CN104820900A - Earthquake acquisition management system and method through technology of network cloud - Google Patents

Earthquake acquisition management system and method through technology of network cloud Download PDF

Info

Publication number
CN104820900A
CN104820900A CN201510248757.7A CN201510248757A CN104820900A CN 104820900 A CN104820900 A CN 104820900A CN 201510248757 A CN201510248757 A CN 201510248757A CN 104820900 A CN104820900 A CN 104820900A
Authority
CN
China
Prior art keywords
data
cloud server
navigation
management
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510248757.7A
Other languages
Chinese (zh)
Inventor
孙素梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510248757.7A priority Critical patent/CN104820900A/en
Publication of CN104820900A publication Critical patent/CN104820900A/en
Pending legal-status Critical Current

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention relates to an earthquake acquisition management system and method through the technology of network cloud. The system comprises a cloud server, a computer main system, an acquisition and navigation client, a well-drilling management client, a blasting management client, and a supervising management client. Through monitoring and recording the working conditions of all construction clients, managers at all stage achieve the management of the whole construction process. The system achieves the positioning and collection of construction data through GPS positioning in a process of construction, achieves the real-time monitoring of the whole construction process through the technology of network, unifies the dispatching, and achieves accurate and high-efficiency purposes.

Description

A kind of seismic acquisition network cloud management system and method
Technical field
The present invention relates to a kind of earthquake-capturing job execution network technology management system and method.
Background technology
Current geophysical survey earthquake-capturing adopts following methods:
1, commentator is according to Party A's requirement, designs theoretical SPS, calculates boundary of works area;
2, surveyor measures according to design SPS, and at design attitude, if can blow out, then piling mark pile No., comprises wire size, period, otherwise demarcates barrier, and the position can blown out on both sides, barrier as far as possible more surveys several point;
3, commentator carries out shot point offset design according to measurement result.Export the SPS that tentatively constructs;
4, related personnel makes an on-the-spot survey confirmation on the spot to preliminary construction SPS.Make marks in the position that can blow out, the position that can not blow out is displaced to other position.Deviation post, if not measuring point, so also needs survey crew to go to mend survey.Verification data report to explanation group;
5, commentator loads verification data, obtains the SPS that constructs.Printout recording geometry drawing;
6, drilling people is with reference to this recording geometry drawing wellbore construction.Drilling well supvr is to wellbore construction each shot point record drilling information; Collector is with reference to this recording geometry drawing payingoff construction; Explanation personnel on earthquake-capturing instrument, blow out SPS Data import.The personnel that blow out put big gun to the well drilling positions of construction;
When 7, occurring in wellbore construction process that well-digging can not be dug a well or forbid to certain reason, also need this point to be displaced to nearest rational position, if offset point is with pre-test mistake, directly write down pile No..If the point of skew is not at point position, then needs to mend survey by survey crew and find accurate location to offset a well;
When 8, to blow out in process if there is miso-fire (big gun that could not ignite), need drilling people to get back to miso-fire position and mend big gun;
9, blow out in work progress and find that certain acquisition station goes wrong, instrumentation person notifies the numbering of acquisition management person's acquisition station, and acquisition management person processes to relevant position;
10, after having constructed, HSE personnel check drilling well and blow out information, the shot point do not ignited is processed, removes a hidden danger.
This existing conventional construction method has following shortcoming:
1, in work progress, often run into commentator and design shot point and can not to dig a well the situation of blowing out, at this moment should shot point reasonably offset that position? according to the recording geometry drawing printed, design drawing is found the position that shot point can offset.After usually managerial personnel go to this position, just find not meet drilling well requirement condition, have to again find suitable position again;
2, field construction is on-the-spot complicated: the frequent village excessively in Plain, irrigation canals and ditches, river, highway, railway, factory and building.Qiu Ling, mountain area often need by ditch slope, river, the woods, bend etc.Night, construction not easily differentiated direction.Well-digging, blow out frequent cut-through district, not easily find next shot point position, affect construction speed;
3, often have in Plain measurement or after beating completion, peasant irrigates the fields, plough or construction gauge point is buried or destroyed to other factors.Ridge, mound, the mountain area drilling well firing interval time is longer, and blowing and raining etc. are often done working-yard changed beyond recognition, makes workmen be difficult to find shot point.Trees are dense in mountain area, and measuring point own is disguised large, and ditch slope is many, also often can not find shot point;
