CN106921162A - A kind of bridge transformer carries out the bypass examination and repair system and method for power quality controlling - Google Patents

A kind of bridge transformer carries out the bypass examination and repair system and method for power quality controlling Download PDF

Info

Publication number
CN106921162A
CN106921162A CN201710250223.7A CN201710250223A CN106921162A CN 106921162 A CN106921162 A CN 106921162A CN 201710250223 A CN201710250223 A CN 201710250223A CN 106921162 A CN106921162 A CN 106921162A
Authority
CN
China
Prior art keywords
power quality
quality controlling
pass switch
bypass
examination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710250223.7A
Other languages
Chinese (zh)
Inventor
刘君
陈沛龙
杨涛
张迅
许逵
曾鹏
田承越
马晓红
曾华荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guizhou Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guizhou Power Grid Co Ltd filed Critical Electric Power Research Institute of Guizhou Power Grid Co Ltd
Priority to CN201710250223.7A priority Critical patent/CN106921162A/en
Publication of CN106921162A publication Critical patent/CN106921162A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/005

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Protection Of Transformers (AREA)

Abstract

The invention discloses bypass examination and repair system and method that a kind of bridge transformer carries out power quality controlling, including multiwinding transformer(1), power quality controlling system, load(5)And by-pass switch, described by-pass switch is separately positioned on multiwinding transformer(1), power quality controlling system and load(5)Between hospital bus bar on, its application method is also disclosed, by setting by-pass switch, it is ensured that safety of maintainer when to quality of power supply turnaround of unit;Power quality controlling device is powered when overhauling by bypass loop, it is ensured that the continuity of power supply;Protect power quality controlling device from the impact of short trouble, currently available technology can be overcome the shortcomings of.

Description

A kind of bridge transformer carries out the bypass examination and repair system and method for power quality controlling
Technical field
The present invention relates to bypass examination and repair system and method that a kind of bridge transformer carries out power quality controlling, belong to electric power Service technique field.
Background technology
Application of the power transformer in power system is widely.High-voltage variable can be changed to low electricity by power transformer Low-voltage, can be also transformed to high voltage by pressure.
Power transformer is a kind of static electrical equipment, is for by the alternating voltage of a certain numerical value(Electric current)Become frequency The voltage that rate identical is another or several numerical value are different(Electric current)Equipment.When first winding passes to alternating current, just produce The magnetic flux of alternation, the magnetic flux of alternation is acted on by iron core magnetic conduction, and AC electromotive force is just induced in Secondary Winding.Secondary sensing The height of electromotive force is relevant with the number of a Secondary Winding number of turn, i.e., voltage swing is directly proportional to the number of turn.Main Function is transmission Electric energy, therefore, rated capacity is its major parameter.Rated capacity is a usual value for performance power, and it is to characterize transmission The size of electric energy, is represented with kVA or MVA, when rated voltage is applied to transformer, is determined according to it under prescribed conditions not More than the rated current of temperature limit.
But traditional power transformer is carried out in the device of power quality controlling, due to system and be not provided with bypass maintenance dress Put, cause the needs when power quality controlling device is overhauled to be stopped power supply, and have electric shock wind during power quality controlling device maintenance Danger, security risk is very big.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of bridge transformer and carries out the bypass maintenance of power quality controlling System and method, the bypass examination and repair system and method for carrying out power quality controlling using a kind of bridge transformer solves traditional electricity Power transformer is carried out in the device of power quality controlling, due to system and be not provided with bypass apparatus for examination and repair, cause in the quality of power supply Need to stop power supply when controlling device is overhauled, and have electric shock risk during power quality controlling device maintenance, security risk is very big Problem, so as to overcome existing technical deficiency.
A kind of bridge transformer carries out the bypass examination and repair system of power quality controlling, including multiwinding transformer, electric energy matter Amount governing system, load and by-pass switch, described by-pass switch are separately positioned on multiwinding transformer, power quality controlling system On hospital bus bar between system and load.
Described power quality controlling system includes series filtering device, power quality controlling device and parallel filtering dress Put, series filtering device is connected by power quality controlling device with parallel filtering device.
Described by-pass switch includes that the first by-pass switch, the second by-pass switch, the 3rd by-pass switch and the 4th bypass are opened Close.
The first described by-pass switch is arranged on the hospital bus bar between multiwinding transformer and series filtering device.
The second described by-pass switch is arranged on the bus between multiwinding transformer and parallel filtering device.
The 3rd described by-pass switch is arranged on the bus between multiwinding transformer and load.
The 4th described by-pass switch is arranged on the bus between parallel filtering device and load.
Its bridge transformer carries out the application method of power quality controlling bypass, comprises the following steps:
When the first step, power quality controlling system need maintenance, the 3rd by-pass switch is closed a floodgate, while the first by-pass switch is divided Lock;
Second step, when power quality controlling system puts into, respectively by the first by-pass switch, the second by-pass switch, the 4th bypass Switch closes a floodgate, while by the 3rd by-pass switch separating brake;
3rd step, when load-side breaks down, power quality controlling system opens the 4th by-pass switch separating brake, to protect electric energy Quality controlling system and device.
It is compared with the prior art, using technical scheme, due in multiwinding transformer, power quality controlling system By-pass switch is respectively provided with hospital bus bar between system and load, it can be ensured that maintainer is to quality of power supply turnaround of unit When safety;Power quality controlling device is powered when overhauling by bypass loop, it is ensured that the continuity of power supply;The protection quality of power supply Impact of the controlling device from short trouble.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
It is designated in figure:1st, multiwinding transformer, 2, series filtering device, 3, power quality controlling device, 4, parallel filtering dress Put, 5, load, the 6, first by-pass switch, the 7, second by-pass switch, the 8, the 3rd by-pass switch, the 9, the 4th by-pass switch.
Specific embodiment
The preferred embodiment that the invention will now be described in detail with reference to the accompanying drawings.
Shown in Figure 1, a kind of bridge transformer carries out the bypass examination and repair system of power quality controlling, including Multiple coil becomes Depressor 1, series filtering device 2, power quality controlling device 3, parallel filtering device 4, the 5, first by-pass switch 6, second of load By-pass switch 7, the 3rd by-pass switch 8 and the 4th by-pass switch 9, by-pass switch are separately positioned on multiwinding transformer 1, electric energy matter On hospital bus bar between amount governing system and load 5.
Further power quality controlling system includes series filtering device 2, power quality controlling device 3 and parallel filtering Device 4, series filtering device 2 is connected by power quality controlling device 3 with parallel filtering device 4, is connected by each device, Can ensure that power quality controlling device is more reliable.
Further first by-pass switch 6 is arranged on the hospital bus bar between multiwinding transformer 1 and series filtering device 2 On, by setting by-pass switch, it is ensured that safety of maintainer when to quality of power supply turnaround of unit;Power quality controlling device Powered by bypass loop during maintenance, it is ensured that the continuity of power supply;Protect power quality controlling device rushing from short trouble Hit.
Further second by-pass switch 7 is arranged on the bus between multiwinding transformer 1 and parallel filtering device 4, By setting by-pass switch, it is ensured that safety of maintainer when to quality of power supply turnaround of unit;Power quality controlling device is examined Powered by bypass loop when repairing, it is ensured that the continuity of power supply;Power quality controlling device is protected from the impact of short trouble.
Further 3rd by-pass switch 8 is arranged on the bus between multiwinding transformer 1 and load 5, by setting By-pass switch, it is ensured that safety of maintainer when to quality of power supply turnaround of unit;Power quality controlling device passes through when overhauling Bypass loop is powered, it is ensured that the continuity of power supply;Power quality controlling device is protected from the impact of short trouble.
Further 4th by-pass switch 9 is arranged on the bus between parallel filtering device 4 and load 5, by setting By-pass switch, it is ensured that safety of maintainer when to quality of power supply turnaround of unit;Power quality controlling device passes through when overhauling Bypass loop is powered, it is ensured that the continuity of power supply;Power quality controlling device is protected from the impact of short trouble.
After the installation of each switch and connection are completed according to technical scheme, you can according to following steps Tested:
When the first step, power quality controlling system need maintenance, the 3rd by-pass switch 8 is closed a floodgate, while by the first by-pass switch 6 Separating brake;
Second step, when power quality controlling system puts into, respectively by by the first by-pass switch 6, the second by-pass switch the 7, the 4th Way switch 9 closes a floodgate, while by the separating brake of the 3rd by-pass switch 8;
3rd step, when load 5 sides break down when, power quality controlling system opens the separating brake of the 4th by-pass switch 9, to protect electricity Can quality controlling system and device.

Claims (8)

1. a kind of bridge transformer carries out the bypass examination and repair system of power quality controlling, including multiwinding transformer(1), electric energy matter Amount governing system, load(5)And by-pass switch, it is characterised in that:Described by-pass switch is separately positioned on multiwinding transformer (1), power quality controlling system and load(5)Between hospital bus bar on.
2. a kind of bridge transformer according to claim 1 carries out the bypass examination and repair system of power quality controlling, its feature It is:Described power quality controlling system includes series filtering device(2), power quality controlling device(3)And parallel filtering Device(4), series filtering device(2)By power quality controlling device(3)With parallel filtering device(4)Connection.
3. a kind of bridge transformer according to claim 1 carries out the bypass examination and repair system of power quality controlling, its feature It is:Described by-pass switch includes the first by-pass switch(6), the second by-pass switch(7), the 3rd by-pass switch(8)With the 4th By-pass switch(9).
4. a kind of bridge transformer according to claim 3 carries out the bypass examination and repair system of power quality controlling, its feature It is:The first described by-pass switch(6)It is arranged on multiwinding transformer(1)With series filtering device(2)Between bypass it is female On line.
5. a kind of bridge transformer according to claim 3 carries out the bypass examination and repair system of power quality controlling, its feature It is:The second described by-pass switch(7)It is arranged on multiwinding transformer(1)With parallel filtering device(4)Between bus on.
6. a kind of bridge transformer according to claim 3 carries out the bypass examination and repair system and method for power quality controlling, It is characterized in that:The 3rd described by-pass switch(8)It is arranged on multiwinding transformer(1)And load(5)Between bus on.
7. a kind of bridge transformer according to claim 3 carries out the bypass examination and repair system and method for power quality controlling, It is characterized in that:The 4th described by-pass switch(9)It is arranged on parallel filtering device(4)And load(5)Between bus on.
8. a kind of application method that power quality controlling bypass is carried out using bridge transformer, it is characterised in that:Including following step Suddenly:
When the first step, power quality controlling system need maintenance, by the 3rd by-pass switch(8)Close a floodgate, while the first bypass is opened Close(6)Separating brake;
Second step, when power quality controlling system puts into, respectively by the first by-pass switch(6), the second by-pass switch(7), Four by-pass switches(9)Close a floodgate, while by the 3rd by-pass switch(8)Separating brake;
3rd step, work as load(5)When side is broken down, power quality controlling system is by the 4th by-pass switch(9)Separating brake is opened, to protect Shield power quality controlling system and device.
CN201710250223.7A 2017-04-17 2017-04-17 A kind of bridge transformer carries out the bypass examination and repair system and method for power quality controlling Pending CN106921162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710250223.7A CN106921162A (en) 2017-04-17 2017-04-17 A kind of bridge transformer carries out the bypass examination and repair system and method for power quality controlling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710250223.7A CN106921162A (en) 2017-04-17 2017-04-17 A kind of bridge transformer carries out the bypass examination and repair system and method for power quality controlling

Publications (1)

Publication Number Publication Date
CN106921162A true CN106921162A (en) 2017-07-04

Family

ID=59568807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710250223.7A Pending CN106921162A (en) 2017-04-17 2017-04-17 A kind of bridge transformer carries out the bypass examination and repair system and method for power quality controlling

Country Status (1)

Country Link
CN (1) CN106921162A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113295992A (en) * 2021-05-13 2021-08-24 深圳供电局有限公司 Method for verifying latching logic relationship of isolating switch

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202488150U (en) * 2012-03-26 2012-10-10 徐州宇飞电力科技有限公司 Three-phase-integrated power quality control device with by-pass switch
CN202583367U (en) * 2012-05-28 2012-12-05 河南电力试验研究院 Electric energy quality comprehensive test platform
CN104882890A (en) * 2015-05-28 2015-09-02 株洲变流技术国家工程研究中心有限公司 Current limiting type dynamic voltage restorer and uninterrupted power supply method thereof
CN204633333U (en) * 2015-05-29 2015-09-09 株洲变流技术国家工程研究中心有限公司 A kind of traction power supply net current-limiting type Power Quality Comprehensive Treatment Device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202488150U (en) * 2012-03-26 2012-10-10 徐州宇飞电力科技有限公司 Three-phase-integrated power quality control device with by-pass switch
CN202583367U (en) * 2012-05-28 2012-12-05 河南电力试验研究院 Electric energy quality comprehensive test platform
CN104882890A (en) * 2015-05-28 2015-09-02 株洲变流技术国家工程研究中心有限公司 Current limiting type dynamic voltage restorer and uninterrupted power supply method thereof
CN204633333U (en) * 2015-05-29 2015-09-09 株洲变流技术国家工程研究中心有限公司 A kind of traction power supply net current-limiting type Power Quality Comprehensive Treatment Device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113295992A (en) * 2021-05-13 2021-08-24 深圳供电局有限公司 Method for verifying latching logic relationship of isolating switch
CN113295992B (en) * 2021-05-13 2023-12-15 深圳供电局有限公司 Method for verifying locking logic relationship of isolating switch

Similar Documents

Publication Publication Date Title
CN108169615B (en) Optical CT-based phase failure detection method for starting standby transformer
Lim et al. Understanding and resolving voltage sag related problems for sensitive industrial customers
CN102780234B (en) High-voltage electric debugging method for power generation project
CN101741307A (en) Dynamic simulation device and method thereof of super and extra high voltage controllable magnetic control shunt reactor
CN201142567Y (en) Secondary side open circuit protecting equipment of current mutual inductor
CN100424956C (en) Fault tolerant re-judging negative sequence direction locking type longitudinal zero voltage inter-turn protection for generator
CN205900232U (en) Bank bridge main transformer's magnetization device in advance
CN105259424A (en) Electric generator iron loss test apparatus and experimental method
CN201789272U (en) Relay protection circuit preventing transformer differential protection malfunction
CN201666933U (en) Electrode insulation detecting device for three-phase AC electric arc furnace
CN105449653B (en) The device of volitional check short-circuit current in a kind of AC network
CN106959406A (en) For carrying out the magnetized experimental rig of generator core and its method at lower voltages
CN202663104U (en) Short-circuit current limit device
CN106921162A (en) A kind of bridge transformer carries out the bypass examination and repair system and method for power quality controlling
CN201562031U (en) Alternating-current induction voltage withstand testing device of graded insulating type voltage transformer
CN206099310U (en) Intelligent controller
CN104659783A (en) Coal mine power supply and distribution dynamic analog system and method
CN207010234U (en) A kind of bridge transformer carries out the bypass examination and repair system of power quality controlling
CN103560484B (en) Three current transformer on-line monitoring multipoint earthing of clamping piece of transformer current control devices
CN102902892A (en) Method for simplifying mathematical model of transformer in power supply system
CN206594260U (en) Generator core magnetic examination device under a kind of low-voltage
CN104183379A (en) Connecting device for maintenance of secondary side of electric power current transformer
CN104992825B (en) From trigger-type current-limiting reactor
CN208399616U (en) A kind of monitor of the CT secondary circuit integrality for service without power-off
CN207303988U (en) A kind of anti-secondary current circuit open circuit set of banked relay type

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170704