A kind of mold 3D built-up welding intelligent robots |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106994577A true CN106994577A (en) | 2017-08-01 |
CN106994577B CN106994577B (en) | 2018-09-28 |
Family
ID=59435537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710259085.9A Active CN106994577B (en) | 2017-04-19 | 2017-04-19 | A kind of mold 3D built-up welding intelligent robots |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106994577B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108436343A (en) * | 2018-06-06 | 2018-08-24 | 陈燕 | A kind of multifunctional industrial robot for intelligence manufacture automatic production line |
CN108747107A (en) * | 2018-06-06 | 2018-11-06 | 陈燕 | A kind of automation can remote monitoring factory |
CN109014667A (en) * | 2018-06-06 | 2018-12-18 | 陈燕 | A kind of automated production assembly system based on intelligent industrial robot |
CN110405392A (en) * | 2019-07-30 | 2019-11-05 | 马鞍山市金韩防水保温工程有限责任公司 | A kind of handware processing surface welder and its application method |
CN111299773A (en) * | 2020-04-03 | 2020-06-19 | 佛山宇仁智能科技有限公司 | Full-automatic metal additive submerged arc printing equipment and method |
CN111421202A (en) * | 2020-01-15 | 2020-07-17 | 广东艾迪特智能科技有限公司 | Multi-robot collaborative material increase platform and material increase method for oversized metal component |
CN111496354A (en) * | 2020-05-09 | 2020-08-07 | 曹瑞 | Spiral submerged arc welded pipe welding seam protection device |
CN111522292A (en) * | 2020-05-07 | 2020-08-11 | 四川一可机器人科技有限公司 | Intelligent electric transportation flat car and operation method thereof |
CN112139810A (en) * | 2020-09-07 | 2020-12-29 | 宋伟雄 | Plate automatic welding equipment with internal stress eliminating function |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4224954C1 (en) * | 1992-07-24 | 1993-06-17 | Lokomotivbau-Elektrotechnische Werke Hennigsdorf Gmbh, O-1422 Hennigsdorf, De | Automatic welding of large sheet sections of arcuate railway carriage roof - by locating sheets in position and welding using upper and lower movable electrodes on frame with 3=dimensional shielding system |
KR20040042632A (en) * | 2002-11-15 | 2004-05-20 | 주식회사 포스코 | Welder |
CN201070762Y (en) * | 2007-07-20 | 2008-06-11 | 深圳市远望工业自动化设备有限公司 | Rotary friction welding mechanical arm |
CN101966633A (en) * | 2010-08-30 | 2011-02-09 | 赵显华 | Metal-plate welding device for eliminating deformation and stress through ultrasonic waves |
WO2011066707A1 (en) * | 2009-12-04 | 2011-06-09 | Chen Chunming | Plasma arc plane overlay welding machine |
CN103506776A (en) * | 2012-06-25 | 2014-01-15 | 崔景超 | Novel welding technique for hammering and forging high-temperature welding line |
CN103692063A (en) * | 2013-12-16 | 2014-04-02 | 华侨大学 | Novel welding device |
CN104959402A (en) * | 2015-06-02 | 2015-10-07 | 陈继明 | Ultrasonic welding reshaping and stress relieving device |
CN105728930A (en) * | 2016-05-05 | 2016-07-06 | 中国人民解放军装甲兵工程学院 | Ultrasonic vibration assisted welding method |
CN106521138A (en) * | 2016-11-10 | 2017-03-22 | 浙江大学宁波理工学院 | Mould repairing stress automatic eliminating system and method |
CN206702475U (en) * | 2017-04-19 | 2017-12-05 | 重庆佛思坦智能装备有限公司 | Mould 3D built-up welding intelligent robots |
-
2017
- 2017-04-19 CN CN201710259085.9A patent/CN106994577B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4224954C1 (en) * | 1992-07-24 | 1993-06-17 | Lokomotivbau-Elektrotechnische Werke Hennigsdorf Gmbh, O-1422 Hennigsdorf, De | Automatic welding of large sheet sections of arcuate railway carriage roof - by locating sheets in position and welding using upper and lower movable electrodes on frame with 3=dimensional shielding system |
KR20040042632A (en) * | 2002-11-15 | 2004-05-20 | 주식회사 포스코 | Welder |
CN201070762Y (en) * | 2007-07-20 | 2008-06-11 | 深圳市远望工业自动化设备有限公司 | Rotary friction welding mechanical arm |
WO2011066707A1 (en) * | 2009-12-04 | 2011-06-09 | Chen Chunming | Plasma arc plane overlay welding machine |
CN101966633A (en) * | 2010-08-30 | 2011-02-09 | 赵显华 | Metal-plate welding device for eliminating deformation and stress through ultrasonic waves |
CN103506776A (en) * | 2012-06-25 | 2014-01-15 | 崔景超 | Novel welding technique for hammering and forging high-temperature welding line |
CN103692063A (en) * | 2013-12-16 | 2014-04-02 | 华侨大学 | Novel welding device |
CN104959402A (en) * | 2015-06-02 | 2015-10-07 | 陈继明 | Ultrasonic welding reshaping and stress relieving device |
CN105728930A (en) * | 2016-05-05 | 2016-07-06 | 中国人民解放军装甲兵工程学院 | Ultrasonic vibration assisted welding method |
CN106521138A (en) * | 2016-11-10 | 2017-03-22 | 浙江大学宁波理工学院 | Mould repairing stress automatic eliminating system and method |
CN206702475U (en) * | 2017-04-19 | 2017-12-05 | 重庆佛思坦智能装备有限公司 | Mould 3D built-up welding intelligent robots |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108436343A (en) * | 2018-06-06 | 2018-08-24 | 陈燕 | A kind of multifunctional industrial robot for intelligence manufacture automatic production line |
CN108747107A (en) * | 2018-06-06 | 2018-11-06 | 陈燕 | A kind of automation can remote monitoring factory |
CN109014667A (en) * | 2018-06-06 | 2018-12-18 | 陈燕 | A kind of automated production assembly system based on intelligent industrial robot |
CN108747107B (en) * | 2018-06-06 | 2021-05-14 | 安徽喜尔奇日用品有限公司 | Automatic but change mill of remote monitoring |
CN109014667B (en) * | 2018-06-06 | 2021-02-05 | 河南省乾憬光电科技有限公司 | Automatic production and assembly system based on intelligent industrial robot |
CN108436343B (en) * | 2018-06-06 | 2020-11-13 | 聊城锐利机械设备有限公司 | Multifunctional industrial robot for intelligent manufacturing automatic production line |
CN110405392A (en) * | 2019-07-30 | 2019-11-05 | 马鞍山市金韩防水保温工程有限责任公司 | A kind of handware processing surface welder and its application method |
CN110405392B (en) * | 2019-07-30 | 2021-07-27 | 马鞍山市金韩防水保温工程有限责任公司 | Surface welding device for hardware processing and use method thereof |
CN111421202A (en) * | 2020-01-15 | 2020-07-17 | 广东艾迪特智能科技有限公司 | Multi-robot collaborative material increase platform and material increase method for oversized metal component |
CN111421202B (en) * | 2020-01-15 | 2022-03-11 | 广东艾迪特智能科技有限公司 | Multi-robot collaborative material increase platform and material increase method for oversized metal component |
CN111299773B (en) * | 2020-04-03 | 2024-05-31 | 阿贝龙(北京)智能科技有限公司 | Full-automatic metal additive submerged arc printing equipment and method |
CN111299773A (en) * | 2020-04-03 | 2020-06-19 | 佛山宇仁智能科技有限公司 | Full-automatic metal additive submerged arc printing equipment and method |
CN111522292A (en) * | 2020-05-07 | 2020-08-11 | 四川一可机器人科技有限公司 | Intelligent electric transportation flat car and operation method thereof |
CN111496354A (en) * | 2020-05-09 | 2020-08-07 | 曹瑞 | Spiral submerged arc welded pipe welding seam protection device |
CN112139810A (en) * | 2020-09-07 | 2020-12-29 | 宋伟雄 | Plate automatic welding equipment with internal stress eliminating function |
Also Published As
Publication number | Publication date |
---|---|
CN106994577B (en) | 2018-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106994577A (en) | A kind of mould 3D built-up welding intelligent robots | |
CN206702475U (en) | Mould 3D built-up welding intelligent robots | |
CN206702472U (en) | Mould 3D built-up welding intelligent robot welds destressing device | |
CN102240860B (en) | Method and equipment for manufacturing gradient material mould | |
CN202943497U (en) | Steel plate surface polishing machine | |
CN102649251B (en) | Steel plate surface polishing machine | |
CN106903432B (en) | Based on the laser assembly solder device and its control method rolled with weldering | |
CN105619355A (en) | Synchronous centering positioning device | |
CN104846187B (en) | Ultrasonic impact strengthens the devices and methods therefor of axial workpiece weld seam | |
CN103589832A (en) | Quenching machine tool capable of preventing bending deformation of slender rod piece during quenching | |
CN111770598B (en) | Preheating device and preheating method for TBM (tunnel boring machine) tool apron welding | |
CN101492762B (en) | Mould surface induction quenching machine tool | |
CN209836225U (en) | Online mobile processing device for steel rail surface based on laminar plasma | |
CN102814609B (en) | Welding and locating device for motorcycle main beam | |
CN106903327A (en) | A kind of high-precision curved process equipment | |
CN111757567A (en) | Preheating device and preheating method for welding workpiece | |
CN206869131U (en) | A kind of high-precision curved process equipment | |
CN204676131U (en) | The device of ultrasonic impact strengthening axial workpiece weld seam | |
CN114799531A (en) | Thermal field assisted laser shot blasting impressing hard particle surface modification device and method | |
CN219195052U (en) | Multipurpose horizontal induction quenching machine tool | |
CN202951895U (en) | Horizontal stable vertical-type drilling combined machine tool | |
CN207629467U (en) | Numerical control bonding machine for automobile metal plate work reparation | |
CN207309154U (en) | A kind of new type auto flame welding machine | |
CN213388774U (en) | Double-station laser quenching equipment | |
CN205803543U (en) | A kind of rail type three-dimensional heat treatment operation machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |