CN106861882A - The method that ball mill has bad luck lifting in building - Google Patents

The method that ball mill has bad luck lifting in building Download PDF

Info

Publication number
CN106861882A
CN106861882A CN201710102564.XA CN201710102564A CN106861882A CN 106861882 A CN106861882 A CN 106861882A CN 201710102564 A CN201710102564 A CN 201710102564A CN 106861882 A CN106861882 A CN 106861882A
Authority
CN
China
Prior art keywords
ball mill
lifting
track
steel
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710102564.XA
Other languages
Chinese (zh)
Inventor
谭飞龙
芦建成
徐红磊
程林
陈国民
朱进涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Engineering Co Ltd
Original Assignee
PowerChina Henan Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Henan Engineering Co Ltd filed Critical PowerChina Henan Engineering Co Ltd
Priority to CN201710102564.XA priority Critical patent/CN106861882A/en
Publication of CN106861882A publication Critical patent/CN106861882A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C17/00Disintegrating by tumbling mills, i.e. mills having a container charged with the material to be disintegrated with or without special disintegrating members such as pebbles or balls
    • B02C17/10Disintegrating by tumbling mills, i.e. mills having a container charged with the material to be disintegrated with or without special disintegrating members such as pebbles or balls with one or a few disintegrating members arranged in the container
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Refuse Collection And Transfer (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses the method that ball mill in a kind of building has bad luck lifting, comprise the following steps:(1)Preparation of construction;(2)Strength check;(3)Make delivery track:Two tracks are spread out using H profile steel, track root is provided with upright supports, and track top is provided with reeded conveying device;(4)Install boom hoisting:Hole to form hole for hoist near spandrel girder position on the platform of Ball Mill Foundation upper floor, shared respectively on the spandrel girder of both sides using I-steel on each hole for hoist, 20t chain blocks are installed on each hole for hoist, ball mill is lifted by crane with chain block when directly over ball mill movement to on-station position;(5)Lifting ball mill.Present invention lifting efficiency high, translational speed is very fast, and the time in place is short.

Description

The method that ball mill has bad luck lifting in building
Technical field:
The present invention relates to a kind of method of lifting, the method that ball mill has bad luck lifting in more particularly to a kind of building.
Background technology:
Industry is installed in equipment, it is often necessary to which the installation for carrying out equipment in interior of building works in place, due to equipment component body Product, weight are larger, it is impossible to take common hanging method, furthermore the lifting facility of maintenance much can not meet and set in building The need for standby integral installation is in place, so the method that a kind of equipment in building of formulation has bad luck lifting is essential.
The content of the invention:
The technical problems to be solved by the invention are:Overcome the deficiencies in the prior art, there is provided a kind of method rationally, can be carried effectively The method that ball mill has bad luck lifting in the building of height lifting efficiency.
The present invention is for the technical solution adopted for solving the technical problem:
A kind of method that ball mill has bad luck lifting in building, comprises the following steps:
(1)Preparation of construction:The position of height, width and the strong point of conveying device is determined according to on-site actual situations, to lifting Place carries out smooth, coordinates the actual machine capability in scene to determine lifting machine and corresponding aid.
(2)Strength check:Determine whether the material composition of conveying device, the selection of lifting device accord with by strength check Conjunction is actually needed.
(3)Make delivery track:Two tracks are spread out using H profile steel, track root is provided with upright supports, track top It is provided with reeded conveying device.
(4)Install boom hoisting:Hole to be formed near spandrel girder position on the platform of Ball Mill Foundation upper floor and hang Dress hole, is shared on the spandrel girder of both sides respectively on each hole for hoist using I-steel, and installing 20t on each hole for hoist pulls Cucurbit, ball mill is lifted by crane when directly over ball mill movement to on-station position with chain block.
(5)Lifting ball mill:Ball mill is had bad luck to lifting position with 100t and 55t truck cranes, double cars have been lifted and have been raised to After certain altitude, 100t and 55t truck cranes slowly move to ball mill on the track fulcrum for laying in advance, then 100t vapour Car hangs loose hook, is lifted by 55t truck crane bicycles, starts to be changed when being consigned to track interior and is lifted by 100t truck crane bicycles, Ball mill is consigned to ball mill on-station position in the horizontal direction with two 10t chain blocks, with 4 installed on floor 20t chain blocks are sling ball mill and by lower tracks and supporting removal, while slowly 4 20 tons of chain blocks of adjustment, will Ball mill falls back to installation site.
In step(3)In two spacing of track be 3 meters, the material of track is the H profile steel of 588 × 500 × 16 × 20mm, Upright supports are made from the square steel of the discarded section bar 20a channel-section steels composition in scene, upright supports design spacing 1.5m, strut length 4.7m。
In step(5)During middle lifting ball mill, to prevent civil engineering beam scratch steel wire rope, ball mill from need to be reserved when entering factory building Go out a certain distance, so 100t truck cranes Heave Here need to be close to factory building side.Double cars must not exceed every crane load when lifting 80%, bicycle lifting is crane load no more than the 90% of rated load.
The steel wire rope is used for the lifting of ball mill, and the I-steel used on the hole for hoist is not shorter than 3.5 meters for 2 25a I-steel.
Positive beneficial effect of the invention is:
1st, the present invention formulates corresponding hanging method according to engineering site actual conditions, makes construction more convenient, not only increases The lifting efficiency of equipment, lifts economic benefit, improves the work output value, and can with larger reduction construction it is dangerous because Element.
2nd, the use material in the present invention has not only saved the input of raw material, and have using the discarded section bar in scene Good environment protecting, translational speed of the present invention is very fast in addition, and the time in place is short, can effectively shorten the lifting duration of equipment, With good practicality.
Brief description of the drawings:
Fig. 1 is the schematic flow sheet of the method that ball mill has bad luck lifting in building of the present invention;
Fig. 2 is the delivery track schematic diagram that ball mill is had bad luck in the method for lifting in building of the present invention;
Fig. 3 is the ball mill top floor punching schematic diagram that ball mill is had bad luck in the method for lifting in building of the present invention;
Fig. 4 is that double cars that ball mill is had bad luck in the method for lifting in building of the present invention lift lifting lifting force analysis figure;
Fig. 5 is the 55t automobiles bicycle lifting lifting force analysis figure that ball mill is had bad luck in the method for lifting in building of the present invention.
Specific embodiment:
The present invention is made further explanation and description with specific embodiment below in conjunction with the accompanying drawings:
Referring to Fig. 1, Fig. 2 and Fig. 3:In figure, 11- cylinders, 12- conveying devices, 13- tracks, 14- columns, 15- spandrel girders, 16- works Word steel, 17- holes for hoist.
Embodiment:A kind of method that ball mill has bad luck lifting in building, comprises the following steps:
(1)Preparation of construction:The position of height, width and the strong point of conveying device is determined according to on-site actual situations, to lifting Place carries out smooth, coordinates the actual machine capability in scene to determine lifting machine and corresponding aid;
(2)Strength check:Determine whether the material composition of conveying device, the selection of lifting device meet reality by strength check Border needs;
(3)Make delivery track:Two tracks 13 are spread out using H profile steel, the root of track 13 is provided with column 14 and supports, track 13 Top is provided with reeded conveying device 12;
(4)Install boom hoisting:Hole to form lifting near the position of spandrel girder 15 on the platform of Ball Mill Foundation upper floor Hole 17, is shared on the spandrel girder 15 of both sides respectively on each hole for hoist 17 using I-steel 16, is installed on each hole for hoist 17 20t chain blocks, ball mill is lifted by crane when directly over ball mill movement to on-station position with chain block;
(5)Lifting ball mill:Ball mill is had bad luck to lifting position with 100t and 55t truck cranes, double cars have been lifted and have been raised to necessarily After height, 100t and 55t truck cranes slowly move to ball mill on the track fulcrum for laying in advance, then 100t truck cranes Loose hook, is lifted by 55t truck crane bicycles, starts to change and lifted by 100t truck crane bicycles to when being consigned inside track 13, is used Two 10t chain blocks are in the horizontal direction consigned to ball mill on-station position ball mill, with 4 installed on floor 20t chain blocks are sling ball mill and by lower tracks 13 and the supporting removal of column 14, while slowly 4 20 tons of adjustment is pulled Cucurbit, installation site is fallen back to by ball mill.
In step(3)In two spacing of track 13 be 3 meters, the material of track 13 is the H of 588 × 500 × 16 × 20mm Shaped steel, the support of column 14 is made from the square steel of the discarded section bar 20a channel-section steels composition in scene, the supported design spacing of column 14 1.5m, the length 4.7m of column 14.
In step(5)During middle lifting ball mill, to prevent civil engineering beam scratch steel wire rope, ball mill from need to be reserved when entering factory building Go out a certain distance, so 100t truck cranes Heave Here need to be close to factory building side, double cars must not exceed every crane load when lifting 80%, bicycle lifting is crane load no more than the 90% of rated load.
Steel wire rope is used for the lifting of ball mill, and the I-steel 16 used on hole for hoist 17 is 2 25a for not being shorter than 3.5 meters Number I-steel 16.
When carrying out strength check, because the part of cylinder 11 weighs 47t altogether, length is 8 meters, crane performance table is checked, to two Crane carries out power can be distributed, and apart from 2 meters of body centre, 55t truck cranes suspension centre is apart from 4 meters of body centre for 100t truck cranes suspension centre (Can be adjusted according to the length situation of cylinder 11), force analysis:F1+F2=47t, 2F1=4·F2, try to achieve:F1=31.33t, F2 =15.67t, 100t truck cranes lifting amount is F during lifting1=31.33t, 55t truck crane lifting amount are F2=15.67t, 100t automobile Maximum lifting amount is 47t when being hung in 7 meters of the radius of gyration 13 meters of brachium, and rate of load condensate is 31.33/47=66.66%, 55t vapour to the maximum Car is hung in 6 meters of the radius of gyration, and the biggest lifting capacity is 23.5t during 18.1 meters of interior brachium, and rate of load condensate is 15.67/23.5=to the maximum 66.68%, rate of load condensate is respectively less than 80% when two cars are lifted, and meets the requirements.
When equipment one end is placed on delivery track 13,100t truck cranes need loose hook, and now 55t truck cranes bicycle hangs Dress, now the track strong point is apart from 2.75 meters of equipment center, force analysis:F3+F4=47t, 4F3=2.75·F4Therefore:F3= 19.15t, F4=27.85t, 55t truck crane undertake lifting amount for F3=19.15t, 55t the truck crane centre of gyration are apart from Heave Here 5.9 Rice, now the biggest lifting capacity is 23.9t under operating mode, and rate of load condensate is 19.15/23.9=80.13% to the maximum, and bicycle lifting rate of load condensate is small In 90%, meet the requirements.
Drawn according to construction procedure, lift the stage in double cars, 100t truck crane suspension centres maximum weighted is 31.33t, using φ 52mm steel wire ropes (6 × 37+1) length is 16 meters, 11 a diameter of 3.26 meters of the cylinder tied up, therefore the level of steel wire rope and ball mill Angle is about 70 °, 100t truck cranes suspension centre totally two strand stress, and single-strand rope stress is(31.33t/2)/sin70°= 16.67t, it is considered to lift dynamic load factor K1=1.25, unbalance factor K2=1.1, calculated weight is according to 47t × 1.25 × 1.1= 64.625t is calculated, altogether four-ply steel wire rope stress, the vertical stress of steel wire rope, and single wire rope and 20t chain block stress are 64.625t/4=16.16t, so stress is larger when steel wire rope is lifted during cord strength is checked, therefore according to stress when lifting i.e. 16.67t is checked, and single-strand rope maximum weighted is 16.67t, is known through tabling look-up:φ 52mm steel wire ropes (6 × 37+1) are disrumpent feelings Pulling force is 1395kN, safe wire cable multiple:(1395/9.8)/ 16.67=8.54 > 8, cord strength meets the requirements.
Known ball mill weight is 47t, and the full payload of track 13 is 47000kg, track 13 from 588 × 500 × 16 × The H profile steel of 20mm, single H profile steel stress is 23500kg, and L=1.5m is computed knowing its module of anti-bending section Wz=6235cm3, should Place's stressing conditions are calculated according to simple beam case:Mmax=FL/4, σ=Mmax/Wz(Wherein Wz is bending resistant section coefficient, MmaxFor Maximal bending moment, F are load), take g=9.8N/kg, allowable stress [σ]=160N/mm2, obtain:σ=F·L/4Wz, σ=(23500×9.8 ×1500)/(4×6235×103)=13.85N/mm2< [σ]=160N/mm2, intensity meets the requirements.
Column 14 uses 20a channel-section steels(Material Q235)During the square steel of composition, supporting leg is spaced every 1.5 meter ampere and fills one, length Degree L=4.7m, force analysis belongs to multispan statically determinate beam, and computational methods are complicated, it is considered to which extreme stressing conditions are all stress by track Column 14 all bears at fulcrum, and altogether everywhere, track Unit Weight is 226kg/m to this programme designed path fulcrum, so single Maximum weighted is 226 × 1.5+47000/4=12089kg under column extreme case, and square steel sectional area is A=57.6cm2
Strength checking:σ=N/A=(12089×9.8)/(57.6×102)=20.57N/mm2< f=215N/mm2,(Wherein f It is the tensile strength design load of steel), intensity meets the requirements.
Level delivery is checked with 10t chain blocks:Cylinder 11 weighs 47t altogether, takes coefficient of maximum static friction μ=0.12, maximum quiet Frictional force f=μ F=0.12 × 47000 × 9.8=55.27kN, pulling force is 55.27/9.8=5.64t, and two 10t chain blocks are maximum Permission stress is 20t > 5.64t, meets and requires.
The conveying device strength check of cylinder 11:Spacing is 5.5m between the strong point of conveying device two, according in cylinder when using The heart is arranged symmetrically, and support uses the H profile steel of 175 × 175 × .5 × 11, and single fulcrum uses 4,8 altogether, delivery circle side by side During shape cylinder, top adds support, prevents ball mill barrel from rolling, and single H profile steel stress is calculated according to 47000kg/8=5875kg, Wz=331cm3, σ=FL/4Wz=(5875×9.8×3000)/(4×331×103)=130.5N/mm2< [σ]=160N/mm2, Intensity meets the requirements.
The pipeline sections of Φ 89 × 3 product is 8.105cm2, the common stress 5.64/2=2.82t in connecting pipe road, single steel pipe stress 2.82/3=0.94t, σ=N/A=(940×9.8)/(8.105×102)=11.37N/mm2< [σ]=160N/mm2, meet the requirements.
The shoulder pole girder strength check of I-steel 16 on floor:Known ball mill weight is 47t, and stress is at single hole for hoist 17 11.75t, each hole for hoist 17 is shared on spandrel girder 15 from two 25a I-steel 16, the stress of single I-steel 16 5875kg, tables look-up and knows its module of anti-bending section Wz=402cm3, take Dynamic factor k1=1.1, unbalanced loading coefficient k2=1.25、 g=9.8N/kg,[σ]=160N/mm2。L≤4[σ]·Wz/k1·k2·F=(4×160×106×402×10- 6)/(1.1× 1.25×5875×9.8)=3.25m, looks into buider's work drawing and knows:Civil engineering 11.95m layers of spandrel girder maximum spacing is 2.55m < 3.25m, Meet the requirements.
The above, is only preferred embodiments of the invention, and any formal limitation is not made to the present invention, all It is any simple modification, equivalent variations and the modification made to above example according to technical spirit of the invention, still falls within In the protection domain of technical solution of the present invention.

Claims (4)

1. a kind of method that ball mill has bad luck lifting in building, it is characterised in that comprise the following steps:
(1)Preparation of construction:The position of height, width and the strong point of conveying device is determined according to on-site actual situations, to lifting Place carries out smooth, coordinates the actual machine capability in scene to determine lifting machine and corresponding aid;
(2)Strength check:Determine whether the material composition of conveying device, the selection of lifting device meet reality by strength check Border needs;
(3)Make delivery track:Two tracks are spread out using H profile steel(13), track(13)Root is provided with column(14)Support, Track(13)Top is provided with reeded conveying device(12);
(4)Install boom hoisting:Near spandrel girder on the platform of Ball Mill Foundation upper floor(15)Position holes to be formed and hangs Dress hole(17), each hole for hoist(17)Upper use I-steel(16)The spandrel girder in both sides is shared respectively(15)On, each lifting Hole(17)On install 20t chain blocks, lift by crane ball mill with chain block when ball mill movement is to directly over on-station position;
(5)Lifting ball mill:Ball mill is had bad luck to lifting position with 100t and 55t truck cranes, double cars have been lifted and have been raised to necessarily After height, 100t and 55t truck cranes slowly move to ball mill on the track fulcrum for laying in advance, then 100t truck cranes Loose hook, is lifted by 55t truck crane bicycles, is started to track(13)Changed during the delivery of inside and lifted by 100t truck crane bicycles, Ball mill is consigned to ball mill on-station position in the horizontal direction with two 10t chain blocks, with 4 installed on floor 20t chain blocks are sling ball mill and by lower tracks(13)And column(14)Supporting removal, while slowly 4 20 tons of adjustment Chain block, installation site is fallen back to by ball mill.
2. the method that ball mill has bad luck lifting in building according to claim 1, it is characterised in that:In step(3)In Two tracks(13)Spacing be 3 meters, track(13)Material be 588 × 500 × 16 × 20mm H profile steel, column(14)Branch Support is made from the square steel of the discarded section bar 20a channel-section steels composition in scene, column(14)Supported design spacing 1.5m, column(14)It is long Degree 4.7m.
3. the method that ball mill has bad luck lifting in building according to claim 1, it is characterised in that:In step(5)In During lifting ball mill, to prevent civil engineering beam scratch steel wire rope, ball mill into a certain distance need to be reserved during factory building, so 100t truck cranes Heave Here need to be close to factory building side, and double cars must not exceed every the 80% of crane load when lifting, bicycle lifting is to hang 90% of car load no more than rated load.
4. the method that ball mill has bad luck lifting in building according to claim 3, it is characterised in that:The steel wire rope is used In the lifting of ball mill, the hole for hoist(17)The I-steel of upper use(16)It is 2 25a I-steel for not being shorter than 3.5 meters (16).
CN201710102564.XA 2017-02-24 2017-02-24 The method that ball mill has bad luck lifting in building Pending CN106861882A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710102564.XA CN106861882A (en) 2017-02-24 2017-02-24 The method that ball mill has bad luck lifting in building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710102564.XA CN106861882A (en) 2017-02-24 2017-02-24 The method that ball mill has bad luck lifting in building

Publications (1)

Publication Number Publication Date
CN106861882A true CN106861882A (en) 2017-06-20

Family

ID=59168690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710102564.XA Pending CN106861882A (en) 2017-02-24 2017-02-24 The method that ball mill has bad luck lifting in building

Country Status (1)

Country Link
CN (1) CN106861882A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109225410A (en) * 2018-08-22 2019-01-18 中国二十冶集团有限公司 A kind of rotary type Crushing Station mounting process
CN112919314A (en) * 2021-02-25 2021-06-08 华诚博远工程技术集团有限公司 Device for assisting in translational transportation and installation of overweight steel column and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253520A (en) * 1996-03-26 1997-09-30 Nkk Corp Rod conveying method from rod mill
CN101712444A (en) * 2009-10-22 2010-05-26 广东力特工程机械有限公司 Method for hoisting large-size workpiece in ordinary plant and hydraulic jacking equipment thereof
DE102009000441A1 (en) * 2009-01-27 2010-07-29 Neuman & Esser Gmbh Mahl- Und Sichtsysteme bowl mill
CN102049335A (en) * 2009-11-06 2011-05-11 中冶成工上海五冶建设有限公司 Installation and construction method of large-sized ball mill
CN103787232A (en) * 2014-02-27 2014-05-14 济南重工股份有限公司 Cylinder body lifting device for ball grinding mill
CN105781108A (en) * 2016-03-04 2016-07-20 中铁隧道集团二处有限公司 Overall transition construction method for large-size steel mould between adjacent field regions

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253520A (en) * 1996-03-26 1997-09-30 Nkk Corp Rod conveying method from rod mill
DE102009000441A1 (en) * 2009-01-27 2010-07-29 Neuman & Esser Gmbh Mahl- Und Sichtsysteme bowl mill
CN101712444A (en) * 2009-10-22 2010-05-26 广东力特工程机械有限公司 Method for hoisting large-size workpiece in ordinary plant and hydraulic jacking equipment thereof
CN102049335A (en) * 2009-11-06 2011-05-11 中冶成工上海五冶建设有限公司 Installation and construction method of large-sized ball mill
CN103787232A (en) * 2014-02-27 2014-05-14 济南重工股份有限公司 Cylinder body lifting device for ball grinding mill
CN105781108A (en) * 2016-03-04 2016-07-20 中铁隧道集团二处有限公司 Overall transition construction method for large-size steel mould between adjacent field regions

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109225410A (en) * 2018-08-22 2019-01-18 中国二十冶集团有限公司 A kind of rotary type Crushing Station mounting process
CN112919314A (en) * 2021-02-25 2021-06-08 华诚博远工程技术集团有限公司 Device for assisting in translational transportation and installation of overweight steel column and construction method
CN112919314B (en) * 2021-02-25 2022-03-08 华诚博远工程技术集团有限公司 Device for assisting in translational transportation and installation of overweight steel column and construction method

Similar Documents

Publication Publication Date Title
CN201228206Y (en) Self-made small-sized hoisting machine
CN103883129B (en) A kind of steel structural roof beam installation method
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN103523683B (en) Construction method for dismantling tower crane by use of small hoisting equipment
CN102080357A (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN207001991U (en) A kind of hanging apparatus of high ferro prefabricated case beam
CN107130770A (en) A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inversion construction method
CN106894342A (en) Pipe installing job platform and construction method
CN103613003A (en) Pulley-type suspension device of large load high-place operation nacelle
CN206538126U (en) The large-scale overweight equipment handling constructing device of Super High
CN104989111B (en) Steel construction high level construction method for hanging
CN206126654U (en) Adopt double -deck balance beam hoist of prestress wire hoist and mount large -tonnage component
CN106861882A (en) The method that ball mill has bad luck lifting in building
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN105776011B (en) Blast furnace roof crane girder installation method
CN203143872U (en) Mobile platform for elevator installation construction
CN106144929A (en) One population hoist device and construction method
CN205709649U (en) A kind of simple suspension crane
CN205603125U (en) Special hoist device that horizontal water tube cooler heat exchange tube was changed
CN103743581B (en) Internal-climbing tower crane test platform device and test method
CN206693031U (en) A kind of large-span suspension bridge cable crane load bearing system of head-rope parallel structure
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN206769526U (en) Jack up Multifunctional creeping gin pole
CN108545629A (en) Utilize the construction method of tower crane lifting girder truss

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 450000 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Applicant after: China Electrical Construction Group Henan Engineering Co., Ltd.

Address before: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Applicant before: China Electric Power Construction Group Henan engineering company

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620