4, often occur that shot point does not have pile No., report an error the situations such as pile No., and especially in area with a varied topography, not easily pile No. is inferred in estimated distance and orientation;
5, instrument truck is explained personnel control blows out, drilling well situation by radio station, the mouth parched and tongue scorched of all crying out every day, not only arduous but also uninteresting, the time is long, easily makes mistakes;
6, often occurred that drilling well was more shallow, and drilling well has been put miso-fire or has been labeled as firework control big gun especially in mountain area in the past, HSE work does not process in time, causes potential safety hazard after having constructed, and also has some to have an ulterior motive, takes explosive and coerce construction team.These big guns do not have accurate location and electronic information, not easily find and process;
7, drilling effort is examined is the problem of more complicated, the workload that the workload of frequent drilling people's statistics and drilling well supvr add up is not inconsistent, the workload that the workload of drilling well supvr statistics and the supvr that blows out add up is not inconsistent, but can not arrive working-yard more again examines;
8, company leader, each construction team leader can not effectively supervise whole production run.
Along with the development of network technology, be that solution is promoted the use of and achieved very large development with network technology.Adopt network technology means to solve current seismic collection network cloud management deficiency, become a kind of effective technical scheme.
Summary of the invention
The present invention proposes a kind of new construction management theory, carries out network cloud technical management by internetwork management system to whole shooting crew earthquake-capturing process.Seismic acquisition network cloud management system of the present invention is located construction data positioning acquisition by GPS in work progress, is monitored in real time, unified allocation of resources, reach precise and high efficiency object by network technology to whole work progress.
Technical scheme provided by the invention is:
Seismic acquisition network cloud management system, comprising:
Cloud Server, comprises data management module, data transmission module; For carry user data, computer main system, gather navigation client, drilling well administrative client, blow out the data that administrative client, supervision and management client process upload, preserve, distribution related data;
Computer main system, comprises SIM, data processing module; For user and rights management, definition border, work area, loads SPS, measuring point data, well depth design data etc., generates, uploads work area map and navigation data to Cloud Server, blow out data from Cloud Server download user positional information, drilling well, statistics generates various form; Download each route of user track, browse track;
Gather navigation client, comprise SIM, data transmission module, collection navigation module; Gather navigation client and download work area map and navigation data from Cloud Server, GPS and electronic compass is utilized to navigate to acceptance point position, calculate the acceptance point pile No. of relevant position simultaneously, record acquisition management person route track, upload acquisition management person's positional information in real time to Cloud Server, download, show the positional information of whole acquisition management person from Cloud Server;
Drilling well administrative client, comprises SIM, data transmission module, well data processing module; Drilling well administrative client downloads work area map and navigation data from Cloud Server, utilize GPS and electronic compass navigation shot point position and record well data, calculate the shot point pile No. of relevant position, record drilling well supvr route track, upload drilling well supvr positional information in real time with the gerentocratic well data of this drilling well to Cloud Server, from Cloud Server download, show the gerentocratic positional information of whole drilling well, well data, data of blowing out;
Blow out administrative client, comprise SIM, data transmission module, blow out data processing module; Administrative client of blowing out downloads work area map and navigation data from Cloud Server, GPS and electronic compass navigation drilling completion position and record is utilized to blow out data, calculate the shot point pile No. of relevant position simultaneously, supvr's route track blown out in record, upload in real time blow out supvr's positional information and this blow out gerentocratic data of blowing out to Cloud Server, download from Cloud Server, show and all blow out gerentocratic positional information, well data, data of blowing out;
Supervision and management client, comprises SIM, data transmission module, information displaying and processing module; Supervision and management client, work area map, navigation data is downloaded from Cloud Server, utilize GPS and electronic compass navigation shot point, acceptance point position, in real time download acquisition management person, drilling well supvr from Cloud Server, blow out supvr's positional information and well data, data of blowing out, and process is carried out to above-mentioned data feed back to relative users.
Concrete, also comprise:
Computer monitor device clients, comprises SIM, data transmission module, information displaying and processing module; Computer monitor device clients, in real time download work area map from Cloud Server, also download acquisition management person, drilling well supvr, blow out supvr's positional information and well data, data of blowing out, monitoring construction speed, and above-mentioned data analysis process is uploaded, instruct instrument operator to blow out.
Concrete, described seismic acquisition network cloud management system is connected with earthquake-capturing instrument.
Present invention also offers seismic acquisition network cloud management method, comprise the following steps:
1) create shooting crew permitted sequence numbers by Cloud Server, create should the system manager user of shooting crew's permitted sequence numbers simultaneously;
2) log in Cloud Server with this shooting crew permitted sequence numbers and system manager's user identity by the connection of computer main system, create the user of this shooting crew corresponding permitted sequence numbers, according to user's function, give corresponding authority;
3) computer main system is by definition boundary of works area, creates work area map, the data such as designing load SPS, measuring point, well depth design, generates construction SPS, navigation data upload to Cloud Server.
4) drilling well management client downloads navigation data, in work progress, real-time upload location information is to Cloud Server, download whole drilling well supvr positional information simultaneously, utilize GPS, electronic compass to navigate display well construction location, Cloud Server is uploaded to each shot point real time record wellbore construction information in drilling process;
5) acquisition management client downloads gathers navigation data, utilize GPS, electronic compass to navigate and show collection construction location, form navigation way, real-time upload location information, to Cloud Server, receives whole acquisition management person's positional information simultaneously and is uploaded to Cloud Server;
6) administrative client unloading navigation-data is blown out, in work progress, real-time upload location information is to Cloud Server, receive simultaneously all blow out supvr's positional information, drilling well management client records drilling information, all blowing out supvr blows out information, utilize GPS, electronic compass navigation completion position, after enforcement is blown out, write down and blow out Construction State information and upload to Cloud Server;
7) navigation data work area map is downloaded to computer monitor device clients or supervision and management client simultaneously, real-time download acquisition management person, drilling well supvr, gerentocratic positional information of blowing out, real-time download well data and data of blowing out, carry out control and command.
Concrete, further comprising the steps of:
Computer main system obtains and gathers construction data, and statistics generates output report.
Concrete, further comprising the steps of:
The related data that earthquake-capturing instrument obtains is uploaded to Cloud Server in real time and is distributed to computer main system, supervision and management client, computer monitor device clients in real time; The data analysis process that computer main system, supervision and management client, computer monitor device clients obtain according to earthquake Acquisition Instrument, and Real-time Feedback relative users.
The present invention improves the level of earthquake-capturing management, reaches following effect:
1, system is by cloud, and the mobile device terminal of shooting crew's PC, Cloud Server, each construction trade is unified into an entirety.
In the mobile device terminal navigation procedure of 2, each construction trade, by the comprehensive use of GPS location, electronic compass, map, SPS data, easily meet field reconnaissance, acceptance point shot point is laid and looks for a needs.
3, drilling well, site operation data of blowing out, managed by cloud service system, realizes digital collection and cloud management.
4, instrument truck, explanation group, gather squad leader, drilling well squad leader, the staff such as squad leader, team leader, overseer, HSE leader that blow out blow out information from cloud server positional information, drilling well, carry out comprehensive real-time control and command, United Dispatching.
5, system has perfect user management, acts in accordance with the division of their functions and duties, for cooperation accomplishes fluently solid foundation.
6, can determine comparatively accurately to offset shot point position by mobile GPS and map, navigational system calculates display pile No. automatically, and skew can be made to look for a rate of accuracy reached more than 80%, and wire size, period rate of accuracy reached, to 100%, save labour turnover.
7, native system is by GPS, electronic compass navigation instruction, under tracking mode, no matter be drive or walking, cross the barriers such as expressway, railway, bridge, village, slope, ditch, the woods, no matter it is daytime or night, all can show looked for shot point/acceptance point in real time in active user orientation and distance, guide user to find point of destination fast.
8, accurately located by the portable mobile terminal of native system, can accurately arrive completion position, when being destroyed at the construction field (site), by scene of exploration, big gun line can being found, implement to blow out, and can accurately report wire size, pile No..
9, the portable mobile terminal of native system can calculate current location pile No. automatically, and the pile No. that reports an error phenomenon has been gone for ever.
10, by the computer monitor device clients on instrument truck or the portable mobile terminal of native system, have at fingertips to the personnel's of blowing out situation of putting in place, easily commander blows out, mends big gun operation, gathers the line inspection.
11, by the real-time each unit managerial personnel position of monitoring, class monitor and group leader can rational allocation, commands behind the scenes.
12, acquisition management person can send collector nearby to connect acquisition station in the shortest time, ensures construction quality.Also can monitor the work of collector to bit rate simultaneously, avoid situation slack in work.
13, the present invention is by contrast drilling well, data of blowing out, and easily can export correlation data, provides miso-fire and firework control big gun information quick and precisely to HSE staff, removes a hidden danger in time.
14, the present invention has drilling well accurately, blows out writing function.The workload of the workload of wellbore construction demographic, drilling well supvr statistics and workload three counterpart of the supvr that blows out statistics are really accomplished.
Blow out data acquisition user trajectory by record when 15, blowing out and can determine to blow out whether supvr arrives appointment shot point.
16, each construction trade client by the theoretical wire size of the work area grid element center point at this client current location place, period and depart from the wire size direction of grid element center position, period direction distance forms; After choosing impact point, system clearly points out this client and impact point distance.
17, in tracking mode, utilize GPS, electronic compass, geomagnetic declination, as long as keep flat, mobile device client shows the direction of position to impact point at current place all the time, and shows phase spacing, enter the prompting of certain distance range alarm.
18 these systems to each shot point from construction to blowing out the process terminated, various states is set: drilling well, drilled well, prepare to blow out, normally excite, miso-fire, forbid blowing out, other etc.Arranged by these states and drilling well, process of blowing out effectively are managed.
Accompanying drawing explanation
The framework map of Fig. 1 system of the present invention.
Embodiment
Seismic acquisition network cloud management system, comprising:
Cloud Server, comprises data management module, data transmission module; For carry user data, computer main system, gather navigation client, drilling well administrative client, blow out the data that administrative client, supervision and management client process upload, preserve, distribution related data;
Computer main system, comprises SIM, data processing module; For user and rights management, definition border, work area, loads SPS, measuring point data, well depth design data etc., generates, uploads work area map and navigation data to Cloud Server, blow out data from Cloud Server download user positional information, drilling well, statistics generates various form; Download each route of user track, browse track;
Gather navigation client, comprise SIM, data transmission module, collection navigation module; Gather navigation client and download work area map and navigation data from Cloud Server, GPS and electronic compass is utilized to navigate to acceptance point position, calculate the acceptance point pile No. of relevant position simultaneously, record acquisition management person route track, upload acquisition management person's positional information in real time to Cloud Server, download, show the positional information of whole acquisition management person from Cloud Server;
Drilling well administrative client, comprises SIM, data transmission module, well data processing module; Drilling well administrative client downloads work area map and navigation data from Cloud Server, utilize GPS and electronic compass navigation shot point position and record well data, calculate the shot point pile No. of relevant position, record drilling well supvr route track, upload drilling well supvr positional information in real time with the gerentocratic well data of this drilling well to Cloud Server, from Cloud Server download, show the gerentocratic positional information of whole drilling well, well data, data of blowing out;
Blow out administrative client, comprise SIM, data transmission module, blow out data processing module; Administrative client of blowing out downloads work area map and navigation data from Cloud Server, GPS and electronic compass navigation drilling completion position and record is utilized to blow out data, calculate the shot point pile No. of relevant position simultaneously, supvr's route track blown out in record, upload in real time blow out supvr's positional information and this blow out gerentocratic data of blowing out to Cloud Server, download from Cloud Server, show and all blow out gerentocratic positional information, well data, data of blowing out;
Supervision and management client, comprises SIM, data transmission module, information displaying and processing module; Supervision and management client, work area map, navigation data is downloaded from Cloud Server, utilize GPS and electronic compass navigation shot point, acceptance point position, in real time download acquisition management person, drilling well supvr from Cloud Server, blow out supvr's positional information and well data, data of blowing out, and process is carried out to above-mentioned data feed back to relative users;
Computer monitor device clients, comprises SIM, data transmission module, information displaying and processing module; Computer monitor device clients, in real time download work area map from Cloud Server, also download acquisition management person, drilling well supvr, blow out supvr's positional information and well data, data of blowing out, monitoring construction speed, and above-mentioned data analysis process is uploaded, instruct instrument operator to blow out.
Described seismic acquisition network cloud management system is connected with earthquake-capturing instrument.
Seismic acquisition network cloud management method, comprises the following steps:
1) create shooting crew permitted sequence numbers by Cloud Server, create should the system manager user of shooting crew's permitted sequence numbers simultaneously;
2) log in Cloud Server with this shooting crew permitted sequence numbers and system manager's user identity by the connection of computer main system, create the user of this shooting crew corresponding permitted sequence numbers, according to user's function, give corresponding authority;
3) computer main system is by definition boundary of works area, creates work area map, the data such as designing load SPS, measuring point, well depth design, generates construction SPS, navigation data upload to Cloud Server.
4) drilling well management client downloads navigation data, in work progress, real-time upload location information is to Cloud Server, download whole drilling well supvr positional information simultaneously, utilize GPS, electronic compass to navigate display well construction location, Cloud Server is uploaded to each shot point real time record wellbore construction information in drilling process;
5) acquisition management client downloads gathers navigation data, utilize GPS, electronic compass to navigate and show collection construction location, form navigation way, real-time upload location information, to Cloud Server, receives whole acquisition management person's positional information simultaneously and is uploaded to Cloud Server;
6) administrative client unloading navigation-data is blown out, in work progress, real-time upload location information is to Cloud Server, receive simultaneously all blow out supvr's positional information, drilling well management client records drilling information, all blowing out supvr blows out information, utilize GPS, electronic compass navigation completion position, after enforcement is blown out, write down and blow out Construction State information and upload to Cloud Server;
7) navigation data work area map is downloaded to computer monitor device clients or supervision and management client simultaneously, real-time download acquisition management person, drilling well supvr, gerentocratic positional information of blowing out, real-time download well data and data of blowing out, carry out control and command.
8) computer main system obtains and gathers construction data, and statistics generates output report.
9) related data that earthquake-capturing instrument obtains is uploaded to Cloud Server in real time and is distributed to computer main system, supervision and management client, computer monitor device clients in real time; The data analysis process that computer main system, supervision and management client, computer monitor device clients obtain according to earthquake Acquisition Instrument, and Real-time Feedback relative users.
This system to each shot point from construction to blowing out the process terminated, various states is set: blow out in drilling well, drilled well, preparation, normally excite, miso-fire, forbid blowing out, other etc.Arranged by these states and drilling well, process of blowing out effectively are managed.
This system according to circumstances can set different authorities to different work post user, and sets different data manipulation authorities to user of the same race.As acquisition management person, drilling well supvr, gerentocratic authority of blowing out are just different.As being set as that drilling well supvr, drilling well squad leader etc. are to adapt to the management expectancy of drilling well teams and groups construction to drilling well management classification.
When forbidding drilling well in wellbore construction process for a certain reason, utilize GPS location and electronic compass in conjunction with work area map, quick and precisely arrive nearest rational position drilling well.After completing, typing note drilling information, uploads to Cloud Server, reinforms survey crew benefit and surveys.
When to blow out in process if there is miso-fire (big gun that could not ignite), the supvr that blows out uploads miso-fire information in time to Cloud Server, and Cloud Server is forwarded to drilling well supvr, and drilling well supvr is quickly navigate to miso-fire position in time and mends big gun.Cloud Server is uploaded to after completing.
Blow out in work progress and find that certain acceptance point does not work, computer monitor device client end subscriber is by computer monitor device clients, find from the nearest acquisition management person of this point, notify that he goes to rectify and improve maintenance fast, guarantee that working path does not obtain recovering in time normal, simultaneously by positional information monitoring acquisition management person to bit rate and work quality.
Computer main system monitors whole production run simultaneously, obtains and gathers construction data, and statistics generates various form, comprises drilling well and blows out information contrast table.
After having constructed, HSE personnel, according to brill, information contrast table of blowing out, are printed the shot point do not ignited, are processed, remove a hidden danger.
All levels of management personnel are by the monitoring function of computer monitor device clients, supervision and management client, and the production of monitoring construction in real time overall process, carries out United Dispatching commander.

Claims (6)

1. seismic acquisition network cloud management system, is characterized in that, comprising:
Cloud Server, comprises data management module, data transmission module; For carry user data, computer main system, gather navigation client, drilling well administrative client, blow out the data that administrative client, supervision and management client process upload, preserve, distribution related data;
Computer main system, comprises SIM, data processing module; For user and rights management, definition border, work area, loads SPS, measuring point data, well depth design data etc., generates, uploads work area map and navigation data to Cloud Server, blow out data from Cloud Server download user positional information, drilling well, statistics generates various form; Download each route of user track, browse track;
Gather navigation client, comprise SIM, data transmission module, collection navigation module; Gather navigation client and download work area map and navigation data from Cloud Server, GPS and electronic compass is utilized to navigate to acceptance point position, calculate the acceptance point pile No. of relevant position simultaneously, record acquisition management person route track, upload acquisition management person's positional information in real time to Cloud Server, download, show the positional information of whole acquisition management person from Cloud Server;
Drilling well administrative client, comprises SIM, data transmission module, well data processing module; Drilling well administrative client downloads work area map and navigation data from Cloud Server, utilize GPS and electronic compass navigation shot point position and record well data, calculate the shot point pile No. of relevant position, record drilling well supvr route track, upload drilling well supvr positional information in real time with the gerentocratic well data of this drilling well to Cloud Server, from Cloud Server download, show the gerentocratic positional information of whole drilling well, well data, data of blowing out;
Blow out administrative client, comprise SIM, data transmission module, blow out data processing module; Administrative client of blowing out downloads work area map and navigation data from Cloud Server, GPS and electronic compass navigation drilling completion position and record is utilized to blow out data, calculate the shot point pile No. of relevant position simultaneously, supvr's route track blown out in record, upload in real time blow out supvr's positional information and this blow out gerentocratic data of blowing out to Cloud Server, download from Cloud Server, show and all blow out gerentocratic positional information, well data, data of blowing out;
Supervision and management client, comprises SIM, data transmission module, information displaying and processing module; Supervision and management client, work area map, navigation data is downloaded from Cloud Server, utilize GPS and electronic compass navigation shot point, acceptance point position, in real time download acquisition management person, drilling well supvr from Cloud Server, blow out supvr's positional information and well data, data of blowing out, and process is carried out to above-mentioned data feed back to relative users.
2. seismic acquisition network cloud management system according to claim 1, is characterized in that, also comprise:
Computer monitor device clients, comprises SIM, data transmission module, information displaying and processing module; Computer monitor device clients, in real time download work area map from Cloud Server, also download acquisition management person, drilling well supvr, blow out supvr's positional information and well data, data of blowing out, monitoring construction speed, and above-mentioned data analysis process is uploaded, instruct instrument operator to blow out.
3. seismic acquisition network cloud management system according to claim 1, it is characterized in that, described seismic acquisition network cloud management system is connected with earthquake-capturing instrument.
4. seismic acquisition network cloud management method, is characterized in that, comprises the following steps:
1) create shooting crew permitted sequence numbers by Cloud Server, create should the system manager user of shooting crew's permitted sequence numbers simultaneously;
2) log in Cloud Server with this shooting crew permitted sequence numbers and system manager's user identity by the connection of computer main system, create the user of this shooting crew corresponding permitted sequence numbers, according to user's function, give corresponding authority;
3) computer main system is by definition boundary of works area, creates work area map, the data such as designing load SPS, measuring point, well depth design, generates construction SPS, navigation data upload to Cloud Server;
4) drilling well management client downloads navigation data, in work progress, real-time upload location information is to Cloud Server, download whole drilling well supvr positional information simultaneously, utilize GPS, electronic compass to navigate display well construction location, Cloud Server is uploaded to each shot point real time record wellbore construction information in drilling process;
5) acquisition management client downloads gathers navigation data, utilize GPS, electronic compass to navigate and show collection construction location, form navigation way, real-time upload location information, to Cloud Server, receives whole acquisition management person's positional information simultaneously and is uploaded to Cloud Server;
6) administrative client unloading navigation-data is blown out, in work progress, real-time upload location information is to Cloud Server, receive simultaneously all blow out supvr's positional information, drilling well management client records drilling information, all blowing out supvr blows out information, utilize GPS, electronic compass navigation completion position, after enforcement is blown out, write down and blow out Construction State information and upload to Cloud Server;
7) navigation data, work area map are downloaded to computer monitor device clients or supervision and management client simultaneously, real-time download acquisition management person, drilling well supvr, gerentocratic positional information of blowing out, real-time download well data and data of blowing out, carry out control and command.
5. seismic acquisition network cloud management method according to claim 4, is characterized in that, further comprising the steps of:
Computer main system obtains and gathers construction data, and statistics generates output report.
6. seismic acquisition network cloud management method according to claim 4, is characterized in that, further comprising the steps of:
The related data that earthquake-capturing instrument obtains is uploaded to Cloud Server in real time and is distributed to computer main system, supervision and management client, computer monitor device clients in real time; The data analysis process that computer main system, supervision and management client, computer monitor device clients obtain according to earthquake Acquisition Instrument, and Real-time Feedback relative users.
CN201510248757.7A 2015-05-17 2015-05-17 Earthquake acquisition management system and method through technology of network cloud Pending CN104820900A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510248757.7A CN104820900A (en) 2015-05-17 2015-05-17 Earthquake acquisition management system and method through technology of network cloud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510248757.7A CN104820900A (en) 2015-05-17 2015-05-17 Earthquake acquisition management system and method through technology of network cloud

Publications (1)

Publication Number Publication Date
CN104820900A true CN104820900A (en) 2015-08-05

Family

ID=53731186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510248757.7A Pending CN104820900A (en) 2015-05-17 2015-05-17 Earthquake acquisition management system and method through technology of network cloud

Country Status (1)

Country Link
CN (1) CN104820900A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401556A (en) * 2016-09-30 2017-02-15 中国石油天然气股份有限公司 Cloud platform and method for drilling supervision
CN106597558A (en) * 2017-01-17 2017-04-26 桂林电子科技大学 Cross-hole CT automatic acquisition and remote monitoring system
CN106982251A (en) * 2017-03-10 2017-07-25 中国地质大学(武汉) Project field work data reporting method and system are reconnoitred based on mobile device
CN107784487A (en) * 2017-11-14 2018-03-09 浙江交工高等级公路养护有限公司 Data processing method and system
CN108984782A (en) * 2018-07-25 2018-12-11 华北水利水电大学 A kind of hydrographic water resource data directory generation system and method
CN112987603A (en) * 2019-12-02 2021-06-18 中国石油化工集团有限公司 Node seismic instrument remote monitoring system based on GPRS

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006014724A2 (en) * 2004-07-20 2006-02-09 Global Precision Solutions, Llp Precision gps driven utility asset management and utility damage prevention system and method
CN104155683A (en) * 2013-05-14 2014-11-19 中国石油集团东方地球物理勘探有限责任公司 Seismic source monitoring method in efficient acquisition
CN104516322A (en) * 2013-09-27 2015-04-15 中国石油集团东方地球物理勘探有限责任公司 Controllable epicenter non-stake mark work method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006014724A2 (en) * 2004-07-20 2006-02-09 Global Precision Solutions, Llp Precision gps driven utility asset management and utility damage prevention system and method
CN104155683A (en) * 2013-05-14 2014-11-19 中国石油集团东方地球物理勘探有限责任公司 Seismic source monitoring method in efficient acquisition
CN104516322A (en) * 2013-09-27 2015-04-15 中国石油集团东方地球物理勘探有限责任公司 Controllable epicenter non-stake mark work method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401556A (en) * 2016-09-30 2017-02-15 中国石油天然气股份有限公司 Cloud platform and method for drilling supervision
CN106597558A (en) * 2017-01-17 2017-04-26 桂林电子科技大学 Cross-hole CT automatic acquisition and remote monitoring system
CN106982251A (en) * 2017-03-10 2017-07-25 中国地质大学(武汉) Project field work data reporting method and system are reconnoitred based on mobile device
CN107784487A (en) * 2017-11-14 2018-03-09 浙江交工高等级公路养护有限公司 Data processing method and system
CN108984782A (en) * 2018-07-25 2018-12-11 华北水利水电大学 A kind of hydrographic water resource data directory generation system and method
CN112987603A (en) * 2019-12-02 2021-06-18 中国石油化工集团有限公司 Node seismic instrument remote monitoring system based on GPRS

Similar Documents

Publication Publication Date Title
CN104820900A (en) Earthquake acquisition management system and method through technology of network cloud
US11501483B2 (en) Removable sensor payload system for unmanned aerial vehicle performing media capture and property analysis
CN103748318B (en) Horizontal directional drilling system including sonde position detection using global positioning systems
Marjoribanks Geological methods in mineral exploration and mining
CN104141483B (en) Digital drilling control method and system for open-pit deep hole blasting
CN108090610A (en) Orbit construction system based on BIM technology
WO2006014724A2 (en) Precision gps driven utility asset management and utility damage prevention system and method
CN205940550U (en) Unmanned aerial vehicle measures equipment of side slope and foundation ditch excavation volume
CN109685704A (en) Pipe network cruising inspection system based on VR
KR102610423B1 (en) Blasting design device, blasting system and operation method of the same
CN103632509A (en) GIS (geographic information system) based digital and intelligent mine alarm linkage method and platform thereof
WO2023203389A1 (en) A method for generating an automated survey and analysis of an opencast mine using an unmanned aerial vehicle
CN109853580B (en) Open cut foundation pit construction management method based on photogrammetry
Stalin et al. Application of UAV Remote Sensing Technology for Sand Quarry Volumetric Audit and Environmental Impact Assessment: A Case Study Done in Neyvasal Sand Quarry, Cuddalore District, Tamil Nadu—India
CN103938605B (en) Large-area soft ground and water conservancy project structure automatic monitoring system
KR100390600B1 (en) Apparatus for monitoring woodfire and position pursuit and a method for operating the same
AU2012391717B2 (en) Projection device
Li [Retracted] Application of Multimedia Tilt Photogrammetry Technology Based on Unmanned Aerial Vehicle in Geological Survey
Gil et al. Optimization of the location of observation network points in open-pit mining’s
CN108253945A (en) Landslide analysis method based on unmanned plane
Arbanas et al. Remote monitoring of a landslide using an integration of GPS, TPS and conventional geotechnical monitoring methods
JP2017145686A (en) Shovel
CN204252102U (en) Soft foundation and water conservancy project structure automatic monitoring system
Tang et al. Research on Digital Monitoring Technology for Airport High-Pressure Rotary Jet Piles
CN116050952B (en) Surface mine ecological restoration management evaluation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150805