CN106930333A - Steel pipe piles at wharf test fixture - Google Patents

Steel pipe piles at wharf test fixture Download PDF

Info

Publication number
CN106930333A
CN106930333A CN201710138823.4A CN201710138823A CN106930333A CN 106930333 A CN106930333 A CN 106930333A CN 201710138823 A CN201710138823 A CN 201710138823A CN 106930333 A CN106930333 A CN 106930333A
Authority
CN
China
Prior art keywords
steel
location
pipe pile
plate
position fix
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710138823.4A
Other languages
Chinese (zh)
Other versions
CN106930333B (en
Inventor
张章
吴锋
邱松
卓杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
CCCC Shanghai Third Harbor Engineering Science and Technology Research Institute Co Ltd
CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Shanghai Third Harbor Engineering Science and Technology Research Institute Co Ltd
CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Shanghai Third Harbor Engineering Science and Technology Research Institute Co Ltd, CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Shanghai Third Harbor Engineering Science and Technology Research Institute Co Ltd
Priority to CN201710138823.4A priority Critical patent/CN106930333B/en
Publication of CN106930333A publication Critical patent/CN106930333A/en
Application granted granted Critical
Publication of CN106930333B publication Critical patent/CN106930333B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a kind of steel pipe piles at wharf test fixture, it is applied in steel-pipe pile, wherein, the positioner includes:Multiple location-plates, and location-plate at least has an inner concave, and offer a test position fix hole.It is connected with each location-plate and the fixation kit for being fixed on each location-plate on steel-pipe pile.Wherein, when each location-plate by fixation kit after being fixed on steel-pipe pile, its inner concave fits with the stake side face of steel-pipe pile, and the center in each test position fix hole is respectively positioned on same plane, and the plane perpendicular to the axial direction of steel-pipe pile.Compared with the existing technology, the present invention can facilitate staff that foil gauge is pasted on steel-pipe pile according to the position in each test position fix hole, to prevent the center because of each test position fix hole from not causing measurement result deviation occur in same level, and then improve the precision of test.

Description

Steel pipe piles at wharf test fixture
Technical field
The present invention be more particularly directed to building field, more particularly to a kind of steel pipe piles at wharf test fixture.
Background technology
Steel-pipe pile is subject from vertical, horizontal direction load action and bank slope as the important component of dock structure The effect of deformation.Understand the actual stress situation in dock structure, either its Bearing capacity assessment, maintenance or reinforcing all may be used To provide most direct and reliable foundation, with very important engineering significance.
It is particularly significant for specific operating mode reasonable selection method of testing it is determined that during the existing stress of structural elements, it is considered as Allow the various conditions such as degree, influence, the adaptability of on-the-spot test of metallicity change of structural damage wound.With science skill Art is continued to develop, the appearance of new physical principle also for the measurement of existing stress provides new developing direction, but from conversion There is a segment distance into the practical methods with operability.
In the prior art, actual stress test is generally carried out to steel-pipe pile with Blind Hole Method, specific way is in steel pipe Strain rosette (being connected and composed by multiple foil gauges) is pasted in stake and in the centre-drilling hole of strain rosette, by releasing before and after testing bore holes Strain is put to calculate the actual stress of bore position.However, determining the bore position on steel-pipe pile by the way of artificial setting-out With the paste position of foil gauge, it is difficult to ensure that drilling is in same horizontal plane, so as to cause to arrange that foil gauge is surveyed on steel-pipe pile During pilot, even if the stress value measured on each foil gauge is accurate, but the assessment of final pile body force-bearing situation is also inaccurate.Separately Outward, the unstability due to steel-pipe pile when being tested, and manually-operated deviation, easily cause the stickup of foil gauge Position produces deviation, so that the precision that measured result when stress blind hole is tested is carried out on it causes influence.
Therefore, the measuring accuracy when test of stress blind hole is carried out to steel-pipe pile how is lifted at, is that the present invention to be solved Problem.
The content of the invention
The present invention is directed to deficiencies of the prior art, it is proposed that a kind of steel pipe piles at wharf test fixture, The measuring accuracy when test of stress blind hole is carried out to steel-pipe pile can be lifted at.
The present invention is achieved by the following technical solutions, the invention provides a kind of steel pipe piles at wharf test harbour steel Pile tube test fixture, is applied in steel-pipe pile, and the steel pipe piles at wharf is included with test fixture:N number of location-plate, And the location-plate at least has an inner concave, and offer a test position fix hole;
It is connected with each location-plate and the fixation kit for being fixed on each location-plate on the steel-pipe pile;
Wherein, the N is the positive integer more than 1, and when each location-plate is being fixed on the steel pipe by the fixation kit After in stake, its inner concave fits with the stake side face of the steel-pipe pile, and the center in each test position fix hole is respectively positioned on same plane, And the plane is perpendicular to the axial direction of the steel-pipe pile.
Compared with prior art, the present invention is fixed on steel-pipe pile by the assignment test frock by each location-plate, and So that after its inner concave fits with stake side face, you can realize that the center in each test position fix hole is respectively positioned on perpendicular to steel-pipe pile axial direction Same plane on, so as to can facilitate staff that foil gauge is pasted on steel-pipe pile according to the position in each test position fix hole, with Prevent from not causing measurement result deviation occur in same level because of the center in each test position fix hole, and then improve pile foundation The precision of blind hole stress test.
It is preferred that in order to meet the design in practical application, processing and assembling demand, the location-plate is included:With engraving The body member in empty portion, the keeper for being arranged in the hollow-out parts and being detachably connected with the body member;It, the test is fixed Position Kong Jun is opened on each self-corresponding keeper.
It is preferred that at least part is with the center in its test position fix hole as the origin of coordinates and vertical along it on the keeper To the holding section with laterally outward protrusion extension formation;The edge of the hollow-out parts of the body member has for accommodating the card The draw-in groove in conjunction portion.So as to by the mutual cooperation of holding section and draw-in groove, staff be facilitated to carry out keeper and body member Quick assembly and disassembly, to meet different testing requirements.Simultaneously can also be by the setting direction of holding section to follow-up strain The installation site of piece plays a part of a positioning.
Preferably, the keeper is integrally formed with the body member before being cut.So as to can greatly reduce production Cost, economizes on resources.
It is preferred that the keeper at least offers K mounting hole, it is perforated when institute for installing the detection steel-pipe pile By the foil gauge of stress, and the center line of the mounting hole of each keeper and its test position fix hole center line in each self-corresponding throwing Projection in shadow plane is located at same straight line;Wherein, K is positive integer.So as to can greatly reduce production cost, economize on resources.
It is preferred that the K is 3, and between the projection of adjacent two center lines of mounting hole on the projection plane Angle be followed successively by 90 degree, 135 degree, 135 degree.To meet calculating demand when blind hole stress test is carried out to steel-pipe pile, and nothing Setting angle between foil gauge need to be measured and calculated, so as to avoid the error produced by artificial operation.
It is preferred that in order that in above-mentioned foil gauge at least two be its axle for testing steel-pipe pile when being perforated To with cross-sectional direction on stress, the angle of the projection is 90 degree of two center lines of mounting hole in the location-plate quilt It is fixed on when on the steel-pipe pile, its projection is parallel to each other and vertical with the axial direction of the steel-pipe pile respectively.
It is preferred that projection of shape of the mounting hole on the projection plane is rectangle, the shape in the test position fix hole Shape is circle, and the extended line of a rectangle at least rectangular edges may make up the tangent line in each self-corresponding test position fix hole.With It is easy to the distance between staff's measuring strain piece and test position fix hole.
It is preferred that the location-plate is arc, and the surface of each keeper offers graduation mark, and the graduation mark with The extended line is coplanar.Thus staff is after foil gauge is fixed on mounting hole, you can by the correspondence on graduation mark Numerical value, accurately knows the surface distance on the keeper between the center of foil gauge and test position fix hole center, so as to In follow-up calculating.
It is preferred that the N is equal to 3, and two of which location-plate is symmetrically set with the center of the steel-pipe pile as symmetrical centre Put, and the perpendicular bisector location hole that passes through another location-plate of the connecting line between relative two location holes center.With full The need for sufficient steel-pipe pile blind hole stress test.
It is preferred that the bow that the fixation kit is connected with each location-plate respectively by M is constituted, and each bow song The curvature at the laminating position on the corresponding steel-pipe pile of rate is identical;Wherein, M is the positive integer more than 1, and an at least arc Bar is dismountable.Can preferably can be thus fixed on location-plate is firm on steel-pipe pile by bow, and with its steel Pile tube is fitted, and is dismountable because wherein at least has a bow, thus can be easy to staff by harbour steel Pile tube is arranged on steel-pipe pile with test fixture, or it is dismantled.
It is preferred that the bow is that equidistant arrangement is arranged on two arcs successively for two bow main bodys of parallel side-by-side, J Connector between shape bar main body is constituted.May be such that bow, when steel-pipe pile is perforated and produces vibration, is not likely to produce deformation, To ensure the measuring accuracy of each foil gauge on location-plate, wherein, J is the positive integer more than 1.
It is preferred that the M is equal to 2N, and the plane that each bow is constituted with the center line of each location-plate is symmetrical as the plane of symmetry Set.So that each bow is when steel-pipe pile carries out punching test, its stress is more uniformly not likely to produce sliding, and then Improve the integrally-built stability of steel pipe piles at wharf test fixture.
Brief description of the drawings
By the detailed description made to non-limiting example made with reference to the following drawings of reading, it is of the invention other Feature, objects and advantages will become more apparent upon:
Fig. 1 is the assembling schematic diagram of the steel pipe piles at wharf test fixture of first embodiment of the invention;
Fig. 2 is the structural representation of the body member of the location-plate of first embodiment of the invention;
Fig. 3 is the top view of the keeper of first embodiment of the invention;
Fig. 4 is the top view of the keeper of second embodiment of the invention.
Specific embodiment
In order that those skilled in the art more fully understand the technical scheme in the present invention, below in conjunction with of the invention real The accompanying drawing in example is applied, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described implementation Example is only a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, should all belong to protection of the present invention Scope.
The present invention is described in further detail below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, a kind of steel pipe piles at wharf that the first embodiment of the present invention is provided is filled with test position fix Put, be applied to stake on steel-pipe pile 1.The positioner is mainly connected and for will be each fixed by multiple location-plates 2 with each location-plate 2 The fixation kit that position plate 2 is fixed on steel-pipe pile 1 is constituted, wherein, each location-plate 2 at least has an inner concave, and offers The one test position fix hole 3 for being used to carry out positioning drilling.
Wherein, when each location-plate 2 is after being fixed on steel-pipe pile 1, and inner concave is affixed with the stake side face of steel-pipe pile 1 Close, and the center in each test position fix hole 3 is respectively positioned on same plane, and the plane perpendicular to the axial direction of steel-pipe pile 1.And need explanation , in the present embodiment, used as preferred, the number of location-plate 2 is 3, also, two of which location-plate 2 is with steel-pipe pile 1 Center be symmetrical arranged for symmetrical centre, and the connecting line between relative two test position fix holes 3 perpendicular bisector by another The center in the test position fix hole 3 of individual location-plate 2, to meet the blind hole stress test of steel-pipe pile 1 the need for.
In summary, in practical set, by the steel pipe piles at wharf test fixture, consolidate by each location-plate 2 Be scheduled on steel-pipe pile 1, and cause its inner concave and steel-pipe pile 1 stake side face fit after, you can realize each test position fix hole 3 Center is respectively positioned in the plane of the axial direction of steel-pipe pile 1, so as to staff can be facilitated according to the position in each test position fix hole 3 Foil gauge is pasted on steel-pipe pile 1, to prevent the center because of each test position fix hole 3 from not causing measurement to be tied in same level There is deviation in fruit, and then improves the precision of pile foundation blind hole stress test.Also, filled with test position fix by the steel pipe piles at wharf Put can on the steel-pipe pile 1 of same specification choose a section be drilled and blind hole stress test after, can quickly choose An other section carries out blind hole stress test, so as to greatly save the time, improves operating efficiency.
Specifically, in the present embodiment, in order to meet the design in practical application, processing and assembling demand, such as Fig. 2 and Tu Shown in 3, above-mentioned location-plate 2 is by the body member 21 with hollow-out parts 8, is arranged in hollow-out parts 8 and detachable with body member 21 The keeper 22 of connection is constituted.Wherein, above-mentioned test position fix hole 3 is opened on each self-corresponding keeper 22.
Also, as shown in figure 3, at least part is former by coordinate of the center in its test position fix hole 3 on above-mentioned keeper 22 Point, and along the outwardly holding section 23 for extending formation of its vertical and horizontal.The edge of the hollow-out parts 8 of body member 21 is useful In the draw-in groove (not indicated in figure) for accommodating holding section 23.So as to by the mutual cooperation of holding section 23 and draw-in groove, can conveniently work Personnel carry out quick assembly and disassembly to keeper 22 and body member 21, to meet different testing requirements, i.e., in same rule Different types of keeper 22 is assembled on the body member 21 of lattice, the different positioning of the diameter in the test position fix hole 3 for such as opening up Part 22.Simultaneously as holding section 23 is formed with extension is projected axially outward along the longitudinal direction in the test position fix hole 3 of keeper 22, Thus can also play a part of a positioning to the installation site of follow-up foil gauge by the setting direction of holding section 23.Wherein, In the present embodiment, as preferred, as shown in figure 3, the number of holding section 23 is four, and it is oppositely arranged, meanwhile, relatively Two holding sections 23 between the line of centres when keeper 22 is fitted with steel-pipe pile 1, the axial direction with steel-pipe pile 1 is parallel to each other Or it is vertical.
It is noted that in the present embodiment, used as preferred, above-mentioned keeper 22 is with body member 21 before being cut It is integrally formed.So as to can greatly reduce production cost, economize on resources.Also, location-plate 2 is on arc, and arc Inner concave is arc-shaped curved surface.Obviously, in the present embodiment, keeper 22 can also be individually designed and manufacture, similarly, engaging Portion 23 can be made up of the individually designed projection piece on keeper 22, and present embodiment is not made specific restriction to this and said It is bright.
In addition, in the present embodiment, as preferred, the line of centres difference between above-mentioned two relative holding sections 23 Center line with keeper 22 overlaps, also, center and the location-plate 2 of keeper 22 center superposition, with cause carry out it is blind During the stress test of hole, the stress in all directions of keeper 22 is more uniform, and is difficult to be shaken.
As shown in figure 3, in order to further be easy to staff that foil gauge is installed on steel-pipe pile 1, and operating efficiency is improved, Multiple mounting holes 9 are offered in the present embodiment on keeper 22, suffered stress should when being perforated for installation detection steel-pipe pile 1 Become piece, and the center line of the mounting hole 9 of each keeper 22 and the center line in its test position fix hole 3 in each self-corresponding projection plane On projection be located at same straight line.
It follows that due to offering the mounting hole 9 for installing foil gauge on keeper 22, so that staff Location-plate 2 need not be dismantled, you can foil gauge is arranged on steel-pipe pile 1, and center line and each test position fix due to mounting hole 9 Hole 3 is centrally located at same straight line, so that the Impact direction of adaptability to changes is carried out with steel-pipe pile 1 by test position fix hole 3 The stress direction being subject to during punching is consistent, to lift the measuring accuracy of foil gauge.
In detail, in the present embodiment, as preferred, the quantity of above-mentioned mounting hole 9 is 3, also, adjacent two Angle between projection of the center line of mounting hole 9 on above-mentioned projection plane is followed successively by 90 degree, 135 degree, 135 degree, to meet Carry out calculating demand during blind hole stress test to steel-pipe pile 1, and without being measured to the setting angle between foil gauge and Calculate, so as to avoid the error produced by artificial operation.
Meanwhile, in order that in above-mentioned foil gauge at least two be its axial direction for testing steel-pipe pile 1 when being perforated With the stress in cross-sectional direction, the angle of above-mentioned projection is that the center line of 90 degree of two mounting holes is fixed in location-plate When on steel-pipe pile, its projection is parallel to each other and vertical with the axial direction of steel-pipe pile respectively, in order to the Stress calculation in practical application And testing requirement.As shown in figure 3, in order to further meet the design in practical application and assembling demand, the angle of its projection is 90 degree of two center lines of mounting hole can be coplanar with the line of centres between corresponding two holding sections 23 respectively.
In addition, in order to further be easy to staff to be accurately positioned and measure the installation site of foil gauge, it is each fixed The distance between the center in center to its corresponding test position fix hole 3 of each mounting hole on the part 22 of position is equal.
Also, in the present embodiment, as preferred, projection of shape of each mounting hole 9 on above-mentioned projection plane is square Shape, each test position fix hole 3 is shaped as circle, and a rectangle at least rectangular edges extended line may make up it is each self-corresponding The tangent line in test position fix hole 3.In order to the distance between staff's measuring strain piece and test position fix hole 3.
In addition, it is necessary to explanation, as depicted in figs. 1 and 2, used as preferred, above-mentioned fixation kit can be by multiple respectively The bow 4 being connected with each location-plate 2 is constituted, and laminating position on the corresponding steel-pipe pile 1 of curvature of each bow 4 Curvature is identical, wherein, an at least bow 4 is dismountable, and at least one section is arranged to knot that can be undone by a pull such as on the bow 4 (not indicated in figure) connects.
It follows that because the curvature at the laminating position on the corresponding steel-pipe pile 1 of the curvature of each bow 4 is identical, Thus can be preferably fixed on location-plate 2 is firm on steel-pipe pile 1 by bow 4, and be pasted with its steel-pipe pile 1 Close, and be dismountable because wherein at least has a bow 4, thus staff can be easy to test steel pipe piles at wharf Positioner is arranged on steel-pipe pile 1, or it is dismantled.
In detail, above-mentioned bow 4 is main is set by two bow main bodys 41 of parallel side-by-side, multiple equidistant arrangements successively The connector 42 put between two bow main bodys 41 is constituted, wherein, in the present embodiment, can be with as preferred connector 42 By the cylindrical member welded with bow main body 41, such as short muscle is constituted.
It follows that by this structure, may be such that bow 4 when steel-pipe pile 1 is perforated and produces vibration, it is difficult to produce Change shape, to ensure the measuring accuracy of each foil gauge on location-plate 2.
Also, in the present embodiment, as preferred, the quantity of bow 4 is the twice of the quantity of location-plate 2, also, respectively The plane that bow 4 is constituted with the center line of each location-plate 2 is as the plane of symmetry is symmetrical arranged.So that each bow 4 is in steel pipe When stake 1 carries out punching test, its stress is more uniformly not likely to produce sliding, and then improves steel pipe piles at wharf test position fix The integrally-built stability of device.
In addition, being worth one to say that one end that each bow 4 is connected with each location-plate 2 (is not marked by articulated elements in figure Show) it is connected, to cause that each bow 4 be free to be rotated, it is easy to staff to steel pipe piles at wharf test position fix Device is folded and carried.Also, by the structure, also may be such that staff is finely adjusted to the elasticity of bow 4, To meet the demand of practical set.
Furthermore, it is desirable to explanation, in this example, above-mentioned fixation kit can also be realized positioning by parts such as the collars Fixation and laminating of the plate on steel-pipe pile, therefore, the present embodiment can also be made up of for fixation kit which part not to be made Many elaborations and explanation.
The second embodiment of the present invention provides a kind of steel pipe piles at wharf test fixture, and of the invention second implements Example is the further improvement to the first embodiment of the present invention, and it is theed improvement is that, as shown in figure 4, of the invention second In embodiment, the surface of each keeper 22 offers graduation mark 5, and the graduation mark 5 is coplanar with above-mentioned extended line.
It follows that by offering graduation mark 5 on keeper 22, thus foil gauge is being fixed on installation by staff After on hole 9, you can by the corresponding numerical value on graduation mark 5, the center for knowing foil gauge of preparation and the center of test position fix hole 3 it Between distance, in order to follow-up calculating.
Also, being worth mentioning is, above-mentioned keeper 22 is integrally formed with body member 21, therefore, in the present embodiment, positioning Part 22 is arc, thus graduation mark 5 is the graduation mark 5 of arc.
Also, in the present embodiment, as preferred, the width of above-mentioned rectangle is equal to the straight of corresponding test position fix hole 3 Footpath size, can be according to actual situation in order to staff, suitable arc length of side laminating foil gauge on selection mounting hole, and protects Card foil gauge with the projection of the arc length of side at least while coincide.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be in other specific forms realized.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires to be limited rather than described above, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as the claim involved by limitation.

Claims (10)

1. a kind of steel pipe piles at wharf test fixture, is applied on steel-pipe pile, it is characterised in that the steel pipe piles at wharf is used Test fixture includes:N number of location-plate, and the location-plate at least has an inner concave, and offer a test position fix hole;
It is connected with each location-plate and the fixation kit for being fixed on each location-plate on the steel-pipe pile;
Wherein, the N is the positive integer more than 1, and when each location-plate is fixed on the steel-pipe pile by the fixation kit Afterwards, its inner concave fits with the stake side face of the steel-pipe pile, and the center in each test position fix hole is respectively positioned on same plane, and institute Plane is stated perpendicular to the axial direction of the steel-pipe pile.
2. steel pipe piles at wharf test fixture according to claim 1, it is characterised in that the location-plate is included: Body member with hollow-out parts, the keeper for being arranged in the hollow-out parts and being detachably connected with the body member;
Wherein, the test position fix hole is opened on each self-corresponding keeper.
3. steel pipe piles at wharf test fixture according to claim 2, it is characterised in that on the keeper at least There is part with the center in its test position fix hole as the origin of coordinates, and along the outwardly engaging for extending formation of its vertical and horizontal Portion;
The edge of the hollow-out parts of the body member has the draw-in groove for accommodating the holding section.
4. steel pipe piles at wharf test fixture according to claim 3, it is characterised in that the keeper with it is described Body member is integrally formed before being cut.
5. the steel pipe piles at wharf test fixture according to any one in claim 1-4, it is characterised in that described Keeper at least offers K mounting hole, the foil gauge for installing detection steel-pipe pile suffered stress when being perforated, and Projection of the center in the center line of the mounting hole of each keeper and its test position fix hole on each self-corresponding projection plane is located at Same straight line;Wherein, K is positive integer.
6. steel pipe piles at wharf test fixture according to claim 5, it is characterised in that the K is 3, and per phase Angle between projection of the two adjacent center lines of mounting hole on the projection plane is followed successively by 90 degree, 135 degree, 135 degree.
7. steel pipe piles at wharf test fixture according to claim 6, it is characterised in that the angle of the projection is 90 degree of two center lines of mounting hole when the location-plate is fixed on the steel-pipe pile, its projection respectively with the steel The axial direction of pile tube is parallel to each other and vertically.
8. steel pipe piles at wharf test fixture according to claim 6, it is characterised in that the mounting hole is described Projection of shape on projection plane is rectangle, and the test position fix hole is shaped as circle, and a rectangle at least rectangle The extended line on side may make up the tangent line in each self-corresponding test position fix hole.
9. steel pipe piles at wharf test fixture according to claim 1, it is characterised in that the N is equal to 3, and its In two location-plates be symmetrical arranged by symmetrical centre of the center of the steel-pipe pile, and between relative two test position fix holes The center in the test position fix hole that the perpendicular bisector of connecting line passes through another location-plate.
10. steel pipe piles at wharf test fixture according to claim 1, it is characterised in that the fixation kit is by M The individual bow that is connected with each location-plate respectively is constituted, and the laminating position on the corresponding steel-pipe pile of curvature of each bow Curvature it is identical;
Wherein, M is that, more than 1 positive integer, and at least a bow is dismountable.
CN201710138823.4A 2017-03-09 2017-03-09 Steel pipe piles at wharf test fixture Active CN106930333B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710138823.4A CN106930333B (en) 2017-03-09 2017-03-09 Steel pipe piles at wharf test fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710138823.4A CN106930333B (en) 2017-03-09 2017-03-09 Steel pipe piles at wharf test fixture

Publications (2)

Publication Number Publication Date
CN106930333A true CN106930333A (en) 2017-07-07
CN106930333B CN106930333B (en) 2019-03-29

Family

ID=59432970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710138823.4A Active CN106930333B (en) 2017-03-09 2017-03-09 Steel pipe piles at wharf test fixture

Country Status (1)

Country Link
CN (1) CN106930333B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532651A (en) * 2018-04-19 2018-09-14 东南大学 The device of frictional resistance inside and outside a kind of detection steel-pipe pile
CN110158672A (en) * 2019-06-05 2019-08-23 江苏省第二地质工程勘察院 Foundation pile high stress strain gauge installation method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008286679A (en) * 2007-05-18 2008-11-27 Japan Pile Corp Dynamic horizontal loading test method, and dynamic horizontal loading test device for pile
CN205561839U (en) * 2015-12-29 2016-09-07 江苏瑞沃建设集团有限公司 Steel protects a section of thick bamboo or prism positioner that uses of steel -pipe pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008286679A (en) * 2007-05-18 2008-11-27 Japan Pile Corp Dynamic horizontal loading test method, and dynamic horizontal loading test device for pile
CN205561839U (en) * 2015-12-29 2016-09-07 江苏瑞沃建设集团有限公司 Steel protects a section of thick bamboo or prism positioner that uses of steel -pipe pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532651A (en) * 2018-04-19 2018-09-14 东南大学 The device of frictional resistance inside and outside a kind of detection steel-pipe pile
CN110158672A (en) * 2019-06-05 2019-08-23 江苏省第二地质工程勘察院 Foundation pile high stress strain gauge installation method
CN110158672B (en) * 2019-06-05 2021-04-20 江苏省第二地质工程勘察院 Method for mounting foundation pile high-strain stress sensor

Also Published As

Publication number Publication date
CN106930333B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN101915558B (en) Geometric linear detection method of bridge member
CN107869249A (en) Arcuate structure high-formwork construction method
CN106930333A (en) Steel pipe piles at wharf test fixture
CN105586994A (en) Monitoring device and monitoring method for horizontal displacement of pile tip of retaining pile for foundation pit
CN105484299A (en) Contraction positioning support for determining center of pile foundation and construction method of contraction positioning support
CN107905108B (en) Tubular arch bolted web member hole group's accuracy control method
CN103344214B (en) 1.6-degree parabolic extralarge pier measuring and pier body linear control method
CN209027523U (en) A kind of prestress pipe coordinate location ruler
CN107726955A (en) Multifunctional height instrument gauge head
CN207904918U (en) A kind of drilled pile casing locating rack
CN105113418B (en) A kind of bearing pad stone construction lofting method
CN206756071U (en) Tunnel davit flange angle measurement tool
CN206709811U (en) Building inclination dynamic measuring instrument
CN202692985U (en) Transition point marking plate structure for intermediate floor
CN105115473A (en) Method for measuring three-dimensional deformation of cross section of underground cavity
CN109487823A (en) The accurate installation method of groove type embedded part in city integrated piping lane punching block system
US6880261B1 (en) Flexible and collapsible construction geometry tool
CN106949886A (en) The fast-positioning device and localization method of Metro Tunnel circuit measuring point point position
CN112212837A (en) Inspection well center coordinate measuring method and tool
CN216475028U (en) Pile foundation steel reinforcement cage position rechecking device
CN203758513U (en) Conversion device for different reflecting prisms on pier
CN206959752U (en) A kind of workpiece pre-installs frock
CN208845188U (en) Assembled grid tunnel double-lining bar reinforcement positioning device
CN204036422U (en) The assembled frock of marking time in column crane mast section
CN209745143U (en) measuring scale for improving installation precision of prestressed pipeline of prefabricated box girder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right

Effective date of registration: 20170628

Address after: 200030 No. 139, Xuhui District, Shanghai, Pingjiang Road

Applicant after: China Construction Third Engineering Division Co., Ltd.

Applicant after: Shanghai Third Harbor Engineering Science Technology Research Institute Co., Ltd., China Communications Construction Group

Applicant after: CCCC Shanghai Harbour Engineering Design & Research Institute Co., Ltd.

Address before: 200030, 829 Jia Jia Road, Shanghai, Xuhui District

Applicant before: Shanghai Third Harbor Engineering Science Technology Research Institute Co., Ltd., China Communications Construction Group

Applicant before: CCCC Shanghai Harbour Engineering Design & Research Institute Co., Ltd.

TA01 Transfer of patent application right
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant