CN211547345U - Assembled steel-UHPC combined structure based on bolted connection - Google Patents

Assembled steel-UHPC combined structure based on bolted connection Download PDF

Info

Publication number
CN211547345U
CN211547345U CN201921945453.6U CN201921945453U CN211547345U CN 211547345 U CN211547345 U CN 211547345U CN 201921945453 U CN201921945453 U CN 201921945453U CN 211547345 U CN211547345 U CN 211547345U
Authority
CN
China
Prior art keywords
bolt
steel
uhpc
performance concrete
structure based
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921945453.6U
Other languages
Chinese (zh)
Inventor
王俊颜
古金本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201921945453.6U priority Critical patent/CN211547345U/en
Application granted granted Critical
Publication of CN211547345U publication Critical patent/CN211547345U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to an assembled steel-UHPC integrated configuration based on bolted connection, including girder steel (1), prefabricated ultra high performance concrete panel (2) and bolt shear connector (3), bolt shear connector (3) include bolt (32) and corresponding bolt connection sleeve (31), be equipped with a plurality of mounting holes on girder steel (1), the equidistant a plurality of that has inlayed in bottom of prefabricated ultra high performance concrete panel (2) bolt connection sleeve (31), girder steel (1) is connected through bolt shear connector (3) with prefabricated ultra high performance concrete panel (2). Compared with the prior art, the utility model has the advantages of the durability is strong, stability is high, can use repeatedly.

Description

Assembled steel-UHPC combined structure based on bolted connection
Technical Field
The utility model belongs to the technical field of civil engineering technique and specifically relates to an assembled steel-UHPC integrated configuration based on bolted connection is related to.
Background
The steel-concrete continuous system bridge has the advantages of good stress performance, convenient construction and few expansion joints, but under the action of the self weight of the structure and the live load of an automobile, the inner support point of the continuous system bridge generates huge negative bending moment, the influence of the self weight of the structure by the continuous system bridge with large span is more sensitive, the increase of the self weight of the structure can further increase the negative bending moment of the inner support point of the continuous bridge, so that the tensile stress of the inner support point area of the continuous bridge is far greater than that of other parts of the bridge, and the cracking risk of the inner support point area is increased.
The ultra-high performance concrete (UHPC) has excellent mechanical properties, and tends to make the bridge building structure large-span and light. However, for a steel-concrete continuous system bridge, a steel-UHPC composite plate is used in the traditional combination, an inner support point still generates a large negative bending moment under the action of the self weight of the structure and the live load of an automobile, and the transverse connection between main bridge panels still has a large cracking risk.
Chinese patent CN201711478668.7 discloses an assembled steel-concrete composite beam shear key, which is formed by pouring bolt holes through secondary pouring holes at a construction site and then connecting the bolt holes with nuts, so that the overall operation procedure is complicated, and corresponding filling plates need to be filled between the nuts and the steel beams, which is high in cost.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an assembled steel-UHPC integrated configuration based on bolted connection for overcome the defect that the great hogging moment of production, decking exist the fracture risk that above-mentioned prior art exists.
The purpose of the utility model can be realized through the following technical scheme:
the assembled steel-UHPC combined structure based on bolted connection comprises a steel beam, a prefabricated ultrahigh-performance concrete (UHPC) panel and a bolt shear connector, wherein the bolt shear connector comprises a bolt and a corresponding bolt connecting sleeve, a plurality of mounting holes are formed in the steel beam, a plurality of bolt shear connectors are embedded into the bottom of the prefabricated ultrahigh-performance concrete panel at equal intervals, and the steel beam and the prefabricated ultrahigh-performance concrete panel are connected through the bolt shear connectors.
Preferably, the bolt connecting sleeve is an elongated nut.
Preferably, the lengthened nut is a lengthened nut with a gasket.
Preferably, the structure of the mounting hole is a round hole type mounting hole.
The number of the round hole type mounting holes is consistent with that of the bolt shear connectors.
Preferably, the structure of the mounting hole is an oblong hole type mounting hole.
The prefabricated ultrahigh-performance concrete panel is laid above the steel beam.
The joint of the steel beam and the prefabricated ultrahigh-performance concrete panel is the bottom of an upper flange of the steel beam.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses well prefabricated UHPC panel bottom embedding area pad extension nut is as the built-in fitting, then connects the bolted connection sleeve of the prefabricated UHPC panel bottom embedding that lays lower part and upper portion through the bolt, reaches and to dismantle connection and reuse, can eliminate the welding stress that traditional manufacturing methods such as stud and steel welding produced simultaneously.
2. The utility model discloses a circular mounting hole can be adopted to the mounting hole, on the corresponding direction of standardized girder steel and prefabricated ultra high performance concrete panel, the hookup location that all the other bolts and bolted connection sleeve section of thick bamboo can be confirmed to the position that only needs two bolts in the location.
3. The utility model discloses a mounting hole can adopt the long circle mounting hole, to non-standardized prefabricated ultra high performance concrete panel, through the mounted hole of long circle can in time adjusting bolt's hookup location, reduces installation error.
4. The utility model discloses a bolt connection sleeve adopts the area to fill up extension nut, and the gasket at top plays the enlarged footing effect, more helps area pad extension nut anchor.
5. The utility model discloses a prefabricated UHPC board component and girder steel structural component can carry out segmental prefabrication back at the mill, transport the job site and assemble, suitable standardization and industrial production.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection between the steel beam and the prefabricated ultra-high performance concrete panel of the present invention;
fig. 3 is a schematic structural view of the shear connector for bolt according to the present invention.
Reference numerals:
1-a steel beam; 2-prefabricating an ultrahigh-performance concrete panel; 3-bolt shear connectors; 31-lengthened nut with pad; 32-bolt.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments. The embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation manner and a specific operation process are given, but the scope of the present invention is not limited to the following embodiments.
As shown in fig. 1, an assembled steel-UHPC composite structure based on bolt connection includes a steel beam 1, a prefabricated ultra-high performance concrete panel 2 and a bolt shear connector 3, as shown in fig. 3, the bolt shear connector 3 includes bolts 32 and corresponding bolt connection sleeves 31, a plurality of mounting holes are provided on the steel beam 1, as shown in fig. 2, a plurality of bolt connection sleeves 31 are embedded at equal intervals in the bottom of the prefabricated ultra-high performance concrete panel 2, and the steel beam 1 and the prefabricated ultra-high performance concrete panel 2 are connected through the bolt shear connector 3.
The bolt coupling sleeve 31 is an elongated nut.
The lengthened nut is a lengthened nut with a gasket.
The mounting hole is a round hole type mounting hole.
The number of the round hole type mounting holes is consistent with that of the bolt shear connectors 3.
The structure of the mounting hole is a long round hole type mounting hole.
The prefabricated ultrahigh-performance concrete panel 2 is laid above the steel beam 1.
The joint of the steel beam 1 and the prefabricated ultrahigh-performance concrete panel 2 is the bottom of the upper flange of the steel beam 1.
The water cement ratio of the prefabricated ultra-high performance concrete panel 2 is less than 0.25.
Example one
And fixing the lengthened nut 31 with the pad on a fixed mould in a prefabrication factory, and then performing formwork erecting, pouring and normal-temperature maintenance on the ultrahigh-performance concrete to form the prefabricated UHPC panel with the lengthened nut 31 with the pad embedded at the bottom of the prefabricated UHPC panel 2. Meanwhile, a circular mounting hole is formed in the H-shaped steel beam 1 to be matched with a bolt 32, then the prefabricated UHPC panel whole body 2 and the perforated H-shaped steel beam 1 are transported to a construction site to be hoisted and butted, and then the H-shaped steel beam 1 is connected with the prefabricated UHPC panel 2 through the bolt 32.
Example two
The installation hole on the H-shaped steel beam 1 is an oblong installation hole, and the rest of the embodiment is the same as the embodiment I.
In addition, it should be noted that the specific embodiments described in the present specification may have different names, and the above contents described in the present specification are only illustrations of the structures of the present invention. All minor or simple changes made according to the structure, characteristics and principles of the present invention are included in the protection scope of the present invention. Various modifications or additions may be made to the described embodiments or similar methods may be adopted by those skilled in the art without departing from the scope of the invention as defined in the claims.

Claims (8)

1. The assembled steel-UHPC combined structure based on bolt connection comprises a steel beam (1), a prefabricated ultrahigh-performance concrete panel (2) and a bolt shear connector (3), wherein the bolt shear connector (3) comprises bolts (32) and corresponding bolt connecting sleeves (31), and is characterized in that a plurality of mounting holes are formed in the steel beam (1), a plurality of the bolt connecting sleeves (31) are embedded in the bottom of the prefabricated ultrahigh-performance concrete panel (2) at equal intervals, and the steel beam (1) and the prefabricated ultrahigh-performance concrete panel (2) are connected through the bolt shear connector (3).
2. The assembled steel-UHPC composite structure based on bolt connection as claimed in claim 1, characterized in that the bolt connection sleeve (31) is an extended nut.
3. The assembled steel-UHPC combined structure based on bolted connection of claim 2, characterized in that the extension nut is a cushioned extension nut.
4. The assembled steel-UHPC combined structure based on bolt connection as claimed in claim 1, wherein, the structure of the mounting hole is a round hole type mounting hole.
5. The assembled steel-UHPC based bolt connection combination according to claim 4, characterized in that the number of round hole type mounting holes is the same as the number of bolt shear connectors (3).
6. The assembled steel-UHPC combined structure based on bolt connection of claim 1, characterized in that the structure of the mounting hole is an oblong hole type mounting hole.
7. Assembled steel-UHPC combined structure based on bolted connections according to claim 1, characterised in that the prefabricated ultra high performance concrete panels (2) are laid on top of steel beams (1).
8. The assembled steel-UHPC combined structure based on bolted connection according to claim 7, characterized in that, the junction of steel beam (1) and prefabricated ultra high performance concrete panel (2) is the bottom of the upper flange of steel beam (1).
CN201921945453.6U 2019-11-12 2019-11-12 Assembled steel-UHPC combined structure based on bolted connection Active CN211547345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921945453.6U CN211547345U (en) 2019-11-12 2019-11-12 Assembled steel-UHPC combined structure based on bolted connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921945453.6U CN211547345U (en) 2019-11-12 2019-11-12 Assembled steel-UHPC combined structure based on bolted connection

Publications (1)

Publication Number Publication Date
CN211547345U true CN211547345U (en) 2020-09-22

Family

ID=72500452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921945453.6U Active CN211547345U (en) 2019-11-12 2019-11-12 Assembled steel-UHPC combined structure based on bolted connection

Country Status (1)

Country Link
CN (1) CN211547345U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863428A (en) * 2019-11-12 2020-03-06 同济大学 Assembled steel-UHPC combined structure based on bolted connection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863428A (en) * 2019-11-12 2020-03-06 同济大学 Assembled steel-UHPC combined structure based on bolted connection

Similar Documents

Publication Publication Date Title
CN103924505B (en) Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate
CN208917657U (en) Prefabricated assembled ultra-high performance concrete prestressing force i-shaped beams
KR20010078870A (en) Development and construction methods of the prestressed composite truss beams
CN102691257A (en) Continuous box girder made of corrugated steel web pre-tensioned prestressed concrete and construction method
CN111206489A (en) Assembled corrugated web steel box-UHPC (ultra high performance concrete) combined beam bridge and construction method
CN110792165A (en) Prefabricated assembly type concrete beam column joint connecting device and method
CN110846996A (en) Construction method of continuous composite beam bridge and continuous composite beam bridge
CN103243638B (en) Bridge space radioactive concrete-filled steel tube bridge pier and construction method thereof
CN109610311A (en) Prefabrication and assembly construction L-type floorings seam construction and implementation method
CN103806594B (en) A kind of precast concrete
CN110578289A (en) Novel steel-concrete composite beam shear force connecting key
CN211547345U (en) Assembled steel-UHPC combined structure based on bolted connection
CN202610696U (en) Corrugated steel web pre-tensioning pre-stressed concrete continuous box beam
JP2006009449A (en) Truss panel girder and precast truss panel
CN110130485B (en) Prefabricated assembly type beam column node with toothed plates and assembly method thereof
CN112761051A (en) Prefabricated ultrahigh-performance concrete arch bridge and construction method thereof
CN214737322U (en) Assembled mound roof beam concreties structure
CN202610695U (en) Corrugated steel web type pre-tensioned prestressed concrete I-type beam
CN212836086U (en) Assembled composite wall based on H shaped steel
CN113863494A (en) Assembly type concrete beam column connecting node and mounting method thereof
CN112796201A (en) Assembled mound roof beam concreties structure
CN103911948A (en) Transverse truss type structure applied to wide concrete rib plate beam and construction method of structure
CN113700153A (en) Connecting structure of assembled laminated slab and combination beam and construction method thereof
CN110863428A (en) Assembled steel-UHPC combined structure based on bolted connection
CN106869403B (en) Multilayer prefabricated square steel pipe concrete connecting beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant