CN106985266A - A kind of production method and production system for positioning plasterboard - Google Patents

A kind of production method and production system for positioning plasterboard Download PDF

Info

Publication number
CN106985266A
CN106985266A CN201610042126.4A CN201610042126A CN106985266A CN 106985266 A CN106985266 A CN 106985266A CN 201610042126 A CN201610042126 A CN 201610042126A CN 106985266 A CN106985266 A CN 106985266A
Authority
CN
China
Prior art keywords
plasterboard
positioning
cutting machine
station location
location marker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610042126.4A
Other languages
Chinese (zh)
Inventor
朱冬冬
周梦文
赵云峰
赵红玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing New Building Material Group Co Ltd
Original Assignee
Beijing New Building Material Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing New Building Material Group Co Ltd filed Critical Beijing New Building Material Group Co Ltd
Priority to CN201610042126.4A priority Critical patent/CN106985266A/en
Publication of CN106985266A publication Critical patent/CN106985266A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/14Apparatus or processes for treating or working the shaped or preshaped articles for dividing shaped articles by cutting
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • G05B19/19Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by positioning or contouring control systems, e.g. to control position from one programmed point to another or to control movement along a programmed continuous path

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

A kind of production method and production system for positioning plasterboard, using before being arranged on cutting machine, the detection means above transfer passage, detect the station location marker on the positioning plasterboard transmitted on a production line;The detection means is detected after the station location marker, and the indication signal for representing to detect station location marker is sent to the control device of the cutting machine;The control device of the cutting machine performs rupturing operation according to the indication signal received to the positioning plasterboard.The block positioning plasterboard that the above method is produced, the lengthwise position of its registration pattern on gypsum is fixed, be not in anchor point apart from the upper and lower edge of plasterboard too close to or it is remote, or when the combination of two block gypsum plates is installed, junction surface anchor point too close to or be spaced it is too remote the problem of, so as to preferably meet the requirement of job specfication so that positioning plasterboard preferably plays quickening speed of application, improves the effect of efficiency of construction.

Description

A kind of production method and production system for positioning plasterboard
Technical field
The present invention relates to construction material, more particularly, to a kind of production method for positioning plasterboard and life Production system.
Background technology
Plasterboard and other building plasterboards have multidirectional purposes, and it is indispensable in construction industry 's.Plasterboard is produced in large quantities in conveyer belt, and is arrived with defined standard size and specification dispensing Market, its basic specification has two kinds i.e. 1.2m × 3m and 1.2m × 2.4m, 1.2m to be width, text In also referred to as laterally, 3m or 2.4m are also referred to as longitudinal direction in length direction, text.When mounted, then root Cut off according to the condition at scene, it is contemplated that inserting the necessary fixing point such as screw.With stone Exemplified by installation of the cream plate on lightgage steel joist.According to bulkhead of light-weight steel keel plaster tablet job specfication construction technology And the requirement of quality standard, the plasterboard application specific antirust tapping screw on lightgage steel joist fixes and electricity consumption Dynamic screw gun is once squeezed into and tightened.
As shown in FIG. 1A and 1B, it is advisable along plasterboard periphery screw spacing with 200mm, spiral shell in plate Nail spacing is advisable with 300mm;Screw should be 10~15mm away from edges of boards bound edge, 15 are should be away from cut-out side~ 20mm.Plasterboard on the left of Figure 1A is fixed on the keel of 3 vertical directions, except two row of both sides Outside screw, a row screw is also equipped with the intermediate region of plate, the position of the row screw is in plate middle.And Plasterboard on the left of Figure 1B is fixed on the keel of 4 vertical directions, in addition to two row screws of both sides, Two row screws are also equipped with the intermediate region of plate, respectively the left side away from plate and right side 400mm or so.As schemed Shown in 2, in engineering, because the height of wall is different, it is often necessary to plasterboard is cut off with suitable Answer the height of wall.Now, on the vertical direction of wall, it is often required to using two block gypsum plates even more The plasterboard of polylith carries out split.
When constructing at the scene, in order to meet the requirement of above-mentioned job specfication, commonly use and come using the mode of snap the line The position of positioning screw, works very numerous and diverse and time-consuming, requires very carefully to operate again.For not By install training workman for, result in process greatly prolong or construction quality decline.
In order to solve this problem, Chinese patent ZL200410020452.2, which proposes one kind, has installation to position The production method of the Thistle board of point, including Thistle board forming step, also have automatic in paper stone The processing step for installing anchor point is set on cream plate.Due to automatic in Paper-faced gyp in process of producing product Set on plate and anchor point is installed so that workmen can be according to the installation anchor point being set on product Installed.
The present inventor it has been investigated that, although plasterboard in the program has anchor point, these Spacing is also to determine between anchor point.But, in the production process of plasterboard, gypsum sheet metal forming it It can be cut off afterwards to obtain the plasterboard of dimension, and in cutting-off process, positioning is not considered The lengthwise position of point, this causes the position of anchor point in the vertical on the plasterboard after cut-out to be not true Fixed.By taking Chinese patent ZL200410020452.2 as an example, the horizontal, vertical of anchor point is mentioned in the patent Set to spacing according to size as defined in job specfication.As shown in Figure 3A, it is assumed that be provided with 5 in the vertical Row anchor point, specific positioning are as illustrated, the longitudinal pitch of plasterboard periphery screw is 200mm, plate The longitudinal pitch of middle screw is 300mm.When the figure assumes that cut-out, middle 3 row anchor point is apart from gypsum The distance of plate top is 150mm, and distance of the row anchor point of both sides 2 apart from plasterboard top is 100mm In the case of the pattern that shows.And due to the position of anchor point can't be considered when plasterboard is cut off, thus It is also likely to occur anchor point distribution as shown in Figure 3 B, now, middle 3 row anchor point is apart from gypsum The distance of plate top is 50mm, and distance of the row anchor point of both sides 2 apart from plasterboard top is 0mm, phase Obvious skew is occurred in that to Fig. 3 A.Such case result in anchor point be possible to appear in very close to Or the position away from upper and lower side, and the requirement of job specfication is not met, and if not based on the 1st row Anchor point play screw because the pitch requirements between each row, other positions are also had no idea according to positioning Put to play screw, this prevents anchor point from playing its effect.In another case, will two curbs It is inconsistent due to this upper and lower back gauge of two block gypsum plates when cream plate splices, it there is also in junction surface spiral shell Excessively intensive situation is followed closely, as shown in Figure 3 C.May also similarly occur at a distance of excessive situation.These feelings The appearance of condition, in order to meet the requirement of job specfication, workmen can not just come according to existing anchor point Screw is played, so that anchor point loses its original effect.
Chinese patent application 201510180113.9 discloses a kind of Thistle board of convenient construction, for The Thistle board that width is 120 centimetres, length is 300 centimetres, its mask paper is all provided with length The horizontal graduation mark of 120 centimetres of top margin, the first to the 7th horizontal graduation mark, the horizontal graduation mark in base;Shield The longitudinal scale of left side that the length being parallel to each other is all 300 centimetres is sequentially provided with facial tissue from left to right Line, the longitudinal graduation mark in left side, the longitudinal graduation mark in center, the longitudinal graduation mark in right side, the longitudinal scale of right edge Line.For 120 centimetres of width, the Thistle board of 240 centimetres of length, its mask paper is provided with length It is all 120 centimetres of the horizontal graduation mark of top margin, the first to the 5th horizontal graduation mark, the horizontal graduation mark in base; The longitudinal scale of left side that the length being parallel to each other is all 300 centimetres is sequentially provided with mask paper from left to right Line, the longitudinal graduation mark in left side, the longitudinal graduation mark in center, the longitudinal graduation mark in right side, the longitudinal scale of right edge Line.
Although the program carrys out auxiliary positioning there is provided graduation mark, come during construction according to this graduation mark Position and inconvenient.Because when playing each screw, being required for being gone through according to scale determining correctly Position, operate very cumbersome, it is also difficult to reach very high efficiency of construction, be unfavorable for plasterboard determine Bit function is promoted the use of.
More in the prior art, the horizontal and vertical position line for being used without scale carrys out auxiliary construction, Although but these position lines can auxiliary positioning in the vertical, in the horizontal due to apart from upper and lower side Position is unfixed, is still difficult to be accurately positioned.And if aided in excessive located lateral line, Not only workmen is difficult to offer an explanation, and will also result in the raising of printing cost.
The content of the invention
In view of this, the invention provides following technical scheme.
A kind of production method for positioning plasterboard, including:
Using before being arranged on cutting machine, the detection means above transfer passage, detection passes on a production line Station location marker on defeated positioning plasterboard;
The detection means is detected after the station location marker, and table is sent to the control device of the cutting machine Show the indication signal for detecting station location marker;
The control device of the cutting machine is held according to the indication signal received to the positioning plasterboard Row rupturing operation.
A kind of production system for positioning plasterboard, including:Cutting machine, the control device of cutting machine, cut-out Transfer passage before machine, in addition to before being arranged on the cutting machine, the detection means above transfer passage, Wherein:
The detection means, the station location marker on positioning plasterboard transmitted on a production line for detecting, After the station location marker is detected, send expression to the control device of the cutting machine and detect position mark The indication signal of knowledge;
The control device of the cutting machine, for according to the indication signal received, to the positioning stone Cream plate performs rupturing operation.
The each piece of positioning plasterboard that the above method is produced, the longitudinal direction of its registration pattern on gypsum Position is fixed, be not in anchor point apart from the upper and lower edge of plasterboard too close to or it is remote, or Person by two block gypsum plates combine install when, junction surface anchor point too close to or be spaced it is too remote the problem of, from And can preferably meet the requirement of job specfication so that positioning plasterboard preferably plays quickening construction speed Degree, improves the effect of efficiency of construction.
Brief description of the drawings
Figure 1A and Figure 1B are the schematic diagrames that plasterboard is fixedly mounted on keel;
Fig. 2 is the schematic diagram that many block gypsum plates are constituted into wall;
Fig. 3 A and Fig. 3 B are locating-point plasterboards because slit shearing position is different and causes anchor point relative The schematic diagram of skew;
Fig. 3 C are the schematic diagrames at junction anchor point interval when two pieces of locating-point plasterboard combinations are installed;
Fig. 4 is the schematic diagram that the embodiment of the present invention positions plasterboard;
Fig. 5 is the schematic diagram of positioning plasterboard cut-out of the embodiment of the present invention;
Fig. 6 is the flow chart that the embodiment of the present invention positions plasterboard manufacturing process.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, below in conjunction with accompanying drawing Embodiments of the invention are described in detail.It should be noted that in the case where not conflicting, this Shen Please in embodiment and the feature in embodiment can mutually be combined.
What the present embodiment existed by the improvement to plasterboard and gypsum board manufacture technique to solve prior art The problem of anchor point is offset.
Understand for convenience, Thistle board production process first exemplary to one makes a presentation.It is as follows:
Dispensing:Material in feed bin is conveyed by level, vertical transport equipment, and given by rigid impeller Material machine is sent to belt conveyer scale.Unnecessary material, then sent by crossing the conveying equipments such as feed back conveyer, elevator Feed back storehouse.Plaster of Paris, modified starch, coagulant, glass fibre (the water-fast Thistle board of production, During refractory plasterboard with) etc. after raw material measured respectively, into mixing screw mixing after it is continuous Send into vertical mixer.Foaming agent adds storage tank.In use, foaming agent and moisture are respectively by measuring pump Foam device is sent to, and is passed through compressed air, stable foam is produced, is sent in vertical mixer. The glue spraying mouthful of feeding forming station both sides, paper on Thistle board is sprayed on by adhesive tape after viscous side glue is prepared in tank Both sides.Upper and lower mask paper is transported on paper frame by electric block.
Shaping:The lower paper of shaping is sent to forming station through storing paper machine, tensioning apparatus, scratching device, deviation correcting device, Calcium plaster is flowed on the lower paper of shaping from vertical mixer.Paper machine is through storing paper machine, tensioning apparatus, entangling in shaping After deflection device and viscose glue, forming station is sent to.Forming machine collect paper, lower paper, calcium plaster extruding wrap up in established practice Determine the sheet material of thickness, the plasterboard band of forming steadily delivers to cutting machine through solidifying belt feeder, rollgang Place sends into 1 type cross conveyor by setting length cut-out, then by acceleration roller-way, is sent into after drawing close roller-way Drying machine.
Dry:Thistle board is sent into each layer of drying machine, the drying machine point by bridge-type dispenser by program 2nd area, using vapours as thermal source, while hot blast Thistle board is advanced slowly in drying machine, with The hot-air of longitudinal flow constantly carries out heat exchange, and sheet material absorbs to dissociate in heat, temperature rise, sheet material Moisture slow evaporation, but the crystallization water of dihydrate gypsum is not destroyed.When Thistle board goes out drying machine, its Water content answers≤1%.After Thistle board is dried through drying machine, cooled down by the cooling section of drying machine, then Through the discharging machine ejecting plate out of drying machine in an orderly manner.
Trimming, stacking:The Paper-faced gyp paper for going out drying machine is conveyed through roller conveyor, 2 type lateral transfers Bead cutter is sent into after machine, combinating machine, required size is accurately switched to, production board is sent through finished product roller conveyor Enter piler stacking, into pile after by fork truck deliver to warehouse for finished product storage.
For the production of positioning plasterboard (plasterboard with the registration pattern for constructing), , it is necessary to form the pattern of positioning, such as position line, anchor point in its construction surface during production.Tool Body, construction surface can be used as using modes such as printing, sprayings before gypsum board manufacture shaping These patterns are formed on mask paper.Certainly, the present invention can also be directly described using having been formed in production The mask paper that registration pattern and position mark are praised, just need not be printed and be sprayed in production.
The positioning plasterboard of the present embodiment is compared with common positioning plasterboard, as shown in figure 4, in positioning Plasterboard 1 is positioned as the mask paper (also having the mask paper as mounting surface) of construction surface except being formed Outside 2 grade registration patterns of point, a station location marker 3 also add.As illustrated, the position of the present embodiment Mark is located on the axis of positioning plasterboard, but the present invention is not limited to this.Station location marker and positioning stone Registration pattern on cream plate can be formed simultaneously, but it is also possible to which it is for example prefabricated to be initially formed registration pattern, in life Station location marker is re-formed during production plasterboard, or conversely.
It should be noted that Fig. 4 be illustrated that after the completion of plasterboard (by taking 1.2m × 2.4m sizes as an example), On mask paper before cutting, above-mentioned station location marker is to circulate appearance with plate a length of cycle, also It is to say, station location marker is to be longitudinally spaced setting, the interval between adjacent station location marker is equal to described Position the length of plasterboard.For Thistle board, station location marker can be any graphic code, be, for example, Station location marker in one-dimension code or Quick Response Code or customized code, figure is one of example.Numeral, Word, symbol etc. are one kind of figure, can as graphic code part.
The present embodiment adds a detection means to detect above-mentioned station location marker on gypsum board production line. As shown in figure 5, the both sides of cutting machine 11 are transmission roller channels 13, one is provided with the front of cutting machine 11 Individual detection means, in the present embodiment, the detection means are optics code reader 17, are pacified by support 18 The top of transmission roller channel 13 before cutting machine.Above-mentioned optics code reader 17 for example can be that infrared ray is swept The types such as code device, laser code reader.The optics code reader 17 and the control circuit of cutting machine 11 (do not show Go out) electrical connection, thus available for the cutoff action of control cutting machine 11.
Specifically, the present embodiment positioning plasterboard production method as shown in fig. 6, including:
Step 110, using the detection means being arranged on before cutting machine, what detection was transmitted on a production line Position the station location marker on plasterboard;
As shown in figure 5, station location marker 3 is formed on mask paper of the plasterboard 1 as construction surface is positioned, During being transported to cutting machine, the code reader 17 being arranged on before cutting machine can be with the scanning discovery position Put and identify and identify.
Because being connection cut-out to plasterboard in plasterboard continuous flow procedure.In once connection life During production, if the registration pattern of first block of plate have passed through longitudinal register, the positioning figure of follow-up plasterboard The lengthwise position of case is substantially identical.Therefore, detection means can be in one-time continuous production process Before cutting off for the first time, the station location marker is detected, subsequently can be without detection.If it is considered that by mistake The accumulation of difference, can also be before first time cuts off, and the time cycle set is then, and detection is described Station location marker.So can be with simplify control, it is to avoid failure.
Step 120, the detection means is detected after the station location marker, to the control of the cutting machine Device sends the indication signal for representing to detect station location marker;
The indication signal can be simple a high level or low level signal or encoded Data signal, the present invention do not do to this and limits to.
Step 130, the control device of the cutting machine is according to the indication signal received, to described fixed Position plasterboard performs rupturing operation.
In this step, after the indication signal that the control device of the cutting machine is received, i.e., to described fixed Position plasterboard performs rupturing operation.But, the indication signal that the control device of the cutting machine is received Afterwards, the time that can also postpone setting performs rupturing operation to the positioning plasterboard again.
It is assumed that detection means detects station location marker performs the time of rupturing operation for T to cutting machine, gypsum The transmission speed of plate is V, and desired station location marker is L (Fig. 4 apart from the distance of plasterboard top edge In by taking 600mm as an example), then detection means apart from cutting machine off-position can be according to the following formula apart from S Calculate:S=L+TV.If the S so calculated is too short, the control device of cutting machine can be delayed Rupturing operation is performed after time t again, now S=L+ (T+t1) V.According to above-mentioned theory formula, with reference to life Experience in production, can accurately obtain the appropriate value of above-mentioned parameter, and positioning plasterboard is realized exactly Longitudinal register.It is readily appreciated that, when station location marker is fixed apart from the position of plasterboard top edge, gypsum The position of the equidistant plasterboard top edge of anchor point, position line on plate is also fixed.
In some gypsum board manufacturing process, if there is the cut-out behaviour of multiple rupturing operation, then this step Work is the horizontal rupturing operation of last time before the positioning plasterboard length is determined.Last time is laterally Rupturing operation complete after, the final length of plasterboard is to have determined that.
Produce according to the method described above each piece positioning plasterboard, its registration pattern is on gypsum Lengthwise position be it is fixed, as shown in Figure 4.So, would not exist anchor point on plasterboard, Lower edge too close to or it is remote, or by two block gypsum plates combine install when, junction surface anchor point is excessively The problem of close or too remote interval, so as to preferably meet the requirement of job specfication so that positioning stone Cream plate preferably plays quickening speed of application, improves the effect of efficiency of construction.
The present embodiment additionally provides a kind of production system of plasterboard, as shown in figure 5, including:Cutting machine 11st, the transfer passage 13 before the control device (not shown) of cutting machine, cutting machine, especially, is also wrapped The detection means 17 before being arranged on the cutting machine is included, wherein:
The detection means 17, the position mark on positioning plasterboard 1 transmitted on a production line for detecting Know 3, after the station location marker is detected, send expression to the control device of the cutting machine and detect The indication signal of station location marker;
The control device of the cutting machine, for according to the indication signal received, to the positioning stone Cream plate 1 performs rupturing operation.
Alternatively, the production system also includes:
Identification generation apparatus, for regarding station location marker formation as construction surface in the positioning plasterboard Mask paper on, and the interval being longitudinally spaced between setting, adjacent station location marker be equal to it is described fixed The length of position plasterboard.The identification generation apparatus can use the machines such as printing, ink-jet to realize, make For construction surface mask paper pull open after, participate in before shaping, print or spray upper described in its surface Station location marker, at the same printing or the upper corresponding registration pattern of spray, for registration pattern in itself, the present invention Do not limit, can be position line, anchor point, other registration patterns and combinations thereof.
Alternatively,
The detection means 17 is optics code reader, and the optics code reader is arranged on defeated by support 18 Send the top of passage 13.
Alternatively,
The control device of the cutting machine is held according to the indication signal received to the positioning plasterboard Row rupturing operation, including:After the indication signal received, i.e., cut-out is performed to the positioning plasterboard Operation;Or, after the indication signal received, postpone the time of setting again to the positioning plasterboard Perform rupturing operation.
Alternatively,
The detection means detects the station location marker, including:The first of one-time continuous production process Before secondary cut-out, the station location marker is detected;Or, in once connection production process, for the first time Before cut-out, and the time cycle set is then, detects the station location marker.
Alternatively,
The cutting machine is to perform the last time transversely cutting before the positioning plasterboard length is determined Cutting machine.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every The equivalent structure or equivalent flow conversion made using description of the invention and accompanying drawing content, or directly or Connect and be used in other related technical fields, be included within the scope of the present invention.

Claims (12)

1. a kind of production method for positioning plasterboard, including:
Using before being arranged on cutting machine, the detection means above transfer passage, detection passes on a production line Station location marker on defeated positioning plasterboard;
The detection means is detected after the station location marker, and table is sent to the control device of the cutting machine Show the indication signal for detecting station location marker;
The control device of the cutting machine is held according to the indication signal received to the positioning plasterboard Row rupturing operation.
2. production method as claimed in claim 1, it is characterised in that:
The station location marker is formed on the mask paper for positioning plasterboard as construction surface, and in longitudinal direction Upper to be arranged at intervals, the interval between adjacent station location marker is equal to the length of the positioning plasterboard.
3. production method as claimed in claim 1, it is characterised in that:
The detection means is optics code reader, and the station location marker is graphic code.
4. production method as claimed in claim 1, it is characterised in that:
The rupturing operation is the horizontal cut-out behaviour of last time before the positioning plasterboard length is determined Make.
5. the production method as described in any in claim 1-4, it is characterised in that:
The control device of the cutting machine is held according to the indication signal received to the positioning plasterboard Row rupturing operation, including:
After the indication signal that the control device of the cutting machine is received, i.e., the positioning plasterboard is held Row rupturing operation;Or
After the indication signal that the control device of the cutting machine is received, postpone the time of setting again to institute State positioning plasterboard and perform rupturing operation.
6. the production method as described in any in claim 1-4, it is characterised in that:
The detection means detects the station location marker, including:
The detection means detects the position mark before the first time cut-out of one-time continuous production process Know;Or
The detection means is in once connection production process, before first time cuts off, and setting Time cycle then, detects the station location marker.
7. a kind of production system for positioning plasterboard, including:Cutting machine, the control device of cutting machine, cut Transfer passage before off line, it is characterised in that before also including being arranged on the cutting machine, transfer passage The detection means of top, wherein:
The detection means, the station location marker on positioning plasterboard transmitted on a production line for detecting, After the station location marker is detected, send expression to the control device of the cutting machine and detect position mark The indication signal of knowledge;
The control device of the cutting machine, for according to the indication signal received, to the positioning stone Cream plate performs rupturing operation.
8. production system as claimed in claim 7, it is characterised in that:
Identification generation apparatus, for regarding station location marker formation as construction surface in the positioning plasterboard Mask paper on, and the interval being longitudinally spaced between setting, adjacent station location marker be equal to it is described fixed The length of position plasterboard.
9. production system as claimed in claim 7, it is characterised in that:
The detection means is optics code reader, and the optics code reader is arranged on the conveying by support The top of passage.
10. the production system as described in any in claim 7, it is characterised in that:
The cutting machine is to perform the last time transversely cutting before the positioning plasterboard length is determined Cutting machine.
11. the production system as described in any in claim 7-10, it is characterised in that:
The control device of the cutting machine is held according to the indication signal received to the positioning plasterboard After row rupturing operation, including the indication signal received, i.e., cut-out behaviour is performed to the positioning plasterboard Make;Or, after the indication signal received, the time for postponing setting holds to the positioning plasterboard again Row rupturing operation.
12. the production system as described in any in claim 7-10, it is characterised in that:
The detection means detects the station location marker, including:The first of one-time continuous production process Before secondary cut-out, the station location marker is detected;Or, in once connection production process, for the first time Before cut-out, and the time cycle set is then, detects the station location marker.
CN201610042126.4A 2016-01-21 2016-01-21 A kind of production method and production system for positioning plasterboard Pending CN106985266A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610042126.4A CN106985266A (en) 2016-01-21 2016-01-21 A kind of production method and production system for positioning plasterboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610042126.4A CN106985266A (en) 2016-01-21 2016-01-21 A kind of production method and production system for positioning plasterboard

Publications (1)

Publication Number Publication Date
CN106985266A true CN106985266A (en) 2017-07-28

Family

ID=59414282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610042126.4A Pending CN106985266A (en) 2016-01-21 2016-01-21 A kind of production method and production system for positioning plasterboard

Country Status (1)

Country Link
CN (1) CN106985266A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112078017A (en) * 2020-08-11 2020-12-15 故城北新建材有限公司 Control device, system and method for gypsum board production line
CN113478635A (en) * 2021-06-18 2021-10-08 淮南北新建材有限公司 Automatic package placing system and operation method thereof
CN113589768A (en) * 2021-07-29 2021-11-02 湖北北新建材有限公司 Three-control system for processing finished product after gypsum board is dried and control method
CN114274347A (en) * 2021-12-28 2022-04-05 北新建材(天津)有限公司 Gypsum board base plate apparatus for producing

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1570328A (en) * 2004-04-26 2005-01-26 林常胜 Paper faced plaster tablet with mounting location spos and production method thereof
CN1587587A (en) * 2004-08-24 2005-03-02 孙小力 Paper surface gypsum plate having mounting positioning line and producing method
JP2009154315A (en) * 2007-12-25 2009-07-16 Koichi Hirata Method for producing gypsum board
CN102873768A (en) * 2012-10-25 2013-01-16 河南天丰节能板材科技股份有限公司 Automatic composite board cutting method and special cutting device used therein
CN103287045A (en) * 2013-05-21 2013-09-11 曾庆举 Gypsum board mask paper with construction grids and gypsum plaster board
CN203257022U (en) * 2013-05-21 2013-10-30 曾庆举 Gypsum board surface protecting paper with construction square grid and gypsum plaster board
CN103806625A (en) * 2014-01-30 2014-05-21 孙小力 Gypsum plaster board with construction positioning lines or grids and manufacturing technological method of gypsum plaster board
CN203783039U (en) * 2014-01-30 2014-08-20 孙小力 Gypsum plaster board with construction position lines or grids
CN104805974A (en) * 2015-04-16 2015-07-29 肯特河北建材有限公司 Gypsum plaster board with convenient construction advantage

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1570328A (en) * 2004-04-26 2005-01-26 林常胜 Paper faced plaster tablet with mounting location spos and production method thereof
CN1587587A (en) * 2004-08-24 2005-03-02 孙小力 Paper surface gypsum plate having mounting positioning line and producing method
JP2009154315A (en) * 2007-12-25 2009-07-16 Koichi Hirata Method for producing gypsum board
CN102873768A (en) * 2012-10-25 2013-01-16 河南天丰节能板材科技股份有限公司 Automatic composite board cutting method and special cutting device used therein
CN103287045A (en) * 2013-05-21 2013-09-11 曾庆举 Gypsum board mask paper with construction grids and gypsum plaster board
CN203257022U (en) * 2013-05-21 2013-10-30 曾庆举 Gypsum board surface protecting paper with construction square grid and gypsum plaster board
CN103806625A (en) * 2014-01-30 2014-05-21 孙小力 Gypsum plaster board with construction positioning lines or grids and manufacturing technological method of gypsum plaster board
CN203783039U (en) * 2014-01-30 2014-08-20 孙小力 Gypsum plaster board with construction position lines or grids
CN104805974A (en) * 2015-04-16 2015-07-29 肯特河北建材有限公司 Gypsum plaster board with convenient construction advantage

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112078017A (en) * 2020-08-11 2020-12-15 故城北新建材有限公司 Control device, system and method for gypsum board production line
CN113478635A (en) * 2021-06-18 2021-10-08 淮南北新建材有限公司 Automatic package placing system and operation method thereof
CN113589768A (en) * 2021-07-29 2021-11-02 湖北北新建材有限公司 Three-control system for processing finished product after gypsum board is dried and control method
CN114274347A (en) * 2021-12-28 2022-04-05 北新建材(天津)有限公司 Gypsum board base plate apparatus for producing
CN114274347B (en) * 2021-12-28 2023-10-27 北新建材(天津)有限公司 Gypsum board base plate apparatus for producing

Similar Documents

Publication Publication Date Title
CN106985266A (en) A kind of production method and production system for positioning plasterboard
KR102282426B1 (en) Apparatus and method for the production of gypsum board
US4858402A (en) Building board, particularly gypsum plasterboard
CA2994689C (en) System and method for manufacturing cementitious boards with on-line void detection
CN101346046B (en) Plastering apparatus and method for printed circuit board
CN105729620A (en) Brick making machine
CN105358965A (en) Sizing defect detection system and sizing defect detection method
CN205521892U (en) Shutting -off system of location gypsum board
CN205071471U (en) Two -sided laminating reinforcement tool of flexible line way board
CA2946371C (en) Gypsum hardened body, gypsum panel, method for manufacturing gypsum hardened body, and method for manufacturing gypsum board
WO2014061308A1 (en) Method for detecting voids in gypsum-based construction board and method for producing gypsum-based construction board
CN205660868U (en) Brick molding machine
CN207321649U (en) Flexible circuit board target shooting machine
CN107338931A (en) The mounting structure and installation method of wallboard
CN202498355U (en) Sheet material automatic forming machine
CN206678388U (en) The online thermal transfer warpage preventing system of PVC foam plate
CN209793111U (en) Automatic assembly line for bottom frame production of cooling tower
KR100463664B1 (en) Manufacturing method of metallic switch box for conduit pipe and it's handling mechanism
CN206886073U (en) Automatic feeding
KR20160116433A (en) Multi-type auto system for manufacturing aluminum form
CN106044220A (en) Substrate conveying apparatus
CN108724582A (en) A kind of production system and production technology of integral bathroom wallboard
CN106145844A (en) Improved magnesium oxide-based building board and manufacture method thereof
CN104378919B (en) A kind of production method of rule composing reinforcing chip
CN104378918B (en) A kind of production equipment of rule composing reinforcing chip

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170728