CN106930476A - A kind of Weng Ding Was old countries house is with natural couch grass tile laying method - Google Patents
A kind of Weng Ding Was old countries house is with natural couch grass tile laying method Download PDFInfo
- Publication number
- CN106930476A CN106930476A CN201710291331.9A CN201710291331A CN106930476A CN 106930476 A CN106930476 A CN 106930476A CN 201710291331 A CN201710291331 A CN 201710291331A CN 106930476 A CN106930476 A CN 106930476A
- Authority
- CN
- China
- Prior art keywords
- couch grass
- tile
- grass tile
- natural
- cogongrass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D9/00—Roof covering by using straw, thatch, or like materials
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Cultivation Of Plants (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of Weng Ding Was old countries house with natural couch grass tile laying method, the Weng Ding Was old countries house is comprised the following steps that with natural couch grass tile laying method:S1:Keel laid, S2:Litter watt, S3:Multilayer is fixed, S4:Back timber is fixed, S5:Back timber is laid, S6:Top is fixed.The present invention is using coherent mating formation and couch grass tile can be mated formation on keel in layer, so that the effect of mating formation of couch grass tile is more preferable, more there is stereovision, top is by the way of couch grass tile bending covering simultaneously, can cause that couch grass tile is preferably fitted so that couch grass tile is greatly improved in the visual effect that roof is mated formation.
Description
Technical field
The present invention relates to natural couch grass tile technical field, the specially a kind of natural couch grass tile in Weng Ding Was old countries house
Laying method.
Background technology
Weng Ding Was old countries are an ecosystem clans on Lincang Was mountain, with excellent tourist resources, annual reception
Domestic and foreign tourists are up to 300,000 person-times.Due to the relative closure external plus village in history backward in economy for a long time, cause
The construction of Wa's local-style dwelling houses of wherein great nationality amorous feedings and the existing national regulation requirement of construction serious non-compliance.Through adjusting on the spot
Look into, the main feature following points of Weng Ding Was old countries local-style dwelling houses.Substantially timber structure is used, wherein with bottom stable breeding domestic animal,
Based on the dry bar timber structure that upper strata villager lives.The material that structure is used is essentially gathers materials on the spot, with pinus yunnanensis, Pinuns densata,
Based on chestnut, circle bamboo.Due to protection of the government to the forest reserves in recent years so that old long structural elements is substituted for for difficulty
Topic, is badly in need of the appearance and research of new material, and construction quality and the level of the craftsman of locality of old countries local-style dwelling houses have very big with experience
Relation, each village's level differs, and structure processing method differs, and node way differs, and causes the protection reinforcement of old countries i.e.
Need uniformity needs targetedly again.Made using cogongrass in building construction, the improvement making to cogongrass tile is for we
The problem being subjected to the old countries transformation of Weng Ding Was.Mating formation for couch grass tile is that we need the problem of solution simultaneously, more preferably
Effect of mating formation can be so that building for banda be more perfect.
The content of the invention
It is an object of the invention to provide a kind of Weng Ding Was old countries house natural couch grass tile laying method, father-in-law's fourth
Wa's old countries house is comprised the following steps that with natural couch grass tile laying method:
S1:Keel laid, carries out water-proofing treatment to roof in advance, is bonded on construction roof with tar felt/SBS, waterproof volume
Material overlaps the overlap joint for needing 200 ㎜, and then in the rough ground of waterproof layer upper berth longitudinal direction, the spacing between rough ground and rough ground is not
Less than 500 ㎜, horizontal rough ground is installed on longitudinal rough ground;
S2:Litter watt, after vertical and horizontal rough ground is installed, basecoat couch grass tile is set according to sequence, use 50
Number nailing gun carries out the fixation of first row couch grass tile, and then second layer covering ground floor 2/3rds region, fixes the second layer
Third layer, the 4th layer of fixation are carried out successively;
S3:Multilayer is fixed, and every layer of keel are needed disposably to be taped against position, and other direction pavings are carried out when being taped against at the middle and upper levels
If last time carries out top ending;
S4:Back timber is fixed, and top should be noted top nail intensive setting when finishing up, be adjusted according to width during ending
It is whole, pruned using scissors;
S5:Back timber is laid, and surrounding carries out being routed to back timber position according to same step, carries out the fixation on four sides, is the later stage
The fixation of top couch grass tile is ready;
S6:Top is fixed, and couch grass tile is carried out into bending treatment, and couch grass tile is clamped on into top, and couch grass tile two ends are fixed on
On keel, be compacted for cogongrass after terminating by fixation, and unnecessary part carries out pruning modes, is sprayed once from roof with water afterwards.
Preferably, the conventional laid process of the couch grass tile laying is every square metre 4.
Preferably, the couch grass tile is fixed on horizontal rough ground, and the every fixed nail spacing of cogongrass is not less than 300mm
One.
Preferably, if the roof is cylindrical type roof, then cogongrass can be split out from bamboo chip woven stripe, is worn with the rope made of hemp
String, then bundlees along cylinder outside.
The bamboo chip in couch grass tile need to only be cut when being cut to couch grass tile in the step S6, without being carried out to cogongrass
Cut.
Preferably, mat formation and need to use scissors to prune combing to the weeds on eaves and roof after finishing, after holding is mated formation
Cogongrass tile it is uniform.
Preferably, not only can carry out cogongrass tile using No. 50 nailing guns in the step S2 to fix, while can also adopt
It is fixed with iron nail.
Preferably, the specification for mating formation the cogongrass tile for using be 500 × 800 millimeters, thickness be 30 millimeters, or
1000 × 1100 millimeters, thickness be 50 millimeters.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention using it is coherent in layer mat formation can
Mat formation on keel with by couch grass tile so that the effect of mating formation of couch grass tile is more preferable, more with stereovision, while top uses thatch
The mode of grass watt bending covering, can cause that couch grass tile is preferably fitted so that couch grass tile is big in the visual effect that roof is mated formation
It is big to improve.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with specific embodiment, to this
Invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, not
For limiting the present invention.
Embodiment 1
Use natural with natural couch grass tile laying method, the Weng Ding Was old countries house in a kind of Weng Ding Was old countries house
Couch grass tile laying method is comprised the following steps that:
S1:Keel laid, carries out water-proofing treatment to roof in advance, is bonded on construction roof with tar felt/SBS, waterproof volume
Material overlaps the overlap joint for needing 200 ㎜, and then in the rough ground of waterproof layer upper berth longitudinal direction, the spacing between rough ground and rough ground is not
Less than 500 ㎜, horizontal rough ground is installed on longitudinal rough ground;
S2:Litter watt, after vertical and horizontal rough ground is installed, basecoat couch grass tile is set according to sequence, use 50
Number nailing gun carries out the fixation of first row couch grass tile, and then second layer covering ground floor 2/3rds region, fixes the second layer
Third layer, the 4th layer of fixation are carried out successively;
S3:Multilayer is fixed, and every layer of keel are needed disposably to be taped against position, and other direction pavings are carried out when being taped against at the middle and upper levels
If last time carries out top ending;
S4:Back timber is fixed, and top should be noted top nail intensive setting when finishing up, be adjusted according to width during ending
It is whole, pruned using scissors;
S5:Back timber is laid, and surrounding carries out being routed to back timber position according to same step, carries out the fixation on four sides, is the later stage
The fixation of top couch grass tile is ready;
S6:Top is fixed, and couch grass tile is carried out into bending treatment, and couch grass tile is clamped on into top, and couch grass tile two ends are fixed on
On keel, be compacted for cogongrass after terminating by fixation, and unnecessary part carries out pruning modes, is sprayed once from roof with water afterwards.
The conventional laid process of the couch grass tile laying is every square metre 4.The couch grass tile is fixed on horizontal rough ground, every
The fixed nail spacing of cogongrass is not less than 300mm mono-.If the roof is cylindrical type roof, then cogongrass can be compiled from bamboo chip
Knit in bar and split out, string is worn with the rope made of hemp, then bundled along cylinder outside.Only needed when being cut to couch grass tile in the step S6
Bamboo chip in couch grass tile is cut, without being cut to cogongrass.Mat formation needed to use after finishing scissors to eaves and
The weeds on roof prune combing, and the cogongrass tile after holding is mated formation is uniform.The specification of the cogongrass tile for using of mating formation
500 × 800 millimeters, thickness be 30 millimeters.
Embodiment 2
Use natural with natural couch grass tile laying method, the Weng Ding Was old countries house in a kind of Weng Ding Was old countries house
Couch grass tile laying method is comprised the following steps that:
S1:Keel laid, carries out water-proofing treatment to roof in advance, is bonded on construction roof with tar felt/SBS, waterproof volume
Material overlaps the overlap joint for needing 200 ㎜, and then in the rough ground of waterproof layer upper berth longitudinal direction, the spacing between rough ground and rough ground is not
Less than 500 ㎜, horizontal rough ground is installed on longitudinal rough ground;
S2:Litter watt, after vertical and horizontal rough ground is installed, basecoat couch grass tile is set according to sequence, use iron
Nail carries out the fixation of first row couch grass tile, and then second layer covering ground floor 2/3rds region, fixes the second layer and enter successively
Row third layer, the 4th layer of fixation;
S3:Multilayer is fixed, and every layer of keel are needed disposably to be taped against position, and other direction pavings are carried out when being taped against at the middle and upper levels
If last time carries out top ending;
S4:Back timber is fixed, and top should be noted top nail intensive setting when finishing up, be adjusted according to width during ending
It is whole, pruned using scissors;
S5:Back timber is laid, and surrounding carries out being routed to back timber position according to same step, carries out the fixation on four sides, is the later stage
The fixation of top couch grass tile is ready;
S6:Top is fixed, and couch grass tile is carried out into bending treatment, and couch grass tile is clamped on into top, and couch grass tile two ends are fixed on
On keel, be compacted for cogongrass after terminating by fixation, and unnecessary part carries out pruning modes, is sprayed once from roof with water afterwards.
The conventional laid process of the couch grass tile laying is every square metre 4.The couch grass tile is fixed on horizontal rough ground, every
The fixed nail spacing of cogongrass is not less than 300mm mono-.If the roof is cylindrical type roof, then cogongrass can be compiled from bamboo chip
Knit in bar and split out, string is worn with the rope made of hemp, then bundled along cylinder outside.Only needed when being cut to couch grass tile in the step S6
Bamboo chip in couch grass tile is cut, without being cut to cogongrass.Mat formation needed to use after finishing scissors to eaves and
The weeds on roof prune combing, and the cogongrass tile after holding is mated formation is uniform.The specification of the cogongrass tile for using of mating formation
500 × 800 millimeters, thickness be 30 millimeters.
Embodiment 3
Use natural with natural couch grass tile laying method, the Weng Ding Was old countries house in a kind of Weng Ding Was old countries house
Couch grass tile laying method is comprised the following steps that:
S1:Keel laid, carries out water-proofing treatment to roof in advance, is bonded on construction roof with tar felt/SBS, waterproof volume
Material overlaps the overlap joint for needing 200 ㎜, and then in the rough ground of waterproof layer upper berth longitudinal direction, the spacing between rough ground and rough ground is not
Less than 500 ㎜, horizontal rough ground is installed on longitudinal rough ground;
S2:Litter watt, after vertical and horizontal rough ground is installed, basecoat couch grass tile is set according to sequence, use 50
Number nailing gun carries out the fixation of first row couch grass tile, and then second layer covering ground floor 2/3rds region, fixes the second layer
Third layer, the 4th layer of fixation are carried out successively;
S3:Multilayer is fixed, and every layer of keel are needed disposably to be taped against position, and other direction pavings are carried out when being taped against at the middle and upper levels
If last time carries out top ending;
S4:Back timber is fixed, and top should be noted top nail intensive setting when finishing up, be adjusted according to width during ending
It is whole, pruned using scissors;
S5:Back timber is laid, and surrounding carries out being routed to back timber position according to same step, carries out the fixation on four sides, is the later stage
The fixation of top couch grass tile is ready;
S6:Top is fixed, and couch grass tile is carried out into bending treatment, and couch grass tile is clamped on into top, and couch grass tile two ends are fixed on
On keel, be compacted for cogongrass after terminating by fixation, and unnecessary part carries out pruning modes, is sprayed once from roof with water afterwards.
The conventional laid process of the couch grass tile laying is every square metre 4.The couch grass tile is fixed on horizontal rough ground, every
The fixed nail spacing of cogongrass is not less than 300mm mono-.If the roof is cylindrical type roof, then cogongrass can be compiled from bamboo chip
Knit in bar and split out, string is worn with the rope made of hemp, then bundled along cylinder outside.Only needed when being cut to couch grass tile in the step S6
Bamboo chip in couch grass tile is cut, without being cut to cogongrass.Mat formation needed to use after finishing scissors to eaves and
The weeds on roof prune combing, and the cogongrass tile after holding is mated formation is uniform.The specification of the cogongrass tile for using of mating formation
1000 × 1100 millimeters, thickness be 50 millimeters.
The present invention is using coherent mating formation and couch grass tile can be mated formation on keel in layer so that couch grass tile
Effect of mating formation is more preferable, more with stereovision, while top can cause couch grass tile more by the way of couch grass tile bending covering
Good laminating so that couch grass tile is greatly improved in the visual effect that roof is mated formation.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technology according to the present invention scheme and its
Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.
Claims (8)
1. a kind of Weng Ding Was old countries house is with natural couch grass tile laying method, it is characterised in that:The Weng Ding Was old countries
House is comprised the following steps that with natural couch grass tile laying method:
S1:Keel laid, carries out water-proofing treatment to roof in advance, is bonded on construction roof with tar felt/SBS, waterproof roll weight
The overlap joint of 200 ㎜ of folded needs, then in the rough ground of waterproof layer upper berth longitudinal direction, the spacing between rough ground and rough ground is no less than
500 ㎜, are provided with horizontal rough ground on longitudinal rough ground;
S2:Litter watt, after vertical and horizontal rough ground is installed, basecoat couch grass tile is set according to sequence, penetrated using No. 50
Nail gun carries out the fixation of first row couch grass tile, and then second layer covering ground floor 2/3rds region, fixes the second layer successively
Carry out third layer, the 4th layer of fixation;
S3:Multilayer is fixed, and every layer of keel need disposably to be taped against position, other direction layings are carried out when being taped against at the middle and upper levels, most
Top ending is disposably carried out afterwards;
S4:Back timber is fixed, and top should be noted top nail intensive setting when finishing up, be adjusted according to width during ending, make
Pruned with scissors;
S5:Back timber is laid, and surrounding carries out being routed to back timber position according to same step, carries out the fixation on four sides, is later stage top
The fixation of couch grass tile is ready;
S6:Top is fixed, and couch grass tile is carried out into bending treatment, and couch grass tile is cut into 300-500 millimeters of specification, by couch grass tile card
Tight at top, couch grass tile two ends are fixed on keel, and be compacted for cogongrass after terminating by fixation, and unnecessary part carries out pruning modes,
Sprayed once from roof with water afterwards.
2. with natural couch grass tile laying method, its feature exists in a kind of Weng Ding Was old countries house according to claim 1
In:The conventional laid process of the couch grass tile laying is every square metre 4.
3. the method that desulfurated plaster improves salt-soda soil is applied in a kind of deep ploughing of tiling according to claim 1, it is characterised in that:
The couch grass tile is fixed on horizontal rough ground, and the every fixed nail spacing of cogongrass is not less than 300mm mono-.
4. with natural couch grass tile laying method, its feature exists in a kind of Weng Ding Was old countries house according to claim 1
In:If the roof is cylindrical type roof, then cogongrass can be split out from bamboo chip woven stripe, string be worn with the rope made of hemp, then along circle
The binding of cylinder outside.
5. with natural couch grass tile laying method, its feature exists in a kind of Weng Ding Was old countries house according to claim 1
In:The bamboo chip in couch grass tile need to only be cut when being cut to couch grass tile in the step S6, without being cut to cogongrass.
6. with natural couch grass tile laying method, its feature exists in a kind of Weng Ding Was old countries house according to claim 1
In:Mat formation and need to use scissors to prune combing to the weeds on eaves and roof after finishing, the cogongrass tile after holding is mated formation is whole
It is neat standardized.
7. with natural couch grass tile laying method, its feature exists in a kind of Weng Ding Was old countries house according to claim 1
In:Not only cogongrass tile can be carried out in the step S2 using No. 50 nailing guns to fix, while can also be consolidated using iron nail
It is fixed.
8. with natural couch grass tile laying method, its feature exists in a kind of Weng Ding Was old countries house according to claim 1
In:The specification for mating formation the cogongrass tile for using is 500 × 800 millimeters, thickness is 30 millimeters, or 1000 × 1100 millis
Rice, thickness are 50 millimeters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710291331.9A CN106930476B (en) | 2017-04-28 | 2017-04-28 | A kind of natural couch grass tile laying method in Weng Ding Wa old countries house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710291331.9A CN106930476B (en) | 2017-04-28 | 2017-04-28 | A kind of natural couch grass tile laying method in Weng Ding Wa old countries house |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106930476A true CN106930476A (en) | 2017-07-07 |
CN106930476B CN106930476B (en) | 2019-03-15 |
Family
ID=59438516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710291331.9A Active CN106930476B (en) | 2017-04-28 | 2017-04-28 | A kind of natural couch grass tile laying method in Weng Ding Wa old countries house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106930476B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112240081A (en) * | 2019-07-19 | 2021-01-19 | 苏州侪联景观工程有限公司 | Laying process of natural reed grass roof |
CN112392207A (en) * | 2019-08-15 | 2021-02-23 | 李达 | Structure of thatch house roof and construction method thereof |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2440786A (en) * | 2006-08-08 | 2008-02-13 | Antony David Stewardson | Roof soundproofing |
CN201679159U (en) * | 2010-05-13 | 2010-12-22 | 昆明理工大学 | Ventilated anticorrosive thatch roof |
CN102733553A (en) * | 2012-07-05 | 2012-10-17 | 江苏武进建筑安装工程有限公司 | Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs |
CN203049936U (en) * | 2012-03-20 | 2013-07-10 | 李志军 | Plastic simulation plant covering part |
CN203145342U (en) * | 2013-03-18 | 2013-08-21 | 甄长松 | Banda roof imitating laying assembly |
CN205024919U (en) * | 2015-09-29 | 2016-02-10 | 上海通璞建筑科技有限公司 | Roofing system |
CN205314380U (en) * | 2015-12-29 | 2016-06-15 | 厦门晋博建筑科技有限公司 | Roofing structure of light gauge steel building |
CN105888114A (en) * | 2016-05-30 | 2016-08-24 | 浙江省二建建设集团有限公司 | Light steel slope roof foundation layer dry tile hanging structure and construction method of changing plane roof into slope roof |
CN106401040A (en) * | 2016-05-30 | 2017-02-15 | 浙江省二建建设集团有限公司 | Light steel pitched roof substrate dry tile hanging structure and method for changing plane roof into pitched roof |
-
2017
- 2017-04-28 CN CN201710291331.9A patent/CN106930476B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2440786A (en) * | 2006-08-08 | 2008-02-13 | Antony David Stewardson | Roof soundproofing |
CN201679159U (en) * | 2010-05-13 | 2010-12-22 | 昆明理工大学 | Ventilated anticorrosive thatch roof |
CN203049936U (en) * | 2012-03-20 | 2013-07-10 | 李志军 | Plastic simulation plant covering part |
CN102733553A (en) * | 2012-07-05 | 2012-10-17 | 江苏武进建筑安装工程有限公司 | Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs |
CN203145342U (en) * | 2013-03-18 | 2013-08-21 | 甄长松 | Banda roof imitating laying assembly |
CN205024919U (en) * | 2015-09-29 | 2016-02-10 | 上海通璞建筑科技有限公司 | Roofing system |
CN205314380U (en) * | 2015-12-29 | 2016-06-15 | 厦门晋博建筑科技有限公司 | Roofing structure of light gauge steel building |
CN105888114A (en) * | 2016-05-30 | 2016-08-24 | 浙江省二建建设集团有限公司 | Light steel slope roof foundation layer dry tile hanging structure and construction method of changing plane roof into slope roof |
CN106401040A (en) * | 2016-05-30 | 2017-02-15 | 浙江省二建建设集团有限公司 | Light steel pitched roof substrate dry tile hanging structure and method for changing plane roof into pitched roof |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112240081A (en) * | 2019-07-19 | 2021-01-19 | 苏州侪联景观工程有限公司 | Laying process of natural reed grass roof |
CN112392207A (en) * | 2019-08-15 | 2021-02-23 | 李达 | Structure of thatch house roof and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106930476B (en) | 2019-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102128035B (en) | Construction method of bilateral biased small-clear distance tunnel | |
CN203531260U (en) | Inverted planting roofing structure | |
CN100532728C (en) | Method for sand-prevention, sand-fixation and planting in desert area | |
CN106930476A (en) | A kind of Weng Ding Was old countries house is with natural couch grass tile laying method | |
CN212129054U (en) | Water conservancy assembled slope protection structure | |
CN106193066A (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
JP5519100B2 (en) | Planting base | |
CN106193061A (en) | The method on top board greening heap slope, storehouse, a kind of ground | |
CN206873395U (en) | A kind of ecological revetment dike | |
CN101874458B (en) | Novel light gutter-connected plastic tent | |
CN205617555U (en) | Roof root resistance waterproof construction is planted to basement | |
KR100729389B1 (en) | The Panel for both drainage and water storage, and green roof system using the same | |
CN204850903U (en) | Waterproof node structure warms up bathroom | |
CN107912182A (en) | A kind of useless slope is with degradable growth belt and its plants method of taking off | |
CN105064273B (en) | A kind of grass planting gabion ecology terraced fields ridge | |
CN104264911B (en) | A kind of laying method of bituminized shingle | |
Noble | Turf-walled houses of the central highlands: An experiment in reconstruction | |
CN207776302U (en) | A kind of pitched roof bar planting welding levelling constructing device of zinc-plated square tube | |
CN206956661U (en) | A kind of new water conservancy construction protective slope structure | |
KR101744574B1 (en) | Underground tunnel house constructing method and underground tunnel house manufactured by the same | |
CN205305632U (en) | Tobacco seedling floats pond of growing seedlings | |
CN104594363A (en) | Vegetation blanket separation revetment structure and construction method thereof | |
CN203951967U (en) | A kind of Cement arch frame plastic tunnel that is suitable for plateau area of Southern Ningxia facilities vegetable production | |
CN217079175U (en) | Quick change-over integral bathroom structure | |
CN107299726A (en) | A kind of dark keel thatch roofing structure and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 650000 No. 27 Qianwang Road, Xishan District, Kunming City, Yunnan Province Patentee after: Kunming Institute of architectural design and research Limited by Share Ltd Address before: 650000 No. 27 Qianwang Road, Xishan District, Kunming City, Yunnan Province Patentee before: Kunming architectural design and Research Institute Group Co Ltd |
|
CP01 | Change in the name or title of a patent holder |