CN106894342A - Pipe installing job platform and construction method - Google Patents

Pipe installing job platform and construction method Download PDF

Info

Publication number
CN106894342A
CN106894342A CN201710038004.2A CN201710038004A CN106894342A CN 106894342 A CN106894342 A CN 106894342A CN 201710038004 A CN201710038004 A CN 201710038004A CN 106894342 A CN106894342 A CN 106894342A
Authority
CN
China
Prior art keywords
job platform
bridge
girder truss
cantilever girder
cantilever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710038004.2A
Other languages
Chinese (zh)
Other versions
CN106894342B (en
Inventor
章勇
刘谨
蔡俊福
侯晓俊
李云峰
王强
董桂生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Rui Fu Technology Co Ltd
Original Assignee
Hunan Rui Fu Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Rui Fu Technology Co Ltd filed Critical Hunan Rui Fu Technology Co Ltd
Priority to CN201710038004.2A priority Critical patent/CN106894342B/en
Publication of CN106894342A publication Critical patent/CN106894342A/en
Application granted granted Critical
Publication of CN106894342B publication Critical patent/CN106894342B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of Pipe installing job platform and construction method, including:It is slidably supported in the trackless dolly group on the bridge floor of bridge, cantilever girder truss mechanism is fixedly connected with trackless dolly group, cantilever girder truss includes the cantilever girder truss assembly being fixedly connected with trackless dolly group, the top for being fixedly connected on cantilever girder truss assembly for by the lifting pipeline component below drainage pipeline device for hoisting bridge, cantilever girder truss assembly is connected with for preventing Pipe installing job platform from facing the counterweight column frame mechanism tumbled sky side towards bridge.Cantilever girder truss assembly is also associated with job platform mechanism, job platform mechanism includes being connected with the cantilever end of cantilever girder truss assembly and positioned at the job platform truss assembly of bridge side, job platform truss assembly is connected with the main job platform for Construction of Supporting personnel's operation, and main job platform is horizontally disposed and the lower section of bridge is extended to by the side of bridge.

Description

Pipe installing job platform and construction method
Technical field
The present invention relates to road, field of bridge construction, especially, it is related to a kind of Pipe installing job platform.Additionally, this hair It is bright to further relate to a kind of Pipe installing job platform construction method.
Background technology
Bridge inspection vehicle, is the special equipment of a kind of maintenance suitable for large and medium-sized bridge and preventive inspection operation, main Want function comprehensively to be checked with to each structure of bridge, repaired for support operating personnel, be that bridge security provides safeguard.It is existing Have in constructing, according to construction requirement, it is necessary to install the drainage pipeline of draining in the lower section of the bridge spanning the sea of large span.
Because drainage pipeline length is more long and weight weight is, it is necessary to be lifted to bridge drainage pipeline using special hanging device The lower section of beam is installed, and is lifted to bridge lower section drainage pipeline using special hanging device, reuses bridge inspection vehicle branch Support workmen carries out the scheme of installation exercise to drainage pipeline, because the basket of work loaded area of bridge inspection vehicle is small, holds Loading capability is weak, therefore is not suitable for that length is more long and installation exercise of drainage pipeline of heavier-weight;In addition, bridge inspection vehicle and specially It is high with hanging device cost, it is expensive, cause construction cost high when using.
The content of the invention
The invention provides a kind of Pipe installing job platform and construction method, with solve bridge inspection vehicle do not apply to it is existing The construction of bridge drainage pipeline and construction cost technical problem high.
The technical solution adopted by the present invention is as follows:
A kind of Pipe installing job platform, it is slidably supported in carrying out correlation to bridge for Construction of Supporting personnel on bridge Operation, Pipe installing job platform includes:It is slidably supported in the trackless dolly group on the bridge floor of bridge, it is fixed in trackless dolly group Cantilever girder truss mechanism is connected with, cantilever girder truss mechanism includes the cantilever girder truss being fixedly connected with trackless dolly group Assembly, the top of cantilever girder truss assembly is fixedly connected on for drainage pipeline to be lifted the lifting pipeline to bridge Component, cantilever girder truss assembly is connected with for preventing Pipe installing job platform from facing the counterweight column tumbled sky side towards bridge Frame mechanism;Cantilever girder truss assembly is also associated with job platform mechanism, and job platform mechanism includes total with cantilever girder truss Into cantilever end be connected and positioned at the job platform truss assembly of bridge side, job platform truss assembly is connected with for supporting The main job platform of workmen's operation, main job platform is horizontally disposed and the lower section of bridge is extended to by the side of bridge.
Further, lifting pipeline component includes being fixedly connected on the mounting bracket at the top of cantilever girder truss assembly, peace Multigroup lifting part for lifting by crane drainage pipeline is interval with dress support, each group lifting part includes:It is fixedly connected on peace Hoist engine, rotating support on dress support is in the pulley in mounting bracket, the lifting rope being wound on hoist engine and pulley and connection In the suspension hook of lifting rope end.
Further, job platform mechanism also includes that at least one set is lifted to below bridge for accepting by lifting part The mobile jacking component groups of drainage pipeline, the mobile jacking component that every group of movement jacking component groups are oppositely arranged including two pieces, often Part movement jacking component is slidably supported on job platform truss assembly along the bearing of trend of main job platform.
Further, job platform truss assembly include vertical beam component, vertical beam component be vertically arranged at the side of bridge and Its top is fixedly connected with the cantilever end of cantilever girder truss assembly;The bottom of vertical beam component is connected with perpendicular intersecting two Root connecting cross beam, is provided with the main job platform for connecting both between two connecting cross beams.
Further, job platform mechanism also includes dropping out main work for the workmen for preventing from being located on main job platform The multiaspect guardrail component of industry platform, multiaspect guardrail component is connected with vertical beam component and two connecting cross beams respectively, and multiaspect guardrail Component joins end to end enclose outside main job platform successively;It is provided with for connecting both between each guardrail component and main job platform And for the auxiliary job platform of workmen's operation.
Further, cantilever girder truss mechanism also includes that multi rack is climbed to cantilever girder purlin for the workmen on bridge Ladder stand at the top of frame assembly, each frame ladder stand is fixedly connected on the top of cantilever girder truss assembly and towards the bridge floor of bridge Extend.
Further, trackless dolly group includes being divided into four trackless dollies at four drift angles of square frame, cantilever girder Truss assembly is connected on four trackless dollies simultaneously, and each trackless dolly includes:Vehicle frame, is connected with many below vehicle frame Group roller group, multigroup roller group sets gradually and is connected along the traffic direction of trackless dolly, and every group of roller group is included along vertical nothing Multiple rollers that the traffic direction of rail dolly sets gradually and is connected;It is provided with above vehicle frame and is connected with one of which roller group With the actuator for driving all rollers in this group of roller group to roll.
According to another aspect of the present invention, a kind of Pipe installing job platform construction method is additionally provided, for constructing Pipe installing job platform described above, construction method specifically includes following steps:In Pipe installing job platform to be built Trackless dolly group is constructed on the bridge floor of bridge;Cantilever girder truss mechanism is built in trackless dolly group and in cantilever girder purlin Counterweight column frame mechanism is built on frame mechanism;Job platform mechanism is built on cantilever girder truss mechanism.
Further, cantilever girder truss mechanism is built in trackless dolly group and is built on cantilever girder truss mechanism Counterweight column frame mechanism specifically includes following steps:Go out cantilever girder truss assembly, lifting pipeline component in bridge floor over-assemble and match somebody with somebody Weight column frame assembly;Cantilever girder truss assembly is assembled in trackless dolly group;Counterweight column frame assembly is assembled to cantilever girder On the side wall of truss assembly, and balancing weight is placed in counterweight column frame assembly;Lifting pipeline component is assembled to cantilever girder purlin The top of frame assembly.
Further, job platform mechanism is built on cantilever girder truss mechanism and specifically includes following steps:In bridge floor Over-assemble goes out vertical beam component, two connecting cross beams, the main pedals of polylith for the main job platform of component;By the top of vertical beam component Cantilever end with cantilever girder truss mechanism is fixedly connected;Two connecting cross beams are connected in the lower horizontal of vertical beam component;Two The main pedal of polylith is laid between root connecting cross beam to construct main job platform.
The invention has the advantages that:
Pipe installing job platform of the invention includes cantilever girder truss assembly, the cantilever end of cantilever girder truss assembly Job platform truss assembly is connected with, job platform truss assembly is connected with the main operation horizontal for Construction of Supporting personnel's operation Platform, the main job platform is horizontally disposed and the lower section of bridge is extended to by the side of bridge, and cantilever girder truss assembly top Portion is fixedly connected with lifting pipeline component, so as to can not only be lifted drainage pipeline using Pipe installing job platform of the invention To the lower section of bridge, while can support several workmens operation simultaneously drainage pipeline is attached to the lower section of bridge;This hair Bright Pipe installing job platform simple structure, it is easy to build, dismantle, while supporting several workmen's operations can to improve construction Efficiency and constructing operation security;Due to Pipe installing job platform simple structure, it is easy to build, so that can be to a certain extent Reduce because of the increased construction cost using bridge inspection vehicle and special hoisting equipment.
In addition to objects, features and advantages described above, the present invention also has other objects, features and advantages. Below with reference to figure, the present invention is further detailed explanation.
Brief description of the drawings
The accompanying drawing for constituting the part of the application is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate, for explaining the present invention, not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the space structure schematic diagram of the Pipe installing job platform of the preferred embodiment of the present invention;
Fig. 2 is the main structure diagram that Pipe installing job platform builds when on bridge in Fig. 1;
Fig. 3 is for building the structural representation of the main pedal of main job platform in Fig. 1;
Fig. 4 is the structural representation of several guardrail components in Fig. 1;
Fig. 5 is for building the structural representation of the auxiliary pedal of auxiliary job platform in Fig. 1;
Fig. 6 is the structural representation of mobile jacking component in Fig. 1;
Fig. 7 is the structural representation of connecting cross beam in Fig. 1;
Fig. 8 is the structural representation of lifting pipeline component in Fig. 1;
Fig. 9 is the structural representation of counterweight column frame assembly in Fig. 1;
Figure 10 is the structural representation of trackless dolly in Fig. 1.
Marginal data
10th, bridge;20th, cantilever girder truss mechanism;21st, cantilever girder truss assembly;211st, cantilever main beam member;212、 Girder connecting elements;22nd, lifting pipeline component;221st, mounting bracket;222nd, hoist engine;223rd, pulley;224th, lifting rope;225th, hang Hook;23rd, ladder stand;30th, counterweight column frame mechanism;31st, counterweight column frame assembly;40th, job platform mechanism;41st, job platform truss Assembly;411st, vertical beam component;412nd, connecting cross beam;42nd, main job platform;421st, main pedal;43rd, guardrail component;44th, auxiliary operation Platform;441st, auxiliary pedal;45th, mobile jacking component;50th, trackless dolly;51st, vehicle frame;52nd, roller group;53rd, actuator.
Specific embodiment
Embodiments of the invention are described in detail below in conjunction with accompanying drawing, but the present invention can be defined by the claims Multitude of different ways with covering is implemented.
Referring to Figures 1 and 2, the preferred embodiments of the present invention provide a kind of Pipe installing job platform, it is slidably supported in Related operation is carried out to bridge 10 for Construction of Supporting personnel on bridge 10, Pipe installing job platform includes:It is slidably supported In the trackless dolly group on the bridge floor of bridge 10, cantilever girder truss mechanism 20, cantilever master are fixedly connected with trackless dolly group Cantilever girder truss assembly 21 that beam truss 20 includes being fixedly connected with trackless dolly group, to be fixedly connected on cantilever girder truss total Top into 21 is for by the lifting pipeline component 22 of the lower section of drainage pipeline device for hoisting bridge 10, cantilever girder truss assembly 21 It is connected with for preventing Pipe installing job platform from facing the counterweight column frame mechanism 30 tumbled sky side towards bridge 10.Cantilever girder purlin Frame assembly 21 is also associated with job platform mechanism 40, and job platform mechanism 40 includes the cantilever end with cantilever girder truss assembly 21 It is connected and positioned at the job platform truss assembly 41 of the side of bridge 10, job platform truss assembly 41 is connected with for Construction of Supporting The main job platform 42 of personnel's operation, main job platform 42 is horizontally disposed and is extended under bridge 10 by the side of bridge 10 Side.Pipe installing job platform of the invention includes cantilever girder truss assembly 21, the cantilever end of cantilever girder truss assembly 21 Job platform truss assembly 41 is connected with, job platform truss assembly 41 is connected with the main operation for Construction of Supporting personnel's operation Platform 42, the main job platform 42 is horizontally disposed and the lower section of bridge 10 is extended to by the side of bridge 10, and cantilever girder purlin The top of frame assembly 21 is fixedly connected with lifting pipeline component 22, so as to not only may be used using Pipe installing job platform of the invention Drainage pipeline is lifted to the lower section of bridge 10, while can support several workmens operation being simultaneously attached to by drainage pipeline The lower section of bridge 10;Pipe installing job platform simple structure of the invention, it is easy to build, dismantle, while supporting several constructions Personnel's operation can improve efficiency of construction and constructing operation security;Due to Pipe installing job platform simple structure, it is easy to build, So as to reduce to a certain extent because of the increased construction cost using bridge inspection vehicle and special hoisting equipment.
Specifically, as shown in Figure 2 and Figure 8, lifting pipeline component 22 includes being fixedly connected on cantilever girder truss assembly 21 The mounting bracket 221 at top, is interval with multigroup lifting part for lifting by crane drainage pipeline in mounting bracket 221, each group rises Hanging part part includes:The hoist engine 222, rotating support in mounting bracket 221 is fixedly connected in the pulley in mounting bracket 221 223rd, the lifting rope 224 being wound on hoist engine 222 and pulley 223 and the suspension hook 225 for being connected to the end of lifting rope 224.It is of the invention In Pipe installing job platform, can be by the drainage pipeline on bridge floor by hoist engine 222, pulley 223, lifting rope 224 and suspension hook 225 Lift to the lower section of bridge 10 downwards, so that drainage pipeline is attached to bridge 10 by the workmen being located on main job platform 42 Lower section so that Pipe installing job platform of the invention can be additionally used in the installation of drainage pipeline.
Further, as shown in Fig. 2 job platform mechanism 40 also includes that at least one set is lifted by crane for accepting by lifting part To the mobile jacking component groups of the drainage pipeline of the lower section of bridge 10, the shifting that every group of movement jacking component groups are oppositely arranged including two pieces Dynamic jacking component 45, as shown in accompanying drawing Fig. 6, every mobile jacking component 45 is along main job platform for the structure of mobile jacking component 45 42 bearing of trend is slidably supported on job platform truss assembly 41.In the specific embodiment of the invention, job platform mechanism 40 Including one group of movement jacking component groups, the movement jacking component groups include two pieces movement jacking component 45, every mobile jacking structure Part 45 is slidably supported on job platform truss assembly 41.Mobile jacking component 45 is outsourcing piece, not only can be along job platform purlin The bearing of trend of frame assembly 41 is slided, while can also oscilaltion.
Alternatively, as shown in Figure 2 and Figure 7, job platform truss assembly 41 includes vertical beam component 411, and vertical beam component 411 is erected The straight side and its top for being arranged at bridge 10 is fixedly connected with the cantilever end of cantilever girder truss assembly 21.It is of the invention specific real Apply in example, vertical beam component 411 includes the connection vertical beam that two opposed verticals are set, and is provided with for connecting between two connection vertical beams Both connecting elements.The bottom of vertical beam component 411 is connected with perpendicular two intersecting connecting cross beams 412, two connections The main job platform 42 for connecting both is provided between crossbeam 412.In the specific embodiment of the invention, as shown in figures 1 and 3, Main job platform 42 is assembled by polylith main pedal 421 as shown in Figure 3.
Preferably, as shown in Fig. 2 to prevent from outwards dropping out main work during the workmen's operation being located on main job platform 42 Industry platform 42, in the preferred embodiment of the present invention, job platform mechanism 40 is also included for preventing from being located on main job platform 42 Workmen drops out the multiaspect guardrail component 43 of main job platform 42, the structure of multiaspect guardrail component 43 as shown in accompanying drawing Fig. 4, In other embodiments, the structure of multiaspect guardrail component 43 can be the same or different, multiaspect guardrail component 43 respectively with vertical beam Component 411 is connected with two connecting cross beams 412, and multiaspect guardrail component 43 joins end to end enclose located at main job platform 42 successively Outward.Further, it is provided between each guardrail component 43 and main job platform 42 for connecting both and supplying workmen's operation Auxiliary job platform 44.In the specific embodiment of the invention, as shown in Figure 2 and Figure 5, auxiliary job platform 44 is as shown in Figure 5 by polylith Auxiliary pedal 441 is assembled.Both connections are provided for by between each guardrail component 43 and main job platform 42 and for applying The auxiliary job platform 44 of workman person's operation, can further increase the Area of bearing of Pipe installing job platform, so as to further expand Big detection, boundary of works area of the workmen to bridge, improves operating efficiency and constructing operation security.
Alternatively, as shown in Fig. 2 cantilever girder truss assembly 21 is in frame type, it includes two pieces of cantilevers being oppositely arranged Main beam member 211, is provided with polylith for connecting both girder connecting elements 212 between two pieces of cantilever main beam members 211.Counterweight Column frame mechanism 30 is fixedly connected with away from the soar aloft girder connecting elements 212 of side of bridge 10.
Further, as shown in Fig. 2 cantilever main beam member 211 includes that horizontally disposed and end extends to the side of bridge 10 Space in cantilever girder.Lifting pipeline component 22 is fixedly connected on two cantilever girders.Job platform truss assembly 41 Cantilever end with two blocks of the two of cantilever main beam member 211 cantilever girders is fixedly connected.
Preferably, as depicted in figs. 1 and 2, being climbed to the top of cantilever girder truss assembly 21 for ease of workmen is carried out Operation, in the preferred embodiment of the present invention, cantilever girder truss mechanism 20 also includes multi rack for the workmen's climbing on bridge 10 To the ladder stand 23 at the top of cantilever girder truss assembly 21, each frame ladder stand 23 is fixedly connected on cantilever girder truss assembly 21 Top and towards bridge 10 bridge floor extend.
Alternatively, as shown in Fig. 2 counterweight column frame mechanism 30 is included in the counterweight column frame assembly 31 of frame type, counterweight column frame The structure of assembly 31 as shown in accompanying drawing Fig. 9, with away from the soar aloft girder connecting elements 212 of side of bridge 10 consolidate by counterweight column frame assembly 31 Fixed connection.Balancing weight (not shown) is provided with counterweight column frame assembly 31.
Alternatively, as shown in figs. 2 and 10, trackless dolly group includes being divided into four tracklesses at four drift angles of frame type Dolly 50, cantilever girder truss assembly 21 is connected on four trackless dollies 50 simultaneously, and each trackless dolly 50 includes:Vehicle frame 51, the lower section of vehicle frame 51 is connected with multigroup roller group 52, and multigroup roller group 52 sets successively along the traffic direction of trackless dolly 50 Put and be connected, every group of roller group 52 includes the multiple rollers for setting gradually and being connected along the traffic direction of vertical trackless dolly 50. The top of vehicle frame 51 is provided with and is connected to drive what all rollers in this group of roller group 52 were rolled with one of which roller group 52 Actuator 53.In the specific embodiment of the invention, as shown in Figure 10, actuator 53 is motor, Pipe installing job platform bag Include two groups of trackless dolly groups, two groups of trackless dolly groups along bridge 10 bearing of trend interval setting, every group of trackless dolly group include Two trackless dollies 50 being oppositely arranged, each trackless dolly 50 includes vehicle frame 51, and the lower section of vehicle frame 51 is connected with two groups Roller group 52, two groups of roller groups 52 along trackless dolly 50 glide direction interval setting, every group of roller group 52 include along vertical nothing Three rollers that the traffic direction of rail dolly 50 sets gradually and is connected.
Referring to Figures 1 and 2, the preferred embodiments of the present invention additionally provide a kind of Pipe installing job platform construction method, For constructing Pipe installing job platform described above, construction method specifically includes following steps:
S1:Trackless dolly group is constructed on the bridge floor of the bridge 10 of Pipe installing job platform to be built.
S2:Cantilever girder truss mechanism 20 is built in trackless dolly group and is built on cantilever girder truss mechanism 20 and matched somebody with somebody Weight column frame mechanism 30.
S3:Job platform mechanism 40 is built on cantilever girder truss mechanism 20.
Pipe installing job platform construction method constructing operation for constructing Pipe installing job platform of the invention Simply, using construction method of the invention can rapid build go out pipeline mounting operation platform, for Construction of Supporting personnel's operation, Compared to using bridge inspection vehicle, the Pipe installing job platform simple structure constructed using construction method of the invention, it is easy to Build, dismantle;Area of bearing is big, can simultaneously carry several workmens, thus can expand workmen to the detection of bridge, apply Work scope, and operating efficiency is improved, while improving constructing operation security, and can reduce to a certain extent because being examined using bridge Look into car and increased construction cost.
Alternatively, cantilever girder truss mechanism 20 and the structure on cantilever girder truss mechanism 20 are built in trackless dolly group Build counterweight column frame mechanism 30 and specifically include following steps:
S201:Go out cantilever girder truss assembly 21, lifting pipeline component 22 and counterweight column frame assembly 31 in bridge floor over-assemble.
S202:Cantilever girder truss assembly 21 is assembled in trackless dolly group.
S203:Counterweight column frame assembly 31 is assembled on the side wall of cantilever girder truss assembly 21, and balancing weight is placed in In counterweight column frame assembly 31.
S204:Lifting pipeline component 22 is assembled to the top of cantilever girder truss assembly 21.
Specifically, cantilever girder truss mechanism 20 and the structure on cantilever girder truss mechanism 20 are built in trackless dolly group Counterweight column frame mechanism 30 is built to specifically include:First on bridge floor cantilever girder truss assembly is assembled with I-steel and connecting rod 21st, lifting pipeline component 22 and counterweight column frame assembly 31, the structure that cantilever girder truss assembly 21 is assembled such as accompanying drawing Fig. 2 institutes Show, the structure that lifting pipeline component 22 is assembled as shown in accompanying drawing Fig. 8, the structure such as accompanying drawing figure that counterweight column frame assembly 31 is assembled Shown in 9;Then the cantilever girder truss assembly 21 that will be assembled again is assembled on many trackless dollies 50;Then will assemble Counterweight column frame assembly 31 is assembled on the side wall of cantilever girder truss assembly 21, and balancing weight is placed in into counterweight column frame assembly 31 It is interior;The lifting pipeline component 22 that will finally assemble is assembled to the top of cantilever girder truss assembly 21, so as to complete cantilever master The structure of beam truss mechanism 20 and the structure counterweight column frame mechanism 30 on cantilever girder truss mechanism 20.
Preferably, cantilever girder truss assembly 21, lifting pipeline component 22 and counterweight column frame assembly are gone out in bridge floor over-assemble Bridge floor over-assemble is additionally included in when 31 and goes out multi rack ladder stand 23, the structure of ladder stand 23 is as shown in accompanying drawing Fig. 2.
Further, step is also included after lifting pipeline component 22 being assembled into the top of cantilever girder truss assembly 21 S205:Multi rack ladder stand 23 is separately assembled to the top of cantilever girder truss assembly 21.
Job platform mechanism 40 is built on cantilever girder truss mechanism 20 and specifically includes following steps:
S301:Go out 411, two connecting cross beams 412 of vertical beam component in bridge floor over-assemble, for the main job platform 42 of component The main pedal 421 of polylith.
S302:The top of vertical beam component 411 is fixedly connected with the cantilever end of cantilever girder truss mechanism 20.
S303:Two connecting cross beams 412 are connected in the lower horizontal of vertical beam component 411.
S304:The main pedal 421 of polylith is laid between two connecting cross beams 412 to construct main job platform 42.
Specifically, job platform mechanism 40 is built on cantilever girder truss mechanism 20 to specifically include:First on bridge floor 411, two connecting cross beams 412 of vertical beam component, the main pedal 421 of polylith for the main job platform 42 of component are assembled, the present invention In specific embodiment, as shown in Fig. 2 vertical beam component 411 includes the connection vertical beam that two opposed verticals are set, two connection vertical beams Between be provided with connecting elements for connecting both, the structure of main pedal 421 is as shown in accompanying drawing Fig. 3;Then by vertical beam component 411 Top be fixedly connected with the cantilever end of cantilever girder truss mechanism 20;Then the lower horizontal in vertical beam component 411 connects two Root connecting cross beam 412, the structure of connecting cross beam 412 is as shown in accompanying drawing Fig. 7;The last laying between two connecting cross beams 412 is more The main pedal 421 of block is constructing main job platform 42.
Preferably, go out 411, two connecting cross beams 412 of vertical beam component in bridge floor over-assemble, for building main job platform 42 Polylith main pedal 421 when also include:Go out multiaspect guardrail component 43 and for building auxiliary job platform 44 in bridge floor over-assemble The auxiliary pedal 441 of polylith, the structure of the guardrail component 43 for assembling as shown in accompanying drawing Fig. 4, structure such as accompanying drawing Fig. 5 of auxiliary pedal 441 It is shown.
Further, after the main pedal 421 of polylith is laid between two connecting cross beams 412 to construct main job platform 42 Also include step:
S305:Multiaspect guardrail component 43 is joined end to end successively and is installed in the periphery of main job platform 42;
S306:Auxiliary pedal 441 is laid between guardrail component 43 and main job platform 42 to construct positioned at guardrail component Auxiliary job platform 44 between 43 and main job platform 42.
Specifically, the main pedal 421 of polylith is laid between two connecting cross beams 412 to be gone back after constructing main job platform 42 Including:Multiaspect guardrail component 43 is joined end to end successively first is installed in the periphery of main job platform 42;Then again in guardrail structure Auxiliary pedal 441 is laid between part 43 and main job platform 42 to construct between guardrail component 43 and main job platform 42 Auxiliary job platform 44.By the auxiliary job platform that both connections are provided between each guardrail component 43 and main job platform 42 44, can further increase the Area of bearing of Pipe installing job platform so that further expand workmen to the detection of bridge, Boundary of works area, improves operating efficiency and constructing operation security.
Preferably, auxiliary pedal 441 is laid between guardrail component 43 and main job platform 42 to construct positioned at guardrail structure Also include step S307 after auxiliary job platform 44 between part 43 and main job platform 42:The two pieces of outsourcing is moved into jacking component 45 are separately assembled on two connecting cross beams 412, so that mobile jacking component 45 is slided along the bearing of trend of connecting cross beam 412.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. a kind of Pipe installing job platform, it is characterised in that it is slidably supported on bridge (10) for Construction of Supporting personnel Related operation is carried out to the bridge (10), the Pipe installing job platform includes:
It is slidably supported in the trackless dolly group on the bridge floor of the bridge (10), be fixedly connected with cantilever in the trackless dolly group Girder truss mechanism (20), the cantilever girder truss mechanism (20) includes the cantilever master that is fixedly connected with the trackless dolly group Beam truss assembly (21), be fixedly connected on the top of the cantilever girder truss assembly (21) for by drainage pipeline lift to Lifting pipeline component (22) below the bridge (10), the cantilever girder truss assembly (21) is connected with described for preventing Pipe installing job platform is towards counterweight column frame mechanism (30) tumbled sky side of facing of the bridge (10);
The cantilever girder truss assembly (21) is also associated with job platform mechanism (40), and the job platform mechanism (40) includes It is connected with the cantilever end of the cantilever girder truss assembly (21) and the job platform truss positioned at the bridge (10) side is total Into (41), the job platform truss assembly (41) is connected with the main job platform (42) for Construction of Supporting personnel's operation, institute State the lower section that main job platform (42) is horizontally disposed with and the bridge (10) are extended to by the side of the bridge (10).
2. Pipe installing job platform according to claim 1, it is characterised in that
The lifting pipeline component (22) includes the mounting bracket that is fixedly connected at the top of the cantilever girder truss assembly (21) (221) multigroup lifting part for lifting by crane drainage pipeline, lifting described in each group, are interval with the mounting bracket (221) Part includes:
Hoist engine (222), the rotating support in the mounting bracket (221) are fixedly connected in the mounting bracket (221) Pulley (223), the lifting rope (224) that is wound on the hoist engine (222) and the pulley (223) and be connected to the lifting rope (224) suspension hook (225) of end.
3. Pipe installing job platform according to claim 2, it is characterised in that
The job platform mechanism (40) also includes that at least one set is lifted to the bridge for accepting by the lifting part (10) the mobile jacking component groups of the drainage pipeline below, the shifting that mobile jacking component groups described in every group are oppositely arranged including two pieces Dynamic jacking component (45), every mobile jacking component (45) is slidably supported along the bearing of trend of the main job platform (42) In on the job platform truss assembly (41).
4. Pipe installing job platform according to claim 1, it is characterised in that
The job platform truss assembly (41) includes vertical beam component (411), and the vertical beam component (411) is vertically arranged at described The side and its top of bridge (10) are fixedly connected with the cantilever end of the cantilever girder truss assembly (21);
The bottom of the vertical beam component (411) is connected with perpendicular two intersecting connecting cross beams (412), two connections The described main job platform (42) for connecting both is provided between crossbeam (412).
5. Pipe installing job platform according to claim 4, it is characterised in that
The job platform mechanism (40) also includes being dropped out for the workmen for preventing from being located on the main job platform (42) The multiaspect guardrail component (43) of the main job platform (42), guardrail component (43) described in multiaspect respectively with the vertical beam component (411) it is connected with two connecting cross beams (412), and guardrail component described in multiaspect (43) joins end to end enclose located at described successively Main job platform (42) is outward;
It is provided between each guardrail component (43) and the main job platform (42) for being connected both and making for workmen The auxiliary job platform (44) of industry.
6. Pipe installing job platform according to claim 1, it is characterised in that
The cantilever girder truss mechanism (20) also includes that multi rack is climbed to described for the workmen on the bridge (10) and hangs Ladder stand (23) at the top of arm girder truss assembly (21), ladder stand (23) is fixedly connected on the cantilever girder purlin described in each frame The top of frame assembly (21) and towards the bridge (10) bridge floor extend.
7. Pipe installing job platform according to claim 1, it is characterised in that
The trackless dolly group includes being divided into four trackless dollies (50) at four drift angles of square frame, the cantilever girder purlin Frame assembly (21) is while be connected on four trackless dollies (50), each described trackless dolly (50) includes:
Vehicle frame (51), is connected with multigroup roller group (52), multigroup roller group (52) edge below the vehicle frame (51) The traffic direction of the trackless dolly (50) sets gradually and is connected, and roller group (52) described in every group is including along the vertical trackless Multiple rollers that the traffic direction of dolly (50) sets gradually and is connected;
It is provided with above the vehicle frame (51) and is connected to drive the group roller group with roller group described in one of which (52) (52) actuator (53) that all described roller in is rolled.
8. a kind of Pipe installing job platform construction method, it is characterised in that for constructing as any in claim 1 to 7 Pipe installing job platform described in, the construction method specifically includes following steps:
Trackless dolly group is constructed on the bridge floor of the bridge (10) of the Pipe installing job platform to be built;
Cantilever girder truss mechanism (20) is built in the trackless dolly group and on the cantilever girder truss mechanism (20) Build counterweight column frame mechanism (30);
Job platform mechanism (40) is built on the cantilever girder truss mechanism (20).
9. Pipe installing job platform construction method according to claim 8, it is characterised in that in the trackless dolly group Upper structure cantilever girder truss mechanism (20) and structure counterweight column frame mechanism (30) on the cantilever girder truss mechanism (20) Specifically include following steps:
Go out cantilever girder truss assembly (21), lifting pipeline component (22) and counterweight column frame assembly in the bridge floor over-assemble (31);
The cantilever girder truss assembly (21) is assembled in the trackless dolly group;
Counterweight column frame assembly (31) is assembled on the side wall of the cantilever girder truss assembly (21), and balancing weight is put In counterweight column frame assembly (31);
The lifting pipeline component (22) is assembled to the top of the cantilever girder truss assembly (21).
10. Pipe installing job platform construction method according to claim 8, it is characterised in that in the cantilever girder Job platform mechanism (40) is built on truss mechanism (20) and specifically includes following steps:
Go out vertical beam component (411), two connecting cross beams (412) in the bridge floor over-assemble, for the main job platform of component (42) The main pedal of polylith (421);
The top of the vertical beam component (411) is fixedly connected with the cantilever end of the cantilever girder truss mechanism (20);
Two connecting cross beams (412) are connected in the lower horizontal of the vertical beam component (411);
Main pedal (421) described in polylith is laid between two connecting cross beams (412) to construct the main job platform (42)。
CN201710038004.2A 2017-01-18 2017-01-18 Pipe installing job platform and construction method Expired - Fee Related CN106894342B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710038004.2A CN106894342B (en) 2017-01-18 2017-01-18 Pipe installing job platform and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710038004.2A CN106894342B (en) 2017-01-18 2017-01-18 Pipe installing job platform and construction method

Publications (2)

Publication Number Publication Date
CN106894342A true CN106894342A (en) 2017-06-27
CN106894342B CN106894342B (en) 2019-03-15

Family

ID=59197979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710038004.2A Expired - Fee Related CN106894342B (en) 2017-01-18 2017-01-18 Pipe installing job platform and construction method

Country Status (1)

Country Link
CN (1) CN106894342B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107298392A (en) * 2017-08-25 2017-10-27 黄河科技学院 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket
CN107513944A (en) * 2017-09-21 2017-12-26 宁波交通工程建设集团有限公司 Servicing bridges bridge floor edge of a wing bottom surface Pipe installing movement support and operating method
CN107794840A (en) * 2017-11-08 2018-03-13 中铁上海工程局集团有限公司 A kind of bridge Large Diameter Steel Drainage Pipe erecting device and its construction method
CN108708277A (en) * 2018-06-29 2018-10-26 中国葛洲坝集团第工程有限公司 Overpass bridge bottom wire laying device
CN110158460A (en) * 2019-05-24 2019-08-23 中铁十局集团第一工程有限公司 Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam
CN110409321A (en) * 2019-08-30 2019-11-05 中冶建工集团有限公司 A kind of bridge finishing scaffold device and bridge fitment operation structure
WO2023226935A1 (en) * 2022-05-23 2023-11-30 上海振华重工(集团)股份有限公司 Bridge crane construction platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997020988A1 (en) * 1995-12-07 1997-06-12 Alfons Moog Bridge inspection system
CN2666992Y (en) * 2003-12-30 2004-12-29 交通部公路科学研究所 Light removable assembling bridge detection working frame
CN103898832A (en) * 2012-12-28 2014-07-02 武汉二航路桥特种工程有限责任公司 Bridge cable hanging anchoring end detection working platform
CN105133509A (en) * 2015-09-23 2015-12-09 北京中交桥宇科技有限公司 Truss type simple working platform based on bridge maintenance
CN206591432U (en) * 2017-01-18 2017-10-27 湖南瑞涪科技实业有限公司 Pipe installing job platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997020988A1 (en) * 1995-12-07 1997-06-12 Alfons Moog Bridge inspection system
CN2666992Y (en) * 2003-12-30 2004-12-29 交通部公路科学研究所 Light removable assembling bridge detection working frame
CN103898832A (en) * 2012-12-28 2014-07-02 武汉二航路桥特种工程有限责任公司 Bridge cable hanging anchoring end detection working platform
CN105133509A (en) * 2015-09-23 2015-12-09 北京中交桥宇科技有限公司 Truss type simple working platform based on bridge maintenance
CN206591432U (en) * 2017-01-18 2017-10-27 湖南瑞涪科技实业有限公司 Pipe installing job platform

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107298392A (en) * 2017-08-25 2017-10-27 黄河科技学院 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket
CN107298392B (en) * 2017-08-25 2019-09-13 黄河科技学院 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket
CN107513944A (en) * 2017-09-21 2017-12-26 宁波交通工程建设集团有限公司 Servicing bridges bridge floor edge of a wing bottom surface Pipe installing movement support and operating method
CN107794840A (en) * 2017-11-08 2018-03-13 中铁上海工程局集团有限公司 A kind of bridge Large Diameter Steel Drainage Pipe erecting device and its construction method
CN107794840B (en) * 2017-11-08 2024-02-09 中铁上海工程局集团有限公司 Bridge large-diameter drainage steel pipe installation device and construction method thereof
CN108708277A (en) * 2018-06-29 2018-10-26 中国葛洲坝集团第工程有限公司 Overpass bridge bottom wire laying device
CN110158460A (en) * 2019-05-24 2019-08-23 中铁十局集团第一工程有限公司 Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam
CN110409321A (en) * 2019-08-30 2019-11-05 中冶建工集团有限公司 A kind of bridge finishing scaffold device and bridge fitment operation structure
WO2023226935A1 (en) * 2022-05-23 2023-11-30 上海振华重工(集团)股份有限公司 Bridge crane construction platform

Also Published As

Publication number Publication date
CN106894342B (en) 2019-03-15

Similar Documents

Publication Publication Date Title
CN106894342A (en) Pipe installing job platform and construction method
CN206591432U (en) Pipe installing job platform
CN106638299B (en) Multifunction working platform and construction method
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN106759845B (en) A kind of construction method of Steel corridor
CN106193618A (en) A kind of Long span aerial steel structure truss construction
CN104831846A (en) Hoisting method for indoor inclined curtain wall super-large glass
CN110371823B (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN106948604A (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN102877638A (en) Operating platform and operating method for constructing suspension steel structure system
CN114182647B (en) Construction method for lifting and turning weak arch
CN106121040A (en) Lattice column welding device and welding method
CN115538792A (en) Residential building machine installation construction method and structure
CN102877412B (en) Method of pre-assembly in integral erecting way of steel tower
JP2859163B2 (en) Rotary erection method for bridges with high piers
CN102226497B (en) Manufacturing method of large rubber rolling curtain sealed dry-type gas holder
CN206591431U (en) Multifunction working platform
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN206828012U (en) The central jack-up system of internally climbing tower crane
CN103743581B (en) Internal climbing tower crane test platform device and test method
CN110130644A (en) A kind of construction method of high-altitude steel structure bottom metal curtain wall
CN102191866A (en) Device and method for removal construction of vertical posts positioned on lower part of large-span net rack
CN109057309A (en) A kind of suspended operating platform and its mounting and dismounting method
CN114412192A (en) Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190315

Termination date: 20210118

CF01 Termination of patent right due to non-payment of annual fee