CN106840729A CN201710164322.3A CN201710164322A CN106840729A CN 106840729 A CN106840729 A CN 106840729A CN 201710164322 A CN201710164322 A CN 201710164322A CN 106840729 A CN106840729 A CN 106840729A
Authority
CN
China
Prior art keywords
class rectangle
rectangle shield
shield machine
class
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710164322.3A
Other languages
Chinese (zh)
Other versions
CN106840729B (en
Inventor
魏纲
朱田宇
魏山河
徐银锋
杨波
洪文强
崔程虹
许讯
蔡诗淇
洪子涵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201710164322.3A priority Critical patent/CN106840729B/en
Publication of CN106840729A publication Critical patent/CN106840729A/en
Application granted granted Critical
Publication of CN106840729B publication Critical patent/CN106840729B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention proposes a kind of experimental rig for simulating class rectangle shield segmented excavation, including several unit class rectangle shield machines are connected in sequence, and each unit class rectangle shield machine includes drive control unit, two contracting mechanisms and outer framework;The drive control unit includes four motors, and the output end of each motor power connects the connection of worm gear screw rod, its rear end and electrified wire;Four motors are secure around on each support frame respectively by motor fixture.The present invention uses mechanical structure, and using rigid mechanical structure and shell, effective resistance to compression prevents deformation, makes data more accurate.Using Discrete control, the data variation in realistic simulation is more conformed to.The present invention is simple and convenient, while considering class rectangle shield machine in the process of running to the influence of ground loss, the motor control of use also can preferably carry out related indoor model test.

Description

It is a kind of to simulate the experimental rig that class rectangle shield segmented is excavated
Technical field
The invention belongs to underground engineering technical field, and in particular to the experiment that a kind of simulation class rectangle shield segmented is excavated Device.
Background technology
A kind of novel shield engineering method:Class rectangle shield method is applied in No. 3 line engineerings of ningbo of china subway. And during class rectangle shield-tunneling construction, surrounding soil can be caused to deform, underground utilities around and building can be caused unavoidably Influence.In this regard, being necessary to be furtherd investigate to assist to ensure the safety in work progress.
And in research process, there are many uncertain factors in on-the-spot test, therefore mostly using indoor contracting dimension model examination Test, it is a kind of to simulate the experimental rig that class rectangle shield segmented excavates and be more convenient for the carrying out of experiment in view of the need for experiment, obtain The test data for obtaining can provide effectively help for practice of construction in future.
Drawn according to available data, the related reduced scale cun simulated experiment of class rectangle shield machine is less.And most soil body simulations Experiment has the following disadvantages:
(1) the shield machine model for there was only single-unit is shunk and is expanded simulation, only study two-dimensional soil deformation;
(2) existing most class rectangle simulation shield machines are not fine more coarse enough, there is certain shadow to data accuracy Ring;Or run manually, operate comparatively laborious.
Or the rectangular shield machine simulation driving experiment done such as Shanghai shield contrived experiment research center Co., Ltd is ground Study carefully, which use the experiment rectangular shield machine that sectional dimension is 1200mm × 1000mm, the testing machine uses cross knot The digging of structure cutting tool, two groups of reductors and oil motor drive device drive, have also been devised centralized lubricating system in addition;Or Such as its team of fourth text of Tongji University, a kind of class rectangle shield cutting propulsion simulation experiment system of use.In view of the two models Pilot system carries out reduced scale cun with actual shield machine construction, so maximum is disadvantageous in that:
(3) for full-scale model test or field experiment, expense is far above the homemade class rectangle shield of this set system Machine model test apparatus.
The content of the invention
The purpose of the present invention is to overcome not enough in the prior art, it is an object of the invention to provide one kind simulation class rectangle shield The segmented reduced scale cun experimental rig that structure is excavated, it is proposed that 1:20 reduced scale cun class rectangle shield prototype, by segmented Design, so as to consider three-dimensional soil deformation, with motor control shield machine is used, operation is convenient, saves test period, while using The contracting model machine of outer rigid housing is reaching the purpose that simulation shield machine operation causes ground loss, moreover it is possible to control degree of precision Ground loss and actual conditions of more coincideing soil deformation, for constructing tunnel and design provides it is truer, accurately test Data, with ensure that city shield tunnel builds it is efficient with it is safe.
In order to achieve the above object, the present invention is achieved by the following technical solutions:
The present invention proposes a kind of experimental rig for simulating class rectangle shield segmented excavation, including several unit class rectangles Shield machine is connected in sequence, and each unit class rectangle shield machine includes drive control unit, two contracting mechanisms and housing Frame;
The drive control unit includes four motors, and the output end of each motor power connects worm gear The connection of screw rod, its rear end and electrified wire;
Four motors are secure around on each support frame respectively by motor fixture;
Outer framework is four class arc shell piece connection compositions, respectively by recessed between two neighboring class arc shell piece Slot structure is inlayed, and maintains free gap between two neighboring arc-like sheet;Free gap between two neighboring arc-like sheet Outside is provided with mud guard;
Contracting mechanism is respectively mounted at the two ends of unit class rectangle shield machine;
Two contracting mechanisms are divided into elevating mechanism and horizontal contracting mechanism, wherein:
Elevating mechanism includes rotating disk, bull stick, arc elevator and support frame;Horizontal contracting mechanism includes gear and rotating shaft;
Rotating disk is connected by rotating shaft with support frame, and rotating disk is connected by bull stick with arc elevator, is arranged on driving output The gear at end is meshed with the tooth bar on support frame;The support frame other end is fixedly connected with outer framework;
Rotating disk is rotated by drive control unit, bull stick is driven, arc elevator is rotated, lower bracing frame is hung down Straight motion, realizes the height change of class rectangle shield machine;
Simultaneously by drive control unit rotate gear, the tooth bar that drive is connected with support frame carries out left and right sidesing supporting frame Move horizontally, realize the change width of class rectangle shield machine.
As preferred:Connected by rubber Membrane cover between two neighboring unit shield machine.
Compared with prior art, beneficial effects of the present invention are as follows:
Innovative point of the invention one:Using mechanical structure, using rigid mechanical structure and shell, effective resistance to compression prevents shape Become, make data more accurate.
Innovative point of the invention two:Using Discrete control, the data variation in realistic simulation is more conformed to.
Innovative point of the invention three:The control of device can be controlled by computer or Electronic Control end completely, make operation side Just stablize, can preferably simulate multinomial experiment.
The present invention, rotating shrinking amplitude is controlled using motor and gear, and rotating shrinking is easily controllable and stable, can first shrink After expand, the process that class rectangle shield machine excavates ground loss is simulated completely.
The present invention can adjust unit class rectangle shield machine quantity in multiple using multiple unit class rectangle shield machine combinations Carry out combining convenient between the simulation of different length, and unit class rectangle shield machine and unit class rectangle shield machine in model casing.
The present invention is simple and convenient, while considering class rectangle shield machine in the process of running to the influence of ground loss, adopts With motor control also can preferably carry out related indoor model test.
Brief description of the drawings
Fig. 1 be apparatus of the present invention before deflation after difference in areas schematic diagram.
Fig. 2 is apparatus of the present invention side structure schematic diagram.
Fig. 3 is apparatus of the present invention dimensional structure diagram.
