CN106869974B - A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey - Google Patents

A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey Download PDF

Info

Publication number
CN106869974B
CN106869974B CN201710176455.2A CN201710176455A CN106869974B CN 106869974 B CN106869974 B CN 106869974B CN 201710176455 A CN201710176455 A CN 201710176455A CN 106869974 B CN106869974 B CN 106869974B
Authority
CN
China
Prior art keywords
pipe curtain
jacking
deviation
correcting device
deviation correcting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710176455.2A
Other languages
Chinese (zh)
Other versions
CN106869974A (en
Inventor
卞桂荣
雷明锋
蒋建荣
刘聪
于光远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Central South University
Original Assignee
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd, Central South University filed Critical CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Priority to CN201710176455.2A priority Critical patent/CN106869974B/en
Publication of CN106869974A publication Critical patent/CN106869974A/en
Application granted granted Critical
Publication of CN106869974B publication Critical patent/CN106869974B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey, it include: jacking system, test macro, deviation-rectifying system, the test macro is connect by communication cable with inclination measurement device or sensor, readout instrument, the computer being mounted on pipe curtain, and the deviation-rectifying system is connect by communication cable with computer, deviation correcting device and the deviation correcting device being mounted on pipe curtain;In actual mechanical process, comprising the following steps: pass through test macro, real-time measurement and computer tube curtain jacking axis runout situation first;If deviateing is more than specified value, there is computer to calculate deviation adjustment angle according to bias, and be inputted deviation correcting device, deviation correcting device is further driven by deviation correcting device, implements correction and adjust;The present invention can be achieved in ultra-long horizontal pipe curtain jack-in process, the real-time monitoring and adjustment of pipe curtain axis posture, it can be ensured that pipe curtain jacking precision, to meet predetermined design requirement.

Description

A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey
Technical field
The invention belongs to ground neighboring tunneling technical fields, and in particular to a kind of ultra-long horizontal pipe curtain jacking based on deviational survey Construction control device and method.
Background technique
With greatly developing for infrastructure construction in china, all kinds of ground neighboring tunneling engineerings are emerged in multitude, under tunnel Wear existing sensitive construction of structures.In such construction process, due to the presence of the existing construction of structures in periphery, Deformation control is wanted It asks high, therefore is passed through during practice of construction frequently with the construction ancillary measure such as horizontal tube canopy, pipe curtain, and the distance passed through is more next It is longer, further there is ultra-long horizontal pipe canopy or pipe curtain.
Currently, the construction of ultra-long horizontal pipe curtain is all made of the construction method of single-ended jacking, due to jacking distance, practice of construction Usually occur pipe curtain jacking direction in the process to deviate and be difficult to rectify a deviation, and then lead to the jacking accidents such as unsuccessfully, causes unnecessary Waste and construction delay.Therefore needing to design a kind of suitably real-time monitoring tubular curtain axial location and can realize the device of correction And method can carry out real-time deviation correcting according to departure degree and direction, to keep away once discovery pipe curtain jacking direction is deviateed Exempt to do over again or jacking fails.
Summary of the invention
To solve the above problems, the invention discloses a kind of ultra-long horizontal pipe curtain jacking construction control device based on deviational survey With method, it can be achieved that in ultra-long horizontal pipe curtain jack-in process, the real-time monitoring and adjustment of pipe curtain axis posture, it can be ensured that Guan Muding Into precision, to meet predetermined design requirement.
In order to achieve the above objectives, technical scheme is as follows:
A kind of ultra-long horizontal pipe curtain jacking construction control device based on deviational survey, it is characterised in that: include:
Jacking system, for providing the horizontal pushing tow power in pipe curtain work progress;
Test macro is used for real-time monitoring tubular curtain jacking construction axis runout state;
Deviation-rectifying system, the correction deviateed for pipe curtain jack-in process central axes.
The jacking system is mounted on by the rear of jacking tube curtain, including counterforce device, jack group and distribution steel loop, institute The rear that counterforce device is placed in jacking system is stated, for providing pushing reaction, the jack group is 5-7 same specification jack Composition, is arranged circumferentially, end is placed on the counterforce device, and front end and the distribution steel loop are tight along the distribution steel loop Contiguity touching is used to provide the described the jacking force of pipe curtain jacking, and the distribution steel loop is slightly over the circular concentric ring of the pipe curtain, It is placed in the end of the pipe curtain, for evenly distributing the jacking force from the jack group, makes the pipe curtain uniform force.
The test macro is formed by being mounted on inclinometer pipe, inclinometer, readout instrument and computer on the pipe curtain, and two-by-two Between be respectively adopted communication cable connection.
The inclinometer pipe is two, is mounted on the left and right sides outside the pipe curtain, along the elongated arrangement of pipe curtain, uses respectively Horizontally and vertically deviate situation in jack-in process in testing the pipe curtain axis.
The deviation-rectifying system is made of deviation correcting device, transmission belt group, the deviation correcting device for being mounted on pipe curtain top, institute Stating transmission belt group is 4, and front end is connect with 4 diverters of the deviation correcting device, and 32 tail portion of transmission belt group connects driving wheel 14.
The deviation correcting device is connect by the communication cable with the computer, realizes the transmission of correction instruction.
A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey, which is characterized in that including following Step:
Step 1: being measured first by the inclinometer of the test macro along the inclinometer pipe overall length, by the reading Instrument reads the pipe curtain axis test value, and test value is transmitted and stored into the computer by the communication cable;
Step 2: the test value obtained according to the good program being mounted in the computer prepared in advance and step 1, It calculates the pipe curtain axis and designs the deviation value of axis;
Step 3: the deviation value being calculated and preset specified value are compared, judge deviate situation whether Within allowed band, if so, continuing jacking;If deviateing is more than specified value, stop jacking, and by the computer according to partially Correction amount is calculated from measuring and setting formula, wherein for correction amount;For the diameter of the deviation correcting device roller bearing;For driving wheel rolling Shaft diameter;The deviation value of the pipe curtain axis and design axis that are obtained for measuring and calculation;For the top of pipe curtain described in current state Into length;
Step 4: further the correction amount being calculated being exported to the deviation correcting device and adjusts the 4 of the deviation correcting device A diverter after being adjusted in place, shuts down after trying jacking 1m, repeats step 1~step 2, judge rectifying effect, continue if feasible Jacking, until the pipe curtain axes recovery is to setting or allows path;Otherwise, it shuts down in advance and suitably increases correction amount, repeat Step 1~step 4;
Step 5: after rectifying a deviation in place, 4 diverters of the deviation correcting device are shut down and reset by the driving wheel, after Continuous jacking, is repeated in above-mentioned steps, until jacking construction finishes.
The beneficial effects of the present invention are:
A kind of ultra-long horizontal pipe curtain jacking construction control device based on deviational survey of the present invention and method are, it can be achieved that super In long horizontal tube curtain jack-in process, the real-time monitoring and adjustment of pipe curtain axis posture, it can be ensured that pipe curtain jacking precision, it is pre- to meet Determine design requirement.
Detailed description of the invention
Fig. 1 is system structure diagram of the invention.
Fig. 2 is invention correction amount schematic diagram calculation.
Fig. 3 is applicating flow chart of the invention.
Fig. 4 is diverter schematic diagram of the present invention.
Fig. 5 is diverter operation schematic diagram of the present invention.
Reference signs list:
1, jacking system;2, test macro;3, deviation-rectifying system;4, pipe curtain;5, communication cable;6, emptying aperture;7, fixing axle;8, Diverter;9, groove;10, square groove;11, counterforce device;12, jack group;13, steel loop is distributed;14, driving wheel, 15, tooth post; 21, inclinometer pipe;22, inclinometer;23, readout instrument;24, computer;31, deviation correcting device;32, transmission belt group;33, correction control Device.
Specific embodiment
With reference to the accompanying drawings and detailed description, the present invention is furture elucidated, it should be understood that following specific embodiments are only For illustrating the present invention rather than limiting the scope of the invention.It should be noted that word " preceding " used in the following description, " rear ", "left", "right", "up" and "down" refer to that the direction in attached drawing, word "inner" and "outside" refer respectively to direction or remote Direction from geometric center of specific component.
As shown in Figure 1, a kind of ultra-long horizontal pipe curtain jacking construction control device and side based on deviational survey of the present invention Method, comprising: jacking system 1, for providing the horizontal pushing tow power in pipe curtain work progress;Test macro 2 is used for real-time monitoring Pipe curtain jacking construction axis runout state;Deviation-rectifying system 3, the correction deviateed for pipe curtain jack-in process central axes.
Specifically, as shown in Figure 1, the jacking system 1 is mounted on by the rear of jacking tube curtain 4, including counterforce device 11, Jack group 12 and distribution steel loop 13;The counterforce device 11 is placed in the rear of system, for providing pushing reaction;It is described very heavy Top group 12 is 5~7 same specification jack compositions, is arranged circumferentially along the distribution steel loop 13, and end is placed in described anti- On power device 11, front end and the distribution steel loop 13 are in close contact, and are used to provide the described the jacking force of 4 jacking of pipe curtain;Described point It is slightly over the circular concentric ring of the pipe curtain 4 with steel loop 13, is placed in the end of the pipe curtain 4, comes from institute for evenly distributing The jacking force for stating jack group 12 makes 4 uniform force of pipe curtain.
The test macro 2 is by being mounted on inclinometer pipe 21, inclinometer 22, readout instrument 23 and computer 24 on the pipe curtain 4 Composition, and the connection of communication cable 5 is respectively adopted between any two;The inclinometer pipe 21 is two, is mounted on the left side outside the pipe curtain 4 Right two sides, along the elongated arrangement of the pipe curtain 4, be respectively used to test 4 axis of pipe curtain in jack-in process it is horizontal and vertical partially From situation.
The deviation-rectifying system 3 is by being mounted on deviation correcting device 31, the transmission belt group 32, deviation correcting device on 4 top of pipe curtain 33 compositions;The transmission belt group 32 is 4, is connect respectively with 4 diverters 8 of the deviation correcting device 31;Every transmission belt group 32 square grooves 10 for passing through among the diverter 8 arrange that forming circuit, 32 tail portion of transmission belt group connects transmission along 4 overall length of pipe curtain Wheel 14, the deviation correcting device 33 are connect by the communication cable 5 with the computer 24, realize the transmission of correction instruction.
As shown in Fig. 4~Fig. 5, the deviation correcting device 31 is fixedly mounted on the jacking end of pipe curtain 4, and diverter 8 passes through fixation Axis 7 is connect with deviation correcting device 31, and deviation correcting device 31 is that steel is cylinder-shaped, and wall thickness is slightly larger than jacking tube curtain 4, is fixed by welding manner At pipe curtain jacking end, the front end of the deviation correcting device 31 uniformly cuts with 4 grooves 9, for installing the diverter 8, diverter 8 For wedge-shaped steel plate, quantity is 4 pieces, and 8 front end of diverter is wedge-formed incision type, and 8 rear end nose circle shape of diverter, nose circle shape is drilled with elongated Circular hole, fixing axle 7 protrudes into circular hole, in nose circle shape middle position, cuts with a square groove 10, welds in the fixing axle 7 in square groove 10 There is equally distributed tooth post 15,32 surface of transmission belt group is equipped with emptying aperture 6, during preventing correction, the transmission belt group 32 It is produced relative sliding with the diverter 8, causes the diverter 8 that can not rotate, so that correction failure, in the construction process, Once it was found that 4 direction of pipe curtain is deviateed the transmission belt group 32 can be rotated at pipe curtain pushing end, and then drive the steering Device 8 rotates, and realizes that jacking direction is adjusted.
In this embodiment, as shown in Figure 2 to 3, the present invention the following steps are included:
Step 1: being measured first by the inclinometer 22 of the test macro 2 along 22 overall length of inclinometer pipe, by institute It states readout instrument 23 and reads the 4 axis test value of pipe curtain, and test value is transmitted by the communication cable 5 and stored to described In computer 24;
Step 2: the test obtained according to the good program being mounted in the computer 24 prepared in advance and step 1 Value calculates 4 axis of pipe curtain and designs the deviation value of axis;
Step 3: the deviation value being calculated and preset specified value are compared, judge deviate situation whether Within allowed band, if so, continuing jacking;If deviateing is more than specified value, stop jacking, and by 24 basis of computer Bias and setting formula calculate correction amount, wherein for correction amount;For the diameter of 31 roller bearing of deviation correcting device;For the transmission Take turns 14 roller bearing diameters;The deviation value of 4 axis of pipe curtain and design axis that are obtained for measuring and calculation;To be managed described in current state The jacking length of curtain 4;
Step 4: further the correction amount being calculated being exported to the deviation correcting device 33 and adjusts the deviation correcting device 31 4 diverters after being adjusted in place, shut down after trying jacking 1m, repeat step 1~step 2, rectifying effect is judged, if feasible Then continue jacking, until 4 axes recovery of pipe curtain is to setting or allows path;Otherwise, it shuts down in advance and suitably increases correction Amount repeats step 1~step 4;
Step 5: after rectifying a deviation in place, shutting down and reset by the driving wheel 14 4 steerings of the deviation correcting device 31 Device 8 continues jacking, is repeated in above-mentioned steps, until jacking construction finishes.
It can be seen from the above description that the above embodiments of the present invention propose a kind of overlength water based on deviational survey Flat pipe curtain jacking construction control device and method, it can be achieved that in ultra-long horizontal pipe curtain jack-in process, pipe curtain axis posture it is real-time Monitoring and adjustment, it can be ensured that pipe curtain jacking precision, to meet predetermined design requirement.
The technical means disclosed in the embodiments of the present invention is not limited only to technological means disclosed in above embodiment, further includes Technical solution consisting of any combination of the above technical features.

Claims (2)

1. a kind of ultra-long horizontal pipe curtain jacking construction control device based on deviational survey, it is characterised in that: include:
Jacking system, for providing the horizontal pushing tow power in pipe curtain work progress;The jacking system is mounted on by jacking tube The rear of curtain, including counterforce device, jack group and distribution steel loop, the counterforce device is placed in the rear of jacking system, described Jack group is 5-7 same specification jack composition, is arranged circumferentially along the distribution steel loop, end is placed in the counter-force On device, front end and the distribution steel loop are in close contact, and the distribution steel loop is circular concentric ring, are placed in the end of the pipe curtain End;
Test macro is used for real-time monitoring tubular curtain jacking construction axis runout state;The test macro is by being mounted on the pipe Inclinometer pipe, inclinometer, readout instrument and computer composition on curtain, and communication cable connection, the deviational survey are respectively adopted between any two Pipe is two, is mounted on the left and right sides outside the pipe curtain, is arranged along the pipe curtain length;
Deviation-rectifying system, the correction deviateed for pipe curtain jack-in process central axes;The deviation-rectifying system is by being mounted on pipe curtain top Deviation correcting device, transmission belt group, the deviation correcting device composition at end, the transmission belt group is 4, front end and the 4 of the deviation correcting device A diverter connection;Transmission belt group tail portion connects driving wheel, is formed back between the driving wheel and diverter by transmission belt group Road, the deviation correcting device are connect by communication cable with the computer;The deviation correcting device is fixedly mounted on the top of pipe curtain Inlet side, diverter are connect by fixing axle with deviation correcting device, and the front end of the deviation correcting device uniformly cuts with 4 grooves, diverter Front end is wedge-formed incision type, and diverter rear end nose circle shape, nose circle shape is drilled with elongated circular hole, and fixing axle protrudes into circular hole, in circle Shape middle position is held, square groove is equipped with, fixing axle is equipped with tooth post, and transmission belt group surface is equipped with emptying aperture, the emptying aperture and tooth post phase Matching.
2. a kind of construction party of ultra-long horizontal pipe curtain jacking construction control device based on deviational survey according to claim 1 Method, which comprises the following steps:
Step 1: being measured by the inclinometer of the test macro along the inclinometer pipe overall length, read by the readout instrument first The pipe curtain axis test value is taken, and test value is transmitted and stored into the computer by the communication cable;
Step 2: the test value obtained according to the good program being mounted in the computer prepared in advance and step 1 calculates The deviation value of the pipe curtain axis and design axis
Step 3: the deviation value that will be calculatedIt is compared with preset specified value, judges to deviate whether situation is permitting Perhaps within the scope of, if so, continuing jacking;If deviateing is more than specified value, stop jacking, and by the computer according to deviation Amount and setting formula calculate correction amount;
Step 4: the correction amount being calculated further is exported to the deviation correcting device to 4 turns for adjusting the deviation correcting device To device, after being adjusted in place, is shut down after trying jacking 1m, repeat step 1~step 2, judge rectifying effect, continue to push up if feasible Into until the pipe curtain axes recovery is to setting or allows path;Otherwise, it shuts down in advance and suitably increases correction amount, repeat to walk Rapid 1~step 4;
Step 5: after rectifying a deviation in place, shutting down and reset by the driving wheel 4 diverters of the deviation correcting device, continue to push up Into above-mentioned steps being repeated in, until jacking construction finishes.
CN201710176455.2A 2017-03-23 2017-03-23 A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey Active CN106869974B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710176455.2A CN106869974B (en) 2017-03-23 2017-03-23 A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710176455.2A CN106869974B (en) 2017-03-23 2017-03-23 A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey

Publications (2)

Publication Number Publication Date
CN106869974A CN106869974A (en) 2017-06-20
CN106869974B true CN106869974B (en) 2019-09-06

Family

ID=59172990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710176455.2A Active CN106869974B (en) 2017-03-23 2017-03-23 A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey

Country Status (1)

Country Link
CN (1) CN106869974B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110438913B (en) * 2018-05-03 2024-05-24 河北高达智能装备股份有限公司 Box culvert jacking elevation control system
CN108625302B (en) * 2018-05-11 2020-06-02 东南大学 Adjusting device for box culvert jacking longitudinal gradient and monitoring control method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777189B (en) * 2012-08-09 2015-09-16 中铁城建集团北京工程有限公司 A kind of ultra-long tube curtain non-relay jacking construction device and method
CN203547754U (en) * 2013-07-09 2014-04-16 中铁十四局集团有限公司 Device for improving construction precision of long and large pipe shed
CN104343455B (en) * 2013-08-05 2017-04-12 中铁十八局集团有限公司 Long-distance curved jacking pipe and pipe roof construction technique
CN204002822U (en) * 2014-06-27 2014-12-10 刘春华 A kind of push pipe pipe curtain construction equipment
CN104373041A (en) * 2014-09-11 2015-02-25 中铁十六局集团第五工程有限公司 Drilling deviation rectification method for 60-meter-long hole drilling of tunnel large pipe shed
CN104500085B (en) * 2014-12-19 2016-08-24 北京首尔工程技术有限公司 A kind of screw conveyor is with pipe jacking tube curtain machine

Also Published As

Publication number Publication date
CN106869974A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN106869974B (en) A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey
CN112066167B (en) Total station
CN104532843B (en) A kind of steel column location straightening method of stand column pile
CN106814346A (en) Can automatic controlled height and angle tunnel-liner detection support and detection method
CN105547089A (en) Underground pipeline detection system
CN104551485B (en) Positioning structure of welding tool
CN103386580B (en) Pipeline jointing device
CN105240646B (en) The movable tooling of pipeline inspection
CN210908776U (en) Device for adjusting position and transposition angle of welding interface of ocean engineering steel pipe
CN207335658U (en) A kind of steel pipe girth and ellipticity measurement device
CN108240228B (en) A kind of assembly equipment and construction technology of confined concrete arch
CN206668289U (en) A kind of ultra-long horizontal pipe curtain jacking construction control device based on deviational survey
CN109457806A (en) A kind of adjustable splicing structure and assembling method welding ball grid
CN110241735B (en) Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge
CN107916938B (en) Mounting device for curved line pipe curtain machine guiding device
CN103487027B (en) A kind of table top detection method for super-large spliced platform and system
CN207057946U (en) A kind of cage frame positioner
CN107675775B (en) Construction device and construction method for rainwater pipeline construction
CN215846546U (en) Oil gas long-distance pipeline welding device with correction function
CN206457933U (en) A kind of hinge page type connector mounting and positioning device
CN102864729B (en) Pavement milling machine and operation method thereof
CN105180766A (en) Method for measuring installation inner diameter of converter
CN212377454U (en) Positioning and fixing device for small-diameter circular pipeline
CN110108243B (en) Device and method for detecting quality of intersecting opening
CN105643160B (en) Steel pipe internal partition assembling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant