It is mobile device-based to reconnoitre project field work data reporting method and system
Technical field
The present invention relates to it is a kind of it is mobile device-based reconnoitre project field work data reporting method and system, belong to mine
Produce resource outdoors exploration job information technical field.
Background technique
Reconnoitre project field work progress data digitlization report be mineral resources job information a basis
Link is play an important role during the production practices that number is reconnoitred.Previous reconnoitres project reporting system, needs to be based on
Internet fills in reported data, it is difficult to adapt to the remote field work condition for reconnoitring area.It is not carried out the self-identifying pipe of permission
Reason, since this disadvantage reduces so that passing reporting system is very chaotic to the use of the different actual functional capabilities of roles at different levels
The efficiency actually reported.And previous reporting system does not provide the means of auxiliary typing in project data Input Process,
The efficiency of typing is relatively low.Previous reporting system does not carry out at a unified filing data after data report
Reason, has given filing-up work to user and has voluntarily analyzed filing, very waste of manpower, while also not can guarantee correctness.And with
Past reporting system does not carry out visual analysis and management to the data reported, and intuitive project can not be provided for user
Situation.
Summary of the invention
In order to solve the deficiencies in the prior art, mobile device-based project field work is reconnoitred the present invention provides a kind of
Data reporting method and system can be avoided the confusion of distribution with the management of user rights at different levels, can not assist typing and can not
Automatically classifying and filing save and can not visual analyzing and management data deficiency, realization can make full use of to user by reality
Border production requirement carries out authority distribution and management, and realizes checking and transmitting between multi-layer to project report data are reconnoitred,
Auxiliary typing is provided for user simultaneously, automatically classifying and filing saves and visually analyzes and management data.
The present invention is that technical solution used by solving its technical problem is:Provide a kind of mobile device-based reconnoitre
Project field work data reporting method, includes the following steps:
(1) if not obtaining account, in client-side editing user data, registration request is sent to server, is waited pending
Pass through;If existing account, user end to server send logon information, enter step (2);
(2) server judges user right rank according to logon information, if user right is that project process reports permission,
(3) carry out project is entered step to report;If user right is that audit summarizes permission, enters step (4) and audit and summarize;If
User right is monthly magazine search access right, then enters step (5) and carry out monthly magazine inquiry;If user right is administrator right, into
Enter step (6) and carries out system administration;
(3) project reports:Client selection grassroot project or modification have project and create new projects if grassroot project
And entry item data, project data is then uploaded to server;If modifying existing project, deposited in Remote Open server
The existing project of storage, online modification are simultaneously saved to server;Server is tentatively converged the project data being arranged in the period
Always;
(4) audit summarizes:Client remote is opened in server by the project data tentatively summarized, chooses whether to carry out
Editor saves after editing to the project data tentatively summarized to server if being edited;Otherwise it directly saves preliminary
The project data summarized;
(5) monthly magazine is inquired:Client remote opens the project data summarized in server by audit, checks global project
Situation, every team's project situation and projects situation, and analyze it and examine;
(6) system administration:Client remote opens the project data summarized in server by audit, checks global project
Situation, every team's project situation and projects situation, and analyze it and examine;Registration request is sent in audit server
User data.
It is existing by according to keywords retrieval when the existing project stored in step (3) the Remote Open server
Project;When entry item data and online modification, it is index key according to the value actually entered in field, searches for client automatically
The project data for holding the local field institute typing, presented in the form of combobox according to matching degree data field contents for
Selection.
Step (3) is described tentatively to summarize, including project data is carried out automatically classifying and filing according to unit is reconnoitred.
Step (4) is described the project data tentatively summarized is edited after save to server, specifically include following mistake
Journey:Index key, the item that group subordinate project leader has been filed in Auto-matching server are referred to as according to group's name
Mesh number evidence, and present on the client;It modifies and audits to project data;To finally audit amended report data to
Server, which uploads, to be submitted.
When checking global project situation, every team's project situation and projects situation described in step (5), client is searched automatically
The project data that all groups submit in rope server is presented in client, and carry out histogram and cake chart to project data into
Row visual analyzing.
The user data of registration request is sent in step (6) the audit server, including client obtains service automatically
The user data of registration request is had been filed in device, carries out authority distribution, and examination & approval pass through.
Invention also provides a kind of to reconnoitre project field work data reporting system, including position based on the above method
In the project reporting module of client, audit summarizing module, monthly magazine enquiry module and administrator module, and positioned at server
Server database and preliminary summarizing module, the project reporting module, audit summarizing module, monthly magazine enquiry module and administrator
Respectively with server database by wireless network connection, the preliminary summarizing module directly connects with server database module
It connects.
The project reporting module is equipped with data referencing submodule, automatic computational submodule and fuzzy search submodule,
Middle data referencing submodule is used to using project name be major key automatically in server database belonging to matching entries title
The project data that project last month submits, is downloaded and Auto-writing is in client;The automatic computational submodule is used for entry name
Referred to as major key all items data of the affiliated project of matching entries title in the current year in server database automatically, under
It carries and calculates all data index automatically in client, then show;The fuzzy search submodule be used for field data into
During row typing, the field or similar field data that matching client was filled in carry out fuzzy search.
The all data index include probing rice number, drilling number, industrial hole number, mineralising hole number and complete into
Degree.
The present invention is based on beneficial effects possessed by its technical solution to be:
(1) mobile device-based project field work data reporting method of reconnoitring of the invention utilizes mobile Internet,
Using intelligent mobile phone terminal, by cell phone application, it may be implemented to reconnoitre reporting for project process whenever and wherever possible, solve traditional
The project of reconnoitring reports the Dependence Problem to private network device;
(2) it is of the invention it is mobile device-based reconnoitre in project field work data reporting method and system, different visitors
Family end can be realized at unified APP, and system is by rights management, after logging in different users, automatically into permission pair
The end answered.System to user rights at different levels distribute with manage confusion, the system sufficiently investigated the project of reconnoitring report it is entire
Process actually reports the items function in process to project leader, institute of team team leader, unit leader, administrator's level Four role
And relevance allows reporting system for difference by the way that these functions and relevance are applied in reporting system
Functional authority user typing is provided, the different function privileges such as reports, audit, managing, analyzing so that entirely process is reported to have
The not disorderly progress of item substantially increases the efficiency reported, and there has also been reliably guarantee for the accuracy of each user's functional authority;
(3) the mobile device-based project field work data reporting method and system reconnoitred of the invention realizes automatically
Put on file saves and visual analyze analyzes the affiliated class of logging data by factual survey with management data, system
Not, data automatically can be subjected to Put on file according to affiliated rank, classification, attribute after user completes to edit and record, convenient for using
In checking and file preservation.Simultaneously by means of graphical means, part core data is visually operated, it is clear effective
It conveys and links up information in ground.Data are objective, clearly can express to user, at the same for further decision support establish it is good
Good basis;
(4) the mobile device-based project field work data reporting method and system reconnoitred of the invention can be applied to
Reconnoitring the digitlization of project field work progress data reports field and other data to report field, and system is installed on smart phone etc.
Project data and other project datas are included and are saved in database to realize, be remarkably improved and reconnoitre item by mobile device
The quality and efficiency that mesh report data reports.
Detailed description of the invention
Fig. 1 is the mobile device-based module frame chart for reconnoitring project field work data reporting system of the invention.
Fig. 2 is the mobile device-based analysis data category for reconnoitring project field work data reporting method of the invention
Schematic diagram.
Fig. 3 is the mobile device-based flow diagram for reconnoitring project field work data reporting method of the invention.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
The present invention provides it is a kind of it is mobile device-based reconnoitre project field work data reporting method, referring to Fig. 3, packet
Include following steps:
(1) if not obtaining account, in client-side editing user data, registration request is sent to server, is waited pending
Pass through;If existing account, account are divided into 4 kinds of clients used by a user, are respectively:Space in a newspaper in project, project leader fill out
Write reported data;Audit summarizes end, and group chief engineer summarizes each project data of audit and submits and report;Monthly magazine inquires end, geology
Office leader receives, checks and analyze reported data;System administration end, administrator have repertoire permission and can authorize to user
Audit, different ends are realized under unified client, by rights management, after logging in different users, automatically into permission
Corresponding end;User end to server sends logon information, enters step (2);
(2) server judges user right rank according to logon information, if user right is that project process reports permission,
(3) carry out project is entered step to report;If user right is that audit summarizes permission, enters step (4) and audit and summarize;If
User right is monthly magazine search access right, then enters step (5) and carry out monthly magazine inquiry;If user right is administrator right, into
Enter step (6) and carries out system administration;
(3) project reports:Grassroot project is selected on the interface of client or modifies existing project, if grassroot project,
New projects and entry item data are created, project data is then uploaded to server;If modifying existing project, Remote Open
The existing project stored in server, online modification are simultaneously saved to server;The project data in the period will be arranged in server
Tentatively summarized;
When the existing project stored in Remote Open server, has project by according to keywords retrieval;Fill in item
It is index key, the local word of automatic search client according to the value actually entered in field when mesh number evidence and online modification
The project data of section institute typing, it is for selection that data field contents are presented according to matching degree in the form of combobox;Such as:
In 1 year exploration project implementation process, project name, annual task dispatching data will not be changed under normal circumstances, therefore
In this monthly report data is filled in, the automatic project name quoted in report of upper month, annual task dispatching data, and support
Modification;In report data totaling in data include probing, hole count, industry hole count, mineralising hole count, completed percentage number
According to;
Wherein total probing=∑ (this month completes probing);
Accumulative hole count=∑ (this month completes hole count);
Hole count=industry hole count+mineralising hole count+other hole counts;
Completed percentage=total probing/year task.
It is described tentatively to summarize referring to Fig. 2, including by project data according to reconnoitring unit progress automatically classifying and filing, then into
One step analyzes data category, and project data is divided into evaluation data, looks into data, census data, aberration data in advance, while to this year
Spend full unit project summarize data, institute of every team close item purpose is calculated automatically and is classified preservation.
(4) audit summarizes:Client remote is opened in server by the project data tentatively summarized, chooses whether to carry out
Editor saves after editing to the project data tentatively summarized to server if being edited;Otherwise it directly saves preliminary
The project data summarized;
It states and saves after being edited to the project data tentatively summarized to server, specifically include following procedure:According to big
Team's name is referred to as index key, the project data that group subordinate project leader has been filed in Auto-matching server, and
The core informations such as drilling situation, project process are intuitively presented in the form of related graph on the client;To item number
According to modifying and audit;Amended report data will finally be audited and upload submission to server.
(5) monthly magazine is inquired:Client remote opens the project data summarized in server by audit, checks global project
Situation, every team's project situation and projects situation, and analyze it and examine;
When checking global project situation, every team's project situation and projects situation, in the automatic search server of client
The project data (including mine situation and drilling Percent Complete are shown in probing) that all groups submit is presented in client, and carries out column
Shape figure and cake chart carry out visual analyzing to project data.
(6) system administration:Client remote opens the project data summarized in server by audit, checks global project
Situation, every team's project situation and projects situation, and analyze it and examine, including the use of histogram, cake chart pair
The data such as aperture situation, project process are visually analyzed;Audit the user data that registration request is sent in server.
The user data of registration request is sent in the audit server, including client is obtained in server automatically and mentioned
The user data of registration request is handed over, authority distribution is carried out, examination & approval pass through.
Invention also provides a kind of to reconnoitre project field work data reporting system based on the above method, referring to figure
1, including project reporting module, audit summarizing module, monthly magazine enquiry module and the administrator module positioned at client, and it is located at
The server database of server and preliminary summarizing module, the project reporting module, audit summarizing module, monthly magazine enquiry module
With administrator module respectively with server database by wireless network connection, the preliminary summarizing module is directly and server count
It is connected according to library.
The project reporting module is equipped with data referencing submodule, automatic computational submodule and fuzzy search submodule,
Middle data referencing submodule is used to using project name be major key automatically in server database belonging to matching entries title
The project data that project last month submits, is downloaded and Auto-writing is in client;The automatic computational submodule is used for entry name
Referred to as major key all items data of the affiliated project of matching entries title in the current year in server database automatically, under
It carries and calculates all data index automatically in client, then show;The fuzzy search submodule be used for field data into
During row typing, the field or similar field data that matching client was filled in carry out fuzzy search.
The all data index include probing rice number, drilling number, industrial hole number, mineralising hole number and complete into
Degree.
The present invention reports field and other data to report field applied to the digitlization of project field work progress data is reconnoitred,
System is installed on the mobile devices such as smart phone, but is not limited only to mobile device.It is mobile device-based to reconnoitre project data number
Word reports, and is a kind of important improvement to traditional-handwork data reporting schemes.This brand-new reporting schemes, be by using
The mobile device for reconnoitring project data reporting system is installed, project data and other project datas are included and is saved in data
It is realized in library, is remarkably improved the quality and efficiency for reconnoitring that project report data report.