Fig. 4 is the perisystolic structural representation of apparatus of the present invention.
Fig. 5 is the structural representation after apparatus of the present invention are shunk.
Reference:Gear (1), motor (2), arc elevator (3), mud guard (4), outer framework (5), support frame (6), bull stick (7), rotating disk (8), rotating shaft (9), motor fixture (10).
Specific embodiment
Technical scheme is described further with reference to Figure of description:
As shown in Fig. 1~5, the present invention proposes a kind of specific reality for simulating the experimental rig that class rectangle shield segmented is excavated Example is applied, including several unit class rectangle shield machines are connected in sequence, each unit class rectangle shield machine includes driving controlling Unit processed, two contracting mechanisms and outer framework 5, the drive control unit include four motors 2, and each drives electricity The output end of the power of machine 2 connects the connection of worm gear screw rod, its rear end and electrified wire;Four motors 2 pass through motor fixture 10 are secure around on each support frame 6 respectively;Outer framework 5 is four class arc shell piece connection compositions, in two neighboring class arc Inlayed by groove structure respectively between shape housing piece, and free gap is maintained between two neighboring arc-like sheet;Adjacent two Free gap outside between individual arc-like sheet is provided with mud guard 4;As shown in Figure 4 and Figure 5:The two of unit class rectangle shield machine End is respectively mounted contracting mechanism, and two contracting mechanisms are divided into elevating mechanism and horizontal contracting mechanism, wherein:Elevating mechanism includes turning Disk 8, bull stick 7, arc elevator 3 and support frame 6;Horizontal contracting mechanism includes gear 1 and rotating shaft 9;Rotating disk 8 by rotating shaft 9 with Support frame 6 is connected, and rotating disk 8 is connected by bull stick 7 with arc elevator 3, is arranged on the gear 1 and support frame 6 of drive output On tooth bar be meshed;The other end of support frame 6 is fixedly connected with outer framework 5;Rotating disk 8 is rotated by drive control unit, is driven Bull stick 7, rotates arc elevator 3, is in vertical motion lower bracing frame 6, realizes the height change of class rectangle shield machine; Simultaneously by drive control unit rotate gear 1, the tooth bar that drive is connected with support frame 6 makes left and right sidesing supporting frame 6 carry out level shifting It is dynamic, realize the change width of class rectangle shield machine.
Wherein:Connected by rubber Membrane cover between two neighboring unit shield machine.
The course of work of the invention and operation principle are:Installed in soil box is tested and place this model, then banketed The actual soil pressure in true construction environment is simulated, model is buried in the earth, under the control of control end, model volume is received Contracting, realizes ground loss phenomenon of the simulation class rectangle shield machine in tunneling.
Drive control unit:This model equipment is driven using multiple motors, and motor four is one group, each unit class There are two groups of motors and two groups of reductors on rectangular shield machine, and equipped with supporting adn fixing device.Motor is rotated makes lifting Mechanism and horizontal contracting mechanism are moved, and to make after motor stop motion fixed volume and keeping stabilization, are employed herein snail The self-locking performance of wheel, installs worm-and-wheel gear at motor power output.Motor output connection contracting mechanism, rear end Connection electrified wire, every group of electrified wire controls one group of motor, multigroup electrified wire to be connected with external control end.Control end Every group of motor then can be respectively controlled, and two groups of motors control a motion for unit class rectangle shield machine, make mould Type realizes Discrete control.
As shown in Figure 4 and Figure 5, contracting mechanism:There is contracting mechanism at class rectangle shield machine two ends, and contracting mechanism is divided into lifting Mechanism and horizontal contracting mechanism.Elevating mechanism:Rotating disk is rotated by drive control unit, bull stick is driven, turns arc elevator It is dynamic, lower bracing frame is in vertical motion, change the height of class rectangle shield machine;Horizontal contracting mechanism:By drive control Unit rotational gear, the tooth bar that drive is connected with support frame, is moved horizontally left and right sidesing supporting frame, changes class rectangle shield machine Width.Be change circular section area, reach change cylinder volume come reach simulation class rectangle shield machine cause soil to damage The purpose of mistake, being driven by motor moves elevating mechanism and horizontal contracting mechanism, changes the Gao Yukuan of the model, and because Be frictional force, under the various factors such as external pressure, outer framework hardly along significantly rotating counterclockwise, in the effect of contracting mechanism It is lower that to contract, before and after shrinking, the area in class rectangle section there occurs change such as Fig. 1, so that the change of volume, by calculating It is required that to reduce 5%.
Class rectangle outer framework is then made up of four class arc shell pieces, and its seam crossing prevents sandy soil from entering using embedded structure Enter causes stuck or can not shrink in seam, and installs mud guard in outer layer.
Space wastage formula is in Fig. 1:
(high with a width of fixed proportion)
(C is space wastage percentage)
Wherein:X is horizontal width, unit mm;Y is vertical height, unit mm;Δ X is horizontal width knots modification, unit mm;Δ Y is vertical height knots modification, unit mm.This model X=575mm;Y=350mm.
Model segment is connected:One unit class square is constituted with the combination of two groups of motors, two groups of contracting mechanisms and outer framework Shape shield machine, each unit class rectangle shield machine is all connected respectively at control end, and control end can be allow to distinguish by particular order The contraction of control unit class rectangle shield machine, reaches the purpose of Discrete control, makes the data multistage that detection is obtained, and produces class It is similar to the simulation of ground loss during class rectangle shield machine is pushed ahead.All installed immediately below each unit class rectangle shield machine Horizontal alignment and support meanss, are connected between unit class rectangle shield machine and unit class rectangle shield machine with rubber Membrane cover, make each Unit class rectangle shield machine will not offset, and improve three-dimensional accuracy.
By the coordinate operation of said apparatus, control end is set to control a unit class rectangle shield respectively by particular order The contraction of machine, makes ground loss progressively carry out, and realizes the full simulation for ground loss in true constructing tunnel, coordinates other Monitoring equipment, makes soil body delta data.
Above-described embodiment is the description of the invention, is not limitation of the invention, it is any to simple transformation of the present invention after Scheme belong to protection scope of the present invention.

Claims (3)

1. it is a kind of to simulate the experimental rig that class rectangle shield segmented is excavated, it is characterised in that including several unit class rectangles Shield machine is connected in sequence, and each unit class rectangle shield machine includes drive control unit, two contracting mechanisms and housing Frame (5), the drive control unit includes four motors (2), and the output end of each motor (2) power is connected The connection of worm gear screw rod, its rear end and electrified wire;Four motors (2) are secure around respectively by motor fixture (10) On each support frame (6);
Outer framework (5) is four class arc shell piece connection compositions, respectively by recessed between two neighboring class arc shell piece Slot structure is inlayed, and maintains free gap between two neighboring arc-like sheet;Pacify respectively at the two ends of unit class rectangle shield machine Dress contracting mechanism, two contracting mechanisms are divided into elevating mechanism and horizontal contracting mechanism, wherein:Elevating mechanism includes rotating disk (8), turns Bar (7), arc elevator (3) and support frame (6);Horizontal contracting mechanism includes gear (1) and rotating shaft (9);Rotating disk (8) is by turning Axle (9) is connected with support frame (6), and rotating disk (8) is connected by bull stick (7) with arc elevator (3), is arranged on drive output Gear (1) is meshed with the tooth bar on support frame (6);Support frame (6) other end is fixedly connected with outer framework (5);
Rotating disk (8) is rotated by drive control unit, bull stick (7) is driven, arc elevator (3) is rotated, makes lower bracing frame (6) it is in vertical motion, realizes the height change of class rectangle shield machine;
Simultaneously by drive control unit rotate gear (1), the tooth bar that drive is connected with support frame (6) makes left and right sidesing supporting frame (6) Moved horizontally, realized the change width of class rectangle shield machine.
2. the experimental rig that a kind of simulation class rectangle shield segmented according to claim 1 is excavated, it is characterised in that Connected by rubber Membrane cover between two neighboring unit shield machine.
3. the experimental rig that a kind of simulation class rectangle shield segmented according to claim 1 or 2 is excavated, its feature exists In being provided with mud guard (4) on the outside of the free gap between two neighboring arc-like sheet.
CN201710164322.3A 2017-03-20 2017-03-20 Test device for simulating rectangular shield sectional excavation Active CN106840729B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710164322.3A CN106840729B (en) 2017-03-20 2017-03-20 Test device for simulating rectangular shield sectional excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710164322.3A CN106840729B (en) 2017-03-20 2017-03-20 Test device for simulating rectangular shield sectional excavation

Publications (2)

Publication Number Publication Date
CN106840729A true CN106840729A (en) 2017-06-13
CN106840729B CN106840729B (en) 2023-05-16

Family

ID=59131010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710164322.3A Active CN106840729B (en) 2017-03-20 2017-03-20 Test device for simulating rectangular shield sectional excavation

Country Status (1)

Country Link
CN (1) CN106840729B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387098A (en) * 2017-08-04 2017-11-24 天津大学 A kind of destruction initiating device for simulating shield tunnel local failure accident
CN108776032A (en) * 2018-03-27 2018-11-09 浙江大学城市学院 A kind of segmented reduced scale cun experimental rig that simulation rectangular shield excavates
CN108896329A (en) * 2018-03-27 2018-11-27 浙江大学城市学院 A kind of segmented reduced scale cun experimental rig for simulating shape of a hoof shield tunneling

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU569717A1 (en) * 1975-11-04 1977-08-25 Центральный научно-исследовательский и проектно-конструкторский институт проходческих машин и комплексов для угольной горной промышленности и подземного строительства Actuator of mining shield
JPH03244791A (en) * 1990-02-23 1991-10-31 Nissan Kensetsu Kk Self-running direct concreting shield tunneling method and shield excavator
US5920005A (en) * 1997-08-01 1999-07-06 Moss; Arthur L. Geosynthetic liner testing apparatus and method
CN205638466U (en) * 2016-04-22 2016-10-12 中铁十二局集团第二工程有限公司 Interval shield tunnel ground drilling cultellation retest device of speciality
CN106198931A (en) * 2016-08-26 2016-12-07 浙江大学城市学院 A kind of assay device simulating shield stagewise excavation
CN206573306U (en) * 2017-03-20 2017-10-20 浙江大学城市学院 It is a kind of to simulate the experimental rig that class rectangle shield segmented is excavated

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU569717A1 (en) * 1975-11-04 1977-08-25 Центральный научно-исследовательский и проектно-конструкторский институт проходческих машин и комплексов для угольной горной промышленности и подземного строительства Actuator of mining shield
JPH03244791A (en) * 1990-02-23 1991-10-31 Nissan Kensetsu Kk Self-running direct concreting shield tunneling method and shield excavator
US5920005A (en) * 1997-08-01 1999-07-06 Moss; Arthur L. Geosynthetic liner testing apparatus and method
CN205638466U (en) * 2016-04-22 2016-10-12 中铁十二局集团第二工程有限公司 Interval shield tunnel ground drilling cultellation retest device of speciality
CN106198931A (en) * 2016-08-26 2016-12-07 浙江大学城市学院 A kind of assay device simulating shield stagewise excavation
CN206573306U (en) * 2017-03-20 2017-10-20 浙江大学城市学院 It is a kind of to simulate the experimental rig that class rectangle shield segmented is excavated

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘峰;龚国芳;汪慧;王林涛;: "大型全断面盾构掘进试验台的监控***设计", 工程机械 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387098A (en) * 2017-08-04 2017-11-24 天津大学 A kind of destruction initiating device for simulating shield tunnel local failure accident
CN108776032A (en) * 2018-03-27 2018-11-09 浙江大学城市学院 A kind of segmented reduced scale cun experimental rig that simulation rectangular shield excavates
CN108896329A (en) * 2018-03-27 2018-11-27 浙江大学城市学院 A kind of segmented reduced scale cun experimental rig for simulating shape of a hoof shield tunneling
CN108896329B (en) * 2018-03-27 2024-01-26 浙江大学城市学院 Sectional type shrinkage dimension test device for simulating horseshoe shield excavation
CN108776032B (en) * 2018-03-27 2024-01-30 浙江大学城市学院 Sectional type shrinkage dimension test device for simulating rectangular shield excavation

Also Published As

Publication number Publication date
CN106840729B (en) 2023-05-16

Similar Documents

Publication Publication Date Title
CN106198931B (en) A kind of experimental rig simulated shield segmented and excavated
CN103353516B (en) Large movable lateral uplifting composite lading slope physical model test apparatus
CN106840729A (en) It is a kind of to simulate the experimental rig that class rectangle shield segmented is excavated
CN104897520A (en) Bicircle shield soil chamber residue soil flow characteristic visual observational experiment system and method
CN107560879A (en) A kind of experimental rig and application method of simulation tunnel excavation face unstability
CN104062197B (en) A kind of hard rock hob wearing character testing arrangement
CN102568293B (en) Rectangular tunnel boring machine teaching system
CN103883331B (en) TBM experimental bench cutterhead flexible constraint and attitude measuring
CN208239276U (en) It is a kind of for simulating the experimental rig of karst area Shield Tunneling
CN206573306U (en) It is a kind of to simulate the experimental rig that class rectangle shield segmented is excavated
CN104535413B (en) A kind of seepage field temperature field simulation coupling material bin and TBM cutting test platforms
CN110118516B (en) Method for measuring surface cracks of mining subsidence area
CN104820086A (en) Rock stratum and ground surface subsidence simulation box type test device
CN103061774A (en) Shield tunnel construction environment simulation unit
CN104132833A (en) Ultra-deep excavation centrifuge model test simulation apparatus and testing method thereof
CN210127851U (en) Simulation test device for simulating excavation construction of multiple shield tunnels
CN104949851A (en) Cutting propulsion simulation test system for quasi-rectangular shielding
CN105443123A (en) Automatic coal-cutting stimulation system for analog simulation experiment
CN108756967B (en) Efficient supporting device for rock roadway heading machine
CN109613212A (en) The experimental rig that simulation buried pipeline is influenced by tunnel excavation
CN107100632A (en) A kind of segmented reduced scale cun experimental rig for simulating double-O-tube shield driving
CN103711155A (en) Numerical control automated construction device for large-scale geophysical prospecting test
CN204903189U (en) Cutting of class rectangular shield impels analogue test system
CN206636564U (en) A kind of segmented reduced scale cun experimental rig for simulating double-O-tube shield driving
CN104863603A (en) Constraining system for cutter head of TBM experiment table

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant