CN106906749B - The construction method of full assembled steel-concrete combined structure box beam - Google Patents

The construction method of full assembled steel-concrete combined structure box beam Download PDF

Info

Publication number
CN106906749B
CN106906749B CN201710136792.9A CN201710136792A CN106906749B CN 106906749 B CN106906749 B CN 106906749B CN 201710136792 A CN201710136792 A CN 201710136792A CN 106906749 B CN106906749 B CN 106906749B
Authority
CN
China
Prior art keywords
steel
plate
steel plate
box beam
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710136792.9A
Other languages
Chinese (zh)
Other versions
CN106906749A (en
Inventor
汤意
李斐然
乔倩妃
李国普
莫杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Provincial Communication Planning and Design Institute Co Ltd
Original Assignee
Henan Provincial Communication Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Provincial Communication Planning and Design Institute Co Ltd filed Critical Henan Provincial Communication Planning and Design Institute Co Ltd
Priority to CN201710136792.9A priority Critical patent/CN106906749B/en
Publication of CN106906749A publication Critical patent/CN106906749A/en
Application granted granted Critical
Publication of CN106906749B publication Critical patent/CN106906749B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of construction methods of full assembled steel-concrete combined structure box beam, top plate prefabricated first, first the shear connector upwardly extended is welded on the wave crest face of first waveform steel plate, steel form or the air bag consistent with trough shape are filled in trough as inner membrance, then in the framework of steel reinforcement of the top assembling reinforcement concrete slab of first waveform steel plate, concrete is finally poured into a mould;The alignment of second corrugated sheet steel is placed on above straight steel plate, and is connected by high-strength bolt by prefabricated panel again;If box beam size is smaller, when bottom plate is only with straight steel plate, then this step is omitted;Then the prefabricated Wavelike steel webplate for being fixedly linked with top plate and bottom plate;I-shaped structure connector is processed into web end, or overhanging connector is respectively welded on first waveform steel plate and the second corrugated sheet steel/straight steel plate;Last assembled in situ.The present invention efficiently solves the problems, such as deformation between steel construction and concrete structure.

Description

The construction method of full assembled steel-concrete combined structure box beam
Technical field
The present invention relates to technical field of bridge engineering, more particularly, to a kind of applying for full assembled steel-concrete combined structure box beam Work method.
Background technology
In science of bridge building field, the advantages of steel construction and concrete structure are had both due to steel-concrete combined structure box beam, both may be used Effectively to mitigate dead load, and the span ability of bridge can be improved, therefore there is significant economic benefit and social benefit, answered With having a extensive future.However existing assembled steel-concrete combined structure box beam is applied only on ocean or navigable river, generally It is constructed using the all-welded method of integral prefabricated, girder steel, has the advantages that site operation is fireballing, but due to overall dimensions Greatly, weight is big, and the requirement to hanging device is high, and factory's welding capacity is big, and scene needs also remain for carrying out welding job, this form Composite structure box beam there is only the problems of weld seam anti-fatigue performance deficiency, and there are the temperature and contraction of steel and concrete The nonsynchronous problem of time deformation, it is cracking to be easy to cause pier top position armoured concrete slab, influences beautiful even to weaken bridge The holistic resistant behavior of girder construction.
Invention content
The present invention provides a kind of construction method of full assembled steel-concrete combined structure box beam, it is therefore intended that solves assembled steel The problems such as mixed composite structure box beam overall dimensions are big, lifting is not easy, welding job amount is big, holistic resistant behavior is poor.
To achieve the above object, the present invention can take following technical proposals:
The construction method of full assembled steel-concrete combined structure box beam of the present invention, it is specific as follows:
The first step, prefabricated top plate:
The shear connector upwardly extended first is welded on the wave crest face of first waveform steel plate, steel form is filled in trough Or the air bag consistent with trough shape be as inner membrance, then in the steel of the top assembling reinforcement concrete slab of first waveform steel plate Tendons skeleton finally pours into a mould concrete;
Second step, prefabricated panel:
The alignment of second corrugated sheet steel is placed on above straight steel plate, and is connected by high-strength bolt;If box beam size compared with It is small, when bottom plate is only with straight steel plate, then omit this step;
Third walks, prefabricated web and making connector:
The prefabricated Wavelike steel webplate for being fixedly linked with top plate and bottom plate;I-shaped structure is processed into web end to connect Fitting, or overhanging connector is respectively welded on first waveform steel plate and the second corrugated sheet steel/straight steel plate;
4th step, assembled in situ.
The construction method of full assembled steel-concrete combined structure box beam provided by the invention, fully combines concrete, waveform Steel plate, the advantage of straight steel plate respectively, using the wrinkle effect of corrugated sheet steel efficiently solve steel construction and concrete structure it Between deformation problem, while make box beam under load action have stronger bending strength;Box beam top plate and bottom plate and web Construction precision can be improved in factory's precast block;Reduce site welding amount, reduces a series of diseases brought by weld seam Evil;As a result of prefabrication, the form of construction work of on-site consolidation, substantially reduce the site operation period, accelerate construct into Degree.
Description of the drawings
Fig. 1 is the construction procedure figure of top plate.
Fig. 2 is the construction procedure figure of bottom plate.
Fig. 3 is the structural schematic diagram of full assembled steel-concrete combined structure box beam of the present invention(Web end is welding Connection structure).
Fig. 4 is the enlarged drawing in the portions A in Fig. 3.
Fig. 5 is the structural schematic diagram of full assembled steel-concrete combined structure box beam of the present invention(Web end is bolt Connection structure).
Fig. 6 is the enlarged drawing in the portions B in Fig. 5.
Specific implementation mode
The construction method of full assembled steel-concrete combined structure box beam of the present invention is specific as follows:
The first step, prefabricated top plate:
When construction, first first waveform steel plate 1.1 is laid on smooth ground(See Fig. 1 a), welded on its wave crest face The shear connector 1.3 upwardly extended fills steel form or the air bag consistent with trough shape as inner membrance 1.5 in trough (See Fig. 1 b), then at the top of first waveform steel plate 1.1 according to the framework of steel reinforcement of code requirement assembling reinforcement concrete slab 1.2 1.6(See Fig. 1 c), finally pour into a mould concrete(See Fig. 1 d), form combined bridge deck.
Second step, prefabricated panel:
It is first reserved in the corresponding position of straight steel plate 2.1 and the second corrugated sheet steel 2.2 respectively according to design size when construction Then straight steel plate 2.1 is laid on smooth ground by High-strength bolt hole(See Fig. 2 a), by the second corrugated sheet steel 2.2 to full crying It sets on straight steel plate 2.1(See Fig. 2 b), high-strength bolt 2.3 just twist then according to symmetry principle, after being fully completed, is pressed High-strength bolt 2.3 is screwed onto design value eventually according to symmetry principle(See Fig. 2 c), that is, complete the construction of box beam bottom plate.When box beam size compared with It is small, when box beam bottom plate is only with straight steel plate 2.1, then omit this step.
Third walks, prefabricated web and making connector:
Its end is processed into I-shaped structure and connected by prefabricated Wavelike steel webplate 3.1,3.2 when using welding manner connection Fitting 3.3;When being connected by screw bolts, welded respectively on first waveform steel plate 1.1, the second corrugated sheet steel 2.2 or straight steel plate 2.1 Connect overhanging connector 1.4.
4th step, assembled in situ:
Wavelike steel webplate 3.1,3.2, prefabricated panel, prefabricated top plate etc. are lifted respectively at the scene in place, then uses spiral shell Wavelike steel webplate 3.1,3.2 is connect by bolt/or welding manner with prefabricated top plate and prefabricated panel, ultimately forms the case of an entirety Girder construction.
The full assembled steel-concrete combined structure box beam that above-mentioned assembly is completed as seen in figures 3-6, including top plate and bottom plate and fixation The web being arranged between top plate and bottom plate.
The top plate of the present invention is combined bridge deck, includes the first waveform steel plate 1.1 being fixedly linked with web 3.1,3.2, 1.1 top of first waveform steel plate is provided with armoured concrete slab 1.2, and the shearing being welded on 1.1 wave crest of first waveform steel plate connects 1.3 end of fitting extends in armoured concrete slab 1.2.
When box beam size is smaller, bottom plate is only with straight steel plate 2.1;When box beam size is larger, bottom plate uses combined type, Specifically, the second corrugated sheet steel 2.2 being fixedly linked with web 3.1,3.2, straight steel are provided with above the straight steel plate 2.1 of bottom plate Plate 2.1 is connected at the trough of the second corrugated sheet steel 2.2 by high-strength bolt 2.3, common stress.
Web 3.1,3.2 is the steel plate of waveform configuration, and the resist bending ability of web can be improved, and enhances the whole strong of box beam Degree.Web 3.1,3.2 and the connection of top plate and bottom plate use welding structure or/and bolt fastening structure.With web 3.2 and top plate Connection for, as shown in figure 4, having the I-shaped structure being weldingly connected with first waveform steel plate 1.1 in 3.2 end set of web Connector 3.3, or as shown in fig. 6, be welded with overhanging connector 1.4 on first waveform steel plate 1.1,3.2 end card of web It is connected between overhanging connector 1.4, the two is connected by bolt 3.4.Above-mentioned knot can also be used in the connection that bottom plate is connect with web Any one of structure or two kinds.
The present invention mainly has the following advantages compared with the box beam of existing assembled steel-concrete combined structure:
1)Relative to traditional steel reinforced concrete combined box beam, corrugated sheet steel has extremely strong anti-shearing flexion capabilities, and in transverse direction Under temperature action and concrete shrinkage effect, it is different from concrete deformation that the fold effect of corrugated sheet steel can significantly reduce steel plate The problem of step, can reduce the stress of floorings direction across bridge, avoid the cracking of floorings direction across bridge, to enhance the whole of combined box beam Body stress performance.
2)Corrugated sheet steel has ripe production equipment at present, and forms corrugated sheet steel production line, is easy to extensive Standardized production accelerates construction progress, and saves construction investment cost.
3)The present invention uses corrugated sheet steel on a large scale, fully combines concrete crushing strength height and corrugated sheet steel shearing resistance The good advantage of yield strength high fatigue resistance so that material obtains more reasonably applying, and integral strength is high.
4)The arrangement and method for construction of full assembling, steel construction is broken the whole up into parts, the time of site operation is effectively reduced, makes construction Efficiency increases substantially.
5)The welding capacity for farthest reducing steel construction helps to improve the anti-fatigue performance of steel construction entirety, carries The service life of high bridge.

Claims (1)

1. a kind of construction method of full assembled steel-concrete combined structure box beam, it is characterised in that:
The first step, prefabricated top plate:
Weld the shear connector upwardly extended on the wave crest face of first waveform steel plate first, in trough fill steel form or The air bag consistent with trough shape is as inner membrance, then in the reinforcing bar of the top assembling reinforcement concrete slab of first waveform steel plate Skeleton finally pours into a mould concrete;
Second step, prefabricated panel:
The alignment of second corrugated sheet steel is placed on above straight steel plate, and is connected by high-strength bolt;If box beam size is smaller, bottom When plate is only with straight steel plate, then this step is omitted;
Third walks, prefabricated web and making connector:
The prefabricated Wavelike steel webplate for being fixedly linked with top plate and bottom plate;I-shaped structure connection is processed into web end Part, or overhanging connector is respectively welded on first waveform steel plate and the second corrugated sheet steel/straight steel plate;
4th step, assembled in situ.
CN201710136792.9A 2017-03-09 2017-03-09 The construction method of full assembled steel-concrete combined structure box beam Active CN106906749B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710136792.9A CN106906749B (en) 2017-03-09 2017-03-09 The construction method of full assembled steel-concrete combined structure box beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710136792.9A CN106906749B (en) 2017-03-09 2017-03-09 The construction method of full assembled steel-concrete combined structure box beam

Publications (2)

Publication Number Publication Date
CN106906749A CN106906749A (en) 2017-06-30
CN106906749B true CN106906749B (en) 2018-10-23

Family

ID=59186241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710136792.9A Active CN106906749B (en) 2017-03-09 2017-03-09 The construction method of full assembled steel-concrete combined structure box beam

Country Status (1)

Country Link
CN (1) CN106906749B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724224A (en) * 2017-09-30 2018-02-23 深圳市市政设计研究院有限公司 Trapezoidal clad steel plate mixed structure box beam and method of construction
CN108457182B (en) * 2018-05-18 2024-04-30 中山职业技术学院 Orthotropic bridge deck and construction process thereof
CN112211083B (en) * 2020-11-10 2022-04-08 湖南工学院 Steel-concrete composite beam slab for small bridge and culvert and production method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3623899B2 (en) * 1999-09-13 2005-02-23 新日本製鐵株式会社 Joint structure of concrete slab and steel web in composite box girder
CN103614964B (en) * 2013-12-10 2016-02-03 东南大学 Steel box beam orthotropic deck slab
CN104195959B (en) * 2014-09-26 2016-03-23 中铁二十局集团第五工程有限公司 A kind of prefabricated Wavelike steel webplate PC i beam turns combination box bridge construction technique
KR20160069155A (en) * 2014-12-08 2016-06-16 현인호 Composite Box Girder with concrete composite section in Compression Zone of Steel Box Girder
CN105064198B (en) * 2015-07-30 2018-01-05 苏交科集团股份有限公司 Semi-prefabricated assembled corrugated steel web plate combined box girder and preparation method thereof

Also Published As

Publication number Publication date
CN106906749A (en) 2017-06-30

Similar Documents

Publication Publication Date Title
CN206090273U (en) Prefabricated UHPC of assembling of festival section wave form steel web combination box beam and cable -stay bridge
CN201202084Y (en) Corrugated steel web-prestressed concrete combined box grinder subsection
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN206570672U (en) The box beam of full assembled steel-concrete combined structure
CN208917657U (en) Prefabricated assembled ultra-high performance concrete prestressing force i-shaped beams
CN102877407B (en) Concrete continuous box girder of corrugated steel web for curved bridge
CN101230607B (en) Structure combination parts for hollow slab
CN106906749B (en) The construction method of full assembled steel-concrete combined structure box beam
CN110004822A (en) Wet joint connection design of precast concrete beam
CN205711710U (en) Implanted gum elastic stand apparatus
CN109057148A (en) Ultra-high performance concrete is without regular reinforcement Prestressed U type beam and its construction method
CN202610696U (en) Corrugated steel web pre-tensioning pre-stressed concrete continuous box beam
CN206570671U (en) Based on the prestressed assembled corrugated steel web plate composite box girder of mixing
CN101230659A (en) Force-bearing type underplate component
CN205874944U (en) Double T type wave form steel web profiled steel sheet combination beam
CN208668274U (en) A kind of steel reinforced concrete composite beam bridge
CN204112200U (en) Edge of a wing enhanced waveform steel web plate composite box girder
CN101230605A (en) Structure combination parts for hollow slab
CN203383137U (en) Transversely assembled corrugated steel web combined box girder
CN215561828U (en) Corrugated steel-ultrahigh-strength powder concrete combined box girder continuous rigid frame bridge
CN202610695U (en) Corrugated steel web type pre-tensioned prestressed concrete I-type beam
CN216338993U (en) Longitudinal joint for steel-UHPC (ultra high performance concrete) assembled pi-shaped combination beam
CN211547345U (en) Assembled steel-UHPC combined structure based on bolted connection
CN202990196U (en) Partially prestressed prefabricated thin plate
CN107299721A (en) A kind of precast concrete open tubular column node connecting structure and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant