CN106906748A - Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder - Google Patents

Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder Download PDF

Info

Publication number
CN106906748A
CN106906748A CN201710136336.4A CN201710136336A CN106906748A CN 106906748 A CN106906748 A CN 106906748A CN 201710136336 A CN201710136336 A CN 201710136336A CN 106906748 A CN106906748 A CN 106906748A
Authority
CN
China
Prior art keywords
precast concrete
base plate
steel
top board
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710136336.4A
Other languages
Chinese (zh)
Other versions
CN106906748B (en
Inventor
李斐然
杜战军
马亚丽
孙炜玮
赵彩菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China testing certification Co.,Ltd.
Original Assignee
Henan Provincial Communication Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Provincial Communication Planning and Design Institute Co Ltd filed Critical Henan Provincial Communication Planning and Design Institute Co Ltd
Priority to CN201710136336.4A priority Critical patent/CN106906748B/en
Publication of CN106906748A publication Critical patent/CN106906748A/en
Application granted granted Critical
Publication of CN106906748B publication Critical patent/CN106906748B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder, including carrying out the horizontal and vertical combination beam body being formed by connecting by multiple i-shaped beamses body units, i-shaped beamses body unit is made up of the splicing of individually prefabricated precast concrete top board, precast concrete base plate and Wavelike steel webplate;Lateral connection reinforcing bar, longitudinally connected reinforcing bar and top board prestressed pore passage are embedded with precast concrete top board, its both sides is longitudinally spaced to offer peg notch in multiple;Lateral connection reinforcing bar, longitudinally connected reinforcing bar, pretensioned prestressing steel beam and baseboard prestress duct are embedded with precast concrete base plate, its both sides is longitudinally spaced to offer peg notch under multiple;Wavelike steel webplate upper and lower ends are welded with the flange plate with peg group.The present invention carries out beam body erection using the assembled structure type of precast block, and the volume and weight of each part are all corresponding smaller, transport stabilization, Hoisting Security, beneficial to construction.

Description

Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder
Technical field
The present invention relates to bridge construction technical field, in advance should based on mixing suitable for large bridge more particularly, to a kind of The construction method of the assembled corrugated steel web plate composite box girder of power.
Background technology
Traditional prefabricated case beam web is generally concrete material, and not only weight is big and easy to crack, therefore concrete box girder is only suitable for It is applied to small across footpath(Below 40m)Highway bridge.PC box girder with corrugated steel webs uses the corrugated sheet steel conduct of shearing resistance efficiency high Web, not only mitigates the deadweight of box beam, and because Wavelike steel webplate is distinctive " fold effect ", prestressing force can efficiently apply On concrete roof and floor, in recent years in big-and-middle-sized bridge(More than 50m across footpaths)It is upper to be widely applied.
Constructed using the following two kinds form more than existing Wavelike steel webplate PC combined box beams:
A kind of is by the prefabricated concrete roof of the reinforcing bar of whole box girder body, the prefabricated concrete floor of reinforcing bar and Wavelike steel webplate point For three parts carry out integral prefabricated respectively, lift again afterwards in place, assembly is connected by screw bolts at bridge location.Chinese patent " pin-connected panel prestressed concrete combined box beam "(Application number 200620126505.3)The prefabricated component of said structure is disclosed, and Wavelike steel webplate and top board, the connected mode of base plate are highlighted.But, due to the box beam top board of this structure, base plate and Web is integral structure, and the weight of single prefabricated components is still very heavy.The Wavelike steel webplate case of a width of 16.75m of such as bridge Beam bridge, its weight per linear meter(lin.m.) is up to more than 10t, even if it is still very difficult to lift single prefabricated components during construction respectively.Its Secondary, for convenience of transporting, the length of prefabricated components generally will not be very long, and above-mentioned full span erection structure is only limitted to the bridge of small across footpath, For the bridge of Long span, top board and web still can be using the prefabricated forms of segmentation.In addition, the patent does not account for actually applying Situations such as applying opportunity of man-hour prestressed strand and reserving hole channel, and also not plus discussed for the treatment measures of hogging moment area, If lacking the measure of reply beam body loaded deformation and the detailed consideration of Specific construction process aspect, the feasibility of construction is poor.
Another kind is that top board, base plate and Wavelike steel webplate are fixed the precast assembly unit for being linked to be I-shaped structure, at the scene " two times tensioning is pre- for completion bridge construction such as Chinese patent after the assembled rigid unit of multiple I-shaped structures is carried out into horizontal and vertical splicing Stress assembled Wavelike steel webplate combination beam and its construction method "(Application number 201510255113.0)Disclose said structure Transverse H-shaped prefabricated member, and apply secondary prestress in corresponding opportunity, realize the laterally assembled of transverse H-shaped prefabricated member.It is above-mentioned pre- The assembled rigid unit volume of system is big, tonnage weight(Weight of such as single prefabricated I-shaped unit per linear meter(lin.m.) is up to 5t or so), and And the stability of itself is also poor, easily causes cost of transportation and hoisting cost rises;To lifting appliance requirement in installation process Higher, hoisting safety is relatively low.
The content of the invention
The present invention provides a kind of based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder, purpose It is that solution existing Wavelike steel webplate PC combined box beams easily occur transporting, lift and later maintenance when being applied to large bridge Etc. aspect problem.
To achieve the above object, the characteristics of present invention makes full use of corrugated steel web plate composite box girder, in different plates in Different opportunitys apply prestressing force:For Wavelike steel webplate combination beam, there is the spy of non resistance axle power due to Wavelike steel webplate Point, the axial force of precast concrete base plate and outer Prestressing can reach over time and space it is natural separate, thus Can be by the prestressing force single tension of precast concrete base plate to design load;Using the spy of corrugated sheet steel combination beam " weak beam-ends effect " Linear pattern pretensioned prestressing steel beam is used in point, precast concrete base plate.After the completion of horizontal I-beam assembly is completed, then open The secondary prestress steel beam of precast concrete base plate and the top board prestressed strand of adjacent across footpath pier top hogging moment area are drawn, specifically may be used Take following technical proposals:
It is of the present invention based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder, it is main include with Lower step:
The first step, by Bridge Design requirement, precast concrete top board, the concrete of independent prefabricated composition i-shaped beamses body unit Native base plate and Wavelike steel webplate:
For precast concrete top board, first colligation is provided with the roof steel bar of lateral connection muscle, longitudinally connected muscle and peg notch Net, the peg notch is longitudinally spaced to be arranged on roof steel bar net both sides, then pier top hogging moment prestressed pore passage is arranged on In roof steel bar net, poured afterwards;
For precast concrete base plate, first pass through tensioning equipment and pretensioned prestressing steel Shu Jinhang tensioning, then colligation are provided with The baseplate reinforcing bar net of lateral connection muscle, longitudinally connected muscle and peg notch, the peg notch is longitudinally spaced to be arranged on base plate Bar-mat reinforcement both sides, and baseboard prestress duct is arranged in baseplate reinforcing bar net, installation form, casting concrete, wait to mix afterwards After solidifying soil reaches design strength, form removal loosens pretensioned prestressing steel beam;
For Wavelike steel webplate, first punch process corrugated sheet steel, then flange plate is welded at corrugated sheet steel two ends, afterwards in the wing Multigroup spaced peg group is welded on listrium;
Second step, carries out assembled in situ preparation:
Mobile support device is set between the adjacent abutment or bridge pier that complete construction at the scene used as auxiliary construction platform, meanwhile, By the precast concrete top board of prefabricated completion, precast concrete base plate and corrugated steel web transport to job site;
3rd step, carries out i-shaped beamses body unit and its horizontally-spliced assembling:
Precast concrete base plate is lifted to Mobile support device using hanging device, Wavelike steel webplate is hung in recurrence, and by ripple Shape steel web bottom peg group is inserted into the peg notch of precast concrete base plate;Afterwards, precast concrete top board is lifted by crane, together Sample completes the I-shaped beam body of first piece by Wavelike steel webplate top peg group inserting to the peg notch of precast concrete top board The assembling construction of unit;
Then by Mobile support device along bridge cross direction horizontal transfer, the construction procedure according to first piece i-shaped beamses body unit is complete The assembling construction of other i-shaped beamses body units transversely set in into the spanning;The adjacent i-shaped beamses body unit of colligation afterwards Lateral connection muscle between top board, base plate, pours that to form precast concrete top board longitudinal wet joint and precast concrete base plate vertical To wet seam, the secondary prestress steel Shu Jinhang tensioning in baseboard prestress duct is pointed to afterwards;
4th step, is combined the longitudinal spliced assembling of beam:
Mobile support device is transferred to other spanning positions successively, the 3rd step operation is repeated, each spanning beam body in longitudinal direction is completed Construction;
Longitudinally connected muscle of the colligation adjacent bridge between top board, base plate, pours to form laterally wet seam or crossbeam, and according to first side The order of central sill after beam, is pointed in contiguous prefabricated concrete roof pier top hogging moment prestressed pore passage using symmetrical tensioning principle Tensioning steel Shu Jinhang tensioning, formed continuous beam on many supports system;
5th step, completes the erection of affiliated facility, terminates construction.
Constitute single precast concrete top board, precast concrete base plate and the Wavelike steel webplate of the i-shaped beamses body unit Length be respectively 5-30 meters.
Construction method based on the prestressed assembled corrugated steel web plate composite box girder of mixing of the present invention, using list Spelled at the precast concrete top board of only prefabricated i-shaped beamses body unit, precast concrete base plate and Wavelike steel webplate, then scene Connect the mode of construction.The present invention carries out piecemeal to existing integral prefabricated I-shaped component in a vertical enterprising step, on the one hand " the fold effect " for taking full advantage of Wavelike steel webplate realizes that box beam breaks the whole up into parts, and prefabricated components volume is fully reduced, and makes structure Part volume reduces, it is easy to transport and lifting, is conducive to the fast erecting of bridge, while avoiding integral prefabricated I-shaped component The problem of self stability difference;On the other hand it is also distinctive weak " beam-ends effect " using Wavelike steel webplate, on precast concrete top The prestressed pore passage for wearing pier top hogging moment tensioning steel beam is provided with plate, is provided with precast concrete base plate and first opened Method prestressed strand and secondary prestress steel beam, with work progress perfect cooperation, realize the maximum convenient of construction.Wherein, entering The tensioning of pretensioning steel beam is carried out before row precast concrete base plate, and it is complete horizontal I-beam body unit assembly is completed Cheng Hou, then tensioning secondary prestress steel beam, the stress for resisting concrete shrinkage and creep generation;Web is by end peg group Top, the mode in base plate peg notch is inserted into be attached, be connected firmly, construct it is convenient.Adjacent top board and base plate are in bridge Beam job site can by pour wet seam arrangements carry out splicing laterally and/or longitudinally with obtain the bridge of various requirement it is wide, Spanning.Specifically, advantages of the present invention can be embodied in it is following some:
(1)The present invention carries out beam body erection using the assembled structure type of precast block, and the volume and weight of each part are all corresponding It is smaller, stability of the prefabricated component in transportation can not only be effectively ensured, and be easily guaranteed that the peace of component in hoisting process Quan Xing, beneficial to construction.
(2)The achievable scale of various prefabricated components is prefabricated in the present invention, effectively increases efficiency of construction, shortens construction Cycle.
(3)The present invention applies different types of prestressing force to top board and base plate on different opportunitys, and all using pre- in vivo Stress rib, prestress application effect is relatively stable;Due to the deformed bar negligible amounts of tensioning at the scene, therefore construction party Just, fast.
Brief description of the drawings
Fig. 1 is the structural representation of i-shaped beamses body unit in the present invention.
Fig. 2 is the structural representation of precast concrete top board in Fig. 1.(Omit longitudinally connected reinforcing bar)
Fig. 3 is the structural representation of precast concrete base plate in Fig. 1.(Omit longitudinally connected reinforcing bar)
The structural representation of Wavelike steel webplate in Fig. 4 Fig. 1.
Fig. 5, Fig. 6, Fig. 7 are work progress schematic diagrames.
Fig. 8-13 is the relevant drawings that schematic illustration is carried out to the present invention.
Specific embodiment
Construction method based on the prestressed assembled corrugated steel web plate composite box girder of mixing of the present invention, main bag Include following steps:
The first step, it is individually prefabricated to constitute i-shaped beamses body unit by Bridge Design requirement(As shown in Figure 1)Precast concrete top Plate 1, precast concrete base plate 2 and Wavelike steel webplate 3:
Specifically, during prefabricated precast concrete top board 1 as shown in Figure 2, first colligation is provided with lateral connection muscle 1.1, longitudinal direction and connects The roof steel bar net of muscle and peg notch 1.2 is connect, the peg notch 1.2 is longitudinally spaced to be arranged on roof steel bar net both sides, Pier top hogging moment prestressed pore passage 1.3 is arranged in roof steel bar net again, is poured afterwards;
During prefabricated precast concrete base plate 2 as shown in Figure 3, first to fix pre-tensioning system pre- the precalculated position on pre-tensioning system stretching bed Stress steel beam 2.2 is stretched to design load, then colligation is provided with the bottom of lateral connection muscle 2.1, longitudinally connected muscle and peg notch 2.3 Plate bar-mat reinforcement, the peg notch 2.3 is longitudinally spaced to be arranged on baseplate reinforcing bar net both sides, and by baseboard prestress duct 2.4 In baseplate reinforcing bar net, installation form, casting concrete afterwards, after concrete reaches design strength, form removal is put Loose pretensioned prestressing steel beam 2.2, completes prefabricated, the above-mentioned pretensioned prestressing steel of mixing prestressing force precast concrete base plate 2 Beam 2.2 is used to resist the stress of concrete shrinkage and creep generation;
During prefabricated Wavelike steel webplate 3 as shown in Figure 4, first punch process corrugated sheet steel, then weld the edge of a wing at corrugated sheet steel two ends Plate 3.1, welds multigroup spaced peg group 3.2 on the flange plate 3.1 afterwards;Above-mentioned peg group 3.2 and top, base plate On peg notch 1.2,2.3 positions it is corresponding, shape is engaged, and can firmly insert.
Second step, carries out assembled in situ preparation:
Mobile support device is set between the adjacent abutment or bridge pier that complete construction at the scene used as auxiliary construction platform, meanwhile, The precast concrete top board 1 of prefabricated completion, precast concrete base plate 2 and Wavelike steel webplate 3 are transported to job site.
3rd step, carries out i-shaped beamses body unit and its horizontally-spliced assembling:
Precast concrete base plate 2 is lifted to Mobile support device 4 using hanging device(As shown in Figure 5)On, waveform is hung in recurrence Steel web 3, and the bottom peg group of Wavelike steel webplate 3 is inserted into the peg notch of precast concrete base plate 2;Afterwards, lift by crane Precast concrete top board 1, equally inserts in the peg notch of precast concrete top board 1 the top peg group of Wavelike steel webplate 3, Complete the assembling construction of first piece i-shaped beamses body unit.
Then by Mobile support device 4 along bridge cross direction horizontal transfer, according to the construction of first piece i-shaped beamses body unit Step completes the assembling construction of other i-shaped beamses body units transversely set in the spanning;The adjacent i-shaped beamses of colligation afterwards Lateral connection muscle 1.1,2.1 between body unit top, base plate, and pour to form precast concrete top board longitudinal wet joint 5 and pre- Concrete floor longitudinal wet joint 6 processed(As shown in Figure 6).In order to resist the moment of flexure of second phase load generation, when above-mentioned longitudinal wet connects After seam reaches some strength, the secondary prestress steel Shu Jinhang that need to be pointed in baseboard prestress duct 2.4 is stretched to design load.
The i-shaped beamses body unit of above-mentioned lateral connection can constitute single chamber structure as shown in Figure 6, also can continuously splice The double chambers of composition or many chamber structures.
4th step, is combined the longitudinal spliced assembling of beam:
Mobile support device 4 is transferred to other spanning positions successively, the 3rd step operation is repeated, each spanning beam body in longitudinal direction is completed Construction;
Longitudinally connected muscle of the colligation adjacent bridge between top, base plate, pours to form laterally wet seam or crossbeam 7(As shown in Figure 7); In order to resist the pier top hogging moment of adjacent across footpath box beam, when laterally wet seam or crossbeam 7 reach some strength, according to first side bar The order of central sill, contiguous prefabricated concrete roof pier top hogging moment prestressed pore passage 1.3 is pointed to using symmetrical tensioning principle afterwards Interior tensioning steel Shu Jinhang tensioning, forms continuous beam on many supports system;
5th step, completes the erection of affiliated facility, terminates construction.
In order to reduce the workload of the wet seam of cast in situs, efficiency of construction is improved, constitute the single of i-shaped beamses body unit The length of precast concrete top board 1, precast concrete base plate 2 and Wavelike steel webplate 3 is respectively 5-30 meters.
Vertically spliced the following is to Wavelike steel webplate built H beam of the present invention, applied mixing this construction of prestressing force The concrete principle explanation that the feasibility of method, reasonability are made:
Stress of the precast concrete base plate under two states is analyzed first.
1. the 1st state:
Precast concrete base plate as shown in Figure 8, the prestressing force that the stretch-draw prestressing force steel beam set in it is applied is N, then in advance Section upper stress on concrete floor processed is:
2. the 2nd state:
When above-mentioned precast concrete floor combination turns into I-shaped Wavelike steel webplate combination beam, its I-shape cross section structure is as schemed Shown in 9.
Apply prestressing force N on precast concrete base plate, the moment of flexure to compound section neutral axis is:
Obtained by the area moment of upper lower section is equal:
The area of combination beam total cross-section is:
The moment of inertia of whole cross section is:
Wavelike steel webplate combination beam can not consider the work of web when anti-bending bearing capacity is calculated due to the non resistance axle power of web With equivalent to without web plate section, therefore setting:
Then:
The stress of top board:
Make ratio of height to thickness
The then stress of top board:
The stress of base plate:
Have for general combination beam section, can obtain
By taking the Wavelike steel webplate combination beam of 30m across footpaths as an example.If, now, bring formula into(9)With(10):
When the across footpath of bridge further increases,WithFurther increase, formula(10)Meet
As can be seen here, under the 1st state and the 2nd state, the stress approximately equal of precast concrete base plate.That is, existing in advance The prestressing force that the prefabricated panel stage applies, is still held essentially constant after Wavelike steel webplate combination beam is overlapped into.Therefore waveform is claimed Steel web combination beam take it is vertical layered it is assembled before and after this mechanical characteristics that can be held essentially constant of stress for co-bearing not Denaturation.This characteristic provides the foundation for the vertical layered splicing of Wavelike steel webplate combination beam.
On the basis of above-mentioned analysis, ordinary steel-mixed built H beam and Wavelike steel webplate built H beam is back to discuss Vertical fractionation with assembly during stress change.Wherein, using prestressing force as only consideration external force:
1. vertical split process:
Figure 10 is the schematic diagram that ordinary steel-mixed built H beam carries out vertical fractionation.
Figure 11 is the schematic diagram that Wavelike steel webplate built H beam carries out vertical fractionation.
2. prestressing force+vertical splicing is mixed:
Schematic diagram when Figure 12 is ordinary steel-mixed built H beam applying mixing prestressing force and vertical splicing.
Figure 13 is schematic diagram when Wavelike steel webplate built H beam applies mixing prestressing force and vertically splices.
Contrast above-mentioned legend to can be seen that for Wavelike steel webplate built H beam, prestressing force is applied just in base plate It seem an independent process;But the situation of ordinary steel-mixed combination is entirely different.Therefore, can be prefabricated in construction Apply all or part of prestressing force during concrete floor, then by precast concrete base plate, Wavelike steel webplate and precast concrete The vertical layered assembly of top board, can so greatly reduce the steel Shu Zhangla workloads at scene, improve factory prefabricating degree.

Claims (2)

1. a kind of based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder, it is characterised in that:Mainly Comprise the following steps:
The first step, by Bridge Design requirement, precast concrete top board, the concrete of independent prefabricated composition i-shaped beamses body unit Native base plate and Wavelike steel webplate:
For precast concrete top board, first colligation is provided with the roof steel bar of lateral connection muscle, longitudinally connected muscle and peg notch Net, the peg notch is longitudinally spaced to be arranged on roof steel bar net both sides, then pier top hogging moment prestressed pore passage is arranged on In roof steel bar net, poured afterwards;
For precast concrete base plate, first pass through tensioning equipment and pretensioned prestressing steel Shu Jinhang tensioning, then colligation are provided with The baseplate reinforcing bar net of lateral connection muscle, longitudinally connected muscle and peg notch, the peg notch is longitudinally spaced to be arranged on base plate Bar-mat reinforcement both sides, and baseboard prestress duct is arranged in baseplate reinforcing bar net, installation form, casting concrete, wait to mix afterwards After solidifying soil reaches design strength, form removal loosens pretensioned prestressing steel beam;
For Wavelike steel webplate, first punch process corrugated sheet steel, then flange plate is welded at corrugated sheet steel two ends, afterwards in the wing Multigroup spaced peg group is welded on listrium;
Second step, carries out assembled in situ preparation:
Mobile support device is set between the adjacent abutment or bridge pier that complete construction at the scene used as auxiliary construction platform, meanwhile, By the precast concrete top board of prefabricated completion, precast concrete base plate and corrugated steel web transport to job site;
3rd step, carries out i-shaped beamses body unit and its horizontally-spliced assembling:
Precast concrete base plate is lifted to Mobile support device using hanging device, Wavelike steel webplate is hung in recurrence, and by ripple Shape steel web bottom peg group is inserted into the peg notch of precast concrete base plate;Afterwards, precast concrete top board is lifted by crane, together Sample completes the I-shaped beam body of first piece by Wavelike steel webplate top peg group inserting to the peg notch of precast concrete top board The assembling construction of unit;
Then by Mobile support device along bridge cross direction horizontal transfer, the construction procedure according to first piece i-shaped beamses body unit is complete The assembling construction of other i-shaped beamses body units transversely set in into the spanning;The adjacent i-shaped beamses body unit of colligation afterwards Lateral connection muscle between top board, base plate, pours that to form precast concrete top board longitudinal wet joint and precast concrete base plate vertical To wet seam, the secondary prestress steel Shu Jinhang tensioning in baseboard prestress duct is pointed to afterwards;
4th step, is combined the longitudinal spliced assembling of beam:
Mobile support device is transferred to other spanning positions successively, the 3rd step operation is repeated, each spanning beam body in longitudinal direction is completed Construction;
Longitudinally connected muscle of the colligation adjacent bridge between top board, base plate, pours to form laterally wet seam or crossbeam, and according to first side The order of central sill after beam, is pointed in contiguous prefabricated concrete roof pier top hogging moment prestressed pore passage using symmetrical tensioning principle Tensioning steel Shu Jinhang tensioning, formed continuous beam on many supports system;
5th step, completes the erection of affiliated facility, terminates construction.
2. according to claim 1 based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder, It is characterized in that:Constitute single precast concrete top board, precast concrete base plate and the waveform steel of the i-shaped beamses body unit The length of web is respectively 5-30 meters.
CN201710136336.4A 2017-03-09 2017-03-09 Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder Active CN106906748B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710136336.4A CN106906748B (en) 2017-03-09 2017-03-09 Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710136336.4A CN106906748B (en) 2017-03-09 2017-03-09 Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder

Publications (2)

Publication Number Publication Date
CN106906748A true CN106906748A (en) 2017-06-30
CN106906748B CN106906748B (en) 2018-08-14

Family

ID=59186398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710136336.4A Active CN106906748B (en) 2017-03-09 2017-03-09 Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder

Country Status (1)

Country Link
CN (1) CN106906748B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938494A (en) * 2017-11-17 2018-04-20 上海市城市建设设计研究总院(集团)有限公司 Easy to field erected across interior steel tabula board member and its installation method and combination beam
CN111335166A (en) * 2020-03-09 2020-06-26 浙江交工集团股份有限公司 Construction method using self-bearing structure as temporary support
CN111455806A (en) * 2020-04-17 2020-07-28 浙江省交通规划设计研究院有限公司 Prestressed concrete beam hogging moment area bridge structure and construction method thereof
CN111455856A (en) * 2020-04-17 2020-07-28 浙江省交通规划设计研究院有限公司 Construction method for applying prestress on bridge deck in hogging moment area of steel-concrete composite bridge
CN112538814A (en) * 2019-09-20 2021-03-23 黑龙江农垦建工路桥有限公司 Construction process of transversely prefabricated and assembled corrugated steel web PC combined box girder for bridge construction
CN113215948A (en) * 2021-05-29 2021-08-06 江苏旭辰交通科技发展有限公司 Assembled combined box girder and construction method thereof
CN113585037A (en) * 2021-08-03 2021-11-02 南京工业大学 Modular prefabricated corrugated steel web plate combined box girder and field assembling process thereof
WO2023010679A1 (en) * 2021-08-03 2023-02-09 苏交科集团股份有限公司 Prefabricated assembly corrugated steel web composite bridge, and cantilever construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1952261A (en) * 2006-11-16 2007-04-25 东南大学 Split type prestressed concrete combined box beam
CN102691257A (en) * 2012-06-25 2012-09-26 河南省交通规划勘察设计院有限责任公司 Continuous box girder made of corrugated steel web pre-tensioned prestressed concrete and construction method
KR20120108073A (en) * 2011-03-23 2012-10-05 (주)삼현피에프 Manufacturing method of box type steel-concrete composite girder and construction method of thereof
CN202610696U (en) * 2012-06-25 2012-12-19 河南省交通规划勘察设计院有限责任公司 Corrugated steel web pre-tensioning pre-stressed concrete continuous box beam
CN103388303A (en) * 2013-08-07 2013-11-13 河南省交通规划勘察设计院有限责任公司 Horizontal splicing corrugated steel web plate combined box girder and construction method
CN103938549A (en) * 2014-05-14 2014-07-23 河南省交通规划勘察设计院有限责任公司 Construction method for fabricated type corrugated steel inclined web combined beam
CN104074129A (en) * 2014-06-05 2014-10-01 邢台路桥建设总公司 Assembled corrugated steel web box girder and construction method thereof
CN104195959A (en) * 2014-09-26 2014-12-10 中铁二十局集团第五工程有限公司 Construction technology for prefabricating a corrugated steel web PC I beam into combined box girder bridge
CN104988844A (en) * 2015-05-19 2015-10-21 河南省交通规划勘察设计院有限责任公司 Secondary tensioning prestressed assembly-type corrugated steel web composite beam and construction method thereof
CN105064198A (en) * 2015-07-30 2015-11-18 苏交科集团股份有限公司 Semi-prefabricated assembled corrugated steel web plate combined box girder and preparation method thereof

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1952261A (en) * 2006-11-16 2007-04-25 东南大学 Split type prestressed concrete combined box beam
KR20120108073A (en) * 2011-03-23 2012-10-05 (주)삼현피에프 Manufacturing method of box type steel-concrete composite girder and construction method of thereof
CN102691257A (en) * 2012-06-25 2012-09-26 河南省交通规划勘察设计院有限责任公司 Continuous box girder made of corrugated steel web pre-tensioned prestressed concrete and construction method
CN202610696U (en) * 2012-06-25 2012-12-19 河南省交通规划勘察设计院有限责任公司 Corrugated steel web pre-tensioning pre-stressed concrete continuous box beam
CN103388303A (en) * 2013-08-07 2013-11-13 河南省交通规划勘察设计院有限责任公司 Horizontal splicing corrugated steel web plate combined box girder and construction method
CN103938549A (en) * 2014-05-14 2014-07-23 河南省交通规划勘察设计院有限责任公司 Construction method for fabricated type corrugated steel inclined web combined beam
CN104074129A (en) * 2014-06-05 2014-10-01 邢台路桥建设总公司 Assembled corrugated steel web box girder and construction method thereof
CN104195959A (en) * 2014-09-26 2014-12-10 中铁二十局集团第五工程有限公司 Construction technology for prefabricating a corrugated steel web PC I beam into combined box girder bridge
CN104988844A (en) * 2015-05-19 2015-10-21 河南省交通规划勘察设计院有限责任公司 Secondary tensioning prestressed assembly-type corrugated steel web composite beam and construction method thereof
CN105064198A (en) * 2015-07-30 2015-11-18 苏交科集团股份有限公司 Semi-prefabricated assembled corrugated steel web plate combined box girder and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李斐然: ""二次张拉体内预应力装配式波形钢腹板梁桥的研发"", 《公路交通科技》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938494A (en) * 2017-11-17 2018-04-20 上海市城市建设设计研究总院(集团)有限公司 Easy to field erected across interior steel tabula board member and its installation method and combination beam
CN107938494B (en) * 2017-11-17 2023-09-29 上海市城市建设设计研究总院(集团)有限公司 Inner-crossing steel diaphragm plate component convenient for field installation, installation method thereof and combined beam
CN112538814A (en) * 2019-09-20 2021-03-23 黑龙江农垦建工路桥有限公司 Construction process of transversely prefabricated and assembled corrugated steel web PC combined box girder for bridge construction
CN111335166A (en) * 2020-03-09 2020-06-26 浙江交工集团股份有限公司 Construction method using self-bearing structure as temporary support
CN111455806A (en) * 2020-04-17 2020-07-28 浙江省交通规划设计研究院有限公司 Prestressed concrete beam hogging moment area bridge structure and construction method thereof
CN111455856A (en) * 2020-04-17 2020-07-28 浙江省交通规划设计研究院有限公司 Construction method for applying prestress on bridge deck in hogging moment area of steel-concrete composite bridge
CN111455856B (en) * 2020-04-17 2021-09-03 浙江数智交院科技股份有限公司 Construction method for applying prestress on bridge deck in hogging moment area of steel-concrete composite bridge
CN111455806B (en) * 2020-04-17 2021-09-03 浙江数智交院科技股份有限公司 Construction method of bridge structure in hogging moment area of prestressed concrete beam
CN113215948A (en) * 2021-05-29 2021-08-06 江苏旭辰交通科技发展有限公司 Assembled combined box girder and construction method thereof
CN113585037A (en) * 2021-08-03 2021-11-02 南京工业大学 Modular prefabricated corrugated steel web plate combined box girder and field assembling process thereof
WO2023010679A1 (en) * 2021-08-03 2023-02-09 苏交科集团股份有限公司 Prefabricated assembly corrugated steel web composite bridge, and cantilever construction method thereof

Also Published As

Publication number Publication date
CN106906748B (en) 2018-08-14

Similar Documents

Publication Publication Date Title
CN106906748B (en) Based on the construction method for mixing prestressed assembled corrugated steel web plate composite box girder
CN106758856B (en) The construction method of the pretensioned prestressing corrugated steel web plate composite box girder of precast block
CN106894326B (en) The construction method of assembled pretensioned prestressing corrugated steel web plate composite box girder
CN101440598B (en) Steel box-concrete combined box plate arch structure and construction method thereof
CN109024225A (en) Ultra-high performance concrete truss arch blade unit, truss arch piece bridge and construction method
CN113481826B (en) Prefabricated assembled corrugated steel web plate combined box girder
CN206570671U (en) Based on the prestressed assembled corrugated steel web plate composite box girder of mixing
CN106758857B (en) The construction method of precast block formula secondary prestress Wavelike steel webplate combination beam
CN111305066A (en) Hybrid combination beam steel-concrete combination section and mounting method thereof
CN108221704B (en) Four-beam type I-steel-concrete composite beam for bridge and construction method
CN203639804U (en) Continuous rigid frame bridge based on steel truss and concrete slab composite beam
CN210086022U (en) Assembled single-box multi-chamber corrugated steel web box girder
JP2004324164A (en) Method of constructing corrugated steel web pc bridge closure section
CN109594461B (en) Assembled steel concrete composite beam and forming method thereof
CN215252243U (en) Short-tower cable-stayed bridge with flexible beams and dense cables
CN206570674U (en) Assembled pretensioned prestressing corrugated steel web plate composite box girder
CN212426749U (en) Hybrid reinforced concrete joint section
CN206570675U (en) The pretensioned prestressing corrugated steel web plate composite box girder of precast block
CN107142830A (en) Steel pipe web prestressing force steel reinforced concrete combines main beam structure and construction method
CN206571049U (en) Precast block formula secondary prestress Wavelike steel webplate combination beam
CN112282207A (en) Combined beam, spliced beam and subway station
CN101886370B (en) Steel massive pillar beam for bridge pier
CN201738249U (en) Steel pillar-holding beam of pier
CN111472284A (en) Assembling method for cantilever of prefabricated segmental beam portal crane of urban viaduct
CN215051984U (en) Wide-width large-span hybrid beam short-tower cable-stayed bridge system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200331

Address after: 450000 Henan city of Zhengzhou province and Zheng Dong New District Road No. 3

Patentee after: HENAN TRAFFIC INSTITUTE ENGINEERING DETECTION TECHNOLOGY Co.,Ltd.

Address before: 450052 No. 70 Longhai Middle Road, 27 District, Henan, Zhengzhou

Co-patentee before: Li Feiran

Patentee before: HENAN PROVINCIAL COMMUNICATIONS PLANNING & DESIGN INSTITUTE Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 450000 Zeyu Street, Zhengdong New District, Zhengzhou City, Henan Province

Patentee after: China testing certification Co.,Ltd.

Address before: 450000 Henan city of Zhengzhou province and Zheng Dong New District Road No. 3

Patentee before: HENAN TRAFFIC INSTITUTE ENGINEERING DETECTION TